- J044--West Haven and Newington Connecticut Boiler Plant Service and Maintenance Amendment 00003
- Solicitation number
- 36C24120Q0260
About this file
This document includes a quality assurance surveillance plan and solicitation for boiler plant service and maintenance at two Department of Veterans Affairs medical centers in Connecticut. The quality assurance plan outlines monitoring methods and performance standards for preventative maintenance and emergency service tasks. The solicitation seeks fixed-price quotes for recurring preventative maintenance and annual emergency services for boiler plants at the West Haven and Newington VA medical centers from September 2020 through August 2025. Quotes are due by April 10, 2020 and will be evaluated based on price, past performance, technical approach, and subcontracting commitments. Awards may be made to small businesses.
36C24120Q0260 S02_QASP.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24120Q0260-008.docx | DOCX document | |
| 36C24120Q0260-007.docx | DOCX document | |
| 36C24120Q0260-006.docx | DOCX document | |
| 36C24120Q0260-002.xlsx | XLSX spreadsheet | |
| 36C24120Q0260-000.docx | DOCX document | |
| 36C24120Q0260-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.1 QUALITY ASSURANCE SURVEILLANCE PLAN
For: West Haven and Newington CT Facilities – Boiler Plant Service and Maintenance Contract Number: 36C24120Q0260 Contract Description: Boiler Plant Service and Maintenance Contractor’s name: TBD
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO – Craig Harris Administrative CS – Josh Gallien
Organization or Agency: Department of Veterans Affairs, VISN1 Consolidated Contracting
b. Contracting Officer’s Technical Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR – TBD
c. Other Key Government Personnel – The COR will designate staff as needed
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor shall serve as the contractor’s program manager for this contract.
a. Program Manager –
4. PERFORMANCE STANDARDS
Task
Indicator
Standard
| Acceptable Quality Level |
| Method of Surveillance |
Incentive
Preventive Maintenance West Haven & Newington CT
The Contractor is required to correct and/or re-work any Boiler Plant Service and Maintenance due to unsatisfactory performance or nonperformance IAW the stated quality and level of effort in the PWS, the final approved quote and final contract. Rework shall be performed at no additional cost to the Government.
95%
Direct Observation
Potential Exercise of Option Period/ Payment of Services Rendered
Emergency Service Repairs at West Haven and Newington facility.
| The Contractor is required to respond to all emergencies at the time limits set forth in the PWS. |
| 95% |
| Direct Observation |
| Potential Exercise of Option Period/ Payment of Services Rendered |
5. INCENTIVES
The Government shall use “Potential Exercise of Option Period” and “Payment of Services Rendered” as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed through random sampling.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
| Rating |
| Description |
Green Yes. Performance and technical specifications are being met at an Acceptable Quality Level (AQL).
Yellow Yes. Performance and technical specifications are currently being met at the minimum AQL, but the following service/deliverable needs contractor attention:
(The Customer must identify what component of the deliverable and/or service requires attention.)
Red No. Performance and technical specifications are not being met at AQL and the following service/deliverable needs immediate contractor resolution:
(The Customer must identify what component of the deliverable and/or service that is below the minimum AQL.)
8. DOCUMENTING PERFORMANCE
The COR shall maintain the Quality Assurance Worksheets in contract file and submit at end of the contract period to the Contracting Officer. These worksheets shall be submitted no later than 30 days after contract expiration.
9. FREQUENCY OF MEASUREMENT
The COR shall assess contract performance on a monthly basis using the Quality Assurance Worksheet.
<After award, both the contractor’s Program Manager and the COR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
Attachment A - Quality Assurance Worksheet
QUALITY ASSURANCE WORKSHEET
Performance Rating
Deliverable/Service
| Quality Rating |
| Causative Factors |
| Effect on Mission |
| Action Required/Date |
All alarm system monitoring services shall be IAW the Performance Work Statement, final approved quote and VA expectations.
Green
Comments Unnecessary for “Green” QA Rating.
Yellow
Red