About this file
This document is a Mini-RFP (Request for Proposals) issued by the Oregon Department of Transportation (ODOT) for a Work Order Contract (WOC) assignment under their ADA Full Service Price Agreement (PA) series Tier B Firms. The services requested include professional design and related services for approximately 315 curb ramps and pedestrian-activated signals at signalized intersections and mid-block crossings on state highways in Myrtle Point, Bandon, Reedsport, and Gold Beach in Coos and Curry Counties. The expected outcome is to deliver the project from conceptual design through final Plans, Specifications and Estimate (PS&E), with the potential for a second phase of contract administration and construction support. The WOC is anticipated to start within 6 weeks of intent to award and be completed by June 1, 2028.
The funding sources for this project are the Federal Highway Administration and the State of Oregon. The method of compensation will be determined by ODOT and may include cost-plus-fixed-fee, fixed price, time and materials, or a combination. A 6% Disadvantaged Business Enterprise (DBE) participation goal has been assigned. ODOT is not obligated to proceed with final design for any alternative and will evaluate all reasonable alternatives before issuing the relevant NEPA decision documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35718_Attachment B_SOW_Final.pdf | ||
| 5709-0 ADDENDUM 1.docx | DOCX document | |
| 35718_Addenda 1.pdf | ||
| 35718_Attachment A_Proposal Cover Sheet.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mini-RFP Template (5/5/22) 1
OREGON DEPARTMENT OF TRANSPORTATION
A&E Services
MINI-RFP/“Open Market Bid Number”: S-73000-00007383
(PCMS Number: 37518) for
Work Order Contract (“WOC”) Assignment Under ADA Full Service Price Agreement (“PA”) series Tier B Firms
[NOTE: Only Consultants that have been awarded a PA in the above PA series may respond to this Mini-RFP.]
Project Name: Southwest Oregon 2024-2027 ADA Curb Ramp Design, Phase I
Project Location: Myrtle Point, Oregon; Bandon, Oregon; Reedsport, Oregon; and Gold Beach, Oregon
ODOT Key Number: 23062
DBE Participation Goal: 6% (see section 1.5.1 for more information)
PROPOSAL SUBMISSION DEADLINE: See “Bid Ending Date” and time for this Mini-RFP in OregonBuys.
Buyer/Single Point of Contact: See “Buyer” for this Mini-RFP in OregonBuys.
Accessibility: The Oregon Department of Transportation is committed to complying with all statutory requirements to ensure that it is providing information that is more accessible to people with disabilities, as required by Section 508 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794d), and 36 C.F.R. 1194 Appendix A. This includes information regarding the solicitation process. Please contact the Single Point of Contact (“SPC”) identified in OregonBuys (see “Buyer”) to request reasonable accommodation for access, due to a disability, to information related to this solicitation, or the solicitation process, or both. Accommodation requests must be received by the SPC 3 business days prior to the Proposal Submission Deadline (see “Bid Ending Date” and time in OregonBuys).
Non-Discrimination Notice: ODOT in accordance with the Title VI of the Civil Rights Act of 1964, 78 Stat. 252. 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all Bidders that it will affirmatively ensure that all business enterprises will be afforded full opportunity
Mini-RFP Template (5/5/22) 2 to submit bids in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
SECTION 0.0 OREGONBUYS
This Mini-RFP is advertised in OregonBuys (https://oregonbuys.gov/bso/) as an Informal Quote, which is open only to registered vendors that have an existing PA with ODOT for the needed Services.
0.1 INFORMATION AND ATTACHMENTS INCORPORATED FROM OREGONBUYS
In addition to the provisions set forth and linked within the Mini-RFP, the Mini-RFP incorporates by this reference the information published on the OregonBuys Informal Quote page for this Mini-RFP, including but not limited to:
• The Bid Ending Date and time specified under the Active Informal Quotes section;
• The Buyer name and contact information specified in the Header Information section;
• Any documents, forms, or other files linked in the Informal Quote Attachments section.
0.2 CROSSWALK OF TERMS USED IN OREGONBUYS
Definition of terms used in OregonBuys.
Bid Ending Date means “Closing” as defined in OAR 137-046-0110(5). In OregonBuys it is the deadline for submitting Quotes (Bids, Proposals or other required responses) required for an Informal Quote.
Change Order means A formal change to an existing MBPO (i.e., any form of contract; agreement;
price agreement or on-call contract, etc.; purchase order; or WOC).
Master Blanket Purchase Order (“MBPO”) means Any form of contract, agreement (i.e. price agreement, on-call contract, etc.), purchase order or WOC.
Quote or Informal Quote means Any form of offer submission by vendors; i.e., Bids, Technical Proposals, Price Proposals, or any other type of offer required by a Bid Solicitation or a Mini-RFP.
Vendor means Any form of business entity registered in OregonBuys. Only registered vendors are eligible to submit a Quote and enter into Purchase Orders, MBPOs, or Release Requisitions pursuant to a Bid Solicitation or Mini-RFP advertised in OregonBuys.
0.3 GUIDANCE FOR OREGONBUYS
For quick reference information regarding common questions from vendors when using OregonBuys, see User Guides under “OregonBuys eProcurement System” on the Contracting with ODOT webpage:
https://www.oregon.gov/odot/Business/Procurement/Pages/HowTo.aspx.
SECTION 1.0 SOLICITATION INFORMATION AND REQUIREMENTS
1.1 SUMMARY OVERVIEW AND WORK ORDER CONTRACT (“WOC”) OBJECTIVES
The Project Location is various highways throughout Region 3 in Southern Oregon.
The Project Location is state highways located in Myrtle Point/ Bandon/ Reedsport/ Gold Beach (“Cities”) on OR42 MP 20.53 to MP 21.84, US101 MP 273.36 to MP 274.48, US101 MP 211.91 to
212.45 and US101 MP 327.49 to 329.64 in Coos and Curry County (“Counties”).
https://oregonbuys.gov/bso/ https://oregonbuys.gov/ https://www.oregon.gov/odot/Business/Procurement/Pages/HowTo.aspx
Mini-RFP Template (5/5/22) 3
Services included in this potential Work Order Contract (“WOC”) consist of professional design services and related services associated with approximately 315 curb ramps at signalized and non-signalized intersections and mid-block crossings (“Project Curb Ramps”) and pedestrian-activated signals at signalized intersections and mid-block crossings (“Project Pedestrian Signals”) on and adjacent to Agency Right of Way (“ROW”), from Conceptual Design through final Plans, Specifications and Estimate (“PS&E”) as well as Bid Assistance services (all collectively the “Services”).
Oregon Department of Transportation (“Agency” or “ODOT") is requesting supplemental information regarding specific A&E and Related Services experience relevant to the above referenced public improvement project (the “Project”). The needed Services are further described in the attached Statement of Work (“SOW”). The expected outcome of the WOC is to deliver the Project from Conceptual Design through PS&E. Proposers responding to the Mini-RFP do so solely at their expense.
Agency is not responsible for any Proposer expenses associated with the Mini-RFP.
The selected Proposer and Agency will negotiate the delivery schedule, costs and final Statement of Work, within the scope of what is advertised here, for inclusion in the final WOC.
The WOC is anticipated to start within 6 weeks of Intent to Award, and is expected to be completed by June 1, 2028. Pending successful negotiations, the selected Proposer shall perform its obligations according to the WOC and applicable terms and conditions of the parent PA and exhibits thereto.
Agency anticipates the construction budget for this Project will not exceed $19,270,000. The Project currently does not have construction funding.
Funding Source(s):
Federal Highway Administration State of Oregon
WOC Payment. Payment will be made for completion of, or acceptable monthly progress on, tasks and deliverables in conformance with PA requirements and all applicable standards. The method of compensation will be determined by Agency and may be based on any of the following methods (may include more than 1 method – “Mixed”):
• Cost Plus Fixed-fee, up to a maximum NTE amount;
• Fixed Price for all Services; Fixed Price per Deliverable; Fixed Price per Milestone;
• Time and Materials, up to a maximum NTE amount;
• Price per Unit.
For further information see PA, Exhibit B “Compensation”.
WOC Phases. The contracted Services will be a phased development as follows:
• Phase I – Conceptual Design through Plans, Specifications and Estimate
• Phase II – Contract Administration/Construction Engineering and Inspection or Construction
Support Agency is not obligated to proceed with final design for any alternative; all reasonable alternatives will be evaluated and given appropriate consideration, and the Consultant under the WOC may not proceed with final design until the relevant NEPA decision documents have been issued.
Mini-RFP Template (5/5/22) 4
Following completion of Phase I, Agency may, at its discretion:
• Amend this WOC to add Phase II tasks – or
• Elect to complete Phase II tasks with in-house staff, or
• Award Phase II tasks to another consulting firm.
Agency and Consultant shall negotiate the detailed tasks, deliverables, schedule and costs for each phase Agency elects to add. Each added phase will be authorized only by written WOC amendment with all required approvals and signatures.
Offer Period: A Proposer's Proposal is a firm offer, irrevocable, valid and binding on the Proposer for not less than 180 days following the closing date for this Mini-RFP. Agency may request, either orally or in writing, that Proposer extend the offer period in writing.
Future Work Limitations: (For these purposes, “Affiliate” or “Affiliates” of a consultant means any Person or entity that controls, is controlled by or is under common ownership or control with that consultant.)
• If a consultant is awarded a WOC to prepare an Environmental Impact Statement, Environmental Assessment, Categorical Exclusion or designs and plans/specifications for a project, that consultant and its Affiliates will not be eligible to propose/bid on or enter into a contract to construct that project.
• If preliminary engineering and final design will be performed under the prospective WOC, Agency is not obligated to proceed with final design for any alternative. All reasonable alternatives will be evaluated and given appropriate consideration, and consultant may not proceed with final design until the relevant NEPA decision documents have been issued (e.g., Categorical Exclusion, Finding of No Significant Impact, or Record of Decision).
• If a consultant is awarded a WOC to prepare an Environmental Impact Statement, Environmental Assessment or Categorical Exclusion for a project, that consultant and its Affiliates may prepare the designs/plans/specifications for the project or may propose under a separate solicitation to prepare designs/plans/specifications for the project only if Agency concludes that the NEPA document was prepared with objectivity. Agency is not obligated to proceed with final design for any alternative. All reasonable alternatives will be evaluated and given appropriate consideration, and consultant may not proceed with final design until the relevant NEPA decision documents have been issued (e.g., Categorical Exclusion, Finding of No Significant Impact, or Record of Decision).
• If a Consultant or an Affiliate of Consultant enters into a WOC or other contract for the purposes of administering, managing, monitoring, inspecting, evaluating compliance with or otherwise overseeing a public contract, that Consultant or an Affiliate of that Consultant will not be eligible to enter into a public contract that is subject to administration, management, monitoring, inspection, evaluation or oversight by means of the personal services. See ORS 279C.307, and 279C.307(3) regarding possible Agency applications for exceptions.
• If a Consultant or any Associate of Consultant enters into a WOC or other contract with Agency for the purpose of advising or assisting in developing specifications, a scope or statement of work, an invitation to bid, a request for proposals or other solicitation documents and materials related to a given procurement, the Consultant may not be eligible to propose/bid on the prospective procurement (based on a case-by-case assessment by Agency).
Mini-RFP Template (5/5/22) 5
1.2 QUESTIONS AND CLARIFICATIONS
1.2.1 PROPOSER QUESTIONS AND AGENCY RESPONSES
The “Buyer” identified in OregonBuys for this Mini-RFP is the Agency’s Single Point of Contact for this solicitation. All inquiries regarding this procurement, whether relating to the Mini-RFP process, administration, deadline or award, potential COI issues, or to the intent or technical aspects of the Services must be submitted in writing via e-mail to the Buyer. Failing to follow the foregoing requirements regarding the Buyer/Single Point of Contact for inquiries may result in Proposal rejection by Agency.
All questions must be received not later than 5 business days prior to the Proposal submission deadline.
Question and Answer documents, if any, will be posted on OregonBuys (in the Informal Quote Attachments section for this Mini-RFP) to respond to inquiries that Agency determines, in its sole discretion, do not effect changes to this Mini-RFP. Question and Answer documents provide clarifications and interpretations but do not change Mini-RFP requirements.
1.2.2 ADDENDA
Answers to questions Agency receives and that Agency, in its sole discretion, determines are substantive and provide new information, will be issued as official Addenda to this Mini-RFP.
When appropriate, as determined by Agency in its sole discretion, revisions, substitutions, or clarifications of the Mini-RFP will be issued as Addenda to this Mini-RFP. Changes or modifications to this Mini-RFP will be binding on Agency only if in the form of written Addenda issued by the Agency. Any Addenda to this Mini-RFP will be published on OregonBuys in the Informal Quote Attachments section for this Mini-RFP.
1.3 PUBLIC RECORDS
After the evaluation/selection and negotiation process is complete, Proposals will be open to public inspection in accordance with ORS 279C.107. If a Proposal contains any information that may be considered exempt from disclosure under the various grounds specified in Oregon Public Records Law, ORS 192.311 through 192.478, the Proposer must clearly designate the portions of its Proposal that Proposer claims are exempt from disclosure, along with a justification and citation to the authority relied upon. Application of the Oregon Public Records Law shall determine whether any information is actually exempt from disclosure. Identifying the Proposal in whole as exempt from disclosure is not acceptable. If Proposer fails to identify the portions of the Proposal that Proposer claims are exempt from disclosure and the authority used to substantiate that claim, Proposer is deemed to waive any future claim for non-disclosure of that information.
1.4 PROPOSAL AND SUBMISSION REQUIREMENTS (“PASS/FAIL” AND “REQUIRED” ITEMS)
1.4.1 PASS/FAIL
• Items in Section 1.4 marked as “PASS/FAIL” that are incomplete (except for minor informalities), not submitted by Proposal due date and time, or are otherwise not in substantial conformance with the requirement, will be rejected as non-responsive. Proposals must comply with ALL requirements marked as “PASS/FAIL” to be considered for further evaluation.
Mini-RFP Template (5/5/22) 6
1.4.2 REQUIRED ITEMS AND SCORING DEDUCTIONS
• Proposals will receive a 2% scoring deduction, based upon the total available points, for each item in Section 1.4 marked as “REQUIRED” that is incomplete (except for minor informalities) or not submitted with the Proposal in substantial conformance of the requirement.
Incomplete or missing items must be completed and submitted within 2 business days of e-mail request by Agency (this does not apply to “PASS/FAIL” items which must be submitted by Proposal due date and time). Missing or incomplete items must be delivered via e-mail. In order to provide an appropriate time stamp. Failure to complete and deliver missing or incomplete “REQUIRED” items within 2 business days of request by Agency shall result in Proposal rejection. Time limitations will be based upon the time of the e-mail sent by Agency and the time of the e-mail sent in response to Agency notification. ·
• Proposals not in conformance with the 12-point minimum font requirements for substantive text (including text in tables) and 11-point minimum font size for resumes or Key Staff Resume form (if required) will receive a 3% scoring deduction and will not be sent back to Proposer for correction.
• Scoring deductions are on an average score per Proposal basis and not a deduction per evaluator. For example, if a Proposer received an average score of 92 points from the evaluation committee, a 2 percent scoring deduction would result in a Proposal score of 90.
(Percentage will be rounded to either the lower number if under .5% or to the higher number if .5% or over.)
1.4.3 PROPOSAL
The Proposal must describe how Proposer meets the requirements that are specified in this Mini-RFP as related to the scoring criteria below. Be clear and concise.
1.4.4 RESERVED
1.4.5 PROPOSAL COVER SHEET (REQUIRED)
The Proposal must include a completed Proposal Cover Sheet using the form attached below as an electronic file, with the “APPROVED” checkbox marked to certify approval.
1.4.6 PROPOSAL SUBMISSION DEADLINE (PASS/FAIL)
Agency will not accept Proposals submitted after the Proposal submission deadline, which is specified as the Bid Ending Date and time for this Mini-RFP in OregonBuys.
1.4.7 SUBMITTAL FILE SIZE AND REQUIRED FORMS (REQUIRED)
The total combined size of all files for Proposal, Coversheet and any forms must not exceed 5 megabytes.
• (REQUIRED) Key Staff Resumes form (using Agency form and minimum 11-point font). Key Staff Resumes form is, available at:
https://www.oregon.gov/odot/Business/Procurement/DocsPSK/keystaff.docx.
https://www.oregon.gov/odot/Business/Procurement/DocsPSK/keystaff.docx
Mini-RFP Template (5/5/22) 7
1.4.8 SUBMITTAL VIA OREGONBUYS
All required submittals must be submitted via OregonBuys (submittals by any other means will be rejected).
When submitting a Proposal (“Quote”) in response to this Mini-RFP:
• Do not enter pricing or any other information in the Item Information section.
1.4.9 FORMAT FOR PROPOSAL AND PAGE LENGTH LIMITATION
The Proposal must be organized in accordance with the list of Scoring Criteria categories in Section
2.2. The Proposal must not exceed 5 pages, excluding Proposal Cover Sheet, any tabs or indexes, table of contents, BOC or other price information (if applicable), “Key Staff Resumes” (if required, including any limitations, in Section 2.2), and Reference Forms (if required). If a Proposer submits a Proposal exceeding this limit, Agency will consider the pages up to the allowable page limit and discard all subsequent pages. The Proposer may choose how to allocate the number of pages between any sections, within the overall page limit.
One Page is defined as: one side of a single 8-1/2" x 11" page, with 12-point minimum font size for the substantive text (including text in tables) and 11-point minimum font size for resumes or Key Staff Resume form. Any page over this size will be counted as 2 pages. Any page, or partial page, tabs, indexes or table of contents with substantive text, tables, graphics, charts, resumes, etc., will be counted as 1 page.
• The Proposal Cover Sheet, Proposal, and Key Staff Resumes must be submitted as a single combined pdf file.
• Conflict of Interest (“COI”) information (see Attachment A, Coversheet) must be submitted as a separate pdf file.
(REQUIRED) Proposals must use 12-point minimum font size for the substantive text in Proposals (including text in tables). “Key Staff Resumes” (if required) or other resume formats (if required) must use an 11-point minimum font. Proposers may use their discretion for the font size of other materials that do not include substantive text (e.g. headings, graphics, picture or graphics captions, and org charts). If hard copies are required, Proposers are to submit Proposals on recycled white paper (stapled only), without binders or cover-stock. If a Proposer submits a Proposal with cover-stock or binding, Agency will remove and recycle them.
1.4.10 TERMS AND CONDITIONS (PASS/FAIL)
Unless otherwise provided in this Mini-RFP, by submitting a Statement of Proposal (SOP), each Proposer agrees to be bound by and comply with the terms and conditions of the Proposer’s existing PA, as amended. Any SOP that is conditioned on Agency’s acceptance of terms and conditions other than those set forth in the existing PA and the requirements specified in this Mini-RFP (as they may be revised by an addendum to this Mini-RFP) will be rejected as non-responsive.
1.5 DBES AND CERTIFIED SMALL BUSINESSES
1.5.1 DISADVANTAGED BUSINESS ENTERPRISE (“DBE”)
The WOC will include Federal funding:
• A DBE participation goal, as set forth on page 1, has been assigned for the prospective WOC.
This goal will apply to the overall WOC including amendments. If a given phase of the WOC
Mini-RFP Template (5/5/22) 8
(such as CA-CEI, if applicable) will include little or no opportunity for DBEs, then DBE utilization in other phases of the WOC will need to be sufficient to meet the overall WOC goal.
Exceptions for a given WOC or amendment will need to be assessed by Agency on a case-by-case basis.
See PA Exhibit E or, for No-Goal WOCs, Exhibit E.1for:
• information on reporting requirements and how credit toward meeting an assigned DBE participation is determined (for goal and no-goal WOCs), and
• further explanation and description of the DBE program.
SECTION 2.0 PROPOSAL EVALUATION & CONSULTANT SELECTION
2.1 EVALUATION PROCESS
2.1.1 EVALUATION
Agency will evaluate Proposals in accordance with the Pass/Fail criteria identified in Section 1.4.
Proposals meeting those criteria will be forwarded to an evaluation committee of at least 3 members that will independently review, score and rank Proposals according to the Scoring Criteria set forth in Section 2.2.
The outcome of the Evaluation process may, at the Agency’s sole discretion, result in:
(a) notice to Proposer(s) of selection or rejection for WOC negotiation and possible award;
(b) further steps to gather additional information for evaluation, (e.g. checking references, notice of placement on an interview list, requesting clarification); or
(c) cancellation of the Mini-RFP and either re-issuance of the Mini-RFP in the same or revised form or no further action by Agency with respect to the Mini-RFP.
Agency reserves the right to reject any or all Proposals and reserves the right to cancel this Mini-RFP at any time if doing either would be in the public interest as determined by Agency. Agency is not liable for any costs a Proposer incurs while preparing or presenting the Proposal or during further evaluation stages. All unreturned Proposals will become property of Agency and part of the public file without obligation to Agency.
2.1.2 INTERVIEWS/FOLLOW-UP QUESTIONS
Agency may conduct interviews/follow-up questions. If interviews/follow-up questions are conducted, the following will apply:
• The number of Proposers selected for interviews/follow-up questions is at the sole discretion of Agency.
• A minimum of 3 evaluators shall score the interviews/follow-up questions;
• Interview/follow-up question scores (up to a maximum of 50 points) will be combined with the other criteria scores to arrive at a total score. The total score will be ranked to determine the apparent successful Proposer.
• Interviews normally require physical attendance at Agency’s offices; however, Agency may elect to conduct interviews via teleconference or video conference. Further details will be included with notification of time and date of interviews, if conducted.
• Evaluation and scoring will be based on one or more of the following criteria:
o Understanding of Requested Services
Mini-RFP Template (5/5/22) 9 o Technical Approach o Project Management/Cost Effectiveness o Proposer’s General Qualifications o Proposer’s Capabilities o Proposer’s Relevant Experience o Project Team and Qualifications
2.1.3 REFERENCES (RESERVED)
2.1.4 AGENCY QUESTIONS
Agency may require any clarification it needs to understand the Proposer’s Proposal. Any necessary clarifications or modifications which are in the best interest of the Agency may be made before the Proposer is awarded a WOC, and some or all of the clarifications or modifications may become part of the final WOC.
2.1.5 METHOD OF AWARD
The total scores and selection for tentative WOC assignment will be determined as follows:
• Total Proposal Score = Total of all evaluator scores for a given Proposal, divided by the number of evaluators, minus any SCORING DEDUCTIONS received per Section 1.4.
• Total Interview Score (if conducted) = Total of all evaluator scores for a given interviewee, divided by the number of evaluators.
Final Score = Total Proposal Score plus Total Interview Score (if conducted).
Agency will negotiate the payment amount and methodology with the top ranked Proposer (based on Final Scores). If negotiations are not successful, Agency may terminate negotiations with the top ranked Proposer and may begin negotiations with the next highest ranked Proposer and so on, until successful negotiations are completed or Agency determines that cancellation of this Mini-RFP is in the best interest of the State.
2.2 SCORING CRITERIA
Proposal scoring will be based on the criteria stated in the subsections below.
2.2.1 EVALUATION ITEM 1 – SPECIFIC EXPERIENCE OF KEY STAFF MAX POINTS: 30
Specific Experience of Key Staff: Complete a “Key Staff Resumes” form available at http://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx.
Provide information for the proposed Project Manager and other key staff (prime and subconsultant) that you believe are most important based on your understanding of the needed Services.
Scoring will be based on relevance of the experience, qualifications, and technical competence of Project Manager and key staff, including key subconsultants proposed for use on this specific Project. Scoring will also consider prior relevant work done together by the prime and the subconsultant(s) – regardless of which firm acted as prime and which acted as subconsultant.
Key Staff Resumes are not included in the Proposal page limit identified for this solicitation; however, a maximum of 4 Key Staff Resumes may be submitted. Any resumes submitted beyond this limit will be discarded by Agency and will not be included in the evaluation. The fields on the Key Staff http://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx
Mini-RFP Template (5/5/22) 10
Resumes form may be expanded, but may not exceed 1 page per resume and must use a minimum of 11 point font for substantive text.
2.2.2 EVALUATION ITEM 2 – APPROACH MAX POINTS: 50
• Describe your firm’s approach to deliver the work identified in Phase 1 of the Statement of
Work, include any unique challenges your firm may encounter and the strategy and staffing used in your approach.
(25 points)
• Describe your firm’s approach to deliver the potential work identified in Phase 2 of the Statement of Work, include any unique challenges your firm may encounter and the strategy and staffing used in your approach.
(25 points)
2.2.3 EVALUATION ITEM 3 – PROJECT SAMPLES MAX POINTS: 20
Provide 3 project samples comparable to the requested services performed by your team (at least one project from your firm), preferably with your proposed subconsultants, within the last 6 years. For the sample projects -
• Describe their relevance to the Project and Services included in this solicitation, including descriptions of how any outstanding issues and project constraints were addressed and resolved.
• Include a brief description of project type, location, size, duration and objectives; a list of key project staff and their roles; tasks performed by the Proposer to fulfill the project objectives;
the project budget, and whether the schedule and budget were met.
Include 2 reference contacts for each project with current contact information.
2.2.3 EVALUATION ITEM 3 – QUALITY MANAGEMENT MAX POINTS: 20
• Describe safeguards Propose will follow to assure quality and consistency in services and deliverables provided by Proposers entire team including subconsultants.
• Describe actions Proposer will take to correct any errors made throughout a project, including construction services.
• Describe how and when Proposer would determine that a client’s total project budget was insufficient to meet the objectives of a given project and the approach Proposer would use to demonstrate that to the client as early as possible during the PE-Design phase.
2.2.5 PROPOSAL SCORE SUMMARY
Total Maximum Points for Proposal 120 Maximum Points for Interviews/Follow-up Questions (if conducted) 50 Maximum Possible Total Score 170
Mini-RFP Template (5/5/22) 11
2.3 AWARD REQUIREMENTS
2.3.1 COST DATA
Following development of the Statement of Work, the selected Proposer shall submit a detailed Breakdown of Costs ( BOC or BOC-NBR, as applicable, available at https://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx) with cost information as required in the WOC Assignment and Requirements Exhibit of the PA.
2.3.2 COMMITTED DBE BREAKDOWN AND CERTIFICATION FORM-AE
During negotiations of the WOC, Consultant shall submit a Committed DBE Breakdown and Certification Form-AE (one for each DBE subcontractor that will be utilized) if a DBE goal greater than 0% is assigned to the WOC. [Note: The Committed DBE Breakdown and Certification Form-AE will not be required for WOCs with no goal assignment or if a DBE goal is not required (i.e., if WOC includes no federal funding)]. The Committed DBE Breakdown and Certification Form-AE must be submitted and approved prior to WOC execution and shall be used to determine Consultant’s responsiveness to the DBE requirements. See PA Exhibit E, DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROVISIONS for detailed requirements.
The Committed DBE Breakdown and Certification Form-AE is available at:
https://www.oregon.gov/odot/Forms/2ODOT/7345235.pdf.
2.3.3 PROPOSER RESPONSIBILITY, DEBT OWED to STATE
Agency may reject an offer and rescind the Intent to Award notice if Agency determines Proposer is not responsible or if Proposer has liquidated and delinquent debt owed to the State or any department or agency of the State.
2.3.4 CONSULTANT QUALITY PLAN (“CQP”)
A CQP consistent with the requirements of Agency’s “Consultant Quality Plan Guidance” (linked below) must be on file with Agency. The apparent successful Proposer shall provide a CQP for Agency’s review and approval if:
• An approved CQP for the applicable PA is not on file at Agency;
• The CQP on file is not in conformance with the requirements of the current Consultant Quality
Plan Guidance linked below;
• The CQP on file is not applicable to the Services required for this Project; or
• There are changes to quality management processes or organizational structure from what is in the approved CQP while the PA is in effect.
If required per the above criteria, submit a new/updated CQP (in PDF format) within 7 calendar days of Intent to Award notice (see instructions and email box for submittal in section 4.1 of the Consultant Quality Plan Guidance linked below). Agency may rescind the award for any apparent successful Proposer that does not submit an updated CQP, if applicable, in the time requested and may select the next highest ranked firm for award.
The CQP must be developed consistent with requirements of Agency’s “Consultant Quality Plan Guidance” (https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance.pdf).
A sample CQP template, as referenced in the Consultant Quality Plan Guidance, is available at:
https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance_AppA_2share.docx.
https://www.oregon.gov/odot/Forms/2ODOT/7345235.pdf https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance.pdf https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance_AppA_2share.docx
Mini-RFP Template (5/5/22) 12
The above documents and other QA/QC guidance can be found on the Quality Plans and Guides webpage at: https://www.oregon.gov/odot/ProjectDel/Pages/Quality-Guides.aspx.
SECTION 3.0 STATEMENT OF WORK (or) SUMMARY of TASKS, DELIVERABLES & SCHEDULE See Attachment B, Sample Work Order Contract. Please note – Agency reserves the right to use an updated template for the final Work Order Contract.
https://www.oregon.gov/odot/ProjectDel/Pages/Quality-Guides.aspx
| OREGON DEPARTMENT OF TRANSPORTATION |
| A&E Services |
| MINI-RFP/“Open Market Bid Number”: S-73000-00007383 |
| (PCMS Number: 37518) |
| for |
| Work Order Contract (“WOC”) Assignment Under ADA Full Service Price Agreement (“PA”) series Tier B Firms |
| SECTION 0.0 OREGONBUYS |
| 0.1 INFORMATION AND ATTACHMENTS INCORPORATED FROM OREGONBUYS |
| 0.2 CROSSWALK OF TERMS USED IN OREGONBUYS |
| 0.3 GUIDANCE FOR OREGONBUYS |
| SECTION 1.0 SOLICITATION INFORMATION AND REQUIREMENTS |
| 1.1 SUMMARY OVERVIEW AND WORK ORDER CONTRACT (“WOC”) OBJECTIVES |
| Funding Source(s): |
| WOC Payment. Payment will be made for completion of, or acceptable monthly progress on, tasks and deliverables in conformance with PA requirements and all applicable standards. The method of compensation will be determined by Agency and may be based o... |
| WOC Phases. The contracted Services will be a phased development as follows: |
| Offer Period: A Proposer's Proposal is a firm offer, irrevocable, valid and binding on the Proposer for not less than 180 days following the closing date for this Mini-RFP. Agency may request, either orally or in writing, that Proposer extend the offe... |
| Future Work Limitations: (For these purposes, “Affiliate” or “Affiliates” of a consultant means any Person or entity that controls, is controlled by or is under common ownership or control with that consultant.) |
| 1.2 QUESTIONS AND CLARIFICATIONS |
| 1.2.1 PROPOSER QUESTIONS AND AGENCY RESPONSES |
| 1.2.2 ADDENDA |
| 1.3 PUBLIC RECORDS |
| 1.4 PROPOSAL AND SUBMISSION REQUIREMENTS (“PASS/FAIL” AND “REQUIRED” ITEMS) |
| 1.4.1 PASS/FAIL |
| 1.4.2 REQUIRED ITEMS AND SCORING DEDUCTIONS |
| 1.4.3 PROPOSAL |
| 1.4.4 RESERVED |
| 1.4.5 PROPOSAL COVER SHEET (REQUIRED) |
| 1.4.6 PROPOSAL SUBMISSION DEADLINE (PASS/FAIL) |
| 1.4.7 SUBMITTAL FILE SIZE AND REQUIRED FORMS (REQUIRED) |
| 1.4.8 SUBMITTAL VIA OREGONBUYS |
| 1.4.9 FORMAT FOR PROPOSAL AND PAGE LENGTH LIMITATION |
| 1.4.10 TERMS AND CONDITIONS (PASS/FAIL) |
| 1.5 DBES AND CERTIFIED SMALL BUSINESSES |
| 1.5.1 DISADVANTAGED BUSINESS ENTERPRISE (“DBE”) |
| SECTION 2.0 PROPOSAL EVALUATION & CONSULTANT SELECTION |
| 2.1 EVALUATION PROCESS |
| 2.1.1 EVALUATION |
| 2.1.2 INTERVIEWS/FOLLOW-UP QUESTIONS |
| 2.1.3 REFERENCES (RESERVED) |
| 2.1.4 AGENCY QUESTIONS |
| 2.1.5 METHOD OF AWARD |
| 2.2 SCORING CRITERIA |
| 2.2.1 EVALUATION ITEM 1 – SPECIFIC EXPERIENCE OF KEY STAFF MAX POINTS: 30 |
| 2.2.2 EVALUATION ITEM 2 – APPROACH MAX POINTS: 50 |
| 2.2.3 EVALUATION ITEM 3 – PROJECT SAMPLES MAX POINTS: 20 |
| 2.2.3 EVALUATION ITEM 3 – QUALITY MANAGEMENT MAX POINTS: 20 |
| 2.2.5 PROPOSAL SCORE SUMMARY |
| 2.3 AWARD REQUIREMENTS |
| 2.3.1 COST DATA |
| 2.3.2 COMMITTED DBE BREAKDOWN AND CERTIFICATION FORM-AE |
| 2.3.3 PROPOSER RESPONSIBILITY, DEBT OWED to STATE |
| 2.3.4 CONSULTANT QUALITY PLAN (“CQP”) |
SECTION 3.0 STATEMENT OF WORK (or) SUMMARY of TASKS, DELIVERABLES & SCHEDULE
File details come from the government source that posted it. Updated .