35640_Rosehill Question and Answer 1.docx
DOCX document 15 KB Posted
- Attached to
- ESB Rosehill Decommission - Tower Removal
- Solicitation number
- S-73000-00006570
- Issued by
- Douglas County, Oregon
About this file
This document contains Questions and Answers #1 related to Invitation to Bid (ITB) 73000-00006570/35640 for the ESB Rosehill Decommission - Tower Removal project in Marion County and Salem City, Oregon. The project involves the removal of a tower and associated ice bridge, including the removal of the tower's legs from the foundation. Power is not currently connected to the tower, and the grounding rods can remain in place. The contract requires the areas where the tower legs connect to the foundation to be ground down smooth.
The document provides clarification on several technical aspects of the tower removal, including the scope of the ice bridge removal, the grounding cable, and the lack of any connected radio equipment or shelter contents. This information is intended to assist bidders in preparing their responses to the ITB for this state and local contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35640 Preliminary Bid Tabs.xlsx | XLSX spreadsheet | |
| 35640_ESB_RFCQ_Rosehill Tower Removal.pdf | ||
| 35640 Exhbit 2 Site Location and Photographs.pdf | ||
| 35640_ESB_RFCQ_Attachments_Rosehill Tower Removal.pdf | ||
| Rose Hill Photos 230510.pdf | ||
| Addendum 2 SOCC RFP Food Truck.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #1
ITB 73000-00006570/35640
ESB Rosehill Decommission – Tower Removal
1. Are both ice bridges being removed or just the one listed on the SOW.
0. The instruction per the land owner is to remove all remnants of the tower itself. This only includes the modified ice bridge that is attached to the tower and shelter. The two post ice bridge will stay
1. Is power connected to the tower?
1. No, power is not connected to the tower. The flex cable you see is a grounding cable that goes from tower to a grounding bar on a shelter. (You can see this in the photos, see attachment: Rose Hill Photos 230510)
1. Will the grounding rods stay?
2. Yes, they can stay
1. Do you want the bolts that hold the tower to the foundation removed?
3. Yes, after further discussion, we would like the areas where the legs of the tower connect to the foundation ground down smooth to the surface of the foundation.
1. Is the antenna connected to anything in the shelter?
4. No, there is no longer any radio equipment or anything else that works with the tower. (Photo shows the coax and grounding cable are not connected to anything in the shelter, see attachment: Rose Hill Photos 230510)