The document is a Schedule of Material Submittals template for a federal construction contract, designed to track and manage various technical document submissions throughout a project lifecycle. The template provides a comprehensive tracking mechanism for contractors to record and document material submittals, including certification of compliance, shop drawings, samples, manufacturer's warranties, catalog data, operating instructions, technical data, test reports, and other critical project documentation.
The template is specifically associated with the SABER IDIQ (Simplified Acquisition for Base Engineering Requirements) solicitation (FA486125R0003) issued by the 99th Contracting Squadron at Nellis Air Force Base. This HUBZone-restricted competitive procurement covers a five-year period with a maximum potential ceiling of $185 million, focusing on design and construction projects ranging from $15,000 to $4 million. Task orders will encompass diverse engineering and construction services including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and infrastructure alterations, with proposals due by 11 November 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER: PROJECT TITLE: SOLICITATION / CONTRACT NO.:
| (To be completed by Project Engineer or Contractor) | (To be completed by Contract Administrator) | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE |
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date received from the Contractor. (MM/DD/YY)
DATE T CIVIL ENGINEERING
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the date the submittal is due back from CE
(MM/DD/YY) SUBMITTAL NUMBERS
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter Resubmittal Number
FINAL APPROVAL
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | |
| APPROVED |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter the submittal final approval date
(MM/DD/YY)
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Mock, Patrick W SMSgt USAF ACC 99 CONS/CS: Enter any comments pertaining to the submittal
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) |
File details come from the government source that posted it. Updated .