This document is a detailed spreadsheet listing access point (AP) locations and preparation requirements for WiFi installation across multiple buildings. The file specifies installation requirements for approximately 50 wireless access points across various buildings (numbered 2-62) and their respective floors (basement through 4th floor), providing specific room numbers/locations and mounting instructions for each AP.
Each AP installation requires a conduit pathway from designated IT closets to the AP location, with 4-11/16" dual gang boxes to be mounted either vertically on walls or horizontally depending on the specific location. The mounting instructions consistently specify installation in open and hard ceiling areas utilizing existing access panels or conduits where available. All installations are marked for rooms containing hard ceilings. The level of detail includes specific IT closet reference numbers (e.g., A110, B24-FB-001E) and precise AP locations (e.g., "Center Left," "Upper Right") with corresponding room numbers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24125Q0301 0003.docx | DOCX document | |
| 03-01_R1 - List of AP Locations.xlsx | XLSX spreadsheet | |
| 36C24125Q0301 0002.docx | DOCX document | |
| 36C24125Q0301 0001.docx | DOCX document | |
| 03-05 SOW Attachment 05 - Seasonal Influenza with Vaccines.pdf | ||
| 03-02 SOW Attachment 02 - Next Gen WiFi Access Point Location Drawings.pdf | ||
| 36C24125Q0301.docx | DOCX document | |
| 03-04 SOW Attachment 04 - Sensitive Infrastructure Data Classification Memo.pdf | ||
| 03-03 SOW Attachment 03 - VA OEHRM Site Infrastructure Reqs 2.0.pdf | ||
| 03-06 SOW Attachment 06 - Specifications.pdf | ||
| 36C24125Q0301 Combined Synopsis Solicitation - EHRM NextGen Wifi Brockton.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Floor Access Point Room Number / Location Mounting Notes
2 1 AP23 A129
Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panels, with 4‐11/16” dual gang box situatedvertically on wall at
AP23 location for room containing hard ceiling.
2 1 AP25 A132
Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panel, with 4‐11/16” dual gang box situated horizontally at AP25 location for room containing hard ceiling
2 2 AP19 B215
Provide conduit pathway from IT closet A214 to designed AP location, above hard ceiling area utilizing existing conduits, with 4‐11/16” dual gang box situated vertically on wall at
AP19 location for room containing hard ceiling
3 Basement AP45 B006B
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP45 location for room containing hard ceiling
3 Basement AP46 B007
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP46 location for room containing hard ceiling
3 Basement AP47 B001
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP47 location for room containing hard ceiling
3 Basement AP48 A012
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP48 location for room containing hard ceiling
4 Basement AP49 A012
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP49 location for room containing hard ceiling
3 Basement AP51 A005
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP51 location for room containing hard ceiling
3 Basement AP53 C003
Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP53 location for room containing hard ceiling
3 2 AP16 C‐211
Provide conduit pathway from IT closet A‐210 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP16 location for room containing hard ceiling
3 4 AP33 C‐418
Provide conduit pathway from IT closet A‐408 to designed AP location, in open and hard ceiling area, with 4‐ 11/16” dual gang box situated vertically on wall at AP33 location for room containing hard ceiling
3 4 AP55 C‐431A
Provide conduit pathway from IT closet A‐408 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP55 location for room containing hard ceiling
3 4 AP56 C‐412
Provide conduit pathway from IT closet A‐408 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP56 location for room containing hard ceiling
4 Basement AP29 A001B
Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP29 location for room containing hard ceiling
4 Basement AP32 C025
Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP32 location for room containing hard ceiling
4 Basement AP33 A039
Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP33 location for room containing hard ceiling
4 Basement AP37 B004
Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP37 location for room containing hard ceiling
5 Basement AP32 B004C
Provide conduit pathway from IT closet A001D to designed
AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP32 location for room containing hard ceiling
5 Basement AP33 B004B
Provide conduit pathway from IT closet A001D to designed
AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP33 location for room containing hard ceiling
5 Basement AP34 B005B
Provide conduit pathway from IT closet A001D to designed
AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP34 location for room containing hard ceiling
5 Basement AP35 C009D
Provide conduit pathway from IT closet A001D to designed
AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP35 location for room containing hard ceiling
5 2 AP09 B218
Provide conduit pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP09 location for room containing hard ceiling
5 2 AP345 B204
Provide conduit pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP35 location for room containing hard ceiling
5 2 AP37 B211A
Provide conduit pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP37 location for room containing hard ceiling
7 Basement AP20 A009
Provide conduit pathway from IT closet A002 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP20 location for room containing hard ceiling
7 Basement AP24 C002
Provide conduit pathway from IT closet A002 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP24 location for room containing hard ceiling
20 1 AP10 CR104
Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling
20 1 AP18 116E
Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP18 location for room containing hard ceiling
20 1 AP19 116F
Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling
20 1 AP20 Hallway Outside 104
Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling
20 1 AP21 104
Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling
23 1 AP03 Hallway Outside 109
Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling
24 1 AP03 Office Bottom Right
Provide conduit pathway from IT closet B24‐FB‐001E to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling
24 1 AP04 Office Top Right
Provide conduit pathway from IT closet B24‐FB‐001E to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP04 location for room containing hard ceiling
25 1 AP26 106
Provide conduit pathway from IT closet 101 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP26 location for room containing hard ceiling
61 1 AP04 C111
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP04 location for room containing hard ceiling
61 1 AP05 C115
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling
61 1 AP06 B103
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP06 location for room containing hard ceiling
61 1 AP07 B110
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP07 location for room containing hard ceiling
61 1 AP08 A110
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP08 location for room containing hard ceiling
61 2 AP03 E201
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling
61 2 AP04 D201
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP04 location for room containing hard ceiling
61 2 AP05 D207
Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling
62 1 AP02 111
Provide conduit pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP02 location for room containing hard ceiling
62 1 AP07 113
Provide conduit pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP07 location for room containing hard ceiling
62 1 AP08 Hallway Outside 117
Provide conduit pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP08 location for room containing hard ceiling
Connecting 1 AP01 Center Left
Provide conduit pathway from IT Closet B32‐F2‐214 to designed AP location, in open and hard ceilinG area, with 4‐
11/16” dual gang box situated vertically on wall at AP01 location for room containing hard ceiling
Connecting 1 AP02 Upper Left
Provide conduit pathway from IT Closet B24‐FB‐001E to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP02 location for room containing hard ceiling
Connecting 1 AP03 Top Left
Provide conduit pathway from IT Closet B8‐FB‐A001 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling
Connecting 1 AP04 Left of Top Center
Provide conduit pathway from IT Closet B25‐F1‐101 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP04
Connecting 1 AP05 Right of Top Center
Provide conduit pathway from IT Closet B22‐F1‐117A to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling
Connecting 1 AP06 Top Right
Provide conduit pathway from IT Closet B7‐FB‐A002 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dualgang box situated vertically on wall at AP06 location for room containing hard ceiling
Connecting 1 AP07 Center Right
Provide conduit pathway from IT Closet B23‐F1‐105A to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP07 location for room containing hard ceiling
Connecting 1 AP08 Bottom Right
Provide conduit pathway from IT Closet to B5‐FB‐A001D designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP08 location for room containing hard ceiling
Connecting 1 AP09 Right of Bottom Center
Provide conduit pathway from IT Closet B34‐F1‐A110A to designed AP location, in open and hard Ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP09 location for room containing hard ceiling
Connecting 1 AP10 Left of Bottom Center
Provide conduit pathway from IT Closet B20‐F2‐220 to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling
Connecting 1 AP11 Bottom Left
Provide conduit pathway from IT Closet B4‐FB‐018A to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP11 location for room containing hard ceiling
Connecting 1 AP12 Lower Left
Provide conduit pathway from IT Closet B4‐FB‐018A to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP12 location for room containing hard ceiling
C1_2_3 1 AP01 Upper Right
Provide conduit pathway from IT Closet B2‐FB‐A006B to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP01 location for room containing hard ceiling
C1_2_3 1 AP02 Upper Left
Provide conduit pathway from IT Closet B1‐FB‐009A to designed AP location, in open and hard ceiling area, with 4‐
11/16” dual gang box situated vertically on wall at AP02