Question and Answers revision 1.pdf

PDF 72 KB Posted

Attached to
Z1DA--518-23-321 Bldg. 78 HVAC Replacement Federal contract opportunity
Solicitation number
36C24124B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document contains questions and answers regarding Solicitation Number 36C24124B0005 for the replacement of Building 78's HVAC rooftop unit at the VA Bedford facility. Key details include that temporary cooling will be required during construction using the existing VAV distribution system. Crane work can be scheduled after hours with two weeks' notice. The existing unit is a Carrier Model 50FY-074BHA500EA. The new unit should match the capacity of the unit being replaced, and new ductwork is only needed to connect to the existing system. Controls integration will involve the existing Johnson Controls system which has been retrofitted with Trane DDC controls.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--518-23-321 Bldg. 78 HVAC Replacement, newest first.
File Type Posted
36C24124B0005 0006.docx DOCX document
Limitations on Subcontracting.docx DOCX document
S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf PDF
36C24124B0005 0005.docx DOCX document
Comp _ Pen.jpg JPG image
SOW Comp Pen rev 1.pdf PDF
36C24124B0005 0004.docx DOCX document
Amb Carrier Data.jpg JPG image
36C24124B0005 0003.docx DOCX document
ParkingMap2020.pdf PDF
36C24124B0005 0002.docx DOCX document
Pre bid sign in sheet 11282023.pdf PDF
36C24124B0005 0001.docx DOCX document
Question and Answers.pdf PDF
36C24124B0005_2.docx DOCX document
General Decision MA20230001 09152023.pdf PDF
SOW Comp Pen.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Solicitation No. 36C24124B0005

Bldg. #78 Comp & Pen Roof Top Unit Replacement VA Bedford

1. Requesting information regarding the material upon which the current unit rests. Is it concrete, wood or something else? Please advise.

Answer: Composite Metal Deck with 6” of concrete

2. Will Temporary heating / cooling be required for this project?

Answer: Yes, for cooling. Heat is from VAV boxes and will require air flow through ducting.

2rv1. Q&A responded that temporary airflow is needed for heating and for temp cooling. If the space is VAV and relies on tempered air which would be reheated (typically ~55 degrees) is a temporary unit capable of providing this tempered air required to be temporarily ducted to the distribution?

Answer: It would need to be sized to have the same capabilities as the existing RTU.

3. Can Crane work be scheduled after normal work hours?

Answer: Yes, provided it does not impact patient access. It will require two week notice for scheduling and prior approval.

4. Will a controls contractor be required for the site?

Answer: Yes

5. Who is the ATC vendor? Johnson Controls, Seimans, Schneider, BCM?

Answer: Johnson Controls and Trane.

5rv1. Q&A # 5 responded that JCI and Trane are control vendors in the building. Our understanding is that B78 has undergone control retrofit to convert to a Trane DDC system and has integrated many existing JCI controllers. Please advise if the unit and associated VAV’s are on Trane controls or JCI and if any controls need to be replaced or if they are to be reused.

Answer: The JCI controls are still in place and the Trane system is connected to that and communicates with the front end.

6. Can VA Provide the existing manufacturer and model of the unit to be replace?

Answer: Carrier Model 50FY-074BHA500EA Serial 3499f45363

7. SOW states to “resize for new unit based on” and does not state what to base the sizing of the new unit. Please confirm how new unit is to be sized.

Answer: The unit should not need to be sized differently as long as it has the same capacity as the original unit.

8. Please confirm new ductwork is only needed as necessary to tie into existing duct.

Answer: Yes, that is correct.