S02_Attachment 3_Price Spreadsheet_NCA Kiosks_6.3.24.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
VA National Cemetary Administration Gravesite Kiosk Location Modernization ID/IQ
Solicitation number
36C10A24Q0032
Issued by

About this file

This document is a Price Spreadsheet template for a federal contract opportunity issued by the Department of Veterans Affairs (VA) Technology Acquisition Center Austin for VA National Cemetery Administration Gravesite Kiosk Location Modernization. The spreadsheet includes instructions for respondents to input proposed unit prices for various kiosk configurations, installation services, and maintenance services across five ordering periods. The contract is an Indefinite Delivery/Indefinite Quantity (ID/IQ) vehicle that is set-aside for Veteran-Owned Small Businesses. The spreadsheet requires respondents to provide pricing for project management, kiosk configurations and installation, and ongoing kiosk maintenance in accordance with the Performance Work Statement. The summary tab automatically calculates the total price across the five ordering periods based on the unit prices entered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
Respondents shall complete this price spreadsheet and submit as Volume III - Price. Only the unit price of the Contract Line Item Number needs to be inputted.

Respondents shall complete the following:

1) Enter the name of the Prime Offeror in tab "Summary" in cell C1.

2) Complete the tabs for Ordering Periods One through Five by entering the proposed unit prices for all separately priced line items (yellow cells) in each tab. *Note - If proposed unit prices are entered with more than two decimal places or a value below zero, cells are formatted to fill the cell red. Ensure all proposed unit price cells are entered and no colored cells remain in the Ordering Period One through Five tabs before submitting the quote.

3) For the Ordering Period One through Five tabs, the Not To Exceed (NTE) Extended Price and Total per Ordering Period will autocalculate. The Summary Tab will also auto calculate once all Ordering Period tab are complete.

Firm Fixed Price Backup Tab Instructions -

1) Price support may be provided on this tab. Additional tabs may be added, if needed.

Summary Respondent Name:

Pricing Summary

Ordering Period One$0.00
Ordering Period Two$0.00
Ordering Period Three$0.00
Ordering Period Four$0.00
Option Period Five$0.00

Grand Total $0.00

Ordering Period One

ORDERING PERIOD ONE
CLINSLINDescription of Services/EquipmentEstimated QuantityUnitUnit PriceNTE Extended Price
0001PROJECT MANAGEMENT - In accorandance with (IAW) Performance Work Statement (PWS) 5.3 and subsections; Product Service Code (PSC) 7E2012Month (MO)Not Separately Priced (NSP)NSP
0001AAContractor Project Management Plan1Lot (LT)NSPNSP
0001ABMonthly Progress Report12Each (EA)NSPNSP
0001ACContractor Staff Roster1LTNSPNSP
0002KIOSK CONFIGURATIONS, INSTALLATION AND REMOVAL - IAW PWS 5.1 and subsections; PSC 7E201LTNSPNSP
0002AAThrough the Wall Kiosk Enclosure3EA$ - 0
0002ABInstallation - Through the Wall Kiosk Enclosure - Contiguousl United States (CONUS)2EA$ - 0
0002ACInstallation - Through the Wall Kiosk Enclosure - Outside the Contiguous United States (OCONUS)1EA$ - 0
0002BAIndoor Floor Freestanding Kiosk Enclosure2EA$ - 0
0002BBInstallation - Indoor Floor Freestanding Kiosk Enclosure - CONUS1EA$ - 0
0002BCInstallation - Indoor Floor Freestanding Kiosk Enclosure - OCONUS1EA$ - 0
0002CASite Plan1LTNSPNSP
0002DAInstallation Report1LTNSPNSP
0002EAKiosk User Guide1LTNSPNSP
0002FAThrough the Wall Kiosk Enclosure Design/Schematic1LTNSPNSP
0002GAIndoor Floor Freestanding Kiosk Enclosure Design/Schematic1LTNSPNSP
0003KIOSK MAINTENANCE IAW PWS 5.2; PSC 7E201LTNSPNSP
0003AATouch Screen - Includes Express Shipping0EA$ - 0$ - 0
0003ABInstallation of Touch Screen - CONUS0EA$ - 0$ - 0
0003ACInstallation of Touch Screen - OCONUS0EA$ - 0$ - 0
0003BAThermal Printer - Includes Express Shipping0EA$ - 0$ - 0
0003BBInstallation of Thermal Printer - CONUS0EA$ - 0$ - 0
0003BCInstallation of Thermal Printer - OCONUS0EA$ - 0$ - 0
0003CAPower Surge Device0EA$ - 0$ - 0
0003CBInstallation of Power Surge Device - CONUS0EA$ - 0$ - 0
0003CCInstallation of Power Surge Device - OCONUS0EA$ - 0$ - 0
0003DAAnnual Maintenance for up to QTY of 113 Kiosks0MO$ - 0$ - 0
0003EAMaintenance Report0LTNSPNSP
Ordering Period One Total$ - 0

Ordering Period Two

ORDERING PERIOD TWO
CLINSLINDescription of Services/EquipmentEstimated QuantityUnitUnit PriceNTE Extended Price
1001PROJECT MANAGEMENT - IAW PWS 5.3 and subsections; PSC 7E2012MONSPNSP
1001AAContractor Project Management Plan1LTNSPNSP
1001ABMonthly Progress Report12EANSPNSP
1001ACContractor Staff Roster1LTNSPNSP
1002KIOSK CONFIGURATIONS, INSTALLATION AND REMOVAL - IAW PWS 5.1 and subsections; PSC 7E201LTNSPNSP
1002AAThrough the Wall Kiosk Enclosure12EA$ - 0
1002ABInstallation - Through the Wall Kiosk Enclosure - CONUS9EA$ - 0
1002ACInstallation - Through the Wall Kiosk Enclosure - OCONUS3EA$ - 0
1002BAIndoor Floor Freestanding Kiosk Enclosure1EA$ - 0
1002BBInstallation - Indoor Floor Freestanding Kiosk Enclosure - CONUS1EA$ - 0
1002BCInstallation - Indoor Floor Freestanding Kiosk Enclosure - OCONUS0EA$ - 0
1002CASite Plan1LTNSPNSP
1002DAInstallation Report1LTNSPNSP
1002EAKiosk User Guide1LTNSPNSP
1002FAThrough the Wall Kiosk Enclosure Design/Schematic1LTNSPNSP
1002GAIndoor Floor Freestanding Kiosk Enclosure Design/Schematic1LTNSPNSP
1003KIOSK MAINTENANCE IAW PWS 5.2; PSC 7E201LTNSPNSP
1003AATouch Screen - Includes Express Shipping24EA$ - 0
1003ABInstallation of Touch Screen - CONUS22EA$ - 0
1003ACInstallation of Touch Screen - OCONUS2EA$ - 0
1003BAThermal Printer - Includes Express Shipping30EA$ - 0
1003BBInstallation of Thermal Printer - CONUS24EA$ - 0
1003BCInstallation of Thermal Printer - OCONUS6EA$ - 0
1003CAPower Surge Device6EA$ - 0
1003CBInstallation of Power Surge Device - CONUS4EA$ - 0
1003CCInstallation of Power Surge Device - OCONUS2EA$ - 0
1003DAAnnual Maintenance for up to QTY of 116 Kiosks12MO$ - 0
1003EAMaintenance Report1LTNSPNSP
Ordering Period Two Total$ - 0

Ordering Period Three

ORDERING PERIOD THREE
CLINSLINDescription of Services/EquipmentEstimated QuantityUnitUnit PriceNTE Extended Price
2001PROJECT MANAGEMENT - IAW PWS 5.3 and subsections; PSC 7E2012MONSPNSP
2001AAContractor Project Management Plan1LTNSPNSP
2001ABMonthly Progress Report12EANSPNSP
2001ACContractor Staff Roster1LTNSPNSP
2002KIOSK CONFIGURATIONS, INSTALLATION AND REMOVAL - IAW PWS 5.1 and subsections; PSC 7E201LTNSPNSP
2002AAThrough the Wall Kiosk Enclosure12EA$ - 0
2002ABInstallation - Through the Wall Kiosk Enclosure - CONUS9EA$ - 0
2002ACInstallation - Through the Wall Kiosk Enclosure - OCONUS3EA$ - 0
2002BAIndoor Floor Freestanding Kiosk Enclosure1EA$ - 0
2002BBInstallation - Indoor Floor Freestanding Kiosk Enclosure - CONUS1EA$ - 0
2002BCInstallation - Indoor Floor Freestanding Kiosk Enclosure - OCONUS0EA$ - 0
2002CASite Plan1LTNSPNSP
2002DAInstallation Report1LTNSPNSP
2002EAKiosk User Guide1LTNSPNSP
2002FAThrough the Wall Kiosk Enclosure Design/Schematic1LTNSPNSP
2002GAIndoor Floor Freestanding Kiosk Enclosure Design/Schematic1LTNSPNSP
2003KIOSK MAINTENANCE IAW PWS 5.2; PSC 7E201LTNSPNSP
2003AATouch Screen - Includes Express Shipping24EA$ - 0
2003ABInstallation of Touch Screen - CONUS22EA$ - 0
2003ACInstallation of Touch Screen - OCONUS2EA$ - 0
2003BAThermal Printer - Includes Express Shipping30EA$ - 0
2003BBInstallation of Thermal Printer - CONUS24EA$ - 0
2003BCInstallation of Thermal Printer - OCONUS6EA$ - 0
2003CAPower Surge Device6EA$ - 0
2003CBInstallation of Power Surge Device - CONUS4EA$ - 0
2003CCInstallation of Power Surge Device - OCONUS2EA$ - 0
2003DAAnnual Maintenance for up to QTY of 119 Kiosks12MO$ - 0
2003EAMaintenance Report1LTNSPNSP
Ordering Period Three Total$ - 0

Ordering Period Four

ORDERING PERIOD FOUR
CLINSLINDescription of Services/EquipmentEstimated QuantityUnitUnit PriceNTE Extended Price
3001PROJECT MANAGEMENT - IAW PWS 5.3 and subsections; PSC 7E2012MONSPNSP
3001AAContractor Project Management Plan1LTNSPNSP
3001ABMonthly Progress Report12EANSPNSP
3001ACContractor Staff Roster1LTNSPNSP
3002KIOSK CONFIGURATIONS, INSTALLATION AND REMOVAL - IAW PWS 5.1 and subsections; PSC 7E201LTNSPNSP
3002AAThrough the Wall Kiosk Enclosure12EA$ - 0
3002ABInstallation - Through the Wall Kiosk Enclosure - CONUS9EA$ - 0
3002ACInstallation - Through the Wall Kiosk Enclosure - OCONUS3EA$ - 0
3002BAIndoor Floor Freestanding Kiosk Enclosure1EA$ - 0
3002BBInstallation - Indoor Floor Freestanding Kiosk Enclosure - CONUS1EA$ - 0
3002BCInstallation - Indoor Floor Freestanding Kiosk Enclosure - OCONUS0EA$ - 0
3002CASite Plan1LTNSPNSP
3002DAInstallation Report1LTNSPNSP
3002EAKiosk User Guide1LTNSPNSP
3002FAThrough the Wall Kiosk Enclosure Design/Schematic1LTNSPNSP
3002GAIndoor Floor Freestanding Kiosk Enclosure Design/Schematic1LTNSPNSP
3003KIOSK MAINTENANCE IAW PWS 5.2; PSC 7E201LTNSPNSP
3003AATouch Screen - Includes Express Shipping24EA$ - 0
3003ABInstallation of Touch Screen - CONUS22EA$ - 0
3003ACInstallation of Touch Screen - OCONUS2EA$ - 0
3003BAThermal Printer - Includes Express Shipping30EA$ - 0
3003BBInstallation of Thermal Printer - CONUS24EA$ - 0
3003BCInstallation of Thermal Printer - OCONUS6EA$ - 0
3003CAPower Surge Device6EA$ - 0
3003CBInstallation of Power Surge Device - CONUS4EA$ - 0
3003CCInstallation of Power Surge Device - OCONUS2EA$ - 0
3003DAAnnual Maintenance for up to QTY of 122 Kiosks12MO$ - 0
3003EAMaintenance Report1LTNSPNSP
Ordering Period Four Total$ - 0

Ordering Period Five

ORDERING PERIOD FIVE
CLINSLINDescription of Services/EquipmentEstimated QuantityUnitUnit PriceNTE Extended Price
4001PROJECT MANAGEMENT - IAW PWS 5.3 and subsections; PSC 7E2012MONSPNSP
4001AAContractor Project Management Plan1LTNSPNSP
4001ABMonthly Progress Report12EANSPNSP
4001ACContractor Staff Roster1LTNSPNSP
4002KIOSK CONFIGURATIONS, INSTALLATION AND REMOVAL - IAW PWS 5.1 and subsections; PSC 7E201LTNSPNSP
4002AAThrough the Wall Kiosk Enclosure12EA$ - 0
4002ABInstallation - Through the Wall Kiosk Enclosure - CONUS9EA$ - 0
4002ACInstallation - Through the Wall Kiosk Enclosure - OCONUS3EA$ - 0
4002BAIndoor Floor Freestanding Kiosk Enclosure1EA$ - 0
4002BBInstallation - Indoor Floor Freestanding Kiosk Enclosure - CONUS1EA$ - 0
4002BCInstallation - Indoor Floor Freestanding Kiosk Enclosure - OCONUS0EA$ - 0
4002CASite Plan1LTNSPNSP
4002DAInstallation Report1LTNSPNSP
4002EAKiosk User Guide1LTNSPNSP
4002FAThrough the Wall Kiosk Enclosure Design/Schematic1LTNSPNSP
4002GAIndoor Floor Freestanding Kiosk Enclosure Design/Schematic1LTNSPNSP
4003KIOSK MAINTENANCE IAW PWS 5.2; PSC 7E201LTNSPNSP
4003AATouch Screen - Includes Express Shipping24EA$ - 0
4003ABInstallation of Touch Screen - CONUS22EA$ - 0
4003ACInstallation of Touch Screen - OCONUS2EA$ - 0
4003BAThermal Printer - Includes Express Shipping30EA$ - 0
4003BBInstallation of Thermal Printer - CONUS24EA$ - 0
4003BCInstallation of Thermal Printer - OCONUS6EA$ - 0
4003CAPower Surge Device6EA$ - 0
4003CBInstallation of Power Surge Device - CONUS4EA$ - 0
4003CCInstallation of Power Surge Device - OCONUS2EA$ - 0
4003DAAnnual Maintenance for up to QTY of 125 Kiosks12MO$ - 0
4003EAMaintenance Report1LTNSPNSP
Ordering Period Five Total$ - 0

FFP Backup

File details come from the government source that posted it. Updated .