Memorandum for Turnkey.pdf

PDF 185 KB Posted

Attached to
6525--May 2022 Consolidation Federal contract opportunity
Solicitation number
36A79722Q0013
Issued by
Department of Veterans Affairs National Acquisition Center

View the file

Other files for this federal contract opportunity

Other files attached to 6525--May 2022 Consolidation, newest first.
File Type Posted
531B24002 - 583B20034 TS.zip ZIP file
436B20008 - 509B22009 TS.zip ZIP file
May 2022 Consolidation - Schedule of Line Items with QAs - Updated 8-24-22.xlsx XLSX spreadsheet
658B29004 - 674B20077 TS.zip ZIP file
583B20036 - 656B29003 TS.zip ZIP file
674B20079 - 740B20014 TS.zip ZIP file
36A79722Q0013 0001.docx DOCX document
May 2022 Consolidation Schedule - Updated 8-24-22.pdf PDF
Amendment 0001 - Continuation Page.pdf PDF
VA Directive 6550 - New Appendix A - published Jun. 2019.pdf PDF
674B20105 - 740B20014 TS.zip ZIP file
673B22039 - 674B20104 TS.zip ZIP file
673B22038 - 675B27006 BM.zip ZIP file
629B20019 - 648B12487 TS.zip ZIP file
583B20056 - 600B20026 TS.zip ZIP file
580B20052 - 672FC2002 BM.zip ZIP file
534B22028 - 554B23018 TS.zip ZIP file
436B20008 - 460B28019 TS.zip ZIP file
May 2022 Consolidation - Schedule of Line Items - Updated 7-13-22.xlsx XLSX spreadsheet
36A79722Q0013_1.docx DOCX document
663B23013 - 668B23000 TS.zip ZIP file
675B27008 - 695B28006 BM.zip ZIP file
580B20049 BM.zip ZIP file
558B20021 - 583B20036 TS.zip ZIP file
499B29003 - 531B24002 TS.zip ZIP file
Memorandum for Training.pdf PDF
Vendor Workup Spreadsheet - 36A79722Q0013.xlsx XLSX spreadsheet
675B27007 BM.zip ZIP file
648B22537 - 663B23007 TS.zip ZIP file
RFQ Instructions to Offerors - May 2022 Consolidation.pdf PDF
MAX Drive HTME User Guide.pdf PDF
Vendor Folders.zip ZIP file
673B22027 - 673B22028 BM.zip ZIP file
673B22012 - 673B22014 BM.zip ZIP file
459B26005 - 578B28009 BM.zip ZIP file
May 2022 Consolidation Schedule.pdf PDF
36A79722Q0013.docx DOCX document
Schedule of Line Items - May Consolidation - 7-6-22.xlsx XLSX spreadsheet
Pre-Solicitation Notice - May 2022 Consolidation.pdf PDF
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Turnkey Specifications

In accordance with FAR 22.401, “Construction, alteration, or repair” means all types of work done by laborers and mechanics employed by the construction contractor or construction subcontractor on a particular building or work at the site thereof, including without limitations—

(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;

(2) Painting and decorating;

(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;

(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (1)(i) and (ii) of the “site of the work” definition of this section, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the “site of work” definition of this section; and

(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the “site of the work” definition in paragraph (1)(ii) of this section, and the physical place or places where the building or work will remain (paragraph (1)(i) in the “site of the work” definition of this section).

FAR 22.4 implements statutes which prescribe labor standards for non-construction contracts involving some construction work, in excess of $2,000.00. HTME contracts are supply contracts for high-tech medical equipment, therefore they do not contain the FAR 22.4 statutes, terms and conditions. As a result, turnkey modifications that involve construction and are valued at over $2,000.00 fail to meet the mandated FAR requirements.

In accordance with FAR 22.402(b)(2), the requirements of FAR 22.4 do not apply if—

“(i) The construction work is incidental to the furnishing of supplies, equipment, or services (for example, the requirements do not apply to simple installation or alteration at a public building or public work that is incidental to furnishing supplies or equipment under a supply contract;

however, if a substantial and segregable amount of construction, alteration, or repair is required, such as for installation of heavy generators or large refrigerator systems or for plant modification or rearrangement, the requirements of this subpart apply); or

(ii) The construction work is so merged with non-construction work or so fragmented in terms of the locations or time spans in which it is to be performed, that it is not capable of being segregated as a separate contractual requirement.”

Effective immediately, to ensure compliance with mandatory FAR guidelines, all turnkey modification requests will be thoroughly reviewed to ensure added work is only that which is required for the proper installation and operation of the equipment. Requests will be limited to that work which is incidental to the furnishing of equipment and is not capable of being segregated as a separate contractual requirement. Any construction work required above and beyond this (e.g. HVAC, painting, building of restrooms and/or waiting rooms) must be completed as a separate requirement by a contracting office that has the proper authority to write construction contracts.

THE FOLLOWING APPLY TO ALL MODALITIES:

INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO

EXTENDED/TURNKEY INSTALLATION - WITHIN 30 DAYS OF EQUIPMENT DELIVERY ADO