Question and Answers.pdf
PDF 65 KB Posted
- Attached to
- Z1DA--518-23-321 Bldg. 78 HVAC Replacement Federal contract opportunity
- Solicitation number
- 36C24124B0005
About this file
This document contains questions and answers regarding solicitation number 36C24124B0005 for the replacement of the roof top unit at building 78 at the VA Bedford facility. The project involves replacing the HVAC unit, which currently sits on a composite metal deck with six inches of concrete. Temporary cooling will be required during construction, to be provided through existing VAV boxes and ductwork. Crane work can be scheduled after hours provided it does not impact patient access with two weeks notice and approval. Both Johnson Controls and Trane are approved controls contractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| 36C24124B0005 0006.docx | DOCX document | |
| Limitations on Subcontracting.docx | DOCX document | |
| Comp _ Pen.jpg | JPG image | |
| SOW Comp Pen rev 1.pdf | ||
| 36C24124B0005 0005.docx | DOCX document | |
| 36C24124B0005 0004.docx | DOCX document | |
| Amb Carrier Data.jpg | JPG image | |
| Question and Answers revision 1.pdf | ||
| 36C24124B0005 0003.docx | DOCX document | |
| ParkingMap2020.pdf | ||
| 36C24124B0005 0002.docx | DOCX document | |
| Pre bid sign in sheet 11282023.pdf | ||
| 36C24124B0005 0001.docx | DOCX document | |
| SOW Comp Pen.docx | DOCX document | |
| 36C24124B0005_2.docx | DOCX document | |
| General Decision MA20230001 09152023.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Solicitation No. 36C24124B0005
Bldg. #78 Comp & Pen Roof Top Unit Replacement VA Bedford
1. Requesting information regarding the material upon which the current unit rests. Is it concrete, wood or something else? Please advise.
Answer: Composite Metal Deck with 6” of concrete
1. Will Temporary heating / cooling be required for this project?
Answer: Yes, for cooling. Heat is from VAV boxes and will require air flow through ducting.
2. Can Crane work be scheduled after normal work hours?
Answer: Yes, provided it does not impact patient access. It will require two week notice for scheduling and prior approval.
3. Will a controls contractor be required for the site?
Answer: Yes
4. Who is the ATC vendor? Johnson Controls, Seimans, Schneider, BCM?
Answer: Johnson Controls and Trane.