35397 Preliminary Bid Results.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- ESB Basques Tree Trimming/Removal Project
- Solicitation number
- S-73000-00004076
- Issued by
- Marion County, Keizer City, Oregon
About this file
This document is a preliminary bid tabulation for the ESB Basques Tree Trimming/Removal Project in Malheur County and Juntura CDP, Oregon. The project involves the removal of trees, stumps, and dead limbs, with an estimated quantity of 1 lump sum. Bids were due on September 27, 2022, at 10:00 AM, and this bid tabulation serves as the Oregon Department of Transportation's (ODOT) notice of intent to award a contract. The lowest responsive bid was submitted by O'Malley Brothers Corporation for $85,752.50.
The bid tabulation includes unit prices and total prices for the three bidders: O'Malley Brothers Corporation, Hueckman Contracting, and Strong Contracting. Aggrieved bidders have a specified number of calendar days from the issued date to protest the intent to award. This bid tabulation is not an indicator of the final award, but rather a tabulation of the bids submitted for consideration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/27/22 | ||||||
| ITB No. | S-73000-0004076/35397 | BIDDER | |||||
| NAME: | O'Malley Brothers Corporation | Hueckman Contracting | Strong Contracting | ||||
| Bid Closing: | September 27, 2022 @ 10:00 AM | CITY/STATE: | Gresham OR | Canyon City OR | John Day OR | ||
| Description: | ESB Basques Tree Trimming/Removal Project | CCB#: | |||||
| This bid tabulation shall serve as ODOT's notice of intent to award a contract to (Insert Contractor Name). Aggrieved Bidders have __ (GTS ITB says 7 days, PW ITB says 5 days; confirm that duration here matches the ITB language) calendar days from the issued date shown above to protest the intent to award. (If a potential winning bid is rejected, repost the revised bid tab and restart the award protest period) |
(OR)
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Remove trees, stumps and trim dead limbs | 1 | LS | $ 85,752.50 | $ 85,752.50 | $ 138,900.00 | $ 138,900.00 | $ 148,690.00 | $ 148,690.00 |
| TOTAL | $ 85,752.50 | $ 138,900.00 | $ 148,690.00 |