36C10F24R0098 0004.docx
DOCX document 18 KB Posted
- Attached to
- Z2JZ--Jefferson Barracks St Louis Completion Contract Federal contract opportunity
- Solicitation number
- 36C10F24R0098
About this file
This document is an Amendment of Solicitation/Modification of Contract for the Jefferson Barracks St. Louis Completion Contract (Solicitation Number 36C10F24R0098) issued by the Department of Veterans Affairs Office of Construction and Facilities Management. The amendment addresses specific inquiries received through a Request for Information (RFI) and provides clarifications on several work items for the project at the St. Louis Jefferson Barracks Veterans Affairs Medical Center.
Key details include clarifications on Work Item #14 (mulch), Work Item #27 (bracket detail), and Work Item #38, which involves pool house remediation. Specific guidance is provided for air filtration during dust-producing operations, temperature maintenance between 65-80 degrees Fahrenheit during remediation, and requirements for exhaust air filtration. The project involves approximately 38 work items aimed at enhancing facility safety, minimizing future maintenance, and addressing critical construction needs across the medical center campus, including wall covering replacement, handrail installation, road work, and lighting upgrades.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Item No. 14 - Mulch.pdf | ||
| Item No. 27 - Bracket Detail 2.pdf | ||
| Completion Items - Specfications Combined 250210.docx | DOCX document | |
| 36C10F24R0098 0003.docx | DOCX document | |
| 36C10F24R0098 0002.docx | DOCX document | |
| 36C10F24R0098 0001.docx | DOCX document | |
| WDOL -SAM.gov.pdf | ||
| 36C10F24R0098_1.docx | DOCX document | |
| P09_SF330 Secton G.pdf | ||
| P09_Past Performance Questionnaire.pdf | ||
| P09_Construction Experience Data Sheet.pdf | ||
| P09_SF330 Section E.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-07-2025 657-313 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 1425 Tri-State Parkway, Suite 140 Gurnee
IL
60031 003C4D Department of Veterans Affairs Office of Construction and Facilities Management 1425 Tri-State Parkway, Suite 140 Gurnee
IL
60031 To all Offerors/Bidders
36C10F24R0098 01-16-2025
X X X X The purpose of this amendment is to address inquiries received through the Request for Information (RFI).
Details are provided on the continuation page.
The attached Item No. 14 and Item No. 27 documents provides additional details regarding the required work items.
Krystal Glasper Contracting Officer
CONTINUATION PAGE
Response to RFI Solicitation 36C10F24R0098 Project 657-313, VAMC Jefferson Barracks Division, St. Louis, MO
Work Item #14 - There is no work item 14 in the original solicitation. Can the applicable details regarding this work item please be provided?
See the attached description for item No. 14.
Work Item #27 - Can a bracket detail please be provided?
See the attached two-page bracket detail.
Work Item #38 - Will scrubbers/filtration be required to clean the air exiting the pool house?
The air exiting the pool house will need any exhaust air to be filtered during all dust producing operations and if the new wall covering produces noxious fumes.
Work Item #38 - What temperature range is acceptable for the pool house and hallway during remediation?
The pool room and connecting hallway will be isolated from the adjacent gym, locker rooms, offices, and corridor. To further keep these adjacent rooms from being too hot or cold and to maintain workable conditions in the pool and connecting hallway, the pool and connection hallway shall be kept between 65 and 80 degrees Fahrenheit but no lower or higher than the final wall coating product installation will allow.
See attached document: Item No. 14 - Mulch.
See attached document: Item No. 27 - Bracket Detail 2.
File details come from the government source that posted it. Updated .