This document is a detailed work item specification for landscaping improvements at the Jefferson Barracks Veterans Affairs Medical Center (VAMC). Specifically, Work Item No. 14 involves relocating mulch areas around six service flagpoles with in-ground lighting fixtures, currently surrounded by grass lawn. The project requires removing existing sod, creating new landscape mulch beds, installing metal steel landscape edging around the flagpole areas, and removing existing metal edging to improve maintenance efficiency and protect in-ground light fixtures during routine mowing operations.

The work is part of a larger solicitation (36C10F24R0098) for the St. Louis Jefferson Barracks VAMC, which encompasses approximately 38 work items designed to enhance facility infrastructure, minimize future maintenance requirements, and ensure safety for patients, visitors, and staff. The project is being managed by the Department of Veterans Affairs Office of Construction and Facilities Management, with a completion target date of 10/31/2024. The specific work item is located in the west campus area and involves precise landscaping modifications to improve operational functionality around flagpole lighting installations.

View the file

Other files for this federal contract opportunity

Other files attached to Z2JZ--Jefferson Barracks St Louis Completion Contract, newest first.
File Type Posted
36C10F24R0098 0004.docx DOCX document
Item No. 27 - Bracket Detail 2.pdf PDF
Completion Items - Specfications Combined 250210.docx DOCX document
36C10F24R0098 0003.docx DOCX document
36C10F24R0098 0002.docx DOCX document
36C10F24R0098 0001.docx DOCX document
P09_Past Performance Questionnaire.pdf PDF
WDOL -SAM.gov.pdf PDF
36C10F24R0098_1.docx DOCX document
P09_SF330 Secton G.pdf PDF
P09_Construction Experience Data Sheet.pdf PDF
P09_SF330 Section E.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jefferson Barracks VAMC Completion Item Details 10/31/2024 Install Edging and Mulch Around Flagpole Lights

Completion Item No. 14 Page 1 of 5

WORK ITEM 14 BACKGROUND

During a project in 2022, the landscaping was updated/installed in the Path of Honor area on the west side of the Jefferson Barracks VAMC campus. As part of this previous work, some lights were installed for the flagpoles that have been causing problems for mowing and maintenance crews. The government would like to extend the nearby mulch areas to include these light fixtures to avoid future maintenance issues.

DESCRIPTION OF WORK:

Item No. 14 – Relocate mulch area around landscape lighting fixtures in the west campus area where the landscape light fixtures are surrounded by grass.

Provide all labor, materials, equipment, and supervision required to remove sod and replace with landscape mulch bed and add metal steel landscape edging around six (6) service flagpoles and their in-ground light fixtures that are currently surrounded by grass lawn which endangers the in-ground light fixtures during routine mowing operations. Install the metal edging around the new perimeter of the new mulched area. Remove existing metal edging.

Completion Item No. 14 Page 2 of 5

LOCATION OF WORK

Completion Item No. 14 Page 3 of 5

SKETCH OF PROPOSED WORK

Plan view sketch of work.

Completion Item No. 14 Page 4 of 5

EXISTING CONDITIONS:

Existing conditions, Fisher House site

Existing conditions looking south

Existing conditions looking north

Completion Item No. 14 Page 5 of 5

In-ground lights for flagpoles to remain in place