Question and Answers.pdf

PDF 65 KB Posted

Attached to
Z1DA--518-23-321 Bldg. 78 HVAC Replacement Federal contract opportunity
Solicitation number
36C24124B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document contains questions and answers regarding solicitation number 36C24124B0005 for the replacement of the roof top unit at building 78 at the VA Bedford facility. The project involves replacing the HVAC unit, which currently sits on a composite metal deck with six inches of concrete. Temporary cooling will be required during construction, to be provided through existing VAV boxes and ductwork. Crane work can be scheduled after hours provided it does not impact patient access with two weeks notice and approval. Both Johnson Controls and Trane are approved controls contractors.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--518-23-321 Bldg. 78 HVAC Replacement, newest first.
File Type Posted
S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf PDF
36C24124B0005 0006.docx DOCX document
Limitations on Subcontracting.docx DOCX document
Comp _ Pen.jpg JPG image
SOW Comp Pen rev 1.pdf PDF
36C24124B0005 0005.docx DOCX document
36C24124B0005 0004.docx DOCX document
Amb Carrier Data.jpg JPG image
Question and Answers revision 1.pdf PDF
36C24124B0005 0003.docx DOCX document
ParkingMap2020.pdf PDF
36C24124B0005 0002.docx DOCX document
Pre bid sign in sheet 11282023.pdf PDF
36C24124B0005 0001.docx DOCX document
SOW Comp Pen.docx DOCX document
36C24124B0005_2.docx DOCX document
General Decision MA20230001 09152023.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Solicitation No. 36C24124B0005

Bldg. #78 Comp & Pen Roof Top Unit Replacement VA Bedford

1. Requesting information regarding the material upon which the current unit rests. Is it concrete, wood or something else? Please advise.

Answer: Composite Metal Deck with 6” of concrete

1. Will Temporary heating / cooling be required for this project?

Answer: Yes, for cooling. Heat is from VAV boxes and will require air flow through ducting.

2. Can Crane work be scheduled after normal work hours?

Answer: Yes, provided it does not impact patient access. It will require two week notice for scheduling and prior approval.

3. Will a controls contractor be required for the site?

Answer: Yes

4. Who is the ATC vendor? Johnson Controls, Seimans, Schneider, BCM?

Answer: Johnson Controls and Trane.