RFQ 36C10B26Q0213_FINAL.docx
DOCX document 383 KB Posted
- Attached to
- DA10--National Teleradiology Program Picture Archive and Communication System Upgrade (VA-26-00042676)
- Solicitation number
- 36C10B26Q0213
About this file
This is a Request for Quote (RFQ) for a National Teleradiology Program (NTP) Picture Archive and Communication System (PACS) upgrade to be performed by the Department of Veterans Affairs Technology Acquisition Center. The solicitation number is 36C10B26Q0213, issued on March 10, 2026, with offers due March 17, 2026 at 12:00 PM EST. The acquisition is unrestricted and not set aside for small business. The intended sole source award is to Intelerad Medical Systems, Inc., located at 800 Boulevard De Maisonneuve East, 12th Floor, Montreal, Quebec H2L 4L8, Canada. The contract will be firm fixed price with an 18-month base period of performance from the date of award and includes one optional 12-month extension period. The NAICS code is 541511 with a size standard of $34 million, and the Product Service Code is DA10 (IT and Telecom-Business Application/Application Development Software as a Service).
The RFQ encompasses three primary contract line items: Project Management (CLIN 0001) covering all labor and deliverables for project management in accordance with the Performance Work Statement; NTP PACS Upgrade (CLIN 0002) requiring upgrades from IntelePACS version 4.9 to version 5.7 or current version with migration of all NTP-specific applications, invoiced upon successful completion of progressive milestones including server installation (20%), DICOM interface activation (15%), HL7 interface activation (15%), custom workflow tools deployment (20%), VA Authority to Operate acquisition (20%), and legacy PACS report import (10%); and Upgraded IntelePACS Service and Support (CLIN 0003) providing ongoing system maintenance and technical support with 99.9% uptime performance guarantee. Invoices are submitted upon receipt and acceptance of deliverables. The contracting officer is Kathryn Pantages (Kathryn.pantages@va.gov, 848-377-5039) and the contract specialist is Sean McAvoy (sean.McAvoy@va.gov, 848-377-5094).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B26Q0213 0001.docx | DOCX document | |
| JA - NTP PACS Upgrade_Final_Redacted.pdf | ||
| AMD 0001_RFQ 36C10B26Q0213.docx | DOCX document | |
| 36C10B26Q0213.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10B26Q0213
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD: $34M
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
03-10-2026 Sean McAvoy – Contract Specialist 848-377-5094 03-17-2026
12PM
EST
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
X
541511
N/A
See Section B.
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724 L4267
LES SYSTEMES MEDICAUX INTELERAD INCORPOREE
INTELERAD MEDICAL SYSTEMS
800 BOUL. DE MAISONNEUVE E 12TH FLOOR
MONTREAL, QUEBEC H2L 4L8
Department of Veterans Affairs
Financial Services Center PO Box 149971 Austin, TX 78714-8971
National Teleradiology Program (NTP) Picture Archive and Communication System (PACS) Upgrade
Period of Performance: 18 months from date of award, with one (1) 12-month option period.
The resultant contract will be Firm Fixed Price.
Points of Contact:
Sean McAvoy, Contract Specialist sean.mcAvoy@va.gov 848-377-5094
Kathryn Pantages, Contracting Officer
Kathryn.pantages@va.gov 848-377-5039
Kathryn Pantages Contracting Officer
Table of Contents
| SECTION B – CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 GOVERNING LAW CLAUSE | 4 |
| B.3 SOFTWARE LICENSE, MAINTENANCE, AND TECHNICAL SUPPORT | 5 |
| B.4 PRICE SCHEDULE | 7 |
| B.5 PERFORMANCE WORK STATEMENT | 16 |
| SECTION C - CONTRACT CLAUSES | 66 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 66 |
| C.2 FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2025) | 68 |
| C.3 52.217-7 OPTION FOR INCREASED QUANTITY-SEPERATELY PRICED LINE ITEM (MAR 1989) | 73 |
| C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 73 |
| C.5 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) | 73 |
| C.6 52.240-93 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2025) (DEVIATION) | 84 |
| C.7 VAAR 852.204-71 INFORMATION AND INFORMATION SYSTEMS SECURITY (FEB 2023) | 86 |
| C.8 VAAR 852.211-76 LIQUIDATED DAMAGES – REIMBURSEMENT FOR DATA BREACH COSTS (FEB 2023) | 96 |
| C.9 VAAR 852.239-76 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY (FEB 2023) | 97 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 98 |
| SECTION E - SOLICITATION PROVISIONS | 99 |
| E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 99 |
| E.2 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (AUG 2020) | 99 |
| E.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025) | 102 |
| E.4 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016) | 103 |
| E.5 52.216-1 TYPE OF CONTRACT (NOV 2025) | 104 |
| E.6 52.233-2 SERVICE OF PROTEST (NOV 2025) | 104 |
| E.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) | 104 |
| E.8 BASIS FOR AWARD AND PROPOSAL SUBMISSION INSTRUCTIONS | 109 |
SECTION B – CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
| a. CONTRACTOR: | Les Systemes Medicaux Inc. | |
| Intelerad Medical Systems, Inc. | ||
| 800 Boul De Maisonneuve E 12th Floor | ||
| Montreal, Quebec H2L 4L8, Canada |
b. GOVERNMENT: Contracting Officer 36C10B, Kathryn Pantages/Kathryn.pantages@va.gov
| Department of Veterans Affairs | |
| Technology Acquisition Center | |
| 23 Christopher Way | |
| Eatontown NJ 07724 |
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Upon receipt and acceptance of deliverables IAW Section B Price Schedule. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
5. ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 GOVERNING LAW CLAUSE
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. § 3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), Source Code Harmonization and Reuse in Information Technology Act “SHARE IT Act” (P.L. 118-187), and FAR clauses 52.212-4 and 52.227-14 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this clause shall prevail. The Contractor shall deliver to the Government all data first produced under this Contract/Order with unlimited rights as defined by FAR 52.227-14, this includes any custom code developed for the purpose of performing under this contract. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ) in accordance with 28 U.S.C. § 516; at the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by modification (Standard Form 30) and shall only be made by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
B.3 SOFTWARE LICENSE, MAINTENANCE, AND TECHNICAL SUPPORT
(1). Definitions.
a) Licensee. The term “licensee” shall mean the U.S. Department of Veterans Affairs (“VA”) and is synonymous with “Government.”
b) Licensor. The term “licensor” shall mean the Contractor having the necessary license or ownership rights to deliver license, software maintenance and support of the computer software being acquired. The term “Contractor” is the party identified in Block 17a on the SF1449. If the Contractor is a reseller and not the Licensor, the Contractor remains responsible for performance under this Contract/Order.
c) Software. The term “software” shall mean the licensed computer software product(s) cited in the Schedule of Supplies/Services.
d) Maintenance. The term “maintenance” is the process of enhancing and optimizing software, as well as remedying defects. It shall include all new fixes, patches, releases, updates, versions and upgrades, as further defined below.
e) Technical Support. The term “technical support” refers to the range of services providing assistance for the software via the telephone, email, a website or otherwise.
f) Release or Update. The term “release” or “update” are terms that refer to a revision of software that contains defect corrections, minor enhancements, or improvements of the software’s functionality. This is usually designated by a change in the number to the right of the decimal point (e.g., from Version 5.3 to 5.4). An example of an update is the addition of new hardware.
g) Version or Upgrade. The term “version” or “upgrade” are terms that refer to a revision of software that contains new or improved functionality. This is usually designated by a change in the number to the left of the decimal point (e.g., from Version 5.4 to 6).
(2). Software License.
a) Unless otherwise stated in the Schedule of Supplies/Services, the Performance Work Statement or Product Description, the software license provided to the Government is a perpetual, nonexclusive license to use the software.
b) The Government may use the software in a networked environment.
c) Any dispute regarding the license grant or usage limitations shall be resolved in accordance with the Disputes Clause incorporated in FAR 52.212-4(d).
d) All limitations of software usage are expressly stated in the Schedule of Supplies/Services and the Performance Work Statement/Product Description.
(3). Software Maintenance and/or Technical Support.
a) If the Government desires to continue software maintenance and support beyond the period of performance identified in this Contract/Order, the Government will issue a separate contract or order for maintenance and support. Conversely, if a contract or order for continuing software maintenance and technical support is not received, the Contractor is neither authorized nor permitted to renew any of the previously furnished services.
b) The Contractor shall provide software support services, which includes periodic updates, enhancements and corrections to the software, and reasonable technical support, all of which are customarily provided by the Contractor to its commercial customers to cause the software to perform according to its specifications, documentation or demonstrated claims.
c) Any telephone support provided by Contractor shall be at no additional cost.
d) The Contractor shall provide all maintenance services in a timely manner in accordance with the Contractor’s customary practice or as defined in the Performance Work Statement or Product Description. However, prolonged delay (exceeding two business days) in resolving software problems will be noted in the Government’s various past performance records on the Contractor (e.g., www.cpars.gov).
e) If the Government allows the maintenance and support to lapse and subsequently wishes to reinstate it, any reinstatement fee charged shall not exceed the amounts that would have been charged if the Government had not allowed the subscription to lapse.
(4). Disabling Software Code.
The Government requires delivery of computer software that does not contain any code that will, upon the occurrence or the nonoccurrence of any event, disable the software. Such code includes but is not limited to a computer virus, restrictive key, node lock, time-out, or other function, whether implemented by electronic, mechanical, or other means, which limits or hinders the use or access to any computer software based on residency on a specific hardware configuration, frequency of duration of use, or other limiting criteria. If any such disabling code is present, the Contractor agrees to indemnify the Government for all damages suffered as a result of a disabling caused by such code, and the contractor agrees to remove such code upon the Government’s request at no extra cost to the Government. Inability of the Contractor to remove the disabling software code will be considered an inexcusable delay and a material breach of contract, and the Government may exercise its right to terminate for cause. In addition, the Government is permitted to remove the code as it deems appropriate and charge the Contractor for consideration for the time and effort expended in removing the code.
(5). Manuals and Publications.
Upon Government request, the Contractor shall furnish the most current version of the user manual and publications for all products/services provided under this Contract/Order at no cost.
B.4 PRICE SCHEDULE
All days referenced below shall be considered calendar days, unless otherwise noted. All items are Inspection/Acceptance/FOB Destination.
Any resulting contract will be awarded on a firm-fixed-price basis as defined by Federal Acquisition Regulation Subpart 16.202. Accordingly, the Contractor shall ensure that any and all costs associated with the Contractor’s proposed application(s), software products, software solution, and/or system, shall be included in the Contractor’s proposed firm-fixed price, and shall serve as the Contractor’s firm-fixed price for the life of any resulting contract. No additional costs or fees relative to the Contractor’s proposed application(s), software products, software solution, and/or system including, but not limited to, licensing costs and any associated licensing maintenance required for the development, delivery, integration, operation, and/or maintenance of the Contractor’s proposed solution will be allowed, accepted, and/or paid by the Government.
Base Period
The Base Period of Performance (PoP) shall be 18 months from date of award.
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
Project Management Project Management in accordance with (IAW) the Performance Work Statement (PWS) paragraph 5.1, inclusive of all subparagraphs.
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all travel, labor and deliverables required for the successful completion of services detailed in PWS paragraph 5.1, inclusive of all subparagraphs.
Product and Service Code (PSC): DA10 - IT and Telecom—Business Application/Application Development Software as a Service
The price of this CLIN shall be allocated to CLIN 0002 and CLIN 0003.
Period of Performance: 18 months
MO
NSP
NSP
| 0001AA |
| Contractor Project Management Plan IAW PWS paragraph 5.1.1 |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AB |
| Monthly Progress Report IAW PWS Paragraph 5.1.2 |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AC |
| Contractor Staff Roster IAW PWS Paragraph 6.2.2 |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
LO
NSP
NSP
| 0002 |
| NTP PACS Upgrade |
NTP PACS Upgrade IAW PWS paragraph 5.2 and 5.3, inclusive of all subparagraphs.
This FFP CLIN includes all travel, labor, materials, and deliverables required for the successful completion of the requirements detailed in PWS paragraphs 5.2 and 5.3, inclusive of all subparagraphs.
PSC: DA10
Invoices may be submitted upon successful completion of the tasks IAW with the following:
| Project Components |
| Progress Payment |
| Installation and configuration of VAEC servers, storage, and software |
| 20% |
| Activation, testing, and validation of all DICOM interfaces |
| 15% |
| Activation, testing, and validation of all HL7 interfaces |
| 15% |
| Design, implementation, and deployment of NTP custom workflow tools equivalent to or better than existing |
| 20% |
| Obtain VA Authority to Operate (ATO) for core PACS and Enterprise Risk Analysis (ERA) for workstations, to include ongoing updates, serving in the role of System Steward/Control Owner |
| 20% |
| Import of all reports from legacy PACS to upgraded PACS |
| 10% |
Government approval of invoices for payment shall be subject to successful completion of task requirements and associated deliverables required by the PWS.
Period of Performance: up to 6 months
| 1 |
| LO |
| $ |
| $ |
| 0002AA |
| Identified Applications Report IAW PWS paragraph 5.2. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AB |
| Overall Project Plan IAW PWS paragraph 5.2. |
Due 14 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AC |
| VAEC Solution Design IAW PWS paragraph 5.2. |
Due 14 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AD |
| VAEC Implementation Plan IAW PWS paragraph 5.2. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AE |
| VA Directive 6550 Appendix A IAW PWS paragraph 5.3. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AF |
| Manufacturer Disclosure Statement for Medical Device Security IAW PWS paragraph 5.3. |
Due 14 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AG |
| Software Bill of Materials IAW PWS paragraph 5.3. |
Due 14 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AH |
| Software and Hardware Inventory IAW PWS paragraph 5.3. |
Due 14 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AI |
| Ports, Protocols, Services Listing IAW PWS paragraph 5.3. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AJ |
| System Architecture IAW PWS paragraph 5.3. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AK |
| System Security Plan IAW PWS paragraph 5.3. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0002AL |
| Additional ATO artifacts per Assessment and Authorization requirements IAW PWS paragraph 5.3. |
Due 30 days after award of the contract and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
Upgraded IntelePACS Service and Support IntelePACS service and support IAW PWS paragraph 5.4, inclusive of all subparagraphs.
This FFP CLIN includes all travel, labor, materials, project management and deliverables required for the successful completion of the requirements detailed in PWS.
PSC: DA10
*The unit price shall equal the monthly unit price for uptime performance of 99.9% and above.
IAW PWS paragraph 5.4.3, please complete the chart below with your proposal to include discounted monthly pricing in the event of system uptime lower than 99.9%:
| Uptime Performance |
| Discount |
| Total |
| 99.9%< = * |
| 0% |
| *$ |
| 99.8%<x<99.9% |
| 10% |
| $ |
| 99.6%<x<99.8% |
| 20% |
| $ |
| 99.4%<x<99.6% |
| 30% |
| $ |
| 99.0%<x<99.4% |
| 40% |
| $ |
| Less than 99.0% |
| 50% |
| $ |
The Contractor shall invoice monthly based on the number of exams complete in the preceding month. Government approval of invoices for payment shall be subject to successful completion of task requirements and associated deliverables required by the PWS.
Period of Performance: Up to 18 months. The PoP shall begin upon successful completion of NTP PACS Upgrade (CLIN 0002)
| Not to Exceed (NTE) 1,500,000 |
| EA |
| *$ |
| NTE |
| 0003AA |
| Monthly Resource Utilization Optimization Plan IAW PWS paragraph 5.4.2. |
Due 30 days after go-live and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0003AC |
| Monthly Outage Report and Adjusted Billing IAW PWS paragraph 5.4.2. |
Due 30 days after go-live and updated monthly thereafter throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
| Base Period Total |
| $ |
Option Period One This 12-month option may be exercised in accordance with FAR 52.217-9, Option to Extend the Term on the Contract. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, Option Period One shall begin immediately after expiration of the Base Period.
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 1001 |
| Project Management |
Project Management in accordance with (IAW) the Performance Work Statement (PWS) paragraph 5.1, inclusive of all subparagraphs.
This Firm-Fixed Price (FFP) Contract Line Item Number (CLIN) includes all travel, labor and deliverables required for the successful completion of services detailed in PWS paragraph 5.1, inclusive of all subparagraphs.
PSC: DA10
The price of this CLIN shall be allocated to CLIN 1002.
Period of Performance: 12 months
| 12 |
| MO |
| NSP |
| NSP |
| 1001AA |
| Contractor Project Management Plan IAW PWS paragraph 5.1.1 |
Due monthly throughout the PoP.
NSP
NSP
| 1001AB |
| Monthly Progress Report IAW PWS Paragraph 5.1.2 |
NSP
NSP
| 1001AC |
| Contractor Staff Roster IAW PWS Paragraph 6.2.2 |
NSP
NSP
| 1002 |
| Upgraded IntelePACS Service and Support - Continued System Support |
IntelePACS service and support IAW PWS paragraph 5.5, inclusive of all subparagraphs.
This FFP CLIN includes all travel, labor, materials, project management and deliverables required for the successful completion of the requirements detailed in PWS.
PSC: DA10
*The unit price shall equal the monthly unit price for uptime performance of 99.9% and above.
IAW PWS paragraph 5.4.3 please complete the chart below with your proposal to include discounted monthly pricing in the event of system uptime lower than 99.9%:
| Uptime Performance |
| Discount |
| Total |
| 99.9%< = * |
| 0% |
| *$ |
| 99.8%<x<99.9% |
| 10% |
| $ |
| 99.6%<x<99.8% |
| 20% |
| $ |
| 99.4%<x<99.6% |
| 30% |
| $ |
| 99.0%<x<99.4% |
| 40% |
| $ |
| Less than 99.0% |
| 50% |
| $ |
The Contractor shall invoice monthly based on the number of exams complete in the preceding month. Government approval of invoices for payment shall be subject to successful completion of task requirements and associated deliverables required by the PWS.
Period of Performance: 12 months
| Not to Exceed (NTE) 1,500,000 |
| EA |
| *$ |
| NTE |
| 1002AA |
| Monthly Resource Utilization Optimization Plan IAW PWS paragraph 5.4.2. |
Due 30 days after Option Period is exercised and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 1002AB |
| Monthly Outage Report and Adjusted Billing IAW PWS paragraph 5.4.2. |
Due 30 days after Option Period is exercised and updated monthly thereafter throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
Option Period One Total
Optional Task
This Optional Task may be exercised at any time and from time to time during the base period of performance up to the maximum number of months specified in the CLIN in accordance with FAR 52.217-7, Option for Increased Quantity-Separately Priced Line Item. Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
| CLIN |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 2001 |
| Legacy Hardware and Software Support |
IntelePACS Legacy Hardware and Software service and support IAW PWS paragraph 5.6, inclusive of all subparagraphs
This FFP CLIN includes all travel, labor, materials, project management and deliverables required for the successful completion of the requirements detailed in PWS.
PSC: DA10
*This CLIN may be exercised in 1 month increments.
Government approval of invoices for payment shall be subject to successful completion of task requirements and associated deliverables required by the PWS.
Period of Performance: up to 12 months
| Up to 12* |
| MO |
| $ |
| $ |
| 2001AA |
| Monthly Outage Report and Adjusted Billing IAW paragraph 5.4.2 of the PWS. |
Due 30 days after exercising of Optional Task and updated monthly thereafter throughout the PoP.
| 1 |
| EA |
| NSP |
| NSP |
Optional Task Total
TOTAL BASE PERIOD + OPTION PERIOD ONE + OPTIONAL TASK
B.5 PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Veterans Health Administration (VHA) National Teleradiology Program (NTP) IntelePACS Upgrade 2026
Date: 02/26/2026
VA-26-00042676
PWS Version Number: 2.0
1.0 BACKGROUND
The Veteran Health Administration (VHA) National Teleradiology Program (NTP) is the Department of Veterans Affairs (VA) in-house Teleradiology service and has been providing 24x7 Teleradiology service to VA facilities since 2010. NTP is currently supporting over 120 sites across all Veterans Integrated Service Networks (VISNs). Yearly workload is approximately 1.4 million exams of which 80% are STAT interpretations. Currently NTP has approximately 230 Picture Archive and Communication System (PACS) workstations distributed across remote users and in-house reading centers providing remote Radiology interpretations.
NTP’s current Teleradiology PACS archive (IntelePACS) and core application servers are located in the Sacramento Data Center, and the software and hardware are well past their end of life. Additional servers are located in regional data centers and NTP reading centers and those system are similarly past their useful life. NTP requires an upgrade of the existing IntelePACS software to the latest commercially available release while providing ongoing service/support to the legacy system until the upgrade is approved for clinical use.
In November 2018, VA issued the Cloud First Policy mandating that all new and existing Information Technology (IT) solutions be assessed to determine suitability to be offered as an enterprise cloud computing service. The VA Enterprise Cloud (VAEC) was established by the Enterprise Cloud Solutions Office (ECSO) in 2017, to host cloud computing solutions. The upgraded system shall be deployed in the VA Enterprise Cloud (VAEC) and the VA shall be responsible for VAEC hosting, while the Contractor shall provide all software and licenses beyond items within the VAEC catalog. The Contractor shall be responsible for managing all VAEC resources associated with the PACS as part of initial deployment and ongoing service and support.
2.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. “Federal Information Security Modernization Act of 2014”
2. Federal Information Processing Standards (FIPS) Publication 140-3, “Security Requirements for Cryptographic Modules”, March 22, 2019
3. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004
4. FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006
5. FIPS Pub 201-3, “Personal Identity Verification of Federal Employees and Contractors,” January 2022
6. 10 U.S.C. § 2224, "Defense Information Assurance Program", as amended
7. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
8. Public Law 109-461 (P.L. 109-461), Veterans Benefits, Health Care, and Information Technology Act of 2006, as amended, Title IX, Information Security Matters
9. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”, as amended
10. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
11. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
12. VA Directive 6102, “Internet/Intranet Services,” August 5, 2019
13. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” as amended
14. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016
15. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”, as amended
16. NIST SP 800-66 Rev. 2, “Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule: A Cybersecurity Resource Guide,” February 2024
17. 45 C.F.R Parts 160 and 164, Subparts A and E, the Standards for Privacy of Individually Identifiable Health Information (“Privacy Rule”); and 45 C.F.R. Parts 160 and 164, Subparts A and C, the Security Standard (“Security Rule”); as amended
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021 (see VA NOTICE 24-18, dated September 27, 2024, “Update to VA Directive 6500 Cybersecurity Program”, and VA Notice 25-07, dated 3/18/25, “Amending VA Directive 6500 to incorporate M-24-15”)
21. VA Handbook 6500, “Risk Management Framework for VA Information Systems VA Information Security Program,” February 24, 2021 (see VA Notice 25-01, dated October 15, 2024, “Update to VA Handbook 6500 Risk Management Framework for VA Information Systems VA Information Security Program”, and VA Notice 25-06, dated 3/18/25, “Amending VA Directive 6500 to incorporate M-24-15”)
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” June 30, 2023
23. VA Handbook 6500.6, “Contract Security,” March 12, 2010 (see VA Notice 24-12, dated April 22, 2024, “Update to VA Handbook 6500.6, Contract Security, Appendix C VA Information and Information System Security/Privacy Language For Inclusion Into Contracts, As Appropriate”)
24. VA Handbook 6500.8, “Information System Contingency Planning,” March 25, 2025
25. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
26. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
27. OIT Process Asset Library (PAL), OIT Process Asset Library.
28. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
29. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014
30. VA Directive 6510, “VA Identity, Credential and Access Management,” September 3, 2024
31. VA Handbook 6510, “VA Identity, Credential and Access Management,” September 27, 2024
32. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017
33. VA Directive 6300, “Records and Information Management,” September 21, 2018
34. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010
35. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018
36. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
37. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
38. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014
39. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005
40. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019
41. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
42. Federal Identity, Credential, and Access Management (FICAM) Architecture, June 30, 2023 (FICAM Architecture (idmanagement.gov))
43. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018
44. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
45. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
46. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
47. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
48. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
49. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
50. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019
51. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008
52. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (P.L. 110–140), December 19, 2007
53. Section 104 of the Energy Policy Act of 2005, (P.L. 109–58), August 8, 2005
54. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
55. VA Directive 0057, “VA Environmental Management Program,” October 25, 2022
56. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
57. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
58. “Veteran Focused Integration Process (VIP) Guide 4.0,” March 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
59. VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
60. “Product Line Management Transformation Playbook” version 3.1, August 2023, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
61. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
62. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol Version 6 (IPv6),” November 19, 2020
63. Social Security Number (SSN) Fraud Prevention Act of 2017
64. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018
65. C.F.R Title 15 Part 7, “Securing the Information and Communications Technology and Services (ICTS) Supply Chain”, as amended
66. Executive Order 14028, “Executive Order on Improving the Nation's Cybersecurity,” May 12, 2021, https://bidenwhitehouse.archives.gov/briefing-room/presidential-actions/2025/01/16/executive-order-on-strengthening-and-promoting-innovation-in-the-nations-cybersecurity/
67. OMB Memorandum M-22-09, “Moving the U.S. Government Toward Zero Trust Cybersecurity Principles”, January 26, 2022, https://www.whitehouse.gov/wp-content/uploads/2022/01/M-22-09.pdf.
68. NIST SP 800-52 Revision 2, “Guidelines for the Selection, Configuration, and Use of Transport Layer Security (TLS) Implementations
69. OMB M-22-18, “Enhancing the Security of the Software Supply Chain through Secure Software Development Practices,” September 14, 2022
70. OMB M-23-16, “Update to Memorandum M-22-18,” June 9, 2023
71. OMB M-21-31, “Improving the Federal Government’s Investigative and Remediation Capabilities Related to Cybersecurity Incidents,” August 27, 2021
72. NIST SP 800-88 Revision 1 “Guidelines for Media Sanitization,” December 2014
73. CISA Binding Operational Directive (BOD) 19-02: “Vulnerability Remediation Requirements of Internet-Accessible Systems,” April 29, 2019, BOD 19-02: Vulnerability Remediation Requirements for Internet-Accessible Systems | CISA
74. CISA BOD 22-01: “Reducing the Significant Risk of Known Exploited Vulnerabilities,” November 3, 2021, BOD 22-01: Reducing the Significant Risk of Known Exploited Vulnerabilities | CISA
75. CISA BOD 23-01: Improving Asset Visibility and Vulnerability Detection on Federal Networks.” Cybersecurity & Infrastructure Security Agency (CISA), BOD 23-01: Improving Asset Visibility and Vulnerability Detection on Federal Networks | CISA
76. VA Directive 6550, Pre-Procurement Assessment and Implementation of Medical Devices/Systems, June 03, 2019
77. VA Memorandum, “VA Security Controls,” January 17, 2025, https://www.voa.va.gov/DocumentView.aspx?DocumentID=5010
78. VA Enterprise Cloud Technical Reference Guide, Version 1.3 July 2018
3.0 SCOPE OF WORK
The Contractor shall upgrade NTP’s existing IntelePACS system from version 4.9 to version 5.7, or the latest commercially available version, and migrate all NTP specific applications to the upgraded platform. The upgraded IntelePACS system shall be installed and hosted in the VAEC infrastructure, specifically Azure Virginia with dual availability zone configuration for fail-over and hardened to VA baseline configurations. The Contractor shall provide activation and installation services of software, testing, validation and training of the software on the VAEC. There shall be design and deployment of NTP custom tools. The Contractor shall obtain and maintain a VA Authority to Operate (ATO). There shall be support and maintenance of the system after the system is deployed.
4.0 PERFORMANCE DETAILS
4.1 PERFORMANCE PERIOD
The period of performance (PoP) shall be 18 months from date of award with 1 12-month option period and 1 optional task. The base period includes up to 6 months for system deployment and acceptance, followed by ongoing service and support post go-live. Option Period One includes 12 months of ongoing service and support after the base period. Optional Task One includes service and support of the legacy IntelePACS which may be exercised at any time and from time to time during the base PoP, up to a maximum of 12-months.
4.2 PLACE OF PERFORMANCE
Tasks under this Performance Work Statement (PWS) shall be performed at Contractor facilities via remote access to the VA network utilizing Personal Identity Verification (PIV). The Contractor shall identify the Contractor’s place of performance in their proposal submission. Applications training will be provided remotely and may include contractor-hosted web-based training and on-line meetings.
4.3 TRAVEL
The Government does not anticipate travel to perform the tasks associated with the effort, as work such as installation of software and service/support will be via remote access. Any travel costs will not be directly reimbursed by the Government and will be included within the Contractor’s implementation work.
4.4 GOVERNMENT FURNISHED PROPERTY
The Government shall provide:
· Cloud capacity in and connectivity to the VA Enterprise Cloud (VAEC) environments.
· VA Enterprise Cloud Operational Tools (VAECOT) comprised of a suite of COTS cloud management tools as identified in the VAEC Technical Reference Guide
· Enterprise Development Environment (EDE) and Tools as identified in the VAEC Technical Reference Guide
5.0 SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the tasks with specific milestones as outlined below:
Installation and configuration of VAEC servers, storage, and software
Activation, testing, and validation of all Digital Imaging and Communications in Medicine (DICOM) interfaces
Activation, testing, and validation of all HL7 interfaces
Design, implementation, and deployment of NTP custom workflow tools equivalent to or better than existing
Obtain VA Authority to Operate (ATO) for core PACS and Enterprise Risk Analysis (ERA) for workstations, to include ongoing updates, serving in the role of System Steward/Control Owner
Import of all reports from legacy PACS to upgraded PACS
PACS service/support for upgraded IntelePACS v5.7 or newer post deployment
Upgrade must be completed no later than September 30, 2026. System may be put into clinical use during the implementation phase as part of system validation, but it must be 100% operational with ALL functionalities as specified within this PWS before being considered complete.
The upgraded system will replicate or improve existing functionality and shall include at a minimum the following features/functionality:
· PACS archive with promiscuous DICOM interface to all VHA PACS and imaging modalities. DICOM ingest will be to a single load balanced IP address across both availability zones (multiple Application Entity Titles (AETs) to account for different workflows such as Telestroke, external peer review, etc. – matching existing functionality) and Query/Retrieve (Q/R) will present a single IP/AET to called VHA PACS.
· Diagnostic PACS viewer shall be optimized for WAN streaming.
· Fully integrated PACS worklist/assignment engine designed to optimize turn-around times, ensure reading prioritization and subspecialty assignment. Assignment Engine shall assign based off prioritization and first in first out.
· Assigned RadPeer peer review as well as peer learning modules.
· Collaboration functionality in the PACS shall generate a pop-up message in front of other windows so that Radiologists can clearly see the notification.
· Critical and non-critical callback workflow for PACS Assistants.
· When a Critical exam comes in that needs immediate attention, notification shall happen in front of all windows so that Radiologists know they need to address a critical exam immediately.
· Suspend button for Radiologists when they take breaks or are preparing to end their shift so they do not get additional cases assigned to them.
· PACS shall combine images, order, and report artifacts into a combined study and show only once on the worklist.
· Acquisition Traffic Controller (ATC) Worklist for case review and processing to mirror existing functionality. ATC to include thumbnail view of series received, pertinent study information, 1-click current and prior image retrieval with automated listing of available images based on prior report availability and targeted c-find to facilities/VISN where the patients have previously received case in VHA.
· Fully functional test system scaled for 10% load for update/upgrade testing and Oracle Health Federal Electronic Health Record (OH FEHR) integration testing.
· System shall be configured initially with 6 months of image storage capacity.
· Master Patient Index (MPI) functionality to consolidate disparate patient identifiers in use by VA: Social Security Number (SSN) with dashes, SSN without dashes, and Electronic Data Interchange Personal Identifier (EDIPI) (OH FEHR identifier). Must be able to manage patients with multiple IDs as a single entity and must have DICOM Q/R intelligence to query source PACS using the primary patient ID used by that specific VA location.
· DICOM normalization per existing IntelePACS standard.
· Image fusion module along with Positron Emission Tomography (PET) viewer and 3D reformatting tools.
· FDA cleared mammography viewer/tools with integration to NTP provided mammography tracking system (MagView), Densitas and Transpara AI modules with Secondary Capture (SC) and Presentation State (PR) writeback to sending mammography PACS.
· System shall include image quality, support assist and critical callback modules.
· Deployment shall include ingestion of all existing reports from current IntelePACS.
· Ongoing support shall include HL7 configuration support for OH FEHR conversion and VistA updates, e.g. HL7 2.3 to HL7 2.4 conversion.
· Activation to be completed within 6 months of contract award.
· Estimated study volume of 1.5 million exams with 10% buffer.
The contractor shall interface the upgraded IntelePACS with the following VHA provided components to provide a fully integrated teleradiology system:
· Voice Recognition (VR) - Existing VHA provided PowerScribe One v2109 system (VAEC Azure Virginia).
· Artificial Intelligence (AI) - Existing VHA provided Blackford AI platform with ICH, LVO, Breast Density, and Breast Nodule Detection (VAEC Azure Virginia) – image routing and worklist escalation for positive findings will be primary integration points.
· HL7 Integration Engine – Existing VHA Provided Rhapsody HL7 engine (VAEC Azure Virginia) for VistA ORM and ORU integration and OH FEHR ORM, ORU and ADT integration.
· Foundations by Health Level – Existing VHA provided PACS analytics tool used for STAT Portal submissions, workflow tracking, productivity and NTP billing (Sacramento Data Center).
The Contractor shall support setup, configuration, and provisioning of the solution in the VAEC environments and work with VA to provide inputs for establishing VAEC capacity, accounts and privileges. This includes monitoring and tracking the creation, update, and deletion of application user (e.g., developer, systems administrator) accounts, and ensuring cloud capacity requirements are satisfied.
The Contractor shall Provide information and documentation to support operational and production readiness reviews and go-no-go decisions. The Contractor shall execute corrective actions to address gaps and provide all required data and prepare supporting documents/artifacts for the reviews
5.1 PROJECT MANAGEMENT
5.1.1 CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP.
Deliverable:
A. Contractor Project Management Plan
5.1.2 REPORTING REQUIREMENTS
The Contractor shall provide the COR with Monthly Progress Reports in electronic form in Microsoft Word format. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding Month.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The Contractor shall monitor performance against the CPMP and report any deviations. It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.
Deliverable:
A. Monthly Progress Report
5.2 NTP PACS UPGRADE
The Contractor shall upgrade the NTP PACS from IntelePACS version 4.9 and migrate all NTP PACS specific applications to version 5.7 or newer. The legacy NTP PACS must remain in continuous 24x7 operation throughout every stage of this upgrade.
The Contractor shall perform a review to identify functionality gaps between the current NTP IntelePACS deployment and IntelePACS version 5.7.
The Contractor shall provide an Identified Applications Report which shall include a list of each identified application with a 4.9 to 5.7 migration dependency and timeline to remediate.
The Contractor shall provide a project plan that outlines upgrade milestones throughout the course of the project.
Per VAEC requirements, the Contractor shall complete the following tasks:
· Develop and maintain the solution architecture aligned with the VAEC Technical Reference Architecture as well as the One-VA Enterprise Architecture. The Contractor shall design the VAEC hosted solution and address VA identified cloud-readiness gaps.
· Develop, maintain, and execute the VAEC Implementation Plan that defines the implementation approach, processes and activities (prior to, during, and after), test strategy, setup and configuration procedure, inventory of IT assets, implementation checklist, risk assessment, key dependencies, and schedule.
· Develop and update project’s VIP Deployment and Installation, Back-out, and Rollback Plan that describes the installation, back-out, and rollback approach, processes and activities, dependencies, and schedule. The plan shall also include the provisioning and installation procedures for VAEC resources.
· Determine cloud capacity and workload requirements. VA shall review and approve cloud capacity requirements and provide the VAEC cloud capacity for the solution as GFE.
Deliverables:
A. Identified Applications Report B. Overall Project Plan C. VAEC Solution Design D. VAEC Implementation Plan
5.3 AUTHORITY TO OPERATE
The Contractor shall develop necessary artifacts to obtain a VA authority to operate (ATO) for the solution and complete VA Assessment and Authorization (A&A) process. After ATO is achieved, the Contractor shall update and maintain the A&A documentation as required to ensure continued compliance.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .