36C24124B0047 0001.docx

DOCX document 22 KB Posted

Attached to
Z2DA--689-24-0130, Boiler Plant PRV Stations #1 and #2
Solicitation number
36C24124B0047
Issued by

About this file

This document is an amendment to a federal solicitation for the Z2DA--689-24-0130, Boiler Plant PRV Stations #1 and #2 project. The key details are:

The amendment is issued to provide additional information, including a site walkthrough sign-in sheet and responses to Requests for Information (RFIs). The solicitation number is 36C24124B0047 and the project is for the replacement of two steam pressure reducing valve (PRV) stations at the VA Boston Healthcare System in Brockton, MA. The amendment extends the proposal deadline to August 23, 2024 at 11:00 AM EST. Asbestos abatement requirements are detailed, including the need for a state-licensed Asbestos Inspector and a written report. The amendment also addresses questions related to cast iron materials, Buy America compliance, steam flow specifications, and material delivery expectations. All work must be completed within 365 days of contract award.

View the file

Other files

File Type Posted
36C24124B0047 0006.docx DOCX document
36C24124B0047 0005.docx DOCX document
36C24124B0047 0004.docx DOCX document
36C24124B0047 0003.docx DOCX document
36C24124B0047 0002.docx DOCX document
S04 Sign-in Sheet Site Visit Walkthrough 07262024.pdf PDF
S02 Specification 232111 02.docx DOCX document
S02 DVA Steam Heating Hot Water and Outside Distribution Systems Design Guide.pdf PDF
S02 Wage Determination CT20240023 07052024.pdf PDF
S02 Final Statement of Work.doc DOC document
S02 VHA PCRA 2023 689-24-130 PRVs 1 and 2 Replacement located in Boiler Plant - Copy.pdf PDF
S02 Construction Safety Guide Book.pdf PDF
Sketch-01 - Copy.png PNG image
36C24124B0047_2.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 689-24-0130 Department of Veterans Affairs VA Boston Healthcare System Contracting Officer (90C) 940 Belmont Street Brockton

MA

02301 Department of Veterans Affairs Network Contracting Office 1 VA Connecticut Healthcare Center 950 Campbell Ave.

West Haven

CT

06516 To all Offerors/Bidders

36C24124B0047 08-23-2024

X X X

08/23/2024 11AM EST

See CONTINUATION Page x This amendment is issued to provide the sign-in log from the site walkthrough on 7/26/2024 at 10:00AM.

"PREBID SITE WALKTHROUGH SIGN IN.pdf" is attached.

Responses to RFI's attached."RFI responses.pdf" is attached.

RFI deadline is unchanged. RFI deadline is scheduled for August 5, 2024 at 4PM EST. Proposal deadline(bid opening) is changed. Proposal deadline is now August 23, 2024 at 11:00AM EST.

Responses to submitted RFI's received by the RFI deadline will be issued with a future amendment/s. RFI's submitted after will be at the discretion of the COR.

*SEE CONTINUATION PAGE.

Tamye Molinaro Contracting Officer

CONTINUATION PAGE

36C24124B0047

This amendment is issued to provide additional information for project 689-24-130, and to provide RFI responses. The bid due date is hereby extended to August 23, 2024, at 11 AM EST.

1. Each of the steam pressure reducing stations shall have a main station inlet and station outlet shut off valves. Valves shall meet the applicable VA specifications.

1. Asbestos abatement:

The awarded contractor shall identify asbestos by a state licensed Asbestos Inspector utilizing a certified laboratory for sample testing. A report shall be generated and provided to the contractor for scope and a copy shall be provided to the VA for verification, justification, and records. The testing shall identify the extent of the scope of abated materials in relation to the area of work. The contractor shall be responsible for the removal of ACM material on the anticipated pipe and provide clearances of at least 3’ from any anticipated cuts and welded connections to existing pipe. The means and methods of removal can be determined by the contractor, the abatement subcontractor, and the VA. All hazardous materials shall be abated & disposed as required by the applicable codes & standards.

The VPIH project manager oversight shall be responsible of the General Contractor, shall be hired by the General Contractor and shall report to and be paid by the General Contractor and shall be a separate entity of the hired abatement subcontractor. The general contractor shall, in coordination with the subcontractor and VA, determine the best course of action of removal of ACM materials, removal of the piping, and reconstruction of the PRV’s in the project. Determination shall include but not limited to time, methods, costs, and disruption to the VA’s normal operations. Staff safety of the operators and others, and potential disruptions to the processes and procedures of the boiler plant shall be key in the processes which may require night and/or weekend work schedule.

With the inclusion of traditional asbestos specification with the other specifications to the project says that the project has asbestos, and the contractor is to be aware of this. The identification of some asbestos is easily made as many of the existing piping within a certain height are with fiberglass insulation. Other piping can be seen as having fiberglass insulation and potential ACM insulation beneath, and other piping can be seen with air-cell insulation, known to be traditionally >1% ACM. The contractor shall be able to identify some ACM with VA placed stickers. The inclusion of the asbestos specification should place a known burden to the contractor’s responsibility of ACM within the project. The addendum shall place the burden of identifying the ACM within the project area to the contractor. Due to regulations for ACM by state and federal, and most likely the contractor’s need to recycle the metal, ACM on the piping shall need to be removed. Due to the expected timeline of the project and need to have the pipe removed and replaced, abatement and movement of the existing pipe with ACM removed for clearances and removed for recovery of the pipe shall be two separate actions. With safety in mind for the contractors working the abatement, a steam shutdown involving the PRVs’ ACM removal may need to be taken. Also, with the time required for the abatement and to provide clearances for work to continue, the window of opportunity within the original scoped period of for the project of the PRV replacement is greatly impacted and the planned Friday-Sunday period of performance will not fit within for both actions of abatement and replacement. There might be a way to complete which might require coordinated staging and methods and processes that may not be a traditional for abatement removal.

The work of the VPIH consultant in no way relieves the Contractor from their responsibility to perform the work in accordance with contract/specification requirements, to perform continuous inspection, monitoring and testing for the safety of their employees, and to perform other such services as specified. The VPIH during asbestos abatement oversight shall be licensed by the State of Connecticut Department of Public Health as an Asbestos Project Monitor with project oversight by a Certified Industrial Hygienist (CIH) accredited by the American Board of Industrial Hygiene (ABIH).

1. Written Reports:

a. A written report shall be generated to summarize work activities and detail the findings of each inspection.

b. The asbestos inspection report shall include quantities and locations of asbestos-containing materials identified, sample location diagrams, photographs of each homogenous area and any damaged materials as documentation of present conditions, sample log and results, as well as the completed laboratory analysis.

c. The lead inspection report shall include locations and components of lead-based paint, a sample location diagram, sample log and results, as well as any laboratory analysis.

d. Two (2) hard copies and one electronic copy of the final report shall be provided, with electronic copy in PDF format. All data tables must be provided in Microsoft Excel format. All sample locations must be identified on a print and marked in the field.

2. Abatement Specifications:

a. A State licensed Project Designer shall review all inspection results and visit the site if regulated or hazardous materials have been identified in the impacted area.

b. Develop a written specification in accordance with the VA Master Spec for abatement of all asbestos-containing materials to be impacted by the renovation work and lead compliance during abatement and renovation for each area that requires asbestos and/or lead abatement.

c. The specification shall include the quantity and location of asbestos-containing materials to be removed and CAD drawings shown containment locations.

d. The materials for constructing the containments shall be outlined as well as methods of asbestos removal and disposal requirements, engineering controls during abatement.

e. Regulatory requirements specific to the site and final clearance criteria shall be detailed.

f. The specification shall also provide appropriate guidance related to the lead compliance and disposal of lead-contaminated demolition debris, and other regulated or hazardous materials identified in the project impacted areas.

3. All other terms and conditions remain unchanged.

RFI’s- Question 1. Is this project subject to VA’s no cost cast Iron materials on steam or condensate systems requirements?

Response- Cast Iron is not allowed. VA prohibits cast iron valve, pipe, and fittings in any part of a pressurized steam and condensate return systems.

Question 2. Is this project requiring Buy America compliance?

Response- Construction materials shall meet the domestic content requirements to comply with the Buy America Act (See FAR Subpart 25.2).

Question 3. Is there any steam flow specification for the regulating stations or is the existing steam station regulating valves CV’s to be utilized as a template for sizing the offered solution?

Response- There is no know steam flow as of now, I believe existing valve’s can be utilized or field visit can confirm the loads. Please ensure all current VA design manual, specification and details are followed not the existing configuration.

Please refer to the SOW for more references.

REFERENCES BUT NOT LIMITED TO:

· DVA Steam, Heating Hot Water, and Outside Distribution Systems design manual, May 1, 2024, Volume 1 STEAM BOILERS (Steam Generating Systems)

· DVA HVAC design NOVEMBER 1, 2017, rev. March 1, 2024.

· DVA Steam Pressure Reducing Station detail.

· DVA Steam Trap Assembly detail.

· ASME Boiler & Pressure Vessel Code.

· ASME B31.1-Power Piping.

Question 4. What is the delivery expectation for all materials offered?

Response- The PRV stations need replacement as soon as possible. All work under this contract shall be completed within 365 days following the award of the contract and the issuance by the VA of the “Notice to Proceed” letter. Completion of the contract includes inspection of all installed project features by the VA COR or designated alternate representative to ensure compliance with all VA requirements.

See attached document: S04 Sign-in Sheet Site Visit Walkthrough 07262024.

File details come from the government source that posted it. Updated .