- Repair and Leveling of 3rd floor warehouse
- Solicitation number
- 36C10E18Q0135
About this file
36C10E18Q0135 Final SOW - Warehouse Floor Leveling.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| -13829.docx | DOCX document | |
| 36C10E18Q0135-00001001.pdf | ||
| 36C10E18Q0135-00001000.docx | DOCX document | |
| 36C10E18Q0135-00001002.pdf | ||
| 36C10E18Q0135-007.docx | DOCX document | |
| 36C10E18Q0135-012.pdf | ||
| 36C10E18Q0135-009.pdf | ||
| 36C10E18Q0135-011.pdf | ||
| 36C10E18Q0135-010.xlsx | XLSX spreadsheet | |
| 36C10E18Q0135-006.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
LEVELING OF FLOOR IN BLDG. 47
3/20/2018
1 Goal
1.1 Background
1.2 Scope
2 General Requirements
2.2 Business Relations
2.3 Contract Administration and Management
2.4 Subcontract Management
2.5 Location and Hours of Work
2.6 Travel / Temporary Duty (TDY)
3 Special Requirements
3.1 Security
3.2 Safety
3.2.2 Mishaps
3.3 Government Furnished Materials
3.4 Environmental Requirements
3.5 Applicable Directives
4 Related Documents
5 Drawing - Building 47 Third Floor Drawing
6 Specification - Cementitious Self Leveling Underlayment
7 Specification - Moisture Remediation Coating
Statement of Work (SOW)
Leveling the 3rd Floor Bldg. 47
1 Goal The goal of the St Petersburg Regional Office is to repair the damage to the floor caused by the excessive weight of the former Mobile File System utilized on the third floor in Building 47.
1.1 Background
The Department of Veterans Affairs has a requirement for the repair of the floor located on the third floor in Building 47 on the VA Regional Office grounds. The concrete floor has a multitude of cracks in it due to its prior use as a file storage facility. There was a previously used mobile files system installed that weighed in excess of 275,000 lbs in addition to the weight of the files.
1.2 Scope
The contractor shall first seal the floor using a thin coat of epoxy sealant to prevent water from leaking to the floor below. The contractor shall utilize a minimum of (1”) floor leveling compound to level the floor to a grade 2 standard in accordance with the VA specifications found in sections 6 and 7 below. The contractor shall level the entire floor area in order to have a smooth surface. The finished floor shall be in a suitable condition to accept new flooring. Contractor shall remove existing cove base and purchase and install new 6” cove base to match existing color.
2 General Requirements Contractor shall fill all holes and cracks in the floor with thin coat of epoxy sealant on the entire 14,500 sq. ft. of floor area. Once all the holes and cracks have been sealed the contractor shall apply floor leveling compound on the floor to a one inch (1”) thickness.
This work will be accomplished during normal business hours as it does not interfere with the operations of the facility. Negative air equipment shall be vented out of the area in order to contain any dust and reduce smells. The result of this work will allow the floor to be returned to a level surface prepared to accept any type of flooring the facility chooses to install. All areas of work must be cleaned and secured prior to the start of the following workday.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (CO) immediately.
2.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors.
The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer (CO) or Contracting Officer Representative (COR).
2.5 Location and Hours of Work
Accomplishment of the results contained in this SOW requires work at the St Petersburg VA Regional Office, 9500 Bay Pines Blvd., St Petersburg, FL 33708. Normal workdays will be Monday through Friday except US Federal Holidays from 6:00 AM until 6:00 PM.
The contractor may work on Saturday and/or Sunday's with prior coordination with the Contracting Officer Representative (COR). .
2.6 Travel / Temporary Duty (TDY)
Travel will not be paid by the government.
3 Special Requirements This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
3.1 Security
It is therefore essential that a VA Form 20-0334 must be completed by the Contractor, contractor employees, and sub-contractors and original copies turned in to the COR prior beginning construction The Contractor is required to enter and exit the St Petersburg VARO through the front entrance. Entering or exiting the building through any other door will require VARO approval and an escort will be required. Upon entering the building the contractor and/or contractor employees will be required to show proof of identity (must have a valid photo ID) as well as pass through a security screening. Due to the sensitivity and personal information processed at the VARO the Contractor as well as the Contractors employees will be required to complete VA Privacy training, Information Security Awareness and Rules of Behavior training.
Certification of completion of training will be submitted to the COR within 10 working days from the contract award date. In addition, a VA Form 20-0334 must be completed by the Contractor, contractor employees, and sub-contractors and original copies turned in to the COR prior beginning construction
3.2 Safety
Equipment - The Contractor shall provide all safety equipment/devices, MSDS, personal protective equipment and clothing as required for its employees. Copies of all MSDS shall be provided to the COR.
OSHA - Prior to commencing work the Contractor shall provide proof that an OSHA designated "competent person (CP)(29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are not present. The Contractor’s on-site supervisor will have completed no less than 30 hours of OSHA approved safety training. All other Contractor employees will have no less than 10 hours of OSHA approved safety training.
Safety Plan - Contractor will provide a site specific safety plan.
Compliance - The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees.
3.2.2 Mishaps
Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the cognizant contracting officer, the contracting officers’ representative, and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety office. Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant contracting officer, the contracting officer’s representative, and/or the cognizant program manager, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.
3.3 Government Furnished Materials
The government shall provide at no cost parking space, use of restrooms, use of elevators, use of canteen and retail store, and access to the VARO loading docks as necessary.
3.4 Environmental Requirements
Non-Hazardous waste disposal
Demolition - The Construction Contractor shall provide all demolition, removal and legal disposal of materials. The Construction Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by local, state, federal regulations.
Disposal vendors - The Whole Building Design Guide website http://www.wbdg.org provides a Construction Waste Management Database that contains information on companies that haul, collect, and process recyclable debris from construction projects.
3.5 Applicable Directives
The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non-mandatory is the contractors' option.
Mandatory compliance (list) http://www.wbdg.org/
29 CFR 1926.20
4 Related Documents The following Documents are related to this project
Florida Building Codes - https://floridabuilding.org/c/default.aspx
VHA Directive 7715, Safety and Health During Construction -https://www.va.gov/vhapublications/publications.cfm?pub=1
29 CFR 1926.20 - Application of the multi-employer policy to particular installation standards.
Found at:
https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p _id=10606 The contractor shall
VA Master Construction Specifications
Found at:
https://www.cfm.va.gov/til/spec.asp#09 https://floridabuilding.org/c/default.aspx https://www.va.gov/vhapublications/publications.cfm?pub=1 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10606 https://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10606 https://www.cfm.va.gov/til/spec.asp#09
5 Drawing - Building 47 Third Floor
6 Specification - Cementitious Self Leveling Underlayment
A. System Descriptions:
1. High performance self-leveling underlayment resurfacer. Single component, self-leveling, cementitious material designed for easy application as an underlayment for all types of flooring materials. It is used for substrate repair and leveling.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up. Gypsum-based products are unacceptable.
C. System Characteristics:
1. Wearing Surface: smooth
2. Thickness: Per architectural drawings, ranging from feathered edge to 1”, per application. Applications greater than 1” require additional 3/8” aggregate to mix or as recommended by manufacturer.
D. Underlayment shall be calcium aluminate cement-based, containing Portland cement. Gypsum-based products are unacceptable.
E. Compressive Strength: Minimum 4100 psi in 28 days in accordance with ASTM C109/C109M.
F. Flexural Strength: Minimum 1000 psi in 28 days in accordance with ASTM C348
G. Dry Time: Underlayment shall receive the application of //moisture insensitive tile in 6 hours, // floor coverings in 16 hours, // and resinous flooring in 3-7 days. //
H. Primer: compatible and as recommended by manufacturer for use over intended substrate
I. System Components: Manufacturer's standard components that are compatible with each other and as follows:
1. Primer:
a. Resin: copolymer
b. Formulation Description: single component ready to use.
c. Application Method: Squeegee and medium nap roller.
All puddles shall be removed, and material shall be allowed to dry, 1-2 hours at 70F/21C.
d. Number of Coats: (1) one.
2. Grout Resurfacing Base:
a. Formulation Description: Single component, cementitious self-leveling high-early and high-ultimate strength grout.
b. Application Method: colloidal mix pump, cam rake, spike roll.
1) Thickness of Coats: Per architectural scope, 1” lifts.
2) Number of Coats: More than one if needed.
c. Aggregates: for applications greater than 1inch, require additional 3/8” aggregate to mix.
7 Specification - Moisture Remediation Coating
A. System Descriptions:
1. High-solids, epoxy system designed to suppress excess moisture in concrete prior to an overlayment. For use under resinous products, VCT, tile and carpet where issues caused by moisture vapor are a concern.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up.
C. System Components: Verify specific requirements as systems vary by manufacturer. Verify build up layers and installation method. Verify compatibility with substrate. Use manufacturer’s standard components, compatible with each other and as follows:
1. Liquid applied coating:
a. Resin: epoxy.
b. Formulation Description: Multiple component high solids.
c. Application: Per manufacturer’s written installation requirements.
d. Thickness: minimum 10 mils
D. Material Vapor Permeance: Application shall achieve a permeance rating of less than 0.1 perm in accordance with ASTM E96/E96M.
E. Maximum RH requirement: 100% testing in accordance with ASTM F2170.
Property Test Value
Tensile Strength
ASTM D638 4,400 psi
Volatile Organic Compound
Limits (V.O.C.)
SCAMD Rule 1113 25 grams per liter
Permeance ASTM E96 0.1 perms
Tensile Modulus ASTM D638 1.9X105 psi
Percent Elongation ASTM D638 12%
Cure Rate Per manufacture’s Data
4 hours Tack free with 24hr recoat window
| 1 Goal |
| 1.1 Background |
| 1.2 Scope |
| 2 General Requirements |
| 2.2 Business Relations |
| 2.3 Contract Administration and Management |
| 2.4 Subcontract Management |
| 2.5 Location and Hours of Work |
| 2.6 Travel / Temporary Duty (TDY) |
| 3 Special Requirements |
| 3.1 Security |
| 3.2 Safety |
| 3.2.2 Mishaps |
| Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resul... |
| 3.3 Government Furnished Materials |
| 3.4 Environmental Requirements |
| 3.5 Applicable Directives |
| 4 Related Documents |
| 5 Drawing - Building 47 Third Floor |