36C10B19R0014-022.docx
DOCX document 433 KB Posted
- Solicitation number
- 36C10B19R0014
About this file
36C10B19R0014 36C10B19R0014 0001.docx
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10B19R0014
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
TAC-19-53433
Department of Veterans Affairs Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
Technology Acquisition Center
23 Christopher Way
To all Offerors/Bidders
X
The purpose of this Amendment 0001 is to:
a. Provide questions and Answers Round 2
a. Provide Question and Answers Round 2 b.
Revise the solicitation based upon the aforementioned questions and answers.
Sharon L. Fernandes Contracting Officer
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Lauren Sankar 732-440-9690 03-28-2019
9 AM EST
Department of Veterans Affairs Technology Acquisition Center
541511 $27.5 Million
N/A
See Delivery Schedule
NJ 07724
Technology Acquisition Center
Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971
Veterans Data Integration and Federation (VDIF) Enterprise Platform Sustainment and Application Integration
POC: Lauren Sankar Contract Specialist lauren.sankar@va.gov Sharon Fernandes Contracting Officer sharon.fernandes@va.gov
Sharon L. Fernandes Contracting Officer
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 4 |
| B.1 CONTRACT ADMINISTRATION DATA | 4 |
| B.2 GOVERNING LAW | 5 |
| B.3 PRICE SCHEDULE | 6 |
| B.4 PERFORMANCE WORK STATEMENT | 40 |
| SECTION C - CONTRACT CLAUSES | 110 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 110 |
| C.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016) | 110 |
| C.3 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2018) | 112 |
| C.4 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM (MAR 1989) | 119 |
| C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 119 |
| C.6 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 119 |
| C.7 52.222-49 SERVICE CONTRACT LABOR STANDARDS—PLACE OF PERFORMANCE UNKNOWN (MAY 2014) | 120 |
| C.8 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 120 |
| C.9 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009) | 121 |
| C.10 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 121 |
| C.11 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 122 |
| C.12 MANDATORY WRITTEN DISCLOSURES | 122 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 123 |
| SECTION E - SOLICITATION PROVISIONS | 124 |
| E.1 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS—REPRESENTATION (JAN 2017) | 124 |
| E.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 124 |
| E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018) | 125 |
| E.4 52.216-1 TYPE OF CONTRACT (APR 1984) | 142 |
| E.5 52.217-5 EVALUATION OF OPTIONS (JUL 1990) | 142 |
| E.6 52.233-2 SERVICE OF PROTEST (SEP 2006) | 142 |
| E.7 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION) | 142 |
| E.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (SEP 2018) | 143 |
| E.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (SEP 2018) | 143 |
| E.10 BASIS FOR AWARD | 144 |
| E.11 EVALUATION APPROACH | 144 |
| E.12 PROPOSAL SUBMISSION INSTRUCTIONS | 146 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Contracting Officer 36C10B Sharon Fernandes Department of Veterans Affairs Technology Acquisition Center 23 Christopher Way Eatontown NJ 07724
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [x] In accordance with the Price Schedule |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs Technology Acquisition Center Financial Services Center PO Box 149971 Austin TX 78714-8971
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 GOVERNING LAW
Federal law and regulations, including the Federal Acquisition Regulations (FAR), shall govern this Contract/Order. Commercial license agreements may be made a part of this Contract/Order but only if both parties expressly make them an addendum hereto. If the commercial license agreement is not made an addendum, it shall not apply, govern, be a part of or have any effect whatsoever on the Contract/Order; this includes, but is not limited to, any agreement embedded in the computer software (clickwrap), any agreement that is otherwise delivered with or provided to the Government with the commercial computer software or documentation (shrinkwrap), or any other license agreement otherwise referred to in any document. If a commercial license agreement is made an addendum, only those provisions addressing data rights regarding the Government’s use, duplication and disclosure of data (e.g., restricted computer software) are included and made a part of this Contract/Order, and only to the extent that those provisions are not duplicative or inconsistent with Federal law, Federal regulation, the incorporated FAR clauses and the provisions of this Contract/Order; those provisions in the commercial license agreement that do not address data rights regarding the Government’s use, duplication and disclosure of data shall not be included or made a part of the Contract/Order. Federal law and regulation including, without limitation, the Contract Disputes Act (41 U.S.C. § 7101 et seq.), the Anti-Deficiency Act (31 U.S.C. § 1341 et seq.), the Competition in Contracting Act (41 U.S.C. § 3301 et seq.), the Prompt Payment Act (31 U.S.C. §3901 et seq.), Contracts for Data Processing or Maintenance (38 USC § 5725), and FAR clauses 52.212-4, 52.227-14, 52.227-19 shall supersede, control, and render ineffective any inconsistent, conflicting, or duplicative provision in any commercial license agreement. In the event of conflict between this Clause and any provision in the Contract/Order or the commercial license agreement or elsewhere, the terms of this Clause shall prevail. Claims of patent or copyright infringement brought against the Government as a party shall be defended by the U.S. Department of Justice (DOJ). 28 U.S.C. § 516. At the discretion of DOJ, the Contractor may be allowed reasonable participation in the defense of the litigation. Any additional changes to the Contract/Order must be made by contract/order modification (Standard Form 30) and shall only be affected by a warranted Contracting Officer. Nothing in this Contract/Order or any commercial license agreement shall be construed as a waiver of sovereign immunity.
DATA RIGHTS
The Contractor shall deliver to VA all data first produced under this contract. “Data” shall be defined by Federal Acquisition Regulation (FAR) 52.227-14; it includes, but is not limited to, all deliverables, software and all data, documents, and plans created or otherwise generated from the software delivered under this contract. VA shall own exclusively all data first produced under this contract. Contractor shall deliver the data first produced under this contract to the VA Repository in accordance with PWS 5.1.3 and 6.7.2.
B.3 PRICE SCHEDULE
Note: All deliverables shall be in accordance with the Performance Work Statement, which shall provide the VA Program Manager (PM), and Contracting Officer’s Representative (COR) electronically submitted artifacts and source code utilizing VA approved toolsets and repositories unless otherwise specified.
Days used below refer to calendar days unless otherwise stated. Deliverables with due dates falling on a weekend or holiday shall be submitted the following Government work day after the weekend or holiday.
Inspection and Acceptance: Destination
| LINE ITEM |
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| TOTAL PRICE |
| 0001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1, inclusive of subparagraphs 5.1.1 through 5.1.9. |
This Firm Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.1 and inclusive of all subparagraphs for the base period and each option period and optional task, if exercised.
The cost of Project Management CLIN 0001 and SLINs 0001AA through 0001AN shall be included in and allocated to CLIN 0002 and 0003.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AA |
| Contractor Project Management Plan (CPMP) IAW TO PWS paragraph 5.1.1. |
The CPMP shall be delivered to the VA PM, COR, CO and CS IAW PWS paragraph 5.1.1
Due at technical kickoff meeting and updated monthly thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AB |
| Staffing Plan IAW PWS paragraph 5.1.2. |
The Staffing Plan shall be delivered to the VA PM, COR, CO and CS IAW PWS paragraph 5.1.2
Draft is due 30 days after contract award and the final is due 5 days after receipt of Government comments.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AC |
| Monthly Progress Report IAW PWS paragraph 5.1.3. |
The Monthly Progress Report shall be delivered to the VA PM, COR, CO and CS IAW PWS paragraph 5.1.3
Due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 0001AD |
| Rational Training Certificate IAW PWS paragraph 5.1.4. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.4
Due 30 days after contract award and annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AE |
| VA Privacy and Information Security Awareness and Rules of Behavior Training Certificate IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Due five days after contract award and annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AF |
| Signed Contractor rules of Behavior IAW PWS paragraph 5.1.5. |
Signed Rules of Behavior shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Due five days after contract award and annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AG |
| VA HIPPA Certificate of Completion IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Due five days after contract award and annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AH |
| Onboarding Status Report IAW PWS paragraph 5.1.6. |
Onboarding Status Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.6 Due five days after contract award and updated weekly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AJ |
| Technical Kickoff Meeting Agenda and Minutes IAW PWS paragraph 5.1.7. |
Agenda delivered to VA PM, COR, CS and CO IAW PWS paragraph 5.1.7
Agenda due five days prior to the kickoff meeting and the meeting minutes due two days after the kickoff meeting.
LO
NSP
NSP
| 0001AK |
| Product Configuration Managemant Plan (CMP) IAW PWS paragraph 5.1.8. |
Draft due 30 days after contract award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AL |
| Recomended List of Configuration Items IAW PWS paragraph 5.1.8. |
Draft due 30 days after contract award and updated monthly thereafter.
| LO |
| NSP |
| NSP |
| 0001AM |
| Version Description Document (VDD) IAW PWS paragraph 5.1.8. |
Due upon delivery of each product build deliverable and updated with each configuration change.
| 1 |
| LO |
| NSP |
| NSP |
| 0001AN |
| Project Schedule IAW PWS paragraph 5.1.9. |
Project Schedule shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.9
Due 30 days after contract award and updated every two weeks thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0002 |
| Base Period – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.2 - VDIF EP Environment Sustainment inclusive of subparagraphs 5.2.1 through 5.2.5. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.2 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 0002 and any sub-line items shall be funded with Office of Information and Technology (OI&T) funds.
| 12 |
| MO |
| $ |
| $ |
| 0002AA |
| Monthly Sustainment Update Report IAW PWS Paragraph 5.2.5, which includes Sections: |
-Transition Acceptance Gap Analysis Report -Sustainment Intake Plan -Patch Implementation Report -Ticket Resolution Report -Testing Progress Report -Defect Management Plan -Product Sustainment Report -Backlog Remediation Plan
The cost of this line item shall be included in CLIN 0002.
The Monthly Sustainment Update Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.2.5
Due 30 days after contract award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0003 |
| Base Period – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.3 - VDIF EP Integration. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.3 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 0003 and any sub-line items, if applicable, shall be funded with Office of Electronic Health Record Modernization (OEHRM) funds.
| 12 |
| MO |
| $ |
| $ |
| 0003AA |
| VA Enterprise Canonical Mapping Model IAW PWS Paragraph 5.3. |
Due 30 days after contract award and updated as required throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 0003AB |
| Kernel Installation and Distribution System (KIDS) Patches into FORUM IAW PWS Paragraph 5.3. |
Due upon completion of each release cycle and two days after Government acceptance of the test results.
| 1 |
| LO |
| NSP |
| NSP |
AGILE SOFTWARE DEVELOPMENT DELIVERABLES
ALL DELIVERABLES LISTED BELOW SHALL BE DELIVERED FOR THE BASE PERIOD AND, IF EXERCISED, OPTIONAL TASKS 5.5 (TASKS 1-3), 5.6 AND DURNG ALL OPTION PERIODS, IF EXERCISED.
| 0004 |
| Agile Software Deliverables |
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.4.
The cost of 0004 and associate sub-line item deliverables shall be allocated to 0002 and 0003 Base Period, 1002 and 1003 Option Period 1, 2002 and 2003 Option Period 2, 3002 and 3003 Option Period 3, and 4002 and 4003 Option Period 4.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AA |
| External MOUs and Associated Documentation IAW PWS paragraph 5.4.1.1. |
Due 30 days after Government request.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AB |
| Interface Documentstion Updates IAW PWS paragraph 5.4.1.1. |
Due 30 days after Government request.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AC |
| Integrated Schedules IAW PWS paragraph 5.4.1.1. |
Due 15 days after Government request.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AD |
| Defect Log Updates IAW PWS paragraph 5.4.1.1. |
Due 15 days after Government request.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AE |
| Ad-Hoc Progress Reports IAW PWS paragraph 5.4.1.1. |
Due 30 days after Government request.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AF |
| Process Improvement and Best Practice Documentation and Technical Guides for Inter-Agency Coordination IAW PWS paragraph 5.4.1.1. |
Due annually 15 days before the end of the base and option performance periods.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AG |
| Requirements Data IAW PWS paragraph 5.4.1.1. |
Due 30 days after contract award and update two days before each sprint event.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AH |
| Build Plan IAW PWS paragraph 5.4.1.2. |
Due 30 days after contract award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AJ |
| Update Backlog IAW PWS paragraph 5.4.1.2. |
Due 30 days after contract award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AK |
| Risk Log IAW PWS paragraph 5.4.1.2. |
Due 30 days after contract award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AL |
| Technical Roadmap (Draft and Final) IAW PWS paragraph 5.4.2.1. |
Draft due after completion of each formal testing event and updated as needed with any subsequent testing event. Final due 14 days after receipt of Government comments.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AM |
| Sprint Plan IAW PWS paragraph 5.4.2.2.3. |
Due one day after the Build Plan and updated as needed with each new sprint.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AN |
| Sprint Acceptance Criteria IAW PWS paragraph 5.4.2.2.3. |
Due one day after the Build Plan and updated as needed with each new sprint.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AP |
| Source Code IAW PWS paragraph 5.4.2.2.4. |
Due upon completion of each release cycle and two days after Government acceptance of the test results.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AQ |
| Signed Build Acceptance Form IAW PWS paragraph 5.4.2.3. |
Due within two (2) after test site concurrence.
The Contractor may invoice at the end of each build upon COR acceptance of the Build Certification Package, including verification of meeting the Definition of Done in the Build Plan, as approved by the VA PM in accordance with PWS 5.4.1.2.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AR |
| Test Plan IAW PWS paragraph 5.4.2.3. |
Due 30 days after contract award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AS |
| Test Case/Scripts IAW PWS paragraph 5.4.2.3. |
Due two days prior to each formal testing event associated with each sprint.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AT |
| Test Execution Data IAW PWS paragraph 5.4.2.3. |
Due two days prior to each formal testing event associated with each sprint.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AU |
| Test Results IAW PWS paragraph 5.4.2.3. |
Due 3 days after completion of each formal testing event.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AV |
| User Acceptance Testing (UAT) Results IAW PWS paragraph 5.4.2.3. |
Due within three (3) days of successful testing
| 1 |
| LO |
| NSP |
| NSP |
| 0004AW |
| Updated Requirements Traceability Matrix (RTM) IAW PWS paragraph 5.4.2.3. |
Due 3 days after completion of each formal testing event.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AX |
| Updated Defect Log IAW PWS paragraph 5.4.2.3. |
Due 3 days after completion of each formal testing event.
| 1 |
| LO |
| NSP |
| NSP |
| 0004AY |
| Build Technical Documentation IAW PWS paragraph 5.4.2.3. |
Due five (5) days prior to National Release
| 1 |
| LO |
| NSP |
| NSP |
| 0004AZ |
| Final Source Code IAW PWS paragraph 5.4.2.3. |
Due five (5) days prior to National Release
| 1 |
| LO |
| NSP |
| NSP |
| 0004BA |
| Vulnerability Scanning Reports and Assessments IAW PWS paragraph 5.4.2.4. |
Due 30 days after completion of vulnerability scans.
| 1 |
| LO |
| NSP |
| NSP |
| 0004BB |
| A&A artifacts as required by the A&A review process IAW PWS paragraph 5.4.2.4. |
Due 30 days after completion of vulnerability scans.
| 1 |
| LO |
| NSP |
| NSP |
| 0004BC |
| POLARIS calendar data updates IAW PWS paragraph 5.4.2.5. |
Updates shall be tracked in the POLARIS tool and the VA/PM and COR shall be notified
Initial due 30 days prior to scheduled release and updated as required.
| 1 |
| LO |
| NSP |
| NSP |
| 0004BD |
| Build Certification Package (POM, Guide, Manual, and ATO Documentation) IAW PWS paragraph 5.4.2.5. |
Due within 15 days of completion of Agile (VIP) IOC Entry approval and updated bi-weekly or within any subsequent production release.
| 1 |
| LO |
| NSP |
| NSP |
| 0004BE |
| Defect resolution Plan IAW PWS paragraph 5.4.3. |
Due within 15 days within completion of IOC Entry approval and updated bi-weekly or within any subsequent production release.
| 1 |
| LO |
| NSP |
| NSP |
OPTIONAL TASK 5.5 (TASKS 1-3)
In accordance with FAR 52.217-7, Option for Increased Quantity-Separately Priced Line Item (MAR 1989), this Optional Task may be exercised multiple times, at any time, and from time to time at the Government’s discretion during the base and/or option periods. The optional task may exceed the period they are exercised within but shall not exceed the contract period of performance of 60 months.
| 5001 |
| Additional Technical Support IAW PWS paragraphs 5.5. inclusive of all subparagraphs 5.5.1, 5.5.2, and 5.5.3. |
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.2 and 5.4 and all corresponding subparagraphs.
The deliverables set forth at CLIN 0004 and sub-line items 0004AA through 0004BE apply to the exercise of this optional task.
EA=cost of 1 scrum team for 4-5 Full Time Equivalents (FTEs) for a 12-month period and associated line items 0004AA through 0004BE.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months).
This optional task may be exercised up to a maximum of 25 times from time to time during any period of performance and shall not be exercised for more than 125 times throughout the period of performance.
| 125 |
| EA |
| $ |
| $ |
| 5002 |
| Transition Support IAW PWS paragraph 5.6. |
This optional task may be exercised once during any period of performance.
The PoP for this optional task is 60 days after exercise of option.
| 1 |
| EA |
| $ |
| $ |
| 5002AA |
| Transition Plan IAW PWS paragraph 5.6. |
Transition Plan shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.6.
Due 10 days after exercise of option.
| 1 |
| EA |
| NSP |
| NSP |
Total Optional Tasks
OPTION PERIOD 1
This option period may be exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
If exercised, this option period shall commence immediately after expiration of the Base Period.
| 1001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1, inclusive of subparagraphs 5.1.1 through 5.1.9. |
This Firm Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.1 and inclusive of all subparagraphs for the base period and each option period and optional task, if exercised.
The cost of Project Management CLIN 1001 and SLINs 1001AA through 1001AL shall be included in and allocated to CLIN 1002 and 1003.
| 1 |
| LO |
| NSP |
| NSP |
| 1001AA |
| Contractor Project Management Plan (CPMP) IAW TO PWS paragraph 5.1.1. |
The CPMP shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.1
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 1001AB |
| Staffing Plan IAW PWS paragraph 5.1.2. |
The Staffing Plan shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.2
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 1001AC |
| Monthly Progress Report IAW PWS paragraph 5.1.3. |
The Monthly Progress Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.3
Upon option exercise, updates due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 1001AD |
| Rational Training Certificate IAW PWS paragraph 5.1.4. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.4
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 1001AE |
| VA Privacy and Information Security Awareness and Rules of Behavior Training Certificate IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 1001AF |
| Signed Contractor rules of Behavior IAW PWS paragraph 5.1.5. |
Signed Rules of Behavior shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 1001AG |
| VA HIPPA Certificate of Completion IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5 Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 1001AH |
| Product Configuration Managemant Plan (CMP) IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 1001AJ |
| Recomended List of Configuration Items IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP)..
| LO |
| NSP |
| NSP |
| 1001AK |
| Version Description Document (VDD) IAW PWS paragraph 5.1.8. |
Upon option exercise, due upon delivery of each product build deliverable and updated with each configuration change.
| 1 |
| LO |
| NSP |
| NSP |
| 1001AL |
| Project Schedule IAW PWS paragraph 5.1.9. |
Project Schedule shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.9
Upon exercise of option, updates due every two weeks thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 1002 |
| Option Period 1 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.2 - VDIF EP Environment Sustainment inclusive of subparagraphs 5.2.1 through 5.2.5. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.2 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 1002 and any sub-line items shall be funded with Office of Information and Technology (OI&T) funds.
| 12 |
| MO |
| $ |
| $ |
| 1002AA |
| Monthly Sustainment Update Report IAW PWS Paragraph 5.2.5, which includes Sections: |
-Transition Acceptance Gap Analysis Report -Sustainment Intake Plan -Patch Implementation Report -Ticket Resolution Report -Testing Progress Report -Defect Management Plan
The cost of this line item shall be included in CLIN 1002.
Monthly Sustainment Update Report shall be delivered to the VA PM, COR, CS, and CO IAW PWS paragraph 5.2.5
Due 30 days after option award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 1003 |
| Option Period 1 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.3 - VDIF EP Integration. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.3 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months) Line items 1003 and any sub-line items, if applicable, shall be funded with Office of Electronic Health Record Modernization (OEHRM) funds.
| 12 |
| MO |
| $ |
| $ |
Total Option Period 1
OPTION PERIOD 2
This option period may be exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
If exercised, this option period shall commence immediately after expiration of the Base Period.
| 2001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1, inclusive of subparagraphs 5.1.1 through 5.1.9. |
This Firm Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.1 and inclusive of all subparagraphs for the base period and each option period and optional task, if exercised.
The cost of Project Management CLIN 2001 and SLINs 2001AA through 2001AL shall be included in and allocated to CLIN 2002 and 2003.
| 1 |
| LO |
| NSP |
| NSP |
| 2001AA |
| Contractor Project Management Plan (CPMP) IAW TO PWS paragraph 5.1.1. |
The CPMP shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.1
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 2001AB |
| Staffing Plan IAW PWS paragraph 5.1.2. |
The Staffing Plan shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.2
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 2001AC |
| Monthly Progress Report IAW PWS paragraph 5.1.3. |
The Monthly Progress Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.3
Upon option exercise, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 2001AD |
| Rational Training Certificate IAW PWS paragraph 5.1.4. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.4
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 2001AE |
| VA Privacy and Information Security Awareness and Rules of Behavior Training Certificate IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 2001AF |
| Signed Contractor rules of Behavior IAW PWS paragraph 5.1.5. |
Signed Rules of Behavior shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 2001AG |
| VA HIPPA Certificate of Completion IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon exercise of option, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 2001AH |
| Product Configuration Managemant Plan (CMP) IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 2001AJ |
| Recomended List of Configuration Items IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| LO |
| NSP |
| NSP |
| 2001AK |
| Version Description Document (VDD) IAW PWS paragraph 5.1.8. |
Upon option exercise, due upon delivery of each product build deliverable and updated with each configuration change.
| 1 |
| LO |
| NSP |
| NSP |
| 2001AL |
| Project Schedule IAW PWS paragraph 5.1.9. |
Project Schedule shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.9
Upon exercise of option, any updates are due every two weeks thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 2002 |
| Option Period 2 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.2 - VDIF EP Environment Sustainment inclusive of subparagraphs 5.2.1 through 5.2.5. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.2 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 2002 and any sub-line items shall be funded with Office of Information and Technology (OI&T) funds.
| 12 |
| MO |
| $ |
| $ |
| 2002AA |
| Monthly Sustainment Update Report IAW PWS Paragraph 5.2.5, which includes Sections: |
-Transition Acceptance Gap Analysis Report -Sustainment Intake Plan -Patch Implementation Report -Ticket Resolution Report -Testing Progress Report -Defect Management Plan
The cost of this line item shall be included in CLIN 2002.
Monthly Sustainment Update Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.2.5
Due 30 days after option award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 2003 |
| Option Period 2 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.3 - VDIF EP Integration. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.3 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 2003 and any sub-line items, if applicable, shall be funded with Office of Electronic Health Record Modernization (OEHRM) funds.
| 12 |
| MO |
| $ |
| $ |
Total Option Period 2
OPTION PERIOD 3
This option period may be exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
If exercised, this option period shall commence immediately after expiration of the Base Period.
| 3001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1, inclusive of subparagraphs 5.1.1 through 5.1.9. |
This Firm Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.1 and inclusive of all subparagraphs for the base period and each option period and optional task, if exercised.
The cost of Project Management CLIN 3001 and SLINs 3001AA through 3001AL shall be included in and allocated to CLIN 3002 and 3003.
| 1 |
| LO |
| NSP |
NSP
| 3001AA |
| Contractor Project Management Plan (CPMP) IAW TO PWS paragraph 5.1.1. |
The CPMP shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.1
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 3001AB |
| Staffing Plan IAW PWS paragraph 5.1.2. |
The Staffing Plan shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.2
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 3001AC |
| Monthly Progress Report IAW PWS paragraph 5.1.3. |
The Monthly Progress Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.3
Upon option exercise, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 3001AD |
| Rational Training Certificate IAW PWS paragraph 5.1.4. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.4
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 3001AE |
| VA Privacy and Information Security Awareness and Rules of Behavior Training Certificate IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP..
| 1 |
| LO |
| NSP |
| NSP |
| 3001AF |
| Signed Contractor rules of Behavior IAW PWS paragraph 5.1.5. |
Signed Rules of Behavior shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 3001AG |
| VA HIPPA Certificate of Completion IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 3001AH |
| Product Configuration Managemant Plan (CMP) IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 3001AJ |
| Reccomended List of Configuration Items IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP)..
| LO |
| NSP |
| NSP |
| 3001AK |
| Version Description Document (VDD) IAW PWS paragraph 5.1.8. |
Upon option exercise, due upon delivery of each product build deliverable and updated with each configuration change.
| 1 |
| LO |
| NSP |
| NSP |
| 3001AL |
| Project Schedule IAW PWS paragraph 5.1.9. |
Project Schedule shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.9 Upon option exercise, updates due every two weeks thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 3002 |
| Option Period 3 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.2 - VDIF EP Environment Sustainment inclusive of subparagraphs 5.2.1 through 5.2.5. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.2 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 3002 and any sub-line items shall be funded with Office of Information and Technology (OI&T) funds.
| 12 |
| MO |
| $ |
| $ |
| 3002AA |
| Monthly Sustainment Update Report IAW PWS Paragraph 5.2.5, which includes Sections: |
-Transition Acceptance Gap Analysis Report -Sustainment Intake Plan -Patch Implementation Report -Ticket Resolution Report -Testing Progress Report -Defect Management Plan
The cost of this line item shall be included in CLIN 3002.
Monthly Sustainment Update Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.2.5
Due 30 days after option award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 3003 |
| Option Period 3 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.3 - VDIF EP Integration. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.3 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months) Line items 3003 and any sub-line items, if applicable, shall be funded with Office of Electronic Health Record Modernization (OEHRM) funds.
| 12 |
| MO |
| $ |
| $ |
Total Option Period 3
OPTION PERIOD 4
This option period may be exercised IAW FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
If exercised, this option period shall commence immediately after expiration of the Base Period.
| 4001 |
| Project Management in accordance with (IAW) Performance Work Statement (PWS) paragraph 5.1, inclusive of subparagraphs 5.1.1 through 5.1.9. |
This Firm Fixed Price (FFP) Contract Line Item Number (CLIN) includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraph 5.1 and inclusive of all subparagraphs for the base period and each option period and optional task, if exercised.
The cost of Project Management CLIN 4001 and SLINs 4001AA through 4001AL shall be included in and allocated to CLIN 4002 and 4003.
| 1 |
| LO |
| NSP |
NSP
| 4001AA |
| Contractor Project Management Plan (CPMP) IAW TO PWS paragraph 5.1.1. |
The CPMP shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.1
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 4001AB |
| Staffing Plan IAW PWS paragraph 5.1.2. |
The Staffing Plan shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.2
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP)..
| 1 |
| LO |
| NSP |
| NSP |
| 4001AC |
| Monthly Progress Report IAW PWS paragraph 5.1.3. |
Monthly Progress Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.3
Upon option exercise, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 4001AD |
| Rational Training Certificate IAW PWS paragraph 5.1.4. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.4
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 4001AE |
| VA Privacy and Information Security Awareness and Rules of Behavior Training Certificate IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 4001AF |
| Signed Contractor rules of Behavior IAW PWS paragraph 5.1.5. |
Signed Rules of Behavior shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 4001AG |
| VA HIPPA Certificate of Completion IAW PWS paragraph 5.1.5. |
Certificates shall be delivered to the VA PM and COR IAW PWS paragraph 5.1.5
Upon option exercise, due annually as required thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 4001AH |
| Product Configuration Managemant Plan (CMP) IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| 1 |
| LO |
| NSP |
| NSP |
| 4001AJ |
| Reccomended List of Configuration Items IAW PWS paragraph 5.1.8. |
Upon option exercise, updates, if applicable, due the fifth day of every month throughout the Period of Performance (PoP).
| LO |
| NSP |
| NSP |
| 4001AK |
| Version Description Document (VDD) IAW PWS paragraph 5.1.8. |
Upon option exercise, due upon delivery of each product build deliverable and updated with each configuration change.
| 1 |
| LO |
| NSP |
| NSP |
| 4001AL |
| Project Schedule IAW PWS paragraph 5.1.9. |
Project Schedule shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.1.9
Upon option exercise, updates, if applicable due every two weeks thereafter throughout the PoP.
| 1 |
| LO |
| NSP |
| NSP |
| 4002 |
| Option Period 4 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.2 - VDIF EP Environment Sustainment inclusive of subparagraphs 5.2.1 through 5.2.5. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.2 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 4002 and any sub-line items shall be funded with Office of Information and Technology (OI&T) funds.
| 12 |
| MO |
| $ |
| $ |
| 4002AA |
| Monthly Sustainment Update Report IAW PWS Paragraph 5.2.5, which includes Sections: |
-Transition Acceptance Gap Analysis Report -Sustainment Intake Plan -Patch Implementation Report -Ticket Resolution Report -Testing Progress Report -Defect Management Plan -Product Sustainment Report -Backlog Remediation Plan
The cost of this line item shall be included in CLIN 4002.
Monthly Sustainment Update Report shall be delivered to the VA PM, COR, CS and CO IAW PWS paragraph 5.2.5
Due 30 days after option award and updated monthly thereafter.
| 1 |
| LO |
| NSP |
| NSP |
| 4003 |
| Option Period 4 – 1 Scrum Team for Sustainment Tasks IAW PWS Paragraph 5.3 - VDIF EP Integration. Additionally, Paragraph 5.4 – VIP Agile Process IAW PWS Paragraph 5.4, inclusive of subparagraphs 5.4.1 through 5.4.3 |
The PoP shall be 12 months from date of option award.
This FFP CLIN includes all labor and deliverables required for the successful completion of the services detailed in PWS paragraphs 5.3 and 5.4 and all corresponding subparagraphs.
The Contractor shall only invoice upon COR acceptance of each release and the number of months it took to complete the release. (i.e. release complete in 2 months contractor invoices monthly price x 2 months)
Line items 4003 and any sub-line items, if applicable, shall be funded with Office of Electronic Health Record Modernization (OEHRM) funds.
| 12 |
| MO |
| $ |
| $ |
Total Option Period 4
B.4 PERFORMANCE WORK STATEMENT
1.0 BACKGROUND
The mission of the Department of Veterans Affairs (VA), Office of Electronic Health Record Modernization (OEHRM) is to provide benefits and services to Veterans of the United States. In meeting these goals, OEHRM strives to provide high quality, effective, and efficient information technology (IT) services to those responsible for providing healthcare to the Veterans in an effective, timely and compassionate manner. VA depends on Information Management/Information Technology (IM/IT) systems to meet mission goals.
On May 17, 2018, the VA announced it had signed a contract with Cerner Government Services, Inc. (Cerner) to replace its Electronic Health Record (EHR) with Cerner’s EHR solution. The change will modernize the VA’s health care IT system and help provide seamless care to Veterans as they transition from military service to Veteran status, and when they choose to seek care outside the VA.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.