36C10F20R0098 0003.docx

DOCX document 113 KB Posted

Attached to
Y1PC--Great Lakes National Cemetery Phase 2 Expansion
Solicitation number
36C10F20R0098
Issued by

About this file

This solicitation is for a design-bid-build construction project to develop approximately 30 acres and provide approximately 29,400 additional gravesites at the Great Lakes National Cemetery in Oakland County, Michigan. The project scope includes pre-placed crypt full casket and oversized crypt gravesites, pre-placed urn crypts, garden niches, terrace sites, columbarium niches, access roads, parking, a new committal service shelter, grading, drainage, landscaping, signage, site furnishings, irrigation, a new satellite public restroom facility, cemetery-wide electrical evaluations and corrections/upgrades, upgrades/improvements to the maintenance complex, security upgrades, re-sealing pavement and sidewalk joints, replacing assembly wall caps, repairing/replacing existing flower watering stations, and energy efficiency upgrades. The solicitation number is 36C10F20R0098 and it is 100% set aside for Service Disabled Veteran Owned Small Businesses. The issuing agency is the Department of Veterans Affairs Office of Construction and Facilities Management. Proposals are due by January 11, 2021.

View the file

Other files

File Type Posted
36C10F20R0098 0004.docx DOCX document
S06 Amend 0004-cont pages.docx DOCX document
S06 GLNC P2 PreProposalWalkthroughSignInSheets_02DEC2020.pdf PDF
S06 GLNC P2 Pre-SolMeetingAttendanceList_02DEC2020.pdf PDF
36C10F20R0098 0002.docx DOCX document
S06 GLNC Phase II Development - 923PC2006 - FCD - Final Specs Volume 2.pdf PDF
S06 Pre-Proposal Conference slides GLNC PH 2 Dec 1 2020.pdf PDF
36C10F20R0098 0001_.docx DOCX document
S02 GLNC Phase II - Plans_Part2.pdf PDF
S02 GLNC Phase II - Plans_Part8.pdf PDF
S02 GLNC Phase II - Plans_Part10.pdf PDF
S02 GLNC Phase II - Plans_Part17.pdf PDF
S02 GLNC Phase II - Plans_Part11.pdf PDF
S02 GLNC Phase II - Final Specs Volume 2 - Appendices.pdf PDF
S02 GLNC Phase II - Final Specs Volume 1.pdf PDF
S02 GLNC Phase II - Plans_Part23.pdf PDF
S02 GLNC Phase II - Plans_Part1.pdf PDF
S02 GLNC Phase II - Plans_Part21.pdf PDF
S02 GLNC Phase II - Plans_Part9.pdf PDF
S02 GLNC Phase II - Plans_Part7.pdf PDF
S02 GLNC Phase II - Plans_Part20.pdf PDF
ATTACHMENT 2 - WD - OAKLAND CO MI HEAVY_02OCT2020.docx DOCX document
S02 GLNC Phase II - Plans_Part22.pdf PDF
ATTACHMENT 4 - Pre-Proposal Inquiry (PPI) Form.docx DOCX document
S02 GLNC Phase II - Plans_Part14.pdf PDF
S02 GLNC Phase II - Plans_Part13.pdf PDF
S02 GLNC Phase II - Plans_Part24.pdf PDF
S02 GLNC Phase II - Plans_Part15.pdf PDF
S02 GLNC Phase II - Plans_Part25.pdf PDF
S02 GLNC Phase II - Plans_Part6.pdf PDF
S02 GLNC Phase II - Plans_Part4.pdf PDF
S02 GLNC Phase II - Plans_Part12.pdf PDF
S02 GLNC Phase II - Plans_Part18.pdf PDF
ATTACHMENT 3 - PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
S02 GLNC Phase II - Plans_Part19.pdf PDF
S02 GLNC Phase II - Plans_Part5.pdf PDF
S02 GLNC Phase II - Plans_Part3.pdf PDF
S02 GLNC Phase II - Plans_Part16.pdf PDF
36C10F20R0098_3.docx DOCX document
ATTACHMENT 1 - WD - OAKLAND CO MI BLDG_25SEP2020.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F20R0098 Amendment 0003

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-21-2020

923CM2006.11

003C4 Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 1425 Tri State Parkway, Suite 140 Gurnee IL 60031 101F Department of Veterans Affairs Office of Construction and Facilities Management (003C4B) 1425 Tri State Parkway, Suite 140 Gurnee IL 60031 To all Offerors/Bidders

36C10F20R0098 11-20-2020

X X X January 11th, 2021 at 12PM CST X Amendment 0003 contains the following:

1. CAD FILES

2. RFI RESPONSES

3. DAVIS BACON ACT WAGE DETERMINATIONS

END OF AMENDMENT 0003

Jeffrey Gerbensky Contracting Officer

GREAT LAKES NATIONAL CEMETERY

PHASE 2 EXPANSION

PRE- PROPOSAL AMENDMENT 0003

DECEMBER 22, 2020

Table of Contents

1.CAD FILES3
a.Phase 2 Grading Plan –3
b.Phase 1 CAD Files –3
c.Phase 1B Record Drawings –3
2.RFI RESPONSES - RFI’s Received through December 18, 2020.4
3.DAVIS BACON ACT WAGE DETERMINATIONS15

Attached File List

1. none

1. CAD FILES

a. Phase 2 Grading Plan –

i. A copy of the CAD file grading plan was requested by a potential offeror to assist with earthwork takeoffs.

ii. Download from following weblink: https://ftp.whga.com/main.html?download&weblink=3d426eba8b0613c41cb1dc908000ef5b&realfilename=CG101.dwg

b. Phase 1 CAD Files –

i. Download from following weblink: https://ftp.whga.com/main.html?download&weblink=3d426eba8b0613c41cb1dc908000ef5b&realfilename=CG101.dwg

c. Phase 1B Record Drawings –

i. Download from following weblink: https://ftp.whga.com/main.html?download&weblink=e59f960f622bdec76c1033d7a7732361&realfilename=Phase$201B-Record.zip

2.

RFI RESPONSES - RFI’s Received through December 18, 2020.

SOLICITATION NUMBER 36C10F20R0098

PRE- PROPOSAL INQUIRY (PPI) FORM

GREAT LAKES NATIONAL CEMETERY PHASE 2 GRAVESITE DEVELOPMENT

Question No.
Reference (Sect/Para/Page)
QUESTION
GOVERNMENT RESPONSE

General

Volume #1 and #2 of the specifications does not include any specs for the HVAC, Electrical, Low-Voltage, Earthwork, Landscaping, or irrigation. These items of work are not noted in the Table of Contents either. Please clarify if these will be issued in a forthcoming amendment,
This was addressed in Amendment 0002.

Solicitation

Section 4.15 VAAR 852.219-74 notes a limitation on subcontracting. What percentage of work must be accomplished by the GC’s own forces? Do General Conditions and Management count toward these goals?

13CFR 125.6 (a)(4) states as follows: “In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime may be paid to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.” In the case of this solicitation, similarly situated firms would be other CVE Verified SDVOSB firms that you subcontract with.

Spec: 03 48 21

Is a list of approved vendors/basis of design available for this scope of work?

List of approved vendors & BOD are not available. Contractor to select vendors based upon solicitation requirements.

Spec: 03 48 24

Is a list of approved vendors/basis of design available for this scope of work?

List of approved vendors & BOD are not available. Contractor to select vendors based upon solicitation requirements.

Spec: 04 73 00

Is a list of approved vendors/basis of design available for this scope of work?

List of approved vendors & BOD are not available. Contractor to select vendors based upon solicitation requirements.

Spec: 11 83 00/11 83 02

Is a list of approved vendors available for this scope of work?

List of approved vendors & BOD are not available. Contractor to select vendors based upon solicitation requirements.

7
Sheet DT500 detail #1
The minimum cover over the top of the precast crypts is shown as 1’-8”, with a maximum cover of 2’. This is a 4” difference that is not typical of NCA projects (usually 2” difference from minimum to maximum coverage). Please confirm desired coverage over the top of the precast crypts.
The desired cover over the top of the precast crypts is

1’-9”.

8
Sheet DT500 detail #1:
Geotextile fabric is shown in between the head and foot of the crypts separating the gravel backfill and sand at the bottom of crypt lid elevation. This is not typical of NCA crypt projects and may result in future difficulties for the cemetery during internments. Please confirm the fabric at these locations is desired.
Confirmed. Fabric to be installed per the plans.
9
Sheet DT500 detail #1
General Note: General Note states, “Provide survey certification of crypt placement prior to backfill being placed between crypts.” Gravel backfill is placed between the crypts as part of the crypt installation process. Is this note meant to state that survey certification of crypt placement is required prior to backfill being placed over the top of the crypts? Please clarify.

Survey Certification is required prior to any backfill placement on the tops of the crypts

10
Solicitation pg. 17

SPEC 01 45 00-1.5.1.2

Solicitation states minimal qualifications for CQC is required to be a graduate Engineer, graduate Architect or a graduate of Construction Management whereas SPEC 01 45 defines the QC qualifications “an individua with a minimum of 5 years combined experience in the following positions: Project Superintendent, QC Manager, Project Manager, Project Engineer or Construction Manager… Which requirement for QC qualifications is to be followed?

Minimum qualifications regarding education & experience stated in the solicitation & specification 01 45 are complimentary & both should be followed. Proposals will be evaluated based upon the minimum qualifications criteria stated in the solicitation.

11
Drawing AA603
Per the material schedule, the Toilet Partitions are to be Bradley Series 500 Stainless Steel, Floor Braced. Can the Toilet Partition SPEC be provided to provide directive for the requirements for hardware, installations, and factory preps for other trades?
The Specification was provided with the contract documents. Refer to Toilet Compartment Specification 10 21 13
12
Drawing AA403
Per ABA Section 604, if there are 6 or more toilets in a restroom, there is a requirement for one of the stalls to be Ambulatory Accessible. The layout of the Women’s Bathroom on page AA403 does not indicate an Ambulatory Accessible stall. Reference: Figure 604.8.2 from the current issue of the ABA Standards to show requirements for Ambulatory Accessible stall. Will ABA be followed and change forthcoming?
The Ambulatory Accessible stall is located at plan grid location B3, Sheet AA403, and is designed in accordance with Figure 604.8.2. No additional changes are anticipated.
13
SPEC 08 11 13 Hollow Metal Doors and Frames
SPEC 08 11 13, Section 1.1-C “This section includes doors and frames at Committal Shelter” This spec is requirements for exterior hollow metal doors and frames. The PIC/Admin Building requires interior hollow metal frames – please advise what these requirements are, as the SPEC does not provide for interior nor provide directive for this scope of work.
Provide door frames as specified.
14
SPEC 08 71 00 Door Hardware
Please advise as to what the existing keying system is to match the Committal Shelter doors (Add Alt). Per Hardware Set #03, “CYLINDERS AS REQUIRED” – what is required?
Cylinders are required to match the existing committal service shelter hardware as specified.
15
SPEC 08 71 00 Door Hardware
08 71 00-3.4 Hardware Sets: Family Restroom – the hinges and mortise lock specified are manual hardware. Please advise how the manual hinges and locks are to work without either an electrical hinge or electrical latch retraction on the lock. In conjunction with this hardware, there is an electric strike scheduled and well has a push/pull plate and a note explaining deadbolt monitoring. Why is there a push/pull scheduled with a door lock? What type of deadbolt is required, as there is not one schedule?
The door hardware for the family restroom door has been designed to operate as follows:

When the door is closed it can be opened by either manually operating the privacy hardware set or by pressing the operator button on the wall. The operator button will do two things. #1 release the electric strike on the frame and #2 at the same time power the door operator to open the door. Once inside the bathroom the door operator will close the door and the occupant can manually operate the thumb turn which is part of the privacy hardware set specified to lock the door. Once the thumb turn has been activated, the deadbolt monitor deactivates the operator button. This provides privacy for the occupant. The privacy set in the hardware spec also has key access from the corridor side. The push pull hardware has been specified to facilitate the manual operation of the door. When the thumb turn is released from the inside of the bathroom, the operator buttons are once again activated and can be used from inside the bathroom as well as from the corridor side.

16
SPEC 08 51 13 Aluminum Windows and Plan Page AA603
SPEC 08 51 13-2.6. A-D: color shall be Kynar #EW0151 Statuary Brown, match existing. Plan Page AA603, Sheet Note #2: Wood Stain: Match sample by Knoll #SWT-KC Cherry for doors and windows. Being the windows are Aluminum Clad Wood Windows, please advise which color (from spec or plan interior finish schedule) are required?
SPEC 08 51 13-2.6. A-D applies to the exterior finish. Plan Page AA603 (PIC/ADMIN BLDG – INTERIOR FINISH PLAN), note #2 refers to interior finish. Interior and exterior colors shall be in accordance with the contract documents.
Are CAD file or as-built drawings available for Phase 1 Development? Specifically, the existing irrigation from Phase 1 for the upcoming ETO Sections 34 & 35 to be developed
Phase 1 CAD files & Phase 1B Record drawings are available and provided via FTP link (See FILES section of this amendment).
18
Drawing: GI200
Please confirm the current GIS/GPS system is up to date and current (software requirements) for ETO work to be input into the GIS database for first burial within the cemetery following acceptance of the ETO work.
The GIS/GPS project requirements of this project are included as part of the Early Turnover work per the project documents.
13
Drawings: CI101, CI102, CI103, CI201, CI501, CI502
Please confirm all existing cemetery signage AND new areas are being updated (replaced) /added.
Site signage shall be installed in accordance with the project documents.
19
Drawings: CI750, CI1751
Please confirm both Committal Shelters (1&2) and Columbarium Committal Service Shelter will have demolition for the Service Emblems with addition of Cut Stone Dakota Mahogany Granite panel.
Both Committal Service Shelters (1&2) as well as the Columbarium Service Shelter will have demolition of the existing manufactured stone and installation of new cut stone Dakota Mahogany granite panels and service seals according to the project documents.
20
Drawings: CI750, CI1751
New mortar to match existing – as existing mortar has been in place for several years subject to various elements – in matching existing is it acknowledged the mortar (old and new) will be of varying colors?
The design intent is to match the color of the existing mortar as closely as possible. Mortar samples are to be provided during the submittal review process for comparison and selection.
21
Drawings: CI750, CI1751
Chipped or damaged existing stones shall require Boral Cultured Stone Masonry Cosmetic Expert for repairs – please advise if mason to awardee of contract is able to make repairs or if above named must be used.
As indicated on the details, Boral Cultured Stone Masonry Cosmetics expert (Rick Conner) must be utilized for repairs of chipped or damaged existing stones. If damage to the stones is avoided, no repairs will be necessary.
22
Drawing: CI760
Please confirm all Assembly Area Wall Caps are to be replaced.
All existing pre-cast concrete Assembly Area Wall Caps (shown in detail 1, CI760) are to be removed, disposed of, and replaced with Indiana Limestone caps.
23
Drawing: CI760
Chipped or damaged existing stones shall require Boral Cultured Stone Masonry Cosmetic Expert for repairs – please advise if mason to awardee of contract is able to make repairs or if above named must be used
As indicated on the details, Boral Cultured Stone Masonry Cosmetics expert (Rick Conner) must be utilized for repairs of chipped or damaged existing stones. If damage to the stones is avoided, no repairs will be necessary.
24
Section 01 00 01
The Contractor shall factor into his bid that there may be adjustments in the Work Sequencing after Contract Award due to unforeseen Cemetery Operational issues-

Is this request to be factored as an allowance and potentially credited back if not used?

This is a contingency to be included in the cost proposal and will not be subject to being credited back.

25
Section 01 00 01
All buildings will be occupied during performance of work.1. Take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Cemetery’s operations will not be hindered. Permit access to Department of Veterans Affairs personnel through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Cemetery operations will continue during the construction period.2. Immediate areas of alterations not mentioned above will be temporarily vacated while alterations are performed.

Will work hours need to be modified to accommodate working in proximity of occupied buildings?

The contractor will avoid disruption of visitation, services and Cemetery operations. Should work hours require modification to achieve this it will be required.

26
Section 01 00 01
Construction Fence: Before construction operations begin, the Contractor shall provide a chain link construction fence, seven feet minimum height, around the construction area indicated on the drawings.

Will 6’ chain link be acceptable? Will privacy screen be required in high visibility areas?

The construction fence shall be installed in accordance with the project documents.

27
Section 01 00 01
Coordination of Construction with Cemetery Director through the RE/COR: The burial activities at a National Cemetery shall take precedence over construction activities. Cooperation and coordination with the Cemetery Director, through the RE/COR, in arranging construction schedule to cause the least possible interference with Cemetery activities in actual burial areas is required. Construction noise during the interment services shall not disturb the service. Coordination of work may require that equipment that is heard from the service location be shut-off, or moved out of the area prior to the service, as acceptable to the Cemetery Director through the RE/COR.

Please provide the average number of daily internments as this could potentially effect production.

The average daily number of interments is 25.

28
Section 01 00 01
Within thirty days after the Notice to Proceed, provide a vehicle for the use of the Resident Engineer for the duration of the project including project closeout. The vehicle shall be one new full-size pickup type vehicle, (such as a Ford F-150 XL Super-Cab or equal). The vehicle will be purchased or leased by the Contractor and will be returned to the Contractor after completion of this project including project closeout.

Will a vehicle from the year prior be acceptable if still “new”?

Yes, a vehicle from the year prior will be acceptable if still “new.”

29
Section 01 00 01
Contractor shall provide an automated punch list application for the project. This solution shall be a Commercial-Off-The-Shelf (COTS) product. Contractor shall procure this service based on the performance criteria

Will VA training of punch list application use be the responsibility of the contractor?

Training will be the contractor’s responsibility

30
Section 01 00 01
The following is a schedule of anticipated monthly nonwork days due to adverse weather to be used as the basis for building the Weather Calendar.

No information provided. Please provide.

This information is to be provided by the contractor to address the sample schedule and to support their CPM following award.

31
Section 01 35 26
A Certified Safety Professional (CSP) with specialized knowledge in construction safety or a certified Construction Safety and Health Technician (CSHT) shall randomly conduct a monthly site safety inspection. The CSP or CSHT can be a corporate safety professional or independently contracted. The CSP or CSHT will provide their certificate number on the required report for verification, as necessary.

Can the contractors SSHO conduct the monthly site safety inspections if properly certified as a CSP or CSHT?

The SSHO can conduct the monthly inspection and prepare the associated report if properly credentialed. However, it should be recognized that this monthly inspection is intended to be above and beyond the typical daily safety duties of an SSHO. The monthly report should be a detailed audit of all onsite activities and associated paperwork required to meet OSHA and contract record keeping requirements.

32
Section 01 91 00
Contractor's Commissioning Coordinator (CCC): Provide an individual on the Contractor's staff who is regularly and frequently on site and shall be responsible for managing the Contractors in their day to-day performance of the specified commissioning work. Required qualifications for the CCC include relevant process management experience and ability to schedule, coordinate and manage mechanical and electrical subcontractors.

Can the Quality Control Manager or superintendent also be the Commissioning Coordinator?

Per 01 45 00 1.5.1 “The only duties and responsibilities of the QC Manager are to manage and implement

GREAT LAKES NATIONAL CEMETERY PROJECT NO. 923-006

PHASE 2 DEVELOPMENT JULY 31, 2020

QUALITY CONTROL

01 45 00 - 4 the QC program on this contract.”

33
Section 01 45 29
Accreditation Requirements: Testing Laboratory retained and paid for by Contractor must be accredited by one or more of the National Voluntary Laboratory Accreditation Program (NVLAP)programs acceptable in the geographic region for the project. Furnish to the Resident Engineer/Contracting Officer’s Representative (RE/COR) a copy of the Certificate of Accreditation and Scope of Accreditation. For testing laboratories that have not yet obtained accreditation by a

NVLAP program, submit an acknowledgement letter from one of the laboratory accreditation authorities indicating that the application for accreditation has been received and the accreditation process has started, and submit to the RE/COR for approval, certified statements, signed by an official of the testing laboratory attesting that the proposed laboratory, meets or conforms to the ASTM standards listed below as appropriate to the testing field.

Upon contacting several testing firms in the region, this certification is not held. Will any deviation be allowed from the NVLAP certification if the testing lab complies with all other appropriate testing parameters?

This is a standard requirement for VA contracts. Several accredited testing sites appear to provide services in Michigan.

Work Sequencing Requirements - All the work for this project must be completed on or before the Contract Completion Date identified in the documents. The ETO work is required to be completed well before the overall Contract completion date, on or before the ETO.

If portions of the project are completed prior to the contract completion date, will the VA accept custody of those areas outside of those specifically required in the ETO phases?

The project contains on ETO(s) and final inspections and acceptance. Incremental inspections and acceptance as work is completed will not be allowed.

35
Solicitation: Key Personnel pg. 16
Project Executive: in lieu of a bachelor’s degree in engineering, Construction, Architecture, Landscape Architecture, or a related field – will the Govt accept 30yrs of experience managing construction work of a similar size and complexity to this cemetery project?
Proposals will be evaluated based upon the minimum qualifications criteria stated in the solicitation.
36
Solicitation: Key Personnel pg. 16
Project Manager: in lieu of a bachelor’s degree in engineering, Construction, Architecture, Landscape Architecture, or a related field – will the Govt accept 20yrs of experience managing construction work of a similar size and complexity to this cemetery project?
Proposals will be evaluated based upon the minimum qualifications criteria stated in the solicitation.
37
Solicitation: Key Personnel 2.2 and 4.26 Special Clauses
How will the Govt evaluate Key Personnel for personnel listed on other proposals for solicitations not yet awarded?
The key personnel proposed by each offeror for this solicitation will be the personnel evaluated by VA.
The IP Surveillance system is based on “Avigilon.” Is there enough storage space on the existing NVR to accommodate all new cameras being requested? If not, will another appliance be added to the existing NVR?
See SE101 Note 1 – “Security contractor shall expand and/or provide new security hardware, devices, POE cameras and software/configuration.” Plans and specs include a new NVR system as required to connect all devices appropriately.
39
Drawing: EY101
“Security Corporation” was mentioned as the previous “Security and Fire Alarm” Contractor. Are they being single sourced for this project to install and provide all “Security and Fire Alarm” additions? If not, what are the “Physical Access Control System” specifications to include Card Readers, Magnetic Locks, Electronic Strikes, Contacts, REX/Motions and Glass Breaks.
Information regarding existing system was provided for informational purposes only. For security plans and specification see sheets beginning with “SE” and “EY” within plan set and associated specification sections.
Due to the Holidays can the Bid Due Date be extended one month?
Proposal due date has been extended to January 11th, 2021, at 12PM CST. Due to the project schedule, the proposal due date cannot be extended any further at this time.
Can past PPQ’s be used for this solicitation due to timing?
Past PPQ’s may be provided, contingent upon offerors providing current contact information for all owner references. If the Contracting Officer (CO) is unable to contact the owner references (due to invalid contact info or reference fails to respond) to independently verify the information contained in the PPQs, then the CO may disregard the PPQ and it may not be considered in the offeror’s Past Performance evaluation.

The IP Surveillance system is based on “Avigilon.” Is there enough storage space on the existing NVR to accommodate all new cameras being requested? If not will another appliance be added to the existing NVR?

See SE101 Note 1 – “Security contractor shall expand and/or provide new security hardware, devices, POE cameras and software/configuration.” Plans and specs include a new NVR system as required to connect all devices appropriately.

On Print# EY101 “Security Corporation” was mentioned as the previous “Security and Fire Alarm” Contractor. Are they being single sourced for this project to install and provide all “Security and Fire Alarm” additions? If not what are the “Physical Access Control System” specifications to include Card Readers, Magnetic Locks, Electronic Strikes, Contacts, REX/Motions and Glass Breaks.
Information regarding existing system was provided for informational purposes only. For security plans and specification see sheets beginning with “SE” and “EY” within plan set and associated specification sections.

My site work guy is requesting CAD files for this. He said I may have to go to the engineer for them.

Any ideas on who I should contact to start?

Phase 2 Grading Plan CAD file is attached to this amendment & provided via FTP link (See FILES section of this amendment).

3. DAVIS BACON ACT WAGE DETERMINATIONS

a. WD - MI20190095, BUILDING, OAKLAND CO MI, REVISED 04OCT2019 IS HEREBY SUPERSEDED WITH THE FOLLOWING "General Decision Number: MI20200095 12/11/2020 Superseded General Decision Number: MI20190095 State: Michigan Construction Type: Building County: Oakland County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 02/14/2020 3 05/08/2020 4 07/03/2020 5 07/24/2020 6 09/04/2020 7 09/11/2020 8 09/25/2020 9 12/11/2020

ASBE0025-002 06/01/2019

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 33.60 32.90

BOIL0169-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 38.65 26.22

* BRMI0001-001 06/01/2020

Rates Fringes

BRICKLAYER.......................$ 36.24 22.74

TILE FINISHER....................$ 28.58 20.45

TILE SETTER......................$ 35.71 20.45

CARP0687-003 06/01/2020

Rates Fringes CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold Building)........................$ 34.20 28.82

CARP1045-001 06/01/2020

Rates Fringes CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 30.60 24.58

CARP1102-002 06/01/2020

Rates Fringes

MILLWRIGHT.......................$ 35.30 34.10

ELEC0058-011 07/02/2020

Rates Fringes

ELECTRICIAN

Excludes Alarm Installation & Low Voltage Wiring......................$ 44.34 24.91 Low Voltage Wiring Installer..................$ 29.60 13.94 Technician.................$ 36.89 14.16

ELEV0036-002 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 53.66 34.765

ENGI0324-017 06/01/2020

Rates Fringes OPERATOR: Power Equipment

GROUP 1....................$ 42.69 24.95

GROUP 2....................$ 41.19 24.95

GROUP 3....................$ 39.69 24.95

GROUP 4....................$ 39.39 24.95

GROUP 5....................$ 38.57 24.95

GROUP 6....................$ 37.71 24.95

GROUP 7....................$ 36.74 24.95

GROUP 8....................$ 35.03 24.95

GROUP 9....................$ 26.69 24.95

FOOTNOTES:

Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.

Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane with boom and jib or leads 400' or longer GROUP 2: Crane with boom and jib or leads 300' or longer GROUP 3: Crane with boom and jib or leads 220' or longer GROUP 4: Crane with boom and jib or leads 140' or longer GROUP 5: Crane with boom and jib or leads 120' or longer GROUP 6: Regular crane operator, and concrete pump with boom operator GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher GROUP 8: Forklift & extend-a-boom forklift GROUP 9: Oiler

IRON0025-019 06/01/2019

Rates Fringes

IRONWORKER

REINFORCING.................$ 30.98 27.99

STRUCTURAL..................$ 36.77 29.03

IRON0025-022 06/01/2019

Rates Fringes IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 36.77 29.03

LABO0259-002 08/01/2019

Rates Fringes LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 29.03 12.92

LABO0334-005 06/01/2019

Rates Fringes LABORER: Landscape & Irrigation

GROUP 1.....................$ 20.75 7.10

GROUP 2.....................$ 18.75 7.10

CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent) GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO1076-003 06/01/2019

Rates Fringes

LABORER

Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;

Pipelayer; Sandblaster......$ 28.55 16.85

PAIN0022-003 06/01/2015

Rates Fringes PAINTER: Brush and Roller.......$ 26.06 17.66 PAINTER: Drywall Finishing/Taping.................$ 27.05 18.26 PAINTER: Spray..................$ 26.86 17.66

PAIN0357-002 06/01/2020

Rates Fringes

GLAZIER..........................$ 34.10 21.46

PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;

provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.

PLAS0067-001 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07

PLAS0067-004 04/01/2014

Rates Fringes

PLASTERER........................$ 30.63 14.07

PLUM0098-001 06/01/2019

Rates Fringes PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 35.77 35.13

PLUM0636-011 06/05/2017

Rates Fringes PIPEFITTER (Includes HVAC Pipe Installation; Excludes HVAC System Installation)........$ 40.41 29.35

ROOF0149-001 06/01/2019

Rates Fringes

ROOFER...........................$ 36.97 23.16

SFMI0704-001 08/01/2020

Rates Fringes SPRINKLER FITTER (Fire Sprinklers)......................$ 45.19 29.73

SHEE0080-001 06/01/2020

Rates Fringes SHEET METAL WORKER, Includes HVAC Duct and Unit Installation.....................$ 44.13 26.27

TEAM0247-001 06/01/2018

Rates Fringes

TRUCK DRIVER

GROUP 1

Flatbed; Pickup; Dump & Tandem.....................$ 26.71 0.70+a

GROUP 2

Semi.......................$ 26.86 0.70+a

GROUP 3

Lowboy.....................$ 26.96 0.70+a PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.

FOOTNOTE:

a. $456.70 per week, plus $67.10 per day.

SUMI2011-020 02/01/2011

Rates Fringes ELECTRICIAN (Alarm Installation)....................$ 24.31 5.53

INSTALLER - OVERHEAD DOOR........$ 27.98 0.00

IRONWORKER, ORNAMENTAL...........$ 18.48 7.93

TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 1.18 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

END OF AMENDMENT 0003