pre-bid site walkthrough sign in.pdf
PDF 454 KB Posted
- Solicitation number
- 36C24124B0041
About this file
The provided document is a sign-in sheet for a pre-bid site walkthrough related to Solicitation No. 36C24124B0041 for Building 78 Roof Repairs at the Bedford VA Medical Center. The solicitation is for a construction project to replace the roof of Building 78. The walkthrough was held on 03/19/2024 and attendees included the Healthcare General Engineer conducting the site visit and several general contractors, some of whom indicated they are Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The solicitation is being issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24124B0041 0008.docx | DOCX document | |
| SF_1409 - 36C24124B0041 - 518-21-118.pdf | ||
| 36C24124B0041 0007.docx | DOCX document | |
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| 36C24124B0041 0006.docx | DOCX document | |
| Bldg 78 Roof - April 1st Site Visit sign in.pdf | ||
| 36C24124B0041 0005.docx | DOCX document | |
| 36C24124B0041 0004.docx | DOCX document | |
| 36C24124B0041 0003.docx | DOCX document | |
| 36C24124B0041 0002.docx | DOCX document | |
| Instructions to Bidders - 36C24124B0041 - Building 78 Roof.pdf | ||
| 36C24124B0041 0001.docx | DOCX document | |
| Davis-Bacon Act WD MA20240001 revised 020924.pdf | ||
| 518-21-118 Building 78 Roof Replacement - SPECIFICATIONS - Bid.pdf | ||
| 518-21-118 Building 78 Roof Replacement - Plans BID Set.pdf | ||
| 36C24124B0041_2.docx | DOCX document | |
| 518-21-118 Building 78 Roof Replacement - Scope of Work.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Contractor Site Visit
Projects: 518-21-118 Building 78 Roof Repairs Solicitation No.: 36C24124B0041 /'-'1 ' E't' L%'C =' A i
Date: 03/19/2024 Location: Building 78 Bedford VA Medical Center
Name/Title Agency/Company General Contractor
SDVOSB
(yes or no) e-mail (general contractors and subcontractors)
Michael Sanford / Healthcare General Engineer (conducting site walkthrou h
VAMC Bedford, Engineering Services N/A
Gt~9~ Ga 5 yo4o I 1 iipc 4c
File details come from the government source that posted it. Updated .