36C10F18R0688_2.docx
DOCX document 254 KB Posted
- Attached to
- 36C10F19C0003, East Campus Demolition & Roadwork
- Solicitation number
- 36C10F18R0688
About this file
36C10F18R0688 36C10F18R0688_2.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10F19C0003-000.docx | DOCX document | |
| 36C10F18R0688-0005001.pdf | ||
| 36C10F18R0688-0005000.docx | DOCX document | |
| 36C10F18R0688_0004.docx | DOCX document | |
| Amendment_4_Summary.pdf | ||
| Amendment_3_Summary.pdf | ||
| 36C10F18R0688_0003.docx | DOCX document | |
| 36C10F18R0688_0002.docx | DOCX document | |
| Amendment_2.pdf | ||
| Amendment_1_Summary_2019_0109.pdf | ||
| 36C10F18R0688_0001.docx | DOCX document | |
| 36C10F18R0688-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2
014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See __________
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C10F18R0688 X 12-13-2018 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (003C4D) 1425 Tri-State Parkway, Suite 140 Gurnee IL 60031 Same as 7 Attention Gerald (Jerry) Brusaw
Gerald (Jerry) Brusaw 224-610-7332 Design-Bid-Build Project 657-313J: Offeror shall provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary for construction of the project as described herein and other specific tasks as fur ther defined by this Request for Proposal (RFP). The Scope of the Contract is described in Section 00 11 21 at Paragraph A1. Work is to be performed at the Jefferson Barracks Division Campus of the VA Medical Center located at 1 Jefferson Barracks Drive, St. Louis, MO 63125.
The project magnitude is between $5,000,000.00 and $10,000,000.00. Davis Bacon Wages apply. The NAICS Code is 238910 and the Small Business Size Standard is $15 million. The project is being solicited as a CVE Verified Service Disabled Veteran Owned Small Business(SDVOSB) set-aside. Any entity wishing to propose shall be listed as an SDVOSB concern in accordance with 38CFR 74 and shall be so listed in the Vendor Information Pages database located at www.vip.vetbiz.gov, and shall comply with the subcontracting limitations in 13 CFR 125.6.
A Pre-Proposal Conference and Site Visit are scheduled to take place at VAMC St Louis, MO Building 48 at 10 AM on 08 January 2019.
Please submit all questions regarding the solicitation and supporting documentation in writing usi ng the RFI submission format as a Microsoft Word Document provided within this solicitation. All RFIs shall be submitted via email to Gerald (Jerry) Brusaw at Gerald.brusaw@va.gov. RFIs will be accepted until January 10, 2019. All offerors are responsible for monitoring and downloading attachments and amendments from FedBizOpps (www.fbo.gov).
Proposals are due January 24, 2019.
482 days X X 52.211-10 X see sect 00 11 21
2PM CST
01-24-2019 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22.
AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27.
PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further con-this contract. The rights and obligations of the parties to this contract tractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
101F Department of Veterans Affairs Office of Construction and Facilities Management (003C4D) 1425 Tri-State Parkway, Suite 140 Gurnee IL 60031 Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin TX 78714-9971
SCHEDULE OF CONTRACT LINE ITEMS AND PRICES/COSTS
In accordance with the Request For Proposal, the contract drawings and specifications and amendments to either, the work of each Contract Line Item as defined herein in general terms includes, but is not limited to, provision of all labor, materials, tools, equipment, transportation, management, supervision, quality control, inspections, testing and all other necessary services and performance of all demolition and sitework services and incidental related work for completion of fully functional, integrated and operational new campus utilities, parking and roadway site improvements.
CLIN 1 BASE PROPOSAL – GENERAL CONSTRUCTION: CLIN 1 is defined in general terms as cost for demolition and removal of existing Buildings 4, 4T, 5, 7, 8, 48 and 49, improvements and other structures; abandonment, removal and relocation of existing utilities; earth and site work including fill, excavations and disposal of surplus excavated earth or other materials, grading, drainage, new underground utilities, paving, roadways, landscaping, site lighting and other site improvements as defined in the contract documents.
CLIN 2 BASE PROPOSAL – ASBESTOS ABATEMENT: CLIN 2 is defined in general terms as cost for planning, documentation, notifications, permits, temporary protection controls, monitoring, sampling, cleaning and all other incidental related work specific to the proper removal and disposal of asbestos and asbestos containing materials to facilitate demolition and removal of existing structures (4, 4T, 5, 7, 8, 48, 49) and/or other existing construction within existing infrastructure manholes and as otherwise required for execution of the work of the project.
CLIN 3 BASE PROPOSAL – HAZARDOUS MATERIALS ABATEMENT: CLIN 3 is defined in general terms as cost for planning, documentation, notifications, permits, temporary protection controls, monitoring, sampling, cleaning and all other incidental related work specific to the proper removal and disposal of hazardous materials (lead containing paint, ozone depleting substances (OSD’s), PCB’s, etc.) to facilitate demolition and removal of existing structures (4, 4T, 5, 7, 8, 48, 49) and/or other existing construction and as otherwise required for execution of the work of the project.
CLIN 4 DEDUCT ALTERNATE – LANDSCAPE AND ELECTRICAL: CLIN 4 is defined in general terms as a deduct to delete applicable Base Proposal costs for all general conditions, labor, materials, tools, equipment, transportation, supervision, submittals, testing, inspections and all incidental related work to modify the work of the project in accordance with Drawings LX401.2, LX501.1, and ESX101.1. The contract specifications remain unchanged unless noted otherwise. CLIN 4 includes deductive costs for all special finish concrete paving and stone paving and all accent and landscape lighting at the west entrance to the new Engineering/Warehouse Building constructed under a separate contract. If CLIN 4 is evaluated, the value of CLIN 4 will be deducted from the value of the Base CLINs 1 thru 3.
CLIN 5 UNIT PRICE NO.1: REMOVAL OF BULK ROCK - $/CUBIC YARD: This CLIN 5 unit price amount shall include all costs for labor, equipment, materials, Contractor’s overhead, profit, insurance taxes and all other related costs to mechanically remove and dispose of off-site any bulk rock, as defined below, not indicated in the specifications and drawings, that is encountered during earthwork excavation at the site. The Project Geotechnical Engineer shall, in consultation with the Contractor and Resident Engineer, verify all quantities of bulk rock removed as required by the Contracting Officer.
Bulk Rock: Bulk Rock is defined as any material encountered during rough grading or mass excavation operations that cannot be removed with a single-tooth ripper device attached to conventional earth-moving equipment such as a D-6 or D-7 bulldozer or similar equipment, and can only be removed using equipment mounted pneumatic jackhammer devices. Bulk rock shall also include any existing concrete slabs, foundations or large pieces of concrete debris not shown on the drawings and discovered below grade; or any other material defined as bulk rock by the Project Geotechnical Engineer during on-site observations.
CLIN 6 UNIT PRICE NO.2: REMOVAL OF TRENCH ROCK - $/CUBIC YARD: This CLIN 6 unit price amount shall include all costs for labor, equipment, materials, Contractor’s overhead, profit, insurance, taxes, and all other related costs to mechanically remove and dispose of off-site any trench rock, as defined below, that is encountered during earthwork excavation at the site. The Project Geotechnical Engineer shall, in consultation with the Contractor and Resident Engineer, verify all quantities of trench rock removed as required by the Contracting Officer.
Trench Rock: Trench Rock is defined as rocks or boulders larger than one (1) cubic yard, rock strata, or existing concrete foundations, footings, or large pieces of concrete debris encountered during trench excavation for structural foundations or underground utility lines that cannot be removed with conventional foundation excavation equipment and can only be removed using equipment mounted or manually operated pneumatic jackhammer devices. Trench rock shall also be any other material defined as such by the Project Geotechnical Engineer during on-site observations. Rocks, boulders, or concrete debris smaller than one (1) cubic yard shall be classified as common excavation and shall be removed as a part of the Base Proposal price.
| $____________________________ | ||
| 36C10F18R0688 | East Campus Demolition & Roadway | |
| VAMC St. Louis, MO-JB Division | ||
| VA Project 657-313J |
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 52.228-1 BID GUARANTEE (SEP 1996) | 9 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 9 |
| SECTION 00 11 21 REQUEST FOR PROPOSAL TO BUILD | 11 |
| SECTION 01 00 00 GENERAL REQUIREMENTS | 28 |
| 1.1 GENERAL INTENTION | 28 |
| 1.2 STATEMENT OF CONTRACT LINE ITEM(S) | 30 |
| 1.3 CONTRACT SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR | 32 |
| 1.4 CONSTRUCTION SECURITY REQUIREMENTS | 32 |
| 1.5 OPERATIONS AND STORAGE AREAS | 35 |
| 1.6 ALTERATIONS | 41 |
| 1.7 DISPOSAL AND RETENTION | 43 |
| 1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS | 46 |
| 1.9 RESTORATION | 50 |
| 1.10 PHYSICAL DATA | 50 |
| 1.11 PROFESSIONAL SURVEYING SERVICES | 51 |
| 1.12 LAYOUT OF WORK | 51 |
| 1.13 AS-BUILT/RECORD DOCUMENTS | 53 |
| 1.14 USE OF ROADWAYS | 54 |
| 1.15 RESIDENT ENGINEER’S FIELD OFFICE (NOT USED) | 54 |
| 1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT (NOT USED) | 54 |
| 1.17 TEMPORARY USE OF EXISTING ELEVATORS (NOT USED) | 54 |
| 1.18 TEMPORARY USE OF NEW ELEVATORS (NOT USED) | 54 |
| 1.19 TEMPORARY TOILETS | 54 |
| 1.20 AVAILABILITY AND USE OF UTILITY SERVICES | 55 |
| 1.21 NEW TELEPHONE EQUIOPMENT (NOT USED) | 56 |
| 1.22 TESTS | 56 |
| 1.23 MANUALS, INSTRUCTIONS AND TRAINING | 56 |
| 1.24 GOVERNMENT-FURNISHED PROPERTY | 58 |
| 1.25 RELOCATED EQUIPMENT OR ITEMS | 59 |
| 1.26 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT (NOT USED) | 59 |
| 1.27 CONSTRUCTION SIGN | 59 |
| 1.28 SAFETY SIGN | 60 |
| 1.29 PHOTOGRAPHIC DOCUMENTATION | 60 |
| 1.30 FINAL EXTERIOR ELEVATION DIGITAL IMAGES (NOT USED) | 61 |
| 1.31 HISTORIC PRESERVATION | 61 |
| 1.32 BUILDING INFORMATION MODELING (BIM) AND COBIE | 62 |
| 1.33 MATERIAL SAFETY DATA SHEETS | 64 |
| 1.34 IDENTIFICATION MARKING | 64 |
| 1.35 CABLING INSTALLATIONS | 64 |
| 1.36 SEPARATE CONTRACT AWARDS | 64 |
| 1.37 PROJECT SCHEDULE | 65 |
| 1.38 SEASON CONSTRAINED WORK | 67 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 69 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 69 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 69 |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 69 |
| 2.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 70 |
| 2.5 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 71 |
| 2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 71 |
| 2.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (SEP 2018) | 71 |
| 2.8 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 72 |
| 2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 72 |
| 2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (SEP 2018) | 73 |
| REPRESENTATIONS AND CERTIFICATIONS | 74 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018) | 74 |
| 3.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) | 77 |
| 3.3 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015) | 79 |
| 3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 79 |
| 3.5 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018) | 81 |
| GENERAL CONDITIONS | 83 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 83 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 83 |
| 4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 84 |
| 4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 85 |
| 4.5 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000) | 85 |
| 4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) | 86 |
| 4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 86 |
| 4.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2016) ALTERNATE I (MAY 2014) | 87 |
| 4.9 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) | 92 |
| 4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS | 92 |
| 4.11 52.236-4 PHYSICAL DATA (APR 1984) | 93 |
| 4.12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 93 |
| 4.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014) | 96 |
| 4.14 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997) | 96 |
| 4.15 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 97 |
| 4.16 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 97 |
| 4.17 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 98 |
| 4.18 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 98 |
| 4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 99 |
| 4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002) | 100 |
| 4.21 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002) ALTERNATE I | 100 |
| 4.22 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002) | 101 |
| 4.23 VAAR 852.236-76 CORRESPONDENCE (APR 1984) | 101 |
| 4.24 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002) | 101 |
| 4.25 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984) | 101 |
| 4.26 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984) | 102 |
| 4.27 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984) | 102 |
| 4.28 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984) | 102 |
| 4.29 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008) | 103 |
| 4.30 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993) | 103 |
| 4.31 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002) | 103 |
| 4.32 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) ALTERNATE I (JAN 2008) | 105 |
| 4.33 VAAR 852.236-91 SPECIAL NOTES (JUL 2002) | 106 |
| 4.34 MANDATORY WRITTEN DISCLOSURES | 107 |
| 4.35 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 107 |
| SAMPLE RFI SUBMISSION FORM | 108 |
| WAGE GENERAL DECISION NUMBER MO180001 11/02/2018 MO1 | 109 |
A.3 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision) Page 1 of Page 1 of Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
(a) Solicitation materials consisting of drawings, specifications and contract forms may be downloaded by qualified General (Prime) Contractors interested in submitting proposals direct to the Department of Veterans Affairs. General (Prime) Contractors may provide these materials to subcontractors for their use in preparing sub bids for General (Prime) Contractors.
(b) One set of drawings and specifications may be downloaded by Builders Exchanges, Chambers of Commerce, Quantity Surveyors, trade and microfilming organizations.
(c) Subcontractors, material firms and others interested in preparing sub bids may, upon registration on the FedBizOpps website (at www.fbo.gov) obtain a list of organizations, such as Builders Exchanges, Chambers of Commerce, Contractors and others, who have registered as interested parties.
(d) If you decide not to bid on this project, please advise the issuing office of your reasons.
(e) A proposal guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000.00. Failure to furnish the required proposal guarantee in the proper form and amount, by the time set for receipt of proposals, will require rejection of the proposal in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then. Copies of SF 24 may be obtained upon application to the issuing office.
(f) If the contract will exceed $100,000 (see FAR 28.102-1 for lesser amount), the offeror to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SF 25 and SF 25A may be obtained upon application to the issuing office.
DESCRIPTION OF WORK: See specification 01 00 00 General Requirements and schedule for list and descriptions of contract line items.
Cost Range: Between $5,000,000.00 and $10,000,000.00
36C10F18R0688
Page 1 of Page 1 of
Page 1 of Page 1 of
SECTION 00 11 21 REQUEST FOR PROPOSAL TO BUILD
SECTION 00 11 21
REQUEST FOR PROPOSAL TO BUILD
EAST CAMPUS DEMOLITION & ROADWORK
PROJECT NO. 657-313J
VA MEDICAL CENTER JEFFERSON BARRACKS DIVISION
ST. LOUIS, MISSOURI
A. PART I - General
A. PART I - GENERAL
A1. Scope of Contract
| A1. | Scope of Contract |
| Provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary for construction of the project described herein and in the contract documents and other specific tasks as further defined by this Request For Proposal (RFP). Work is to be performed at the Jefferson Barracks Division Campus of the St Louis VA Medical Center located at 1 Jefferson Barracks Drive, St. Louis, Missouri 63125. The contract scope includes, but is not limited to abatement and removal and disposal of asbestos or other hazardous materials; demolition and removal of existing Buildings 4, 4T, 5, 7, 8, 48 and 49 and site improvements and features above and below ground; abandonment, removal and relocation of existing underground utilities; installation of new underground utilities, infrastructure, roadways, parking and pavement; earth and site work, including excavation, fill and disposal of surplus excavated earth or other material for construction of new campus utilities, parking, site improvements and other associated work such as lighting, pavement markings, signage, asbestos abatement for utilities or infrastructure tie-in connections, shoring and protection of existing construction to remain or as otherwise required for performance of the work; and other incidental related work. The Contractor shall provide a contractor Quality Control system; laboratory and field testing, inspections and systems testing; and unit pricing for unforeseen bulk rock removal and/or trench rock removal. The contract scope shall be executed in accordance with the drawings and specifications and other requirements of the contract documents. |
A2. Definitions A2. Definitions
A.
| 1. | Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer. |
| 2. | Project Manager: The Contracting Officer's representative responsible for administering contracts under the immediate direction of the Contracting Officer. |
| 3. | Resident Engineer (RE): The Contracting Officer's authorized representative at the construction site. When more than one Resident Engineer is assigned to a construction project one is designated as being incharge and is called the "Senior Resident Engineer". The Resident Engineer is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer. |
| 4. | Contract: This term, as used herein, refers to the contract to perform the construction of the project. |
| 5. | Contractor: This term, as used herein, refers to the successful Offeror (Contractor or Joint Venture) providing construction services under this contract. |
| 6. | Architect/Engineer (A/E): This term, as used herein, refers to the Architect/Engineer firm hired by the VA for the preparation of the contract drawings and specifications and to provide other technical assistance to the VA. |
| B. | Selection Procedure - During the review of offers the VA may ask for additional information. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. See FAR 52. 215-1, Instructions to Offerors - Competitive Acquisition (Jan 2004. |
| C. | Tentative Schedule: |
Request for proposal issued
12/13/2018
Pre-proposal conference
01/08/2019
Written Requests for Information before
01/10/2019
Proposal submitted
01/24/2019
Contract award
02/27/2019
Notice to proceed
3/15/19
Construction completion/final inspection/ custody receipt
_482_ calendar days from NTP
D. Schedule Objectives – Performance of the work required under the awarded contract shall be completed within 482 calendar days of issuance of the Notice to Proceed. The proposed schedule may not be shorter than this, see Part III, C3.A.3.a.4).
A3. Cost Range A3. Cost Range
The anticipated cost range for this project is between $5,000,000.00 and $10,000,000.00.
A4. Pre-Proposal Conference A4. Pre-Proposal Conference A pre-proposal conference will be held on Thursday 08 January 2019 at 10 a.m. CST in Building 48 on the Jefferson Barracks Division VA Medical Center Campus, 1 Jefferson Barracks Drive, St Louis, Missouri. All Offerors, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting:
| 1. | Open meeting; |
| 2. | Review of project; |
| 3. | Specifications, Network analysis system and project sequencing; |
| 4. | General Requirements, Solicitation Documents and Offer Submission Procedure; |
| 5. | Review of "Buy American Act"; |
| 6. | Questions and answers; |
| 7. | Close; and |
| 8. | Site walk through – attendance is optional. |
A5. Selection Criteria and Weightings
| A5. | Selection Criteria and Weightings | |
| A. | General: Proposals will be evaluated and award will be made based on both cost and technical considerations most advantageous to the Government as per FAR Part 15, Best Value – Tradeoff, as the Government may consider award to other than the lowest priced offeror or other than the highest technically rated offeror if it is in the best interest of the Government. OFFERORS ARE ADVISED THAT IN ACCORDANCE WITH FAR 15.306(a)(3) and FAR 52.215-1, THE GOVERNMENT INTENDS TO EVALUATE PROPOSALS AND MAKE AWARD WITHOUT DISCUSSIONS. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors. | |
| B. | Technical Evaluations - All technical factors (other than cost or price) when combined are approximately equal in importance to cost or price. Technical criteria and weightings are as follows: Project Personnel Experience is more important than Technical/Management Approach, which is more important than Corporate Project Experience, which is more important than Past Performance, which is more important than Schedule. Offerors are advised that proposals may be rated lower or considered unresponsive if any of the information requested in the technical proposal requirements listed in paragraph C.3 is not provided. Technical factors are listed below (Technical Proposal Requirements as well as the Basis of Evaluation for each can be found in Section III, paragraphs C3.A.1. thru C3.A.5.) | |
| Factor 1: Project Personnel Experience | ||
| Factor 2: Technical/Management Approach | ||
| Factor 3: Corporate Project Experience | ||
| Factor 4: Past Performance | ||
| Factor 5: Schedule |
C. Cost Proposal - Offerors are advised that if the technical proposals are essentially equal, award will be made based on the lowest cost. See Part III, paragraph C4. for cost proposal requirements and basis of evaluation.
B. PART II - RESPONSIBILITIES
B. PART II - RESPONSIBILITIES
B1. VA Team
| B1. | VA Team |
| A. | The VA Architect/Engineer (A/E) is the A/E of record hired by the VA to produce the contract drawings and specifications. The VA will retain the A/E Team for the remainder of the project’s development for construction period review, and monitoring purposes. The A/E Team that produced the RFP Documents is: |
| Architect & Landscape Architect: |
| Christner Inc. |
168 N. Meramec Avenue, Suite 400 St. Louis, MO 63105
| Civil Engineer: |
| Stock & Associates Consulting Engineers, Inc. |
257 Chesterfield Business Parkway Chesterfield, MO 63005
| Structural Engineer: |
| KPFF Consulting Engineers |
1630 Des Peres Road, Suite 100 St. Louis, MO 63131
| ME & Technology Engineer: |
| IMEG Corporation |
15 Sunnen Drive, Suite 104 St. Louis, MO 63143
| Asbestos Materials: |
| ALTEC Environmental Consulting LLC |
P.O. Box 17867 Shreveport, LA 71138
| Geotechnical: |
| Geotechnology, Inc. |
11816 Lackland Road, Suite 150 St. Louis, MO 63146
B. The VA Team is also comprised of VA Office of Facilities Management and others at VA Headquarters located in Washington, DC, a Resident Engineer (RE) who will be located at the construction site and VA Medical Center staff. The coordinator/manager of the VA Team will be the RE, who will have limited Contracting Officer Authority.
B2. Construction Team:
| B2. | Construction Team: |
| A. | The Construction Team includes the Contractor or all J/V partners, Subcontractors, and other entities who shall provide construction services for construction of the project. |
| B. | The RFP Documents are intended to define the contract requirements. It is the Construction Team’s responsibility to complete the construction in a manner consistent with the intent of the RFP Documents within the required time (contract length). |
C. PART III - PROPOSAL REQUIREMENTS
C. PART III - PROPOSAL REQUIREMENTS
C1. General
| C1. | General |
| A. | Proposals shall be based on solicitation documents issued for RFP Solicitation Number 36C10F18R0688. Proposals will be in the format stipulated elsewhere in this section. |
| B. | Proposals shall be received before 2:00 p.m. Central Standard Time (CST) on 24 January 2019. There will be no public opening of the proposals. |
| C. | Submit sealed offers to: |
| 1. | US Postal Service or Commercial Deliveries: |
Gerald Brusaw, Contracting Officer (003C4D) Office of Construction & Facilities Management Department of Veterans Affairs 1425 Tri State Parkway, Suite 140 Gurnee, IL 60031; OR
2. Hand Carry Only (office open Monday- Friday, 7:30 am to 4:30 PM CST), proposals shall be received by 2:00 p.m. Central Standard Time (CST) on 24 January 2019:
Gerald Brusaw, Contracting Officer Office of Construction & Facilities Management Department of Veterans Affairs 1425 Tri State Parkway, Suite 140 Gurnee, IL 60031
D. Technical and Cost sections of the Offeror’s proposals will be evaluated independently. Offeror shall separately bind each section. Each section shall be labeled with the Offeror's organization, business address, and VA Project Number. Offerors shall affix their names and return addresses on their envelope/packaging.
E. Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard Form 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair) shall be used for submitting price offers. Submit original and two (2) copies of Standard Form 1442 with a bid guarantee as stipulated in “Instructions, Conditions, and Notices to Offerors”:
| 1. | Offeror shall submit separate prices for any Bid Items indicated on the RFP Offer and award; |
| 2. | Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by number. |
C2. Proposal Revisions (FAR 52.215-1)
| C2. | Proposal Revisions (FAR 52.215-1) |
| A. | If determined to be necessary, proposal revisions will be requested from the proposals received. The Contracting Officer will identify those Offerors, whose proposals are within the competitive range, considering the selection criteria identified in this section. Negotiations may be conducted with those Offerors falling within the competitive range, after which proposal revisions will be requested. Those selected as within the competitive range will be given seven (7) calendar days to prepare their proposal revisions. Sealed proposal revisions will be submitted as per Part III.C1.C, above, except as noted below and will be due at a time and place to be determined. |
| B. | Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. Offerors shall provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents that clarifies where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed Standard Form 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair) that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions to Offeror’s price proposal are greater than Offeror’s initial price proposal. |
C3. Technical Proposal Requirements
| C3. | Technical Proposal Requirements |
| A. | The technical proposal shall be limited to not more than 80 double-sided, 8-1/2”x11” pages and shall address the factors listed, in order of importance, in Part I, A5. Pages beyond the stated limit will NOT be considered. Offeror is required to prepare and submit an original, five (5) copies (separately bound), and an electronic copy (on CD or DVD) of the technical proposal. Submission requirements and the basis of evaluation for each factor are provided in paragraphs C3.A.1 thru C3.A.5.b that follow. NOTE: Proposals that exceed stated minimum requirements for individual factors may be rated higher and similarly, proposals that fail to meet or address minimum requirements for individual factors may be rated lower or unacceptable (except as otherwise noted). The following chart may be used as a checklist to assist in making a complete proposal, and may be used as a table of contents for each bound copy of the technical proposal. |
| TECHNICAL PROPOSAL BINDER SUBMITTAL |
(One original and five copies)
RFP: _____________________
Project Title: East Campus Demolition & Roadway, JB Division, VAMC St Louis, MO
INTRO
PAGE
First Page MUST clearly indicate Name and Address of Offeror Business Arrangement (If Joint Venture or other teaming arrangement) Contact Name and Phone Number Email Address DUNS Number CAGE Code Tax Identification Number (Include description of all deviations from the RFP requirements contained within the offeror’s proposal)
| TAB 1 |
| Factor 1, Project Personnel Experience (with supporting documentation required by RFP) |
| TAB 2 |
| Factor 2, Technical Management Approach (with supporting documentation required by RFP) |
| TAB 3 |
| Factor 3, Corporate Project Experience (with supporting documentation required by RFP) |
| TAB 4 |
| Factor 4, Past Performance (with supporting documentation per RFP) |
| TAB 5 |
| Factor 5, Schedule (with supporting documentation per RFP) |
| TAB 6 |
| CD (or DVD) of Technical Proposal (Tabs 1-5 above) |
1. Factor 1 – Project Personnel Experience (Specialized experience and technical competence) :
(i) Submittal Requirements: The Offeror shall demonstrate the relevant experience & qualifications of key project personnel.
1) Supply biographical data for at least the following key personnel (Note if one individual is proposed for more than one position listed):
a) Overall Construction Project Manager.
b) Project Superintendent(s).
c) Site Safety and Health Manager(s)
d) Quality Assurance/Quality Control Manager(s).
e) Project Engineer(s).
f) Certified Industrial Hygienist(s)
2) Biographical data shall include the following:
a) Name of individual.
b) Company employed by.
c) Company position title.
d) Years with the company.
e) Describe work experience with projects that were building abatement and demolition and site improvements on active medical campuses (or similar campus environment) and the company (by name) they worked for when involved in the project.
f) An indication of which (if any) projects submitted under Corporate Project Experience the individual participated in and what the individual’s responsibility was for that project.
g) An indication of which other individuals submitted under Project Personnel Experience this individual has worked with and the project they worked on together, noting if that project has been submitted under Corporate Project Experience.
h) Position that the individual will hold on this contract/Construction Team, description of duties and what percentage of the individual’s time that would be committed to the project during the construction of the project.
i) Describe job related educational experience including degrees, certificates, etc. and granting institutions.
j) Information provided for this factor shall not conflict with other parts of the proposal and shall demonstrate a qualified team whose background, qualifications (including education, training, certifications, and/or licensure) and experience are commensurate with their proposed positions; who have experience with at least two (2) projects of similar size, scope, and complexity in the last 12 years; that have worked together successfully on past similar projects; and who are available to perform in their proposed positions for the duration of construction or the durations stated in the proposal.
(ii) Basis of Evaluation: This factor will be evaluated based on the offeror’s proposed key personnel and how well the information provided compares to the stated requirements and demonstrates the team’s potential to successfully perform.
2. Factor 2 - Technical/Management Approach:
a) Submittal Requirements: - The Offeror shall describe and/or demonstrate the following.
1) An effective Project Delivery Philosophy – Include statements that:
a) Describe offeror’s approach (including measures offeror has taken/will take) to avoid cost or schedule growth
b) Express offeror’s firm commitment to comply with requirement for written change proposals within 30 calendar days of request for all requested changes. Include any commitment to exceed this requirement in this section.
c) Express offeror’s expectations and commitments concerning elements for Successful Partnering, Communication, Commitment and Conflict Resolution.
| 2) | A Quality Assurance/Quality Control Plan(s) with sufficient detail to demonstrate effective controls and practices to ensure adherence to contract requirements and successful delivery of quality construction. |
| 3) | Project Organizational Chart and Narrative - Include team members submitted under Project Personnel Experience. Clearly describe the prime responsible firm (or firms if a J/V) and individuals as well as the roles and responsibilities of individuals proposed as subcontractors. Provide a list of all proposed major Subcontractors, including telephone number, address, and name of contact. (Note, identifying multiple “potential” subcontractors for each major trade, who may or may not end up part of the offeror’s team, will be considered ambiguous and will be evaluated as though the major subcontractor had not been identified, thus resulting in the technical proposal being rated lower). |
| 4) | Capability to perform: |
| a) | Provide the Offeror's total bonding capacity, current available bonding capacity and expected available capacity in 2018 and 2019. |
| b) | Provide the Offeror's current workload and availability of staff listed under Project Personnel Experience to execute the project. Include project schedules for current and pending projects, as well as the anticipated impact of this project on those schedules and staffing plans. |
| 5) | The Offeror shall describe in a written narrative the plan for controlling and sequencing the work to avoid or minimize adverse impact to the Medical Center or its environment from construction traffic, construction noise or vibration, construction activities (building demolition, site work, underground utilities, crane or equipment operations, etc.), utility outages, construction dust & debris, storm water runoff, waste storage, fire, etc. Narrative shall specifically address how the offeror will ensure the facility remains operational and address how the Offeror intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the facility within any specified time limits. |
| 6) | Offeror shall clarify its intended uses of the portions of the site indicated to be available to the Contractor elsewhere in the RFP Documents for materials staging, temporary trailer offices, employee parking, and other activities. |
7) The offeror shall identify which elements of the work it intends to self-perform including percentage of total value that work represents.
b) Basis of Evaluation: This factor will be evaluated based on the how well the offer’s technical/management approach demonstrates capability, availability, and capacity to successfully perform including measures to avoid cost or schedule growth, how well defined the proposed prime/subcontractor team is and how well its organizational structure, controls, lines of authority, planned subcontractors, quality controls and practices, and plans for execution and site use suggest a successful project outcome; & whether the offeror meets the minimum required self-performance.
3. Factor 3 - Corporate Project Experience:
a) Submittal Requirements: The Offeror shall demonstrate, utilizing the General Contractor Reference form at the end of this specification section, the following, relevant to corporate project experience. Scoring will be more favorable if all information is provided and demonstrates relevant project, safety, and environmental experience.
1) A maximum of four (4) example projects completed within the last ten (10) years, similar in size (physical), scope (building abatement, demolition, and site improvements on an active campus), and complexity (multiple elements of construction including hazardous material abatement, building demolition, site work, underground utilities and infrastructure, sidewalks, paving, landscaping, plumbing, electrical, low voltage communication systems, work near occupied buildings, and strict requirements for site access, security, utility outages & cutovers, coordination with public & private utility companies, etc.) to this project. In describing project construction experience, provide the following information:
a) Project title, location and brief description including: project type (building demolition, roadway construction, buried utility construction, etc.) and contracting method (design/bid/construct, CM at risk, etc.).
b) Project owner and name and telephone number of owner’s contact person.
c) Project Design Architect and Engineers and name and telephone number of contact person(s).
d) Name and number of contact person(s) of Major Subcontractors if also proposed for this solicitation.
e) Project Statistics including start and completion dates (original vs. actual) for construction; cost (original award price versus final, with brief explanation of what is included in the cost including any cost and/or schedule growth); building abatement, building demolition, utilities and infrastructure, landscaping, etc. and any awards (prizes) received.
f) Provide the required information utilizing the General Contractor Reference Form included at the end of this specification section.
2) All OSHA and EPA reports for last three years
3) Experience modifier rate (EMR) for last three years.
4. Factor 4 - Past Performance:
a. Submittal Requirements: The offeror shall demonstrate performance on relevant past projects by providing complete General Contractor Reference forms for each example project (under Corporate Project Experience), with accurate point of contact information. In addition to considering all other information available to the Government on the Offeror’s past performance, the evaluation panel will evaluate the information supplied by the offeror on these forms, in response to this solicitation, including contacting the owner’s point of contact supplied for projects submitted under Corporate Project Experience to determine:
1. Presence and character of any cost growth
2. Presence and character of any schedule growth
3. Client overall satisfaction with project: Contact persons will be asked:
a. Does the project fulfill the requirements of the client’s stated function?
b. Does the project require unexpected maintenance activity?
c. Have latent defects been found?
d. Was the construction staffing level consistent with the project size and complexity?
e. How well did the contractor plan and coordinate work to avoid disruption to client’s operations?
f. Was communication of schedule and problem issues adequate and consistent?
g. Was there an established problem solving routine?
h. Was the project completed on time and within the project budget?
i. Would the client like to use this firm again?
b. Basis of Evaluation: This factor will be evaluated based on past performance including evaluation of example project statistics (for cost and schedule growth) and client satisfaction. Evaluation will also include past performance evaluations obtained from the Contractor Performance Appraisal System (CPARS) via the Past Performance Information Retrieval System (PPIRS) along with any data obtained on projects in progress for VA or other agencies.
a) Proposals that indicate Offeror has no relevant project experience will be held neutral for the past performance factor (although proposal may be rated lower for Construction Management – Corporate Project Experience).
5. Factor 5 - Schedule:
a. Submittal Requirements: The offeror shall provide information on his proposed plan for executing the work in the time allocated for the contract. Proposal shall:
1. Identify name, address, phone number of proposed schedule consultant, if any (include resume for individual who will prepare all schedule submissions).
2. Provide proposed schedule in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items will show a start date and a completion date. The detailed schedule will indicate specific tasks with dates for each step of the process including:
a. Construction Period: Mobilization; submission, review, and approval of key submittals and notices; abatement and testing activities; demolition method and sequencing; excavation, removal, and disposal of buried construction; procurement and installation of equipment; provisions for overtime or shift work; utility interruption notices and associated outage durations; excavation, installation, testing, and backfill for site utilities; backfill and grading; parking, paving, sidewalk, and roadway completion and realignment including temporary re-routed Medical Center vehicular and pedestrian routes; testing; preliminary and final inspection(s); punch list completion; closeout submittals. Show relationships between these activities and durations.
3. Provide a narrative to explain the proposed general project delivery schedule. The Offeror shall specify:
a. How much allowance has been made for bad weather in the schedule
b. The days of the week and the hours of construction operations during each sequence of the work
c. The percentage of contract completion that will be achieved at the end of each month of the contract.
4. Short Schedules - Short schedules will not be accepted and will be evaluated unfavorably. Critical path activity durations shall total the number of days indicated on Standard Form 1442, Construction, Offer and Award (Construction, Alteration or Repair), and in section I, paragraph A.2.C. and D. This duration shall establish the contract completion date (see preceding paragraph C3.A.5.a.3)d) for definition of “completion” as it relates to duration) and assessment of liquidated damages (see FAR 52.211-12 Liquidated Damages – Construction, Sept 2000).
b. Basis of Evaluation: This factor will be evaluated based on how reasonably and realistically the proposed schedule captures and addresses key elements and project phasing with respect to conditions and requirements indicated in the RFP and how effectively it demonstrates a successful approach to completing all the work of the contract in the time allotted for performance.
C4. Price Proposal Requirements.
C4. Price Proposal…