03-01 SOW Attachment 01 - List of Access Point Locations and prep requirements.pdf

PDF 107 KB Posted

Attached to
Z2DA--EHRM Next Gen Wifi Brockton - Solicitation #2 Amendment 0003 Federal contract opportunity
Solicitation number
36C24125Q0301
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a detailed spreadsheet listing access point (AP) locations and preparation requirements for WiFi installation across multiple buildings. The file specifies installation requirements for approximately 50 wireless access points across various buildings (numbered 2-62) and their respective floors (basement through 4th floor), providing specific room numbers/locations and mounting instructions for each AP.

Each AP installation requires a conduit pathway from designated IT closets to the AP location, with 4-11/16" dual gang boxes to be mounted either vertically on walls or horizontally depending on the specific location. The mounting instructions consistently specify installation in open and hard ceiling areas utilizing existing access panels or conduits where available. All installations are marked for rooms containing hard ceilings. The level of detail includes specific IT closet reference numbers (e.g., A110, B24-FB-001E) and precise AP locations (e.g., "Center Left," "Upper Right") with corresponding room numbers.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--EHRM Next Gen Wifi Brockton - Solicitation #2 Amendment 0003, newest first.
File Type Posted
36C24125Q0301 0003.docx DOCX document
03-01_R1 - List of AP Locations.xlsx XLSX spreadsheet
36C24125Q0301 0002.docx DOCX document
36C24125Q0301 0001.docx DOCX document
03-05 SOW Attachment 05 - Seasonal Influenza with Vaccines.pdf PDF
03-02 SOW Attachment 02 - Next Gen WiFi Access Point Location Drawings.pdf PDF
36C24125Q0301.docx DOCX document
03-04 SOW Attachment 04 - Sensitive Infrastructure Data Classification Memo.pdf PDF
03-03 SOW Attachment 03 - VA OEHRM Site Infrastructure Reqs 2.0.pdf PDF
03-06 SOW Attachment 06 - Specifications.pdf PDF
36C24125Q0301 Combined Synopsis Solicitation - EHRM NextGen Wifi Brockton.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Floor Access Point Room Number / Location Mounting Notes

2 1 AP23 A129

Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panels, with 4‐11/16” dual gang box situatedvertically on wall at

AP23 location for room containing hard ceiling.

2 1 AP25 A132

Provide pathway from IT closet A110 to designed AP location, above hard hard ceiling area utilizing existing access panel, with 4‐11/16” dual gang box situated horizontally at AP25 location for room containing hard ceiling

2 2 AP19 B215

Provide conduit pathway from IT closet A214 to designed AP location, above hard ceiling area utilizing existing conduits, with 4‐11/16” dual gang box situated vertically on wall at

AP19 location for room containing hard ceiling

3 Basement AP45 B006B

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP45 location for room containing hard ceiling

3 Basement AP46 B007

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP46 location for room containing hard ceiling

3 Basement AP47 B001

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP47 location for room containing hard ceiling

3 Basement AP48 A012

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP48 location for room containing hard ceiling

4 Basement AP49 A012

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP49 location for room containing hard ceiling

3 Basement AP51 A005

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP51 location for room containing hard ceiling

3 Basement AP53 C003

Provide conduit pathway from IT closet A026A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP53 location for room containing hard ceiling

3 2 AP16 C‐211

Provide conduit pathway from IT closet A‐210 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP16 location for room containing hard ceiling

3 4 AP33 C‐418

Provide conduit pathway from IT closet A‐408 to designed AP location, in open and hard ceiling area, with 4‐ 11/16” dual gang box situated vertically on wall at AP33 location for room containing hard ceiling

3 4 AP55 C‐431A

Provide conduit pathway from IT closet A‐408 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP55 location for room containing hard ceiling

3 4 AP56 C‐412

Provide conduit pathway from IT closet A‐408 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP56 location for room containing hard ceiling

4 Basement AP29 A001B

Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP29 location for room containing hard ceiling

4 Basement AP32 C025

Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP32 location for room containing hard ceiling

4 Basement AP33 A039

Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP33 location for room containing hard ceiling

4 Basement AP37 B004

Provide conduit pathway from IT closet A018A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP37 location for room containing hard ceiling

5 Basement AP32 B004C

Provide conduit pathway from IT closet A001D to designed

AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP32 location for room containing hard ceiling

5 Basement AP33 B004B

Provide conduit pathway from IT closet A001D to designed

AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP33 location for room containing hard ceiling

5 Basement AP34 B005B

Provide conduit pathway from IT closet A001D to designed

AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP34 location for room containing hard ceiling

5 Basement AP35 C009D

Provide conduit pathway from IT closet A001D to designed

AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP35 location for room containing hard ceiling

5 2 AP09 B218

Provide conduit pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP09 location for room containing hard ceiling

5 2 AP345 B204

Provide conduit pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP35 location for room containing hard ceiling

5 2 AP37 B211A

Provide conduit pathway from IT closet A212 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP37 location for room containing hard ceiling

7 Basement AP20 A009

Provide conduit pathway from IT closet A002 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP20 location for room containing hard ceiling

7 Basement AP24 C002

Provide conduit pathway from IT closet A002 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP24 location for room containing hard ceiling

20 1 AP10 CR104

Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling

20 1 AP18 116E

Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP18 location for room containing hard ceiling

20 1 AP19 116F

Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling

20 1 AP20 Hallway Outside 104

Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling

20 1 AP21 104

Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling

23 1 AP03 Hallway Outside 109

Provide conduit pathway from IT closet 105A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling

24 1 AP03 Office Bottom Right

Provide conduit pathway from IT closet B24‐FB‐001E to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling

24 1 AP04 Office Top Right

Provide conduit pathway from IT closet B24‐FB‐001E to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP04 location for room containing hard ceiling

25 1 AP26 106

Provide conduit pathway from IT closet 101 to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated horizontally at AP26 location for room containing hard ceiling

61 1 AP04 C111

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP04 location for room containing hard ceiling

61 1 AP05 C115

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling

61 1 AP06 B103

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP06 location for room containing hard ceiling

61 1 AP07 B110

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP07 location for room containing hard ceiling

61 1 AP08 A110

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP08 location for room containing hard ceiling

61 2 AP03 E201

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling

61 2 AP04 D201

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP04 location for room containing hard ceiling

61 2 AP05 D207

Provide conduit pathway from IT closet B61‐FB‐002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling

62 1 AP02 111

Provide conduit pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP02 location for room containing hard ceiling

62 1 AP07 113

Provide conduit pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP07 location for room containing hard ceiling

62 1 AP08 Hallway Outside 117

Provide conduit pathway from IT closet 114A to designed AP location, in open and hard ceiling area, with 4‐11/16” dual gang box situated vertically on wall at AP08 location for room containing hard ceiling

Connecting 1 AP01 Center Left

Provide conduit pathway from IT Closet B32‐F2‐214 to designed AP location, in open and hard ceilinG area, with 4‐

11/16” dual gang box situated vertically on wall at AP01 location for room containing hard ceiling

Connecting 1 AP02 Upper Left

Provide conduit pathway from IT Closet B24‐FB‐001E to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP02 location for room containing hard ceiling

Connecting 1 AP03 Top Left

Provide conduit pathway from IT Closet B8‐FB‐A001 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling

Connecting 1 AP04 Left of Top Center

Provide conduit pathway from IT Closet B25‐F1‐101 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP04

Connecting 1 AP05 Right of Top Center

Provide conduit pathway from IT Closet B22‐F1‐117A to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling

Connecting 1 AP06 Top Right

Provide conduit pathway from IT Closet B7‐FB‐A002 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dualgang box situated vertically on wall at AP06 location for room containing hard ceiling

Connecting 1 AP07 Center Right

Provide conduit pathway from IT Closet B23‐F1‐105A to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP07 location for room containing hard ceiling

Connecting 1 AP08 Bottom Right

Provide conduit pathway from IT Closet to B5‐FB‐A001D designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP08 location for room containing hard ceiling

Connecting 1 AP09 Right of Bottom Center

Provide conduit pathway from IT Closet B34‐F1‐A110A to designed AP location, in open and hard Ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP09 location for room containing hard ceiling

Connecting 1 AP10 Left of Bottom Center

Provide conduit pathway from IT Closet B20‐F2‐220 to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP10 location for room containing hard ceiling

Connecting 1 AP11 Bottom Left

Provide conduit pathway from IT Closet B4‐FB‐018A to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP11 location for room containing hard ceiling

Connecting 1 AP12 Lower Left

Provide conduit pathway from IT Closet B4‐FB‐018A to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP12 location for room containing hard ceiling

C1_2_3 1 AP01 Upper Right

Provide conduit pathway from IT Closet B2‐FB‐A006B to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP01 location for room containing hard ceiling

C1_2_3 1 AP02 Upper Left

Provide conduit pathway from IT Closet B1‐FB‐009A to designed AP location, in open and hard ceiling area, with 4‐

11/16” dual gang box situated vertically on wall at AP02

File details come from the government source that posted it. Updated .