36-44955915801-SPECS-TSP(T590)-Irrigation.pdf

PDF 207 KB Posted

Attached to
Royal Palm Boulevard from East of University Drive to Riverside Drive
Solicitation number
TRN2132636C1
Issued by
Broward County, Florida

About this file

This is a Technical Special Provision (TSP) document for irrigation system work on the Royal Palm Boulevard project in Coral Springs, Florida, involving the City of Coral Springs as the maintaining agency and Broward County Highway Construction and Engineering Division (HCED). The specification details the installation, testing, and acceptance of a complete automatic landscape irrigation system, including modification of the existing system to ensure continued operation during construction. The work encompasses furnishing all components necessary for installation, testing, and acceptance, including materials, labor, layout, excavation, assembly, installation, backfilling, compaction, controller and low voltage feeds, and as-built record drawings. The existing irrigation system Point of Connection (POC) is located at Royal Palm Boulevard Station point 60+15.00, 21 feet left, utilizing a pump and well system. The project requires coordination with the City prior to procuring equipment and maintaining existing irrigation zones operationally during construction, with repairs to any damaged irrigation within proposed work zones required within 48 hours.

Payment for the irrigation work is structured as a lump sum under Item No. 590-70-5 (Irrigation System-Modify Existing System), with the price constituting full compensation for all work specified. Key materials specified include Schedule 40 PVC pipe or HDPE mainline pipe, commercial-grade electrically activated normally-closed remote-control valves with stainless-steel trim and 3.5-watt 24-volt AC solenoid operators, low-voltage irrigation controller wire suitable for direct burial, and gel-based waterproof wire connectors. Critical installation requirements include minimum backfill depths of 36 inches under roadways, 24 inches for sleeving, 18 inches for mainlines, and 12 inches for laterals, with all piping requiring 30-minute minimum curing before handling and 24-hour curing before water filling. The project requires pre-construction and final operational testing in the presence of the Engineer, Maintaining Agency, and Landscape Architect of Record, with as-built record drawings and Operations and Maintenance Manuals required as conditions of Final Acceptance. The document was digitally signed and sealed by Brian R. Shore, RLA (License No. LA-6666770) of Miller, Legg and Associates, Inc. on July 28, 2026.

View the file

Other files

File Type Posted
engrupd.gif GIF image
BRO2021_307946.xml XML file
28-44955915801-PLANS-01-ROADWAY-COREBORINGS.pdf PDF
BRO2021_307948.sdw SDW file
PLANSG01-Josue.dgn —
4-Lobbyist Registration Requirement Certification.docx DOCX document
5-Trench Safety Act Requirement.docx DOCX document
ProposedSlopesPointNames.xml XML file
MODLRD_ExistingUtilitiesVerizon05.dgn —
TEXTUW01.dgn —
BRO2021_308248.sdw SDW file
PayitemDB.xml XML file
ABORRD00.dgn —
BRO2021_307948.sid SID file
SIGNRD01.dgn —
MODLRD01.dgn —
MODLRD_ExistingUtilitiesCrownCastle04.dgn —
CTLSRD01.dgn —
38-44955915801-PLANS-01-ROADWAY.pdf PDF
GDTMRD01.dgn —
MODLRD04.dgn —
KEYSSG01.dgn —
34-44955915801-PLANS-03-SIGNALIZATION-COREBORINGS.pdf PDF
SBVHRD00.dgn —
1-Summary of Vendor Rights for Broward County Competitive Solicitations.docx DOCX document
bluprebd.gif GIF image
7-Standard Instructions to Vendors (Construction BCF 170 Agreements Only).docx DOCX document
32-44955915801-SPECS.pdf PDF
BRO2021_307946.sdw SDW file
engrhomd.gif GIF image
17-Non-Collusion Declaration (FDOT Form No. 575-060-13).pdf PDF
TYPDRD01.dgn —
Controller_Timings.xlsx XLSX spreadsheet
MODLRD_ExistingUtilitiesFPL03.dgn —
TEXTDR01.dgn —
ABORRD02.dgn —
document.css CSS file
ALGNRD01.dgn —
9-Vendor Questionnaire - Quotes and Bids.docx DOCX document
PLANRD01-2.dgn —
engrvbd.gif GIF image
MastArmTab01.dgn —
3-Criminal History Screening Practices Certification.docx DOCX document
bluvbusd.gif GIF image
PLANRD00.dgn —
DRDTRD01.dgn —
16-FDOT - Required Addendum to the Special Instructions to Vendors.pdf PDF
UTADUW01.dgn —
UTEXUW01.dgn —
DRPRRD99.dgn —
Show 40 more

Latest 50 of 198 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECS-TSP(T590); Page 1 of 7

TECHNICAL SPECIAL PROVISION

FOR

590 – IRRIGATION

FINANCIAL PROJECT ID: 449559-1-52-01

This item has been digitally signed and sealed by Brian R. Shore, RLA on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Date: July 28, 2026

Fla. License No.: LA-6666770

Firm Name: Miller, Legg and Associates, Inc.

Firm Address: 13680 NW 5th St Suite 200

City, State, Zipcode: Sunrise, Florida 33325

Pages: 1 through 7

449559-1-58-01

SPECS-TSP(T590); Page 2 of 7

T590-1 Description.

T590-1.1 General: Furnish all components necessary for the installation, testing, and acceptance of a complete, fully functional, automatic, landscape Irrigation

System. Maintain the existing Irrigation System and modify the system in accordance with this Technical Special Provision to ensure specified performance and operation during construction. This work includes, but is not limited to, providing all materials, labor, layout, excavation, assembly, installation, backfilling and compaction, and controller and low voltage feeds to valves, and

Record Drawings (as-builts).

Areas of modified irrigation zones, to remain operational during construction.

Includes the cost of water and power during construction.

T590-1.2 Points of Connection (POC):

T590-1.2.1 Minimum POC System Criteria: Verify the POC minimum conditions can be met prior to the beginning of modification of the existing system. If the conditions cannot be met, notify the Engineer of any discrepancies.

T590-1.2.2 POC Locations: Existing POC(A) is in Royal Palm Boulevard

Station point 60+15.00, 21’ L Pump and Well system.

T590-1.2.3 Maintaining Agency: The maintaining Agency for the Irrigation

System is the City Coral Springs.

T590-2 Materials.

T590-2.1 Pipe:

T590-2.1.1 Polyvinyl Chloride (PVC) Pipe: Pipe locations shown on the Plans are schematic and may require adjustment in the field to avoid conflicts. When laying out laterals, locate pipe near edges of pavement or sidewalks, or against future pavement or sidewalks when known, whenever possible.

Utilize existing sleeves when piping under hardscape items, such as roads, driveways, and sidewalks.

Pipe sizes to conform to those shown on the Plans. No substitutions of smaller pipe sizes to be permitted, but substitutions of larger sizes may be used with

Engineer approval.

Remove all damaged and rejected pipe from the site at the time of rejection.

SPECS-TSP(T590); Page 3 of 7

T590-2.1.2 160/200 Class Pipe: ASTM D2241, ANSI Standard A21.51.E.

Flexible Pipe: "Funny Pipe", Spears "Flexible PVC hose" or as otherwise approved by the Engineer.

T590-2.1.3 Mainline and Service Line Pipe: Mainline to be ASTM D1785

Schedule 40 PVC and/or ASTM D3350, Polythylene (PE) or High Density

Polyethylene (HDPE) Pipe or as otherwise approved by the Engineer.

T590-2.1.4 PVC Pipe Joint Compound and Primer: Pipe joint compound to be gray, slow-drying, heavy-duty cement. Primer to be tinted purple and compatible with cement.

T590-2.1.5 Pipe Fittings:

T590-2.1.5.1 Polyvinyl Chloride (PVC) Pipe Fittings: Schedule 40, socket type

ASTM D2467. Schedule 80 threaded type ASTM D2464.

T590-2.1.5.2 Sleeving Pipe: PVC, PE or HDPE per Section 555.

T590-2.2 Valves and Valve Boxes:

T590-2.2.1 Valves, Relocate: Impacted valves to be relocated per plans.

T590-2.2.2 Valves and Valve Boxes: Utilize commercial grade valves and valve boxes as shown in plans.

Valve for small turf areas (50-200 Gallons per minute (GPM) (189.3-757.1 l/min): maximum 200 psi (13.8 bar).

Valve boxes to be made of Superflexon 1203 traffic rated box.

T590-2.2.3 Valves: Upgrade/provide as necessary when the existing is not in operating condition. Valves to be electrically activated, normally-closed, remote-control valve with manual bleed plug, manual control (cross handle operation on

1-1/2 inch and 2-inch models, screwdriver operation on 1-inch model) and constructed with stainless-steel trim.

Solenoid operator to be 3.5watt, 24volt AC with tamper-proof, molded-coil, and twisting-wire. Diaphragm to be rubber. Continuous water flow through the ports during operation to be prevented through "Tir-Act" solenoid porting or some other similar method. Inlet port to solenoid to be filtered, with self-flushing stainless-steel screen, removable from the outside of the valve body for maintenance.

All parts of the valve to be serviceable while valve is still in place. Valve to have no external plumbing or tubing such that installation of the valve at different angles shall affect valve operation.

SPECS-TSP(T590); Page 4 of 7

T590-2.3 Wiring: Irrigation control wire to be existing thermoplastic solid-copper, single-conductor, low-voltage irrigation controller wire, suitable for direct burial and continuous operation at rated voltages. At all valve boxes coil wire around a

3/4-inch piece of PVC pipe to make a coil using 30 linear inches of wire.

Number all wires, using an electrical book of numbers, according to the Plans.

Number wires in all valve boxes, junction boxes, and at the controller. Wire to be sized, numbered and colored as follows: #12 White for Common, #12 Red for Hot

Wires, #12 Yellow for spares.

T590-2.4 Waterproof Connectors: Gel-based waterproof wire connector with a

Direct Bury Silicon Tube and Red Yellow Wire Nut (DBRY).

T590-2.5 Irrigation Head: Refer to the Plans for irrigation turf spray head irrigation requirements.

T590-2.6 Controller:

T590-2.6.1 Controller, General: Existing battery-operated controller to remain.

T590-3 Construction Requirements.

T590-3.1 Irrigation Equipment: Coordinate with the City prior to procuring irrigation equipment.

T590-3.2 Layout: Lay out irrigation system lateral lines. Make the necessary adjustments as required to consider all site obstructions and limitations prior to excavating trenches. Stake all sprinkler head locations. Adjust location and make the necessary modifications to nozzle types, etc., required to insure 100% head-to-head coverage and no overspray onto impervious areas. Locate all valves prior to excavation. Ensure that their location provides for easy access, and that there are no interferences with physical structures, plants, trees, poles, etc.

T590-3.3 Zones: Operate zones concurrently, as needed, to meet current watering schedule. Existing sequence of all valves to be evaluated and coordinated with the

Maintaining Agency.

T590-3.4 Valves: All valves are to be placed in valve boxes. Valve boxes must be placed a minimum 12inches, and a maximum of 15inches, from the edge of pavement, curbs, etc., and the top of the box must be 2-inches above finish grade.

Using 3inch-high number stencils, paint the valve number in white on the lid of each valve box.

T590-3.5 Pipe Installation: Cut all piping square and de-burr. Clean pipe and fittings of foreign material.

SPECS-TSP(T590); Page 5 of 7

Apply a small amount of primer while ensuring that any excess is wiped off immediately. Primer should not puddle, or drip, from pipe or fittings. Apply a thin coat of PVC cement. First apply a thin layer to the pipe, next a thin layer inside the fitting, and finally another very thin layer on the pipe. Insert the pipe into the fitting.

Ensure that the pipe is inserted to the bottom of the fitting, then turn the pipe a 1/4-turn and hold for 10 seconds. Make sure that the pipe does not recede from the fitting. If the pipe is not at the bottom of the fitting upon completion, the glue joint is unacceptable and must be discarded. Pipes must cure a minimum of 30 minutes prior to handling and placing into trenches. A longer curing time may be required.

Refer to the manufacturer’s recommendations. The pipe must cure a minimum of

24 hours prior to filling with water.

For main line and lateral pipe 3-inches and larger in size, install concrete thrust blocks at all changes in direction of pipe.

For pipe used as irrigation risers, paint pipe flat-black.

For directional bore, install per Section 555.

T590-3.6 Backfill: Pipe to be installed so the following minimum backfill depths are maintained: 36-inch under roadway and 24-inch for all other sleeving, 18-inch for the main line, and 12-inch for all laterals. Backfill to be of suitable material free of rocks, stones, or other debris that is larger than 1/2-inch diameter. Compact all trenches as required by the Standard Specifications.

T590-3.7 Flushing: Prior to the placement of heads, flush all lines for a minimum of 10 minutes or until lines are completely clean of debris, whichever is longer.

Flush all lines. Use screens in all heads and adjust heads for proper coverage, avoiding excess water on walls, walks, and paving.

T590-3.8 Testing:

T590-3.8.1 Pre-construction Irrigation Operational Testing: Coordinate an operational test of the existing system and document any deficiencies prior to work within the limits of the existing irrigation system. Coordination includes coordination with the Engineer, the Maintaining Agency, and Landscape Architect of Record. This testing requires that each zone is operationally tested in the presence of the Engineer, the Maintaining Agency, and the Landscape Architect of

Record, in the proper sequence as coordinated with the Maintaining Agency from the controller. Each zone will be inspected for proper coverage and function. Each zone to be documented with video and photographed while in operation.

The determination of proper coverage and function is at the sole discretion of the

Engineer. Deficiencies, in the existing irrigation system that is to remain, is the responsibility of the Maintaining Agency.

SPECS-TSP(T590); Page 6 of 7

Take responsibility and maintenance of zones identified in the Plans for the duration of construction. Repair/replace any damaged irrigation within proposed work zones within 48 hours, with Maintaining Agency-oversight coordination prior to performing the work.

T590-3.8.2 Final Operational Testing: Upon completion of backfilling, finish grading, and contouring, test the entire system for proper operation, including electrically actuating the remote-control valves. This testing requires that each zone is operationally tested in the presence of the Engineer, the Maintaining

Agency, and the Landscape Architect of Record, in the proper sequence as coordinated with the Maintaining Agency from the controller. Run each zone until water begins to puddle or run off to determine the initial controller run times, and to determine the number of irrigation start times necessary to meet the weekly evapotranspiration requirements of the planting material in each zone. In sandy soils where no puddling occurs, calculate the required run times instead.

T590-3.8.3 Installation Completion: Notify the Engineer no less than seven calendar days in advance of completion of irrigation and Section T580 Landscape.

Refer to T580 for provisions of the landscape establishment period and contractor’s warranty.

T590-3.9 Submittals:

T590-3.9.1 Record Drawings (as-builts): Prior to installation, submit for review, copies of the manufacturer’s cut sheets/specifications for all components to be used in the Irrigation System. After project completion, and as a condition of

Final Acceptance, provide the Engineer with a high-quality, accurate, and legible set of Record Drawings (as-builts). The as-builts must identify all remote-control valves, gate valves, ball valves, splice boxes, controllers, mainline, sleeving, and low voltage wiring. To locate each item two dimensions from fixed objects of a permanent nature must be taken and noted on the as-builts.

T590-3.9.2 Operations and Maintenance Manual: Provide accurate, informative, and easy to follow and understand, Operations and Maintenance

Manuals for all components of the Irrigation System.

T590-4 Method of Measurement: The quantities to be paid for to be the items shown in the Plans, completed and accepted.

SPECS-TSP(T590); Page 7 of 7

T590-5 Basis of Payment: The quantity, determined as provided above, to be paid for at the contract unit price per lump sum. Price and payment to be full compensation for all the Work specified in this Section. Payment to be made under: Item No. 590-70-5 Irrigation System-Modify Existing System, per Lump

Sum.