1. We would like to request the serial number for the units please.

Make: Size: Model: S/N:

APC 80kW Symmetra 0G-PDRPPNX14-M1 PI0845170019 Newly Installed APC 80kW Symmetra SYMBP100F QD2016140033

2. Could you please confirm that you need Preventive Maintenance (PM) each month for the UPSs and 2 PMs for batteries annually. Battery purchase is excluded in this contract.

- Monthly UPS, correct

- Inspection of Alarm / Alert logs.

- Battery replacement is included with in contract.

o UPS A 128 total batteries in 4 racks model # SYBTU1-PLP, (64)installed 02/2018, (64) installed 09/2019 o UPS B 108 total batteries in 3 racks model# SYBTU2-PLP, (108)installed 12/14/2020

3. Please provide the make and model of the UPS’

Newly Installed APC 80kW Symmetra SYMBP100F QD2016140033

4. Please provide the battery count (quantity)

- UPS A 128 total batteries in 4 racks model # SYBTU1-PLP, (64)installed 02/2018, (64) installed 09/2019

- UPS B 108 total batteries in 3 racks model# SYBTU2-PLP, (108)installed 12/14/2020

5. Is it possible to schedule an onsite survey?

6. Can you please provide the serial numbers of the UPS you need covered under this contract?

Newly Install APC 80kW Symmetra SYMBP100F QD2016140033

7. Two items are included in the bid are:

1.4 Electrical Power Distribution Panels Maintenance Checks – Are these PDU’s?

- Circuit breaker panels 1.5a Circuit Breakers (De-energized) – Annual (Once per Year) – Which circuit breakers? Battery? UPS?

Normally if these are stand-alone electrical items they would be handled by a licensed electrician; but are they part of the UPS and you just breaking these items out in the scope? Can you clarify?

Breakers with-in electrical panels served by the UPS

8. The solicitation references (1) 80kVA and (1) 40kVA new 80kw unit but the matrix below shows (3) 40kVA. Can you confirm the quantity of the 40kva?

- The total quantity is (2) 80kVA. Since the time if the original PWS (1) 40kVa has been replaced with and 80kVA. And (2) additional 40kVA units have been removed from a decommissioned site.

9. Also, if possible is the new 80kVA referenced below needing replacement going to be a separate solicitation/contract or part of this contract?

– there is no new UPS’s in this contract, the above referenced new 80kVA has already been installed, replacing the existing 40kVA.

10. Sorry for not sending this additional question initially but could you ask the customer if there are serial numbers for each piece of equipment?

Make: Size: Model: S/N:

11. 1.4 Electrical Power Distribution Panels Maintenance Checks – Are these PDU’s?

- Circuit breaker panels

12. 1.5a Circuit Breakers (De-energized) – Annual (Once per Year) – Which circuit breakers? Battery? UPS?

- Breakers with-in electrical panels served by the UPS

13. Upon checking with Schneider Electric, the Original Equipment Manufacturer, it appears these units’ last service coverage expired in 2016. It this correct?

S/N PI0845170019 was under service contract until 9-30-2020, but not contracted to Schneider Electric S/N QD2016140033 is a newly installed unit that had an install competition date of Dec 2020.

14. On page 5, Paragraph 1.0 it reads that the 40 kVA APC Symmetra is to be replaced by an 80 kVA Symmetra.

These two units have different costs for Service Coverage, when will the 80 kVA UPS be installed?

- The above mentioned 40kVA unit has been removed and replaced with the mentioned 80kVA as of

Dec 2020.

15. In the SOW on Page 9 it reads that there are Monthly Maintenance Checks required. Given that the scope given would require a Schneider Electric Technician for each visit and the scope would be the same as a Maintenance Visit, this would substantially increase the cost of the contract. Would quarterly Maintenance Visits be acceptable? This would also exceed the OEM’s suggested frequency.

- Please explain what task in question requires a Schneider Technician as opposed to in house technician with manufacturer’s training on the equipment?

16. On Page 11 it mentions ‘input/output switchgear’ but no equipment of this type is listed. Can you please provide make, model, and serial number(s) for this equipment?

- Automatic Transfer Switch (ATS), Make Generac, Model 10516810100, S/N 98135, Size 600Amp

17. Page 12 references ‘Circuit Breakers’ and a maintenance SOW for them. Are these circuit breakers associated with any equipment listed in the SOW? In not please provide subject equipment.

- Breakers with-in electrical panels served by the UPS

18. The SYBT1-PLP is designed and manufactured to be an inherently ‘maintenance-free’ battery and is listed as that by the OEM. Should they be PM’d in accordance with the OEM’s Guidelines?

– Yes, the batteries are maintenance free but shall be maintained, tested, and checked per OEM Guide lines.