This is Amendment 0003 to solicitation 36C10F24R0098 issued by the VA Office of Construction and Facilities Management for construction services at the St. Louis Jefferson Barracks VAMC. The amendment provides responses to contractor questions and revises Factor 3 Corporate Project Experience requirements by extending the timeframe for eligible reference projects from 3 years to 5 years prior to RFP issuance.
The amendment includes detailed Q&A covering topics such as price proposal submission requirements, turf/landscaping specifications, testing requirements for new water lines, manhole support bracket details, and specifications for spray-on acoustic plaster installation. Key dates are extended with the RFI deadline now March 3, 2025 and proposal due date March 14, 2025. The amendment also includes a detailed Schedule of Contract Line Items and Prices covering 38 separate work items ranging from electrical work, steam line replacement, sidewalk repairs, lighting installation, and various other construction tasks across the facility campus. Contractors must submit separate pricing for each line item as well as a grand total price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Item No. 14 - Mulch.pdf | ||
| Item No. 27 - Bracket Detail 2.pdf | ||
| 36C10F24R0098 0004.docx | DOCX document | |
| Completion Items - Specfications Combined 250210.docx | DOCX document | |
| 36C10F24R0098 0002.docx | DOCX document | |
| 36C10F24R0098 0001.docx | DOCX document | |
| P09_Past Performance Questionnaire.pdf | ||
| WDOL -SAM.gov.pdf | ||
| 36C10F24R0098_1.docx | DOCX document | |
| P09_Construction Experience Data Sheet.pdf | ||
| P09_SF330 Section E.pdf | ||
| P09_SF330 Secton G.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-11-2025 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (003C4D) 1425 Tri-State Parkway, Suite 140 Gurnee
IL
60031 003C4D Department of Veterans Affairs Office of Construction and Facilities Management 1425 Tri-State Parkway,, Suite 140 Gurnee
IL
60031 To all Offerors/Bidders
36C10F24R0098 01-16-2025
X X X x The purpose of this amendment is to address inquiries received through the Request for Information (RFI).
Details are provided on the continuation page.
Offerors shall submit separate pricing in accordance with the attached price proposal document.
The attached specifications document provides additional details regarding the required work items.
Factor 3, Corporate Project Experience, is revised as follows: The requirement that “the project shall have been completed within three (3) years prior to the date of issuance of the RFP” is now changed to “the project shall have been completed within five (5) years prior to the date of issuance of the RFP.”
Krystal Glasper Contracting Officer
CONTINUATION PAGE
Response to RFI Solicitation 36C10F24R0098 Project 657-313, VAMC Jefferson Barracks Division, St. Louis, MO
General
1. Contractor is not locating instructions on how to submit items that would typically be part of a “Price Proposal” such as pricing, a completed SF1442, acknowledgement of amendments, reps and certs, bid bond, etc. Please clarify what items are required to be submitted and how they should be submitted (in a file along with Factors 1-4, a separate file, etc.)?
The price proposal should include all required pricing documents, a completed SF1442, acknowledgment of amendments, representations and certifications, and any required bid bonds. These documents should be submitted as a separate file from Factors 1-4.
2. Confirming that pricing is to be submitted as 1 grand total and no breakdown or pricing of individual work items is required?
Offeror shall submit separate prices in accordance with the attached price proposal document.
3. Is there a requirement for turf watering, establishment, and/or maintenance? Work item #29 clearly calls for sod and a maintenance period, but the other work items do not address this.
All lawn and planting restoration must be maintained in accordance with Item #29, which includes a maintenance period. The extent of restoration will be determined by the contractor’s means and methods.
4. Is there a particular type of grass seed that is desired?
The required grass seed is Heartland True Tall Fescue Blend or an approved equal.
5. In areas where turf will be disturbed and is not directly addressed in the Scope of Work, should the contractor Seed & Straw or is Sod required?
Sod shall be installed.
6. What will be required for submittals?
Submittals are required for materials including, but not limited to, paint, conduit, irrigation systems, electrical material and equipment, water main pipe, asphalt, concrete, and pavement markings. Additional specifications will be provided as necessary.
7. What will be required for a warranty?
A standard one-year material and workmanship warranty will apply.
8. What will be required for contractor supervision, quality control, and safety?
These requirements are covered in the attached specification sections, which should be reviewed as part of the solicitation documents.
9. Is work within manholes considered confined space? What are the VA’s safety requirements for this work?
Work within the three manholes designated for partial demolition can be performed with two means of egress, similar to an excavation. Access into active steam or chilled water manholes shall be considered confined space work and must comply with VA safety regulations.
10. Contractor has diligently worked on this solicitation to date, but unfortunately, due to the nature of this project and the lack of plans and specifications, the contractor expects more important questions relating to the scope of work to arise. Will the VA please consider extending the cutoff for questions?
The VA extended the deadline for request for information from 31 January 2025 to 3 March 2025. Refer to Amendment 0002.
11. Will the VA please consider extending the proposal due date to allow offerors time to adequately price the project based on the responses to the submitted questions?
The VA changed the proposal due date from 10 February 2025 to 14 March 2025 to allow offerors adequate time to price the project based on the responses provided. Refer to Amendment 0002.
12. Factor 3, Corporate Project Experience, has a time limitation of three (3) years for the example projects. That is a very restrictive requirement. Will the VA please consider extending the time period to a minimum of five (5) years?
Factor will be changed from three to five years for the example projects.
13. For the sections of handrail that are to have toe rails added to existing, our railing contractor requests the option of removing the existing railings, adding the toe rails at their shop, and then re-installing the railings. Is this acceptable to the government? If this is done, what temporary measures need to be incorporated while the railings are removed?
Answer: The contractor may remove east half or west half of the handrails south of the main Building 1 entrance and add the toe rail in the shop. The contractor will be required to maintain one side or the other south of the Building 1 main entrance. The other hand rail sections will need to be replaced by a temporary handrail of equal strength, size, and dimensions when removed to have the toe rail installed.
Work Item #3
1. What are the testing requirements for the new 8” water line? Pressure? Bacterial?
The Medical Center requires a two-hour pressure test and two bacterial tests at the Building 1 and Fisher House locations.
Work Item #9
1. Should the contractor plan on replacing the valve box?
Yes, the existing valve box must be replaced due to damage in the uneven asphalt pavement.
Work Items #14 and #37
1. Confirming there is no work item #14 or work item #37?
There are no Work Items numbered 23, 25, and 37. However, Work Item 14 pertains to installing edging and mulch around flagpole bases and in-ground lights.
Work Item #15
1. Is the VA wanting the void between the new curb and existing asphalt filled with concrete or aggregate?
If there is a gap between the new or old concrete curb, it may be filled with concrete up to two inches below the top of the asphalt. The mill and overlay asphalt will then fill in the remaining two inches.
1. A detail was included for a handicap ramp with detectable warning pavers. Is this part of the scope of work for item 15? If so, where? Dimensions?
There are no handicap ramps or detectable warning pavers included in Work Item #15.
Work Item #18
1. Please clarify the quantity - 100, 63, 60?
The contractor must install 100 new custom-engraved pavers within the existing band of engraved pavers.
Work Items #20 and #28
1. Can the VA provide more details / specifications for the materials required for these work items?
The VA will provide additional material specifications as needed.
Work Item #27
1. Confirming that there are 19 manholes that each need 2 support brackets installed?
17 manholes require 2 support brackets each.
1. Can a detail be provided for the support brackets discussed in work item #27?
A bracket detail will be provided; however, field measurements and shop drawings will still be required.
1. Work item #17 states “Brackets to be L8x4x1/2 galvanized angle iron welded together w 4 each 5/8-inch anchor bolts per bracket with 4-inch depth of embedment per anchor bolt.” What is to be welded together?
The bracket detail will specify how the L8x4x1/2 galvanized angle iron is welded together, along with four 5/8-inch anchor bolts per bracket with 4-inch embedment depth.
1. Contractor is interpreting this work item to include inspecting the anchors on all 19 manholes, epoxying any cracks that are found, and replacing anchors as necessary? Contractor is uncertain how to quantify this work for the bid.
The VA will revise the work description for clarity regarding anchor inspections, epoxy crack repair, and replacement requirements.
Work Item #29
1. Plan shows to remove existing pipes 1’ outside of the structures before backfill. Is it safe to mechanically excavate outside of the structures due to existing utilities? Or will this be a Hydro excavation?
Hydro-excavation should be used to safely clear the area of existing utilities before backfilling.
Work Item #38
1. Can the government please provide the square footage of wall that requires the removal of the existing epoxy wall coating and replacement with spray-on acoustic plaster?
The total square footage is 3,400 SF.
1. Is this work just on the walls? Is any of the work overhead?
The work is limited to walls only; no overhead or ceiling work is required.
1. Are there any expansion joints in the walls to receive spray-on acoustic plaster? If so, how is that to be addressed during installation?
No existing expansion joints are present. Installation joints may be added per the coating manufacturer’s recommendation.
1. Is the spray-on acoustic plaster to be all one color, or striped as shown in the photos?
The spray-on acoustic plaster should be applied in a striped pattern as shown in the provided photos.
1. Is the spray-on acoustic plaster to be painted? Dyed?
The spray-on acoustic plaster must be dyed or painted.
1. Note states “Multiple Photos but not all of the failed locations inside the pool.” How many rooms are involved?
The work will take place in two rooms—the pool area and the connecting hallway.
1. Do all of the walls that are to receive the spray-on acoustic wall panel have CMU block underneath the existing surface?
All walls receiving the spray-on acoustic plaster are constructed of CMU block.
1. The provided photos are zoomed in and the contractor is struggling to get a bearing on the quantity of work and the area in which the work is to be performed. Can photos be provided to show elevation views of the walls to receive this spray-on acoustic plaster?
The VA will explore the possibility of providing additional photos showing elevation views for better clarity.
1. What is the thickness of the existing epoxy wall coating system? Is it different than the thickness of the proposed spray-on acoustic plaster? The reason for the question, is I am trying to determine the full scope of work. Are items such as the flooring, trim, doors, windows, electrical, controls, wall penetrations, etc. going to also be impacted?
The thickness of the existing epoxy wall coating and the new spray-on acoustic plaster is similar. Perimeter elements such as flooring, trim, doors, windows, electrical, controls, and wall penetrations will not be impacted.
1. Confirming that the photos showing the “New Wall Coating to be install after the old wall coating has been completely removed.” are from a different facility as the other provided photos?
The reference photos of the new wall coating were taken at a facility in Tampa, Florida.
SCHEDULE OF CONTRACT LINE ITEMS AND PRICES/COSTS
STL JV VAMC Completion List Project In accordance with the Request For Proposal, the contract drawings and specifications and amendments to either, the work of each Contract Line Item as defined herein in general terms includes, but is not limited to, provision of all labor, materials, tools, equipment, transportation, management, supervision, quality control and all other necessary services and performance of all construction services and incidental related work for completion of fully functional, integrated and operational site improvements.
Item No. 1: Add electrical power to steam manholes 4, 5, and 6 – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 1: $ __________________________ Item No. 2: Reconnect/Replace Ballard lights at Fisher House. Investigate the lighting circuits and restore the operation of the exterior bollard lights using new 36 inch tall light bollard and new concrete bases where the existing bollard are located around the Fisher House. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 2: $ __________________________ Item No. 3: Replace water supply to Fisher House– GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 3: $ __________________________ Item No. 4: Reconnect/Replace Ballard lights at Fisher House – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 4: $ __________________________ Item No. 5: Replace watermain dead leg southeast of Building 1 and Item No. 10: Change the direction of the fire hydrant east of the Building 53 loading dock – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 5 & 10: $ __________________________ Item No. 6: Add toe rail on all handrail south of Building 1 and add new handrail and toe rail north of Building 56 – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 6: $ __________________________ Item No. 7: Replace east sidewalk south of Building 1 that does not meet VA standards for slope – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 7: $ __________________________ Item No. 8: Replace curb islands on either side of the handicap parking spaces south of Building 1 – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 8: $ __________________________
Item No. 9: Repair/regrade asphalt around water main valve – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 9: $ __________________________ Item No. 10: See Item No. 5 – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 10: $ __SEE Item No. 5___________ Item No. 11: Clean under grate and clean silt out of high voltage electrical manhole – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 11: $ _________________________ Item No. 12: Add photocell pedestal controller for B54 exterior lights – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 12: $ _________________________ Item No. 13: Enlarge mulch area or install new mulch area around light fixtures in the west campus areas – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 13: $ _________________________ Item No. 14: Install new metal edging, removed existing sod, and install new mulch around flag pole bases and their inground light bases – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 14: $ _________________________ Item No. 15: Mill and overlay asphalt pavement approximately 660 LF and selectively replace deteriorated concrete curb and gutter in this location – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 15: $ _________________________ Item No. 16: Remove two large trees in the west campus area north of the north entrance road – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 16: $ _________________________ Item No. 17: Add photocell controller to the west campus area exterior lighting – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 17: $ _________________________ Item No. 18: Provide 100 customizable memorial pavers in the existing memorial band of pavers in the west campus area – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 18: $ _________________________ Item No. 19: Remove vegetation existing aggregate base and install new anti-vegetation mat and aggregate base at the top of the cast-in-place retaining wall – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 19: $ _________________________ Item No. 20: Replace existing underground steam line and condensate lines under the asphalt at the Building 24 loading dock – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 20: $ _________________________ Item No. 21: Excavate steam pipe thrust block on new steam manhole 5 and steam manhole 6, take compaction and soil bearing measurements, backfill and restore excavated areas – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 21: $ _________________________ Item No. 22: Construct access roadway/walkway path to existing steam manhole at the southeast corner of Building 57 – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 22: $ _________________________ Item No. 23: Not Used – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 23: $ ____Note Used ____________ Item No. 24: Install new detector loops and new conduits and restore operations to the Building 57 vehicle double gates – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 24: $ _________________________ Item No. 25: Not Used – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 25: $ ____Not Used _____________ Item No. 26: Inside the mechanical room remove silt from the pipe chase pit, reseal the two steam pipe wall penetrations from the inside, replace the steam pit floor drain cover, excavate the stem pipe wall penetrations from outside building 52 and re-seal the penetration from the outside, backfill and restore the excavation area. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 26: $ _________________________ Item No. 27: Add galvanized steel support brackets in the new steam manholes under each end of the center lid support beam. Repair concrete where cracked around the lid center beam connect points. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 27: $ _________________________ Item No. 28: Replace chilled water pipes in chilled water pipe manhole No. 25 which is north of Building 23. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 28: $ _________________________ Item No. 29: Demolish the top of three existing and abandoned steam manholes to 24 inches below existing finish grade, abate and remove the steam pipes in the manholes to 1 ft. inside the connecting underground pipe chases, fill the openings with CMU block walls, fill the now empty manhole with clean aggregate from the bottom of the manhole to 24 inches below finish grade to prevent future settlement, backfill on top of the clean aggregate with clean dirt to 4 inches below subgrade, backfill with 4 inches of tope soil and install sod at finish grade. One manhole will receive an aggregate base in lieu of sod and top soil where it sets in an existing aggregate parking area. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 29: $ _________________________ Item No. 30: Re-install 40 LF of ornamental railing in the west campus area to correct an alignment. The ornamental rail will be cut apart as needed raise 2=approximately 2.5 inches and rewelded and repainted, restored to its existing finish. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 30: $ _________________________ Item No. 31: Replace concrete pavement around light pole at the southeast corner of Building 25. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 31: $ _________________________ Item No. 32: Remove silt from old steam manhole No. 3 at the southeast corner of Building 75 and add block enclosures inside the manhole to prevent silt from entering the manhole from the connecting underground pipe chases. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 32: $ _________________________ Item No. 33: Replace the inground light fixture at monument area with matching light fixture flush with the adjacent exposed aggregate finish. A deviation in elevation of greater than 1/8 inch will not be acceptable for the top of the new inground light fixture. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 33: $ _________________________ Item No. 34: Move electrical panels that are currently inside the chilled water manhole side of manholes 13, and inside steam manhole 15 from the underground manhole vault to a new exterior electrical panel on a new exterior concrete slab. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 34: $ _________________________
Item No. 35: Remove two existing un-sued light pole bases on the west side of building 52. Remove the concrete base to a depth of 18 inches below grade and restore the excavated area with clean dirt, topsoil and seed and straw. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 35: $ _________________________ Item No. 36: Repair the damaged EIFS spots along the south side of Building 1 and repaint the repaired spots. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 36: $ _________________________ Item No. 37: Not Used – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 37: $ _____Not Used____________ Item No. 38: Remove the existing wall coating in the rehab pool and connecting hallway in Building 54 and install a new spray in textured wall coating. Dye the wall coating to patch the existing conditions minus the stripe design. – GENERAL CONSTRUCTION: See solicitation No. 36C10F24R0098 for further details.
Item No. 38: $ _________________________
Grand Total: $_________________________
See attached document: Completion Items - Specfications Combined 250210.