36C24122Q0481 0001.docx

DOCX document 21 KB Posted

Attached to
H341--Fire and Smoke Damper Location Survey
Solicitation number
36C24122Q0481
Issued by

View the file

Other files

File Type Posted
PWS Drawings.pdf PDF
IC Risk Assessment.pdf PDF
LS Drawings.pdf PDF
LOS Certification.pdf PDF
Past Performance Worksheet.xlsx XLSX spreadsheet
WD-2015-4009.pdf PDF
36C24122Q0481.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 36C241 Department of Veterans Affairs VA Connecticut 950 Campbell Avenue West Haven

CT

06516 36C241 Department of Veterans Affairs VA Connecticut 950 Campbell Avenue West Haven

CT

06516 To all Offerors/Bidders

36C24122Q0481 05-11-2022

X X X

3PM Eastern Time on May 16, 2022 See CONTINUATION Page X The purpose of this amendment is to:

1. Extend the offeror due date to 3PM Eastern Time May 16, 2022

2. Attach LS Drawings

3. Attach PWS Drawings

4. Attach IC Risk Assessment

5. Provide information on page two of this amendment

CONTINUATION PAGE

The following clarification information is being added:

1. This is not the TJC (The Joint Commission) or NFPA required fire and smoke damper maintenance and testing, this is as stated in the SOW a contract to locate and document the existence of the fire and smoke dampers. The previously completed TJC/NFPA report is very out of date and numerous projects have been completed since the last report rendering any lists or compiled documents inaccurate and incomplete.

1. Refer to SOW (excerpt below) for ICRA information, if the conditions in the SOW are followed, no containment booth should be required, IC risk assessment attached for record:

0. Only two ceiling tiles at a time may be dislodged as part of the survey effort.

0. No open ceiling tile/access panel or ladder may be left unattended.

0. Do not open ceiling tiles in a patient space while patient is in the space. Coordinate with the COR when ceiling tiles need to be accessing in occupied inpatient spaces.

0. Cover working surfaces with plastic in the following areas prior to opening ceiling tiles or access panels.

3. B200

0. 3W, Same Day Surgery

0. 4N Chemo

0. 5S Endo, 5N Dental

3. B200E

1. 1st Nuc Med, SPS

1. 3rd OR/IR

1. The following table displays the approximate square footages for the buildings and floors.

BUILDING
BASEMENT
1ST FLOOR
2ND FLOOR
3RD FLOOR
4TH FLOOR
5th FLOOR
6th FLOOR
7/8 FLOORS
TOTAL SF
B200E
(G) 38,939
29,881
31,068
31,881
11,076

142,845

B200
(G)19,644
(w/mri) 30933
22,741
20,206
20,215
19,990
12,515
6,499/ 1,520
154,263

B203

6,127
6,127
5,054

17,308

B204
1,012
16,606
15,624
962

34,204

B205

19,753
19,775
19,770
1,829

61,127

B206

20,918
19,377
19,531
1,829

61,655

B207

19,765
20,621
20,586
3,138

64,110

B210
2,698
8,941
1,623
2,866

16,128

B232

14,866
3,655

18,521

B248

15,358
15,358
15,227

45,943

See attached document: PWS Drawings.

See attached document: LS Drawings.

See attached document: IC Risk Assessment.

File details come from the government source that posted it. Updated .