This document is a Statement of Work for project number 518-23-321 to replace the roof-mounted heating and cooling unit and exhaust fan for Building 78 at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts.
The project objectives are to provide a resized replacement unit for the existing roof-mounted unit, which serves a smaller area than originally designed. The vendor shall remove the existing unit and exhaust fan, dispose of them, install a new appropriately sized unit and fan, and make any necessary electrical, mechanical and piping connections to existing systems. The vendor must also provide insulation for new piping and ductwork to prevent bird ingress underneath the new unit. The completion deadline is 270 days after contract award. There are no existing building automation controls for the unit.
The related federal contract opportunity is solicitation number 36C24124B0005 for the HVAC replacement project at the Bedford Veterans Hospital. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| Limitations on Subcontracting.docx | DOCX document | |
| 36C24124B0005 0006.docx | DOCX document | |
| Comp _ Pen.jpg | JPG image | |
| 36C24124B0005 0005.docx | DOCX document | |
| 36C24124B0005 0004.docx | DOCX document | |
| Amb Carrier Data.jpg | JPG image | |
| Question and Answers revision 1.pdf | ||
| 36C24124B0005 0003.docx | DOCX document | |
| ParkingMap2020.pdf | ||
| 36C24124B0005 0002.docx | DOCX document | |
| Question and Answers.pdf | ||
| Pre bid sign in sheet 11282023.pdf | ||
| 36C24124B0005 0001.docx | DOCX document | |
| SOW Comp Pen.docx | DOCX document | |
| General Decision MA20230001 09152023.pdf | ||
| 36C24124B0005_2.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. OVERVIEW —
1.1 Government Agency Department and Address:
Edith Nourse Rogers Memorial Veterans Hospital 200 Springs Road Bedford, MA 01730
1.2 Project Data:
Project Title: Bldg. #78 Comp & Pen Roof Top Unit Replacement Project Number: # 518-23-321 REQUESTOR: Robert McCusker Vendor: TBD
A. OBJECTIVE:
The objective of this project is to:
• Provide a replacement for the existing Bldg. #78 Comp and Pen Roof Mounted Heating and Cooling Unit & Exhaust Fan (Model# RPS018BS Serial# 3WA00760-19)
• Area being served by unit is smaller than original design. Resize for new unit. Unit was originally covering a larger area that had a higher heat load. This used to be our sterile processing area. Some of the original area was absorbed into the new Mental Health Clinic. This unit is currently 100% outside air and needs to be converted back to a return air system utilizing the exhaust ducting as return air.
• Remove old Roof Mounted Heating and Cooling Unit & exhaust fan and discard
• Provide new resized Roof Mounted Heating and Cooling Unit
• Provide needed piping changes for heating connections to existing piping
• Provide insulation for newly installed piping
• Insulation will consist of 2" fiberglass, covered with vinyl jacketing
• Deliver new Roof Mounted Heating and Cooling Unit to equipment pad and remove existing Unit
• New ductwork is only needed as necessary to tie into existing ducts.
Provide coverage below the new unit and ducting to prevent birds from roosting under neath.
• Contractor to confirm existing electrical, piping, and control connections.
• Contractor responsible for all electrical, mechanical, and pipe connection to existing pipe
B. GENERAL SCOPE:
Vendor shall deliver and remove Roof Mounted Heating and Cooling Unit located at Edith N. Rogers Veterans Memorial Hospital, 200 Springs Road, Bedford, Massachusetts bldg. #78. Vendor to provide the following
Remove & Dispose existing Roof Mounted Heating and Cooling Unit.
Replace with resized unit for the needed cooling capacity, provide start up and training
C. GENERAL REQUIREMENTS:
1. Use of common areas in order to deliver and remove existing chiller shall be coordinated with the COR for approval.
2. Vendor to provide products as specified with manufacturers named when noted. Pricing shall be based on specified item. Substitutions can be offered as a deduct alternate if it provides a cost savings. Vendor must obtain written approval for substitution.
3. The Medical Center is a 24/7 facility with multiple end users. The Vendor is required to work directly with the COR. Any changes in the schedule or coordination required with the end user shall be facilitated by the COR.
D. Detailed Requirements:
Bldg. #78 Comp & Pen Roof Mounted Heating and Cooling Unit
• Provide a replacement for the existing #78 Comp & Pen Roof Mounted Heating and Cooling Unit
• Reclaim Refrigerant from chiller.
• Disconnect piping
• Disconnect Electrical
• Remove old chiller & exhaust fan and discard
• Provide new resized Roof Mounted Heating and Cooling Unit &
Exhaust fan
• Install new electrical feed from the existing disconnect, to chiller & fan and tie in power.
• Provide needed piping changes for connections to existing piping
• Provide insulation for newly installed piping
• Insulation will consist of 2" fiberglass, covered with vinyl jacketing
• Contractor to confirm existing electrical, piping, and control connections.
• Contractor to supply any material or devices to interface with existing systems (i.e. pipe connections, ducting connections, control interface, or electrical interphase)
• Provide factory Start-up.
Schedule
Completion 270 days after award
END OF SCOPE OF WORK
E. Additional Information:
• There are no current DDC controls for this unit.
• This system does not have any associated building automation controls. It does not supply any VAV’s. There are only a handful of reheat coils in the ducts.
| A. OBJECTIVE: |
| B. GENERAL SCOPE: |
| C. GENERAL REQUIREMENTS: |
| D. Detailed Requirements: |