35897_Exhibit 1 Technical Specs Revised 2~1.pdf
PDF 653 KB Posted
- Solicitation number
- S-73000-00009125
- Issued by
- Clackamas County, Gladstone City, Oregon
About this file
This document is a technical specification for a state and local contract opportunity issued by the Oregon Department of Transportation (ODOT) to add Lenel access control to multiple entry points at the Government Camp Maintenance Station. The project requires installing 5 card readers and door latch actuators on 4 exterior doors and 1 interior door, running low voltage wiring, and coordinating programming and system testing with ODOT staff. Substantial completion is required by June 30, 2024, with final completion due by July 30, 2024. The contractor must be a Lenel Value Added Reseller and is responsible for providing all necessary equipment, labor, and materials for a fully functional card reader access system. Submittals must be approved prior to the start of on-site construction, and close-out requirements include final inspection, training of ODOT personnel, and providing operations and maintenance documentation.
The contract opportunity is specific to the Government Camp Maintenance Station in Oregon, with the work to be performed in the jurisdictions of Clackamas County and the City of Portland. No pricing terms, set asides, incumbent information, funding sources, or other salient financial details are provided in the specification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35897_ESB_RFCQ_Gov Camp.pdf | ||
| 20242040_G1_Notice of Intent to Award.pdf | ||
| 35897_ESB_RFCQ_Attachments.pdf | ||
| 35897 Preliminary Bid Results.xlsx | XLSX spreadsheet | |
| 35897_Exhibit 2 Plans Revised~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1
TECHNICAL SPECIFICATIONS - Revised
Oregon Department of Transportation ESB - Lenel Card Reader Access – Government Camp Maintenance Station
Project Description Add access control to the existing building entry points at multiple locations. Site requirements are as follows:
• Maintenance Station building requires 4 doors to have card reader access
• Fuel Station building requires 1 door to have card reader access
All required programming and testing of the Lenel Card Access System must be performed by a certified Lenel Reseller (see below under Value Added Resellers List). The Project includes all other necessary equipment, labor, and materials required for a fully functional card reader access system.
Project Location
Government Camp Maintenance Station
90300 US-26
Government Camp, OR 97028
ODOT Contact The ODOT Project Manager for this work is Jorge Ojeda
• Email: jorge.ojeda@odot.oregon.gov
• Cell phone: 971-429-4075
• Address: 3700 SE 92nd Avenue, Portland, OR 97266
The ODOT Project Manager may designate an additional ODOT contact person or engineer to support with inspections or questions in the field.
Scheduling of Contract
1. Substantial completion of the Work shall be no later than June 30, 2024. Final
Completion shall be no later than July 30, 2024.
2. After award of the Contract, the Contractor shall contact the ODOT Project Manager to schedule the Work at least ten (10) business days prior to the start of the Work.
3. The Work shall be accomplished on weekdays between the hours of 8 a.m. and 5 p.m.
Work hours shall exclude weekends and State Holidays, unless specifically requested by the Contractor and approved by the ODOT Project Manager.
4. The Contractor shall coordinate the efforts of all suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.
5. The Contractor shall submit to the ODOT Project Manager a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.
Clean-Up/Conditions of Site
1. The Contractor shall be responsible for keeping the ODOT Project Manager informed of all activity throughout the Work.
2. The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each work day and neatly stack materials and debris in an approved location.
3. The Contractor shall protect materials subject to damage by temperature or other weather conditions.
4. The location for storage of materials, debris, or dumpster on the Premises shall be approved in advance by the ODOT Project Manager. Disposal facilities, bins, or dumpsters shall not be provided by ODOT.
5. The Contractor shall notify the ODOT Project Manager at least 2 days in advance of any major deliveries.
6. Contractor shall immediately notify the ODOT Project Manager of any damage done by the Contractor to the Premises, grounds, or adjacent State properties. Damage done by the Contractor to the Premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.
7. ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the Premises.
8. It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.
9. Any permits required for the Work are the responsibility of the Contractor. The Contractor shall provide copies of permits to the ODOT Project Manager prior to the start of work. The Contractor shall be responsible for posting all permits on site in accordance with local jurisdiction requirements.
10. The Contractor shall immediately bring to the attention of the ODOT Project Manager any conflicts or issues between existing utilities and the Work.
11. Contractor shall be responsible for making arrangements for temporary utility requirements during construction and related costs.
12. Drinking water shall be provided by the Contractor. Due to remote site, on site restrooms will be available for Contractor use.
Detailed Specifications
1. Install card readers and door latch actuators on 4 exterior doors and 1 interior door.
2. Use existing low voltage conduit from fuel station building to MS building.
3. Run wire from door readers and strikes to the network room; coordinate termination with certified Lenel Reseller (see below under Value Added Resellers List) at all locations as necessary.
4. Coordinate programming and system testing with ODOT Access Control staff.
Wiring Specifications:
1. Door Strikes: 18/2 (Green) Plen 1K
2. Card Readers: 22/6 SH (Green) PLE 1K
3. Both reader and latch wiring installed down strike/handle side of the door.
4. The top of the readers must be at or below 48”.
5. Wire should be coiled at each end long enough for installer to connect to the reader, strike and panel.
Submittals
The Contractor shall provide the following submittals at a minimum to the ODOT Project Manager. Submittals shall be approved by the ODOT Project Manager prior to the start of on-site construction.
1. Items specified on this document may be substituted by approved equal if previously approved by ODOT Project Manager.
Value Added Resellers List
1. Everon
2. Convergint Technologies
3. Cook Security Group
4. Reece Complete Security Solutions
5. Securitas Electronic Security Inc.
6. Paladin Technologies
Close-Out
1. Inspection of the Work by the ODOT Project Manager for establishment of Substantial Completion shall be made within three (3) business days after receipt of the Contractor’s written request. At the time of inspection, the ODOT Project Manager and the Contractor shall develop a punchlist document of any incomplete or deficient Work.
2. Prior to Final Completion, Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems that form part of the Work.
3. Prior to Final Completion, Contractor shall provide a digital copy via email of all operations, maintenance, and warranty information to the ODOT Project Manager.
4. Prior to Final Completion, Contractor shall complete all items on the punchlist document.
5. Inspection of the Work by the ODOT Project Manager for establishment of Final
Completion shall be made within five (5) business days after receipt of the Contractor’s written request.
Material List:
See reference drawings for building information including: site plan, building floor plan, door locations, data room location, electrical panel location, and conduit run locations. Please note that the information provided for this security scope of work is overlaid onto a historic document set. Only the security related scope of work described in this solicitation shall be included.
Item Description Item # Qty a.
*Lenel Dual Reader Control Board - 32 Inputs
LNL-X2220 1
b.
Card Reader at doors.
40NKS-00-000000
20TKS-00-000000
c. *Lenel Dual Interface Module LNL-1320-S3 2 d.
Miscellaneous, mounts, connectors, and conduiting
All e.
*8-Door LifeSafety Power Supply with Battery Backup.
FPO150-B100C8D8PE6M 1
f.
Door hardware at five existing frames - Electric Strike with a 630 finish and 501 Faceplate Option. Door strike voltage shall be compatible with Lenel 24V
HES 5200 Series 5
g. Latch guards on exterior doors 4
h. **Programming - Coordinate with Owner All i.
Dedicated electrical circuit & electrical wiring from electrical panel at mezzanine to Lenel panel
120V/20A 1/ All
j. Trade(s) Permit(s) Local Jurisdiction All
* ITEMS MUST BE PURCHASED FROM/ SUPPLIED BY A LENEL VALUE ADDED RESELLER (LENEL
VAR).
** READER PROGRAMMING MUST BE PERFORMED BY A CERTIFIED LENEL RESELLER.
Site Photos:
| Project Description |
| Project Location |
| ODOT Contact |
| Scheduling of Contract |
| Clean-Up/Conditions of Site |
| Detailed Specifications |
| Submittals |
| Close-Out |
| Material List: |
File details come from the government source that posted it. Updated .