36C10X19Q0054-007.pdf

PDF 151 KB Posted

Attached to
NT_NB_Non-IT (HITC) On-Site Bi-Weekly Shredding Service (VA-19-00022474)
Solicitation number
36C10X19Q0054
Issued by

About this file

36C10X19Q0054 Attachment B - QASP - Shredding.pdf

View the file

Other files

File Type Posted
36C10X19Q0054-0001000.docx DOCX document
36C10X19Q0054-0001001.docx DOCX document
36C10X19Q0054-0001003.pdf PDF
36C10X19Q0054-0001002.pdf PDF
36C10X19Q0054-0001004.pdf PDF
36C10X19Q0054-005.pdf PDF
36C10X19Q0054-006.pdf PDF
36C10X19Q0054-004.docx DOCX document
36C10X19Q0054-008.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAP QASP Template_Sep_14_2012

SIMPLIFIED ACQUISITION PROCEDURES (SAP) QUALITY ASSURANCE

SURVEILLANCE PLAN (QASP)

DEPARTMENT OF VETERANS AFFAIRS

Office of Information & Technology Hines Information Technology Center

On Site Shredding

Date: 1/28/2019

QASP Version Number: 2.0

Quality Assurance Surveillance Plan (QASP) Template Version History

Template Version #

Version Description Release Date

2.0 1. Replaced “Acceptable Quality Level (AQL) with Acceptable Levels of Performance (ALPs) document wide

2. SAP Performance Based Service Assessment

– Replaced “Objective” with “Standard”. Added review of invoices under section B.2

Sep 14, 2012

Initial Release Dec 7, 2011

1. SIMPLIFIED ACQUISITION PROCEDURES (SAP) QUALITY ASSURANCE

SURVEILLANCE PLAN

This Simplified Acquisition Procedures (SAP) Quality Assurance Surveillance Plan (QASP) provides a systematic method to monitor Contractor performance.

2. PERFORMANCE STANDARDS

Performance Standards define acceptable performance for specific tasks. The Government performs surveillance to determine if the Contractor meets or does not meet these standards.

The Performance Metrics for Deliverables and Performance Standards are outlined in the SAP Performance Work Statement (PWS). The schedule of deliverables is outlined in Section B of the contract/order. The Government will utilize the Simplified Acquisition Procedures (SAP) Performance Based Service Assessment Survey, provided at the end of this document to compare Contractor performance to the Acceptable Levels of Performance (ALPs).

At the end of each assessment period, the assessment will be reviewed by the CO.

The COR/CO will notify the Contractor of the results no later than 15 working days after the end of the assessment period.

3. METHODS OF QUALITY ASSURANCE (QA) SURVEILLANCE

The COR shall use on-site surveillance in the administration of this SAP QASP. Each assessment period, the COR shall review and document findings from an on-site surveillance and document the results accordingly using the SAP Performance Based Service Assessement attached. This assessment shall be placed in the COR’s QA file.

4. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document acceptable performance accordingly. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the CO. This will always be in writing although when circumstances necessitate immediate verbal communication, that communication will be followed in writing. The COR shall document the discussion and place it in the COR file.

When the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the Contractor's program manager.

The Contractor shall acknowledge receipt of the CDR in writing to the CO. The CDR will state how long after receipt the Contractor has to take corrective action. The CDR will also specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CO shall review the Contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

5. FREQUENCY OF MEASUREMENT

During contract/order performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed, and at a minimum shall be performed twice within the Period of Performance.

SAP PERFORMANCE BASED SERVICE ASSESSMENT

CONTRACTOR: GOVERNMENT REQUIRING ACTIVITY

CONTRACT/ORDER NUMBER/ TITLE:

PERIOD COVERED:

Place an X in the appropriate response

I. Performance Standards for Assessment Acceptable Unacceptable *

A. MEETING TECHNICAL NEEDS:

1. What level of understanding does the contractor have of my technical needs and my mission requirements?

2. What level of efficiency and effectiveness does the contractor demonstrate in meeting my requirements?

3. Overall, how well does the contractor meet my technical needs and mission requirements?

4. Overall, the quality of the products/services provided are….

B. PROJECT MILESTONES AND SCHEDULE:

1. How well does the contractor meet my established milestones and project dates?

2. How timely are products, reports and invoices completed, reviewed, and delivered?

3. How well does the contractor notify me in advance about potential milestones and scheduling problems so that I have enough time to correct them?

*Unacceptable ratings must be explained in Section II (Narrative Clarification) below.

II. NARRATIVE

CLARIFICATION

(USE ADDITIONAL

SPACE AS REQUIRED)

File details come from the government source that posted it.