33330224RF0010003.pdf
PDF 672 KB Posted
- Attached to
- Renew Amphibian Reptile Conservation Center, Smithsonian’s National Zoo and Conservation Biology Institute
- Solicitation number
- 333302-24RF-0010003
- Issued by
-
Smithsonian Institution
About this file
This is a solicitation for architectural and engineering services to plan and design the renewal of the Reptile House at the Smithsonian's National Zoo and Conservation Biology Institute in Washington, D.C. into the new Amphibian Reptile Conservation Center. The $60 million project involves renovating approximately 35,000 square feet of the historic building over multiple years, with planning and design from fall 2024 through late 2026 and construction from 2027 through late 2029. Firms must submit qualifications by March 19, 2024 to provide multidisciplinary services including planning, design, construction documents, and construction phase support. Shortlisted firms may be invited for interviews in Washington, D.C. by early April. If selected, large businesses must include a subcontracting plan with at least 40% to small businesses and minimum goals for small disadvantaged, women-owned, HUBZone, veteran-owned, and service-disabled veteran-owned small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Questions Responses 1-17.pdf | ||
| 33330224RF0010003R2.pdf | ||
| 33330224RF0010003 A1.pdf | ||
| 33330224RF0010003R1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
33330224RF0010003
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
ORDER UNDER DPAS (15 CFR 700)
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP)
SEALED BID (IFB)
5. DATE ISSUED
1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES
1 96
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE
FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
OCON
SMITHSONIAN INSTITUTION
MRC 1200
PO Box 37012 Washington DC 20013-7012
1500 ET 03/19/2024
Christine Grant 202 grantca@si.edu
633-7290
PAGE(S)
Thomas Dempsey
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (Rev. 9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____120_________ calendar days (60 calendar days unless a different period is inserted x dHkOfdYXrDcWwFUYYzYA@addtodropbox.com
02/21/2024
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 96
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
33330224RF0010003
(A) (B) (C) (D) (E) (F)
This contract procurement is in accordance with the Brooks Architect-Engineer (AE) Act as implemented by the Federal Acquisition Regulation
(FAR) Subpart 36.6. The objective is to provide planning, design, construction document and construction phase services for the Smithsonian
Institution's National Zoo and Conservation
Biology Institute Amphibian Reptile Conservation
Center (ARCC).
The North American Industry Classification Code
(NAICS) for this procurement is 541310
(Architectural Services) and the size standard under this code is $12,500,000 (maximum average annual receipts to qualify as a Small Business per 13 CFR § 121.104 a). This announcement is open to all qualified businesses regardless of size. The contract awarded will be firm-fixed-price.
The solicitation number 33330224RF0010003 is provided in the attached PDF document to this announcement.
Please submit your responses by
3:00 pm Eastern Standard Time on April 12, 2024
Any questions should be submitted: (i) in writing
;and (ii) solely to Christine Grant, Contracting
Office; and (iii) transmitted via email to
Grantca@si.edu. Inquiries must be submitted no later than 3:00PM Eastern Standard Time March 5, 2024.
Except as outlined in the preceding sentence, telephone calls, personal visits, and e-mails to
SI staff to discuss this announcement are prohibited.
THIS IS NOT A REQUEST FOR A FEE PROPOSAL
OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NSN 7540-01-152-8067
A - Contract Form
B - Services
C - Description/Specifications
D - Packaging And Marking
E - Inspection And Acceptance
F - Deliveries Or Performance
G - Contract Administration Data
H - Special Contract Requirements
I - Contract Clauses
J - List Of Documents, Exhibits And Other Attachments
K - Representations, Certifications, And Other Statements Of Bidders
L - Instructions,Conditions, And Notices To Bidders
M - Evaluation Factors For Award
Table of Contents
333302-24-RF-0010003 Renew Amphibian Reptile Conservation Center
A - Contract Form
See attached from SF 33
B - Supplies or Services/Price
This contract procurement is in accordance with the Brooks Architect-Engineer (AE) Act as implemented by the Federal Acquisition Regulation (FAR) Subpart 36.6. The objective is to provide planning, design, construction document and construction phase services for the Smithsonian Institution’s National Zoo and Conservation Biology Institute Amphibian Reptile Conservation Center (ARCC). The North American Industry Classification Code (NAICS) for this procurement is 541310 (Architectural Services) and the size standard under this code is $12,500,000 (maximum average annual receipts to qualify as a Small Business per 13 CFR § 121.104 a). This announcement is open to all qualified businesses regardless of size. The contract awarded will be firm-fixed-price.
C - Description/Specifications
This announcement is for the selection and award of an Architect-Engineer Multidiscipline Contract that would provide planning, design, construction document and construction phase services for the renewal of the current Reptile House (also known as the Reptile Discovery Center) into the Amphibian Reptile Conservation Center (ARCC) at the Smithsonian’s National Zoo and Conservation Biology Institute (NZCBI) in Washington, DC. The National Zoological Park Historic District is on the National Register of Historic Places and the Reptile House, built in 1931, is a contributing resource. The Reptile House is approximately 35,000 square feet. The planning, design and construction documents phase is expected to start in the fall of 2024 and be completed by the end of 2026. Construction is expected to begin in 2027 and be completed by the end of 2029.
A. Objective: To provide planning and design services for the Amphibian Reptile Conservation Center (ARCC), an approximately $60 million multi-year, major renovation of a highly visited historic building; NZCBI has 1.8 million visitors annually.
The renovated facility will provide exciting and engaging reptile and amphibian exhibits, education opportunities, animal holding spaces, visitor amenities including public restrooms, staff offices and support spaces. These program elements will reflect NZCBI’s commitment to animal and staff welfare and well-being. The renovation is expected to include the replacement of mechanical, electrical, plumbing, fire detection and fire protection systems. This includes animal smoke control, aquatic animal life support systems, IT and security. Improvements or upgrades include structural, building envelope, public circulation and exhibit viewing. This project will provide new interpretive exhibit design, accessible and inclusive design within the building and adjacent site, vertical transportation, and abatement of hazardous materials. Additional site work to include several exterior animal exhibits, including a dedicated Komodo dragon facility, storm water management, utility upgrades, landscape design, and renovation of the adjacent information/food service Kiosk. The main entrance portico that has been removed and stored by Smithsonian is to be conserved and reinstalled.
The scope of work awarded under this solicitation includes the confirmation of programming, studies, concept design, schematic design, design development, construction documents, and A/E Construction Phase Services, as well as services to achieve at a minimum USGBC LEED Gold, and possibly SITES certification and other sustainable certifications.
B. Background: The Reptile House was designed by Washington D.C. Municipal Architect Albert L. Harris and opened to the public in 1931. The building was designed to incorporate modern zoological practices and was intended to be a state-of-the art building for its era. The Byzantine-Romanesque style building has a rectangular, church-like footprint, red brick masonry walls, terra-cotta roof tiles, decorative corbelled cornices, and cast concrete gargoyle-like reptiles. The main visitor entrance is a focal point of the building and features arches of John Joseph Earley’s polychrome pre-cast concrete mosaic moldings, and a gabled portico featuring decorative carved stone pterodactyls and lizards with tortoise pedestals. These, along with the other reptile castings serve as cues to the animals being exhibited in the building.
For structural reasons the projecting elements of the main entrance portico were removed and documented in 2020 and are being stored by the Smithsonian. As part of a Memorandum of Agreement with the DC State Historic Preservation Officer the portico is to be fully restored and installed in its original location, with several stone elements and figures to be re-carved.
The building contains three main levels: a partially below-grade basement, two above-grade stories, and an octagonal tower centered above the second floor. The exhibits are on the first floor.
Several renovations and changes to the Reptile House occurred over the years, but the building needs a major renovation to address failing infrastructure, upgrade building systems, meet code requirements, and provide excellent animal exhibits, holding facilities and visitor experiences.
C. Design Considerations: The National Zoological Park Historic District is on the National Register of Historic Places and the Reptile House is a contributing resource.
Much of the historic detailing of the original building is intact and is to be preserved.
The original portico is to be fully restored and installed in its original location. The historic entrance doors were relocated to a public area in the building interior; these doors are to be considered for re-use in the design. The south entrance retains its original doors.
The renovation design should be respectful of the historic building and site as well as provide an updated building that meets and exceeds wherever possible zoological design standards, AZA requirements and sustainability goals.
D. Services: The AE shall provide multidisciplinary architectural and engineering services to validate the Owner-provided program of requirements (POR), develop the concept design, schematic design and design development documents, prepare construction documents, and execute construction phase services. The construction contract will likely be a firm fixed price, design-bid-build contract delivery with a best value solicitation.
The selected A/E’s services shall include documentation and submissions to achieve a minimum of Leadership in Energy and Environmental Design (LEED) Gold certification under the U.S. Green Building Council (USGBC) v4, v4.1 or a combination of both. The AE shall also be capable of researching, analyzing, and obtaining other sustainability, waste management, storm water management, energy, site, and resiliency health and wellness certifications applicable to a project like
ARCC.
The AE multidisciplinary team shall include, at a minimum, the following disciplines and expertise. Those indicated with ** will need to meet location requirements per paragraph 3.E. of this solicitation.
1. Planning**
2. Architecture**
3. Historic preservation**
4. Zoo exhibit design
5. Exhibit interpretive design, graphic design, audio-visual and wayfinding
6. Aquatic animal Life Support Systems**
7. Landscape architecture, including arborist, soil consultant, and irrigation consultant**
8. Civil engineering**
9. Geotechnical engineering**
10. Structural engineering**
11. Mechanical, electrical, plumbing engineering**
12. Fire protection/life safety engineering**
13. Security**
14. Information technology design**
15. Lighting, including controls**
16. Acoustical engineer
17. Cost estimating
18. Accessibility and inclusive design
19. Building envelope, including moisture protection and water-proofing design
20. Vertical transportation
21. LEED consultant demonstrating LEED certification of at least 7 buildings similar in size and complexity to this project
22. Industrial hygienist (hazardous materials abatement)
23. Visitor Food Service (at the Kiosk)
24. Other disciplines as may be required for full renovation of structures of this age and significance
The above services and expertise may be provided by the prime or by separate consultants. In addition, the AE shall be required to prepare presentations and project submissions of the proposed designs for review by external agencies and their staff, including the Commission of Fine Arts (CFA), the National Capital Planning Commission (NCPC), and the D.C. State Historic Preservation Office (D.C. SHPO).
The AE will be expected to attend and participate in video-conferencing and on-site meetings in Washington, D.C., in connection with the services described herein.
D - Packaging and Marking
All references to this solicitation shall reference the following:
Renew Amphibian Reptile Conservation Center (ARCC), Smithsonian’s National Zoo and Conservation Biology Institute Solicitation Number: 333302-24RF-0010003 Project # 1733111
E - Inspection and Acceptance
N/A
F - Deliveries or Performance
N/A
G - Contract Administration Data
52.202-S0059 Contract Management
Notwithstanding the Contractor's responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Smithsonian and the Contractor. The following individuals will be the Smithsonian points of contact during the performance of the contract.
52.202-S0060 Contracting Officer
All contract administration will be effected by the Contracting Officer. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer. No changes in or deviation from the scope of work shall be effected without a written modification to the contract executed by the
Contracting Officer authorizing such changes.
52.202-S0061 Contracting Officer's Technical Representative (COTR) (Apr 1988)
(a) The Contracting Officer's Technical Representative (COTR) to be determined at time of award, or her authorized representative shall act for and on behalf of the Contracting Officer in the administration of any resultant contract with respect to:
1. Resolution of issues that may arise between the Contractor and the Smithsonian Institution in connection with such matters as acceptability of workmanship and other technical requirements;
2. Evaluation on an overall basis of the acceptability of workmanship and Contractor's compliance with technical requirements; and
3. The approval and acceptance of work performed under this contract.
(b) This delegation does not authorize the modification of any of the contract's provisions, terms or conditions. All authorities not herein delegated are reserved to the Contracting Officer.
(c) The Contractor shall make available such records, reports and facilities as may be required to carry out this assignment.
52.202-S0062 Authorities
The Contractor is advised that only the Contracting Officer can change or modify the terms of this contract or take any other action which obligates the Smithsonian and then such action must be set forth in a formal modification to the Contract. The authority of the COTR is strictly limited to the specific duties set forth in her letter of appointment, a copy of which will be furnished the Contractor. Contractors who rely on direction from persons other than the Contracting Officer (or a COTR acting within the strict limits of his/her responsibilities as set forth in his/her letter of appointment) do so at their own risk and expense, as such actions do not bind the Smithsonian contractually. All questions concerning the authority of a Smithsonian employee to direct the Contractor contractually should be referred to the Contracting Officer.
52.215-S0002 Authorized Negotiators (Apr 1984)
The offeror or quoter represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this request for proposals or quotations: [list names, titles, and telephone numbers of the authorized negotiators].
52.215-S0063 Key Personnel
(a) The Contractor shall include the key personnel to be assigned under this contract those persons listed below:
Offerors shall also provide this information in their technical proposal.
(b) The persons named above are considered key personnel. The Contractor shall give at least 14 calendar days advance notice if any of these persons are to be removed or diverted from this contract, and shall supply written justification as part of this notice, and shall name the proposed substitute or replacement; but the Contractor will not remove or divert such persons unless authorized by written consent of the
Contracting Officer.
(c) General Approval. All Contractor personnel assigned to this contract are subject to Smithsonian review in accordance with the defined labor categories herein. Contractor personnel found unacceptable by the Smithsonian at any time shall be removed from performing under this contract within 14 calendar days after notification. Such notification shall be delivered in writing by the Contracting Officer to the
Contractor.
H - Special Contract Requirements
52.202-S0010 Use of Smithsonian Name (Jun 2000)
It is recognized and acknowledged that Contractor shall have no right to use the name "Smithsonian" or "Smithsonian Institution", or the name of any Smithsonian Museum or part thereof, including the Facilities, in connection with any of its own advertising, marketing or promotion. However, any marketing or promotional programs concerning the Smithsonian or the Project shall be submitted to the Smithsonian for review and approval prior to any implementation thereof. The Smithsonian may withhold any approval required hereunder as it wishes.
The Prime Contractor shall be responsible for compliance by any subcontractor or supplier or lower tier subcontractor or lower tier supplier with this clause. After award of the contract and upon request of the Contracting Officer, the Prime Contractor shall deliver a written statement acknowledging that this clause has been included in contracts with all subcontractors and suppliers.
52.203-S0004 Advertising of Award Smithsonian Institution
The Contractor shall not refer to the Smithsonian or to any of its museums, organizations, or facilities in any manner or through any medium, whether written, oral or visual, for any purpose whatsoever, including advertising, marketing, and promotion.
52.215-S0009 Information, Services and Rights of the Smithsonian (Apr 1988)
(a) The S.I., through the C.O. and COTR, will provide administration of the contract as hereinafter described.
(b) The S.I. or its authorized representatives shall at all times have access to the Work whenever it is in preparation or progress. The Contractor shall provide safe facilities for such access.
The S.I. or its authorized representatives shall not be responsible for or have control or charge of the construction means, methods, techniques, sequences, or procedures, or for safety precautions and program in connection with the Work, and will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents.
(d) The COTR shall have authority to reject Work when in his opinion, the Work does not conform to the Contract Documents.
(e) Whenever in the COTR's reasonable opinion it is considered necessary or advisable for the implementation of the intent of the Contract Documents, the COTR will have authority to require special inspection or testing of the Work in accordance with the provisions of the Contract Documents whether or not such Work be then fabricated, installed or completed.
(f) The COTR shall have the authority and discretion to call, schedule, and conduct job meetings to be attended by the Contractor, representatives of his Subcontractors, and the Architect to discuss such matters as procedures, progress, problems, payments and scheduling.
(g) The COTR will establish procedures to be followed for processing all Shop Drawings, catalogs, and other project reports and other documentation, test reports, and maintenance manuals.
(h) The COTR will review all requests for changes and shall implement the processing of Change Orders, including applications for extension of the Contract Time.
(1) The COTR will review and process all Progress Payments including the Final Payment.
(2) The Smithsonian Institution or its authorized representatives shall not be responsible or liable to the Contractor for the acts, errors or omissions of the Contractor, any separate Subcontractor, any separate contractor or any contractor's or subcontractor's agents or employees, or any other persons performing any of the Work.
(k) Unless otherwise provided in the Contract Documents, the Contractor will be furnished, free of charge, ten copies of full size Drawings and Specifications reasonably necessary for the execution of the Work.
(l) The foregoing rights are in addition to other rights of the S.I. enumerated herein and those provided by law.
52.223-S0070 Dissemination of Information
There shall be no dissemination or publication of information, except between the Contractor and any subcontractors, of information developed under this contract or any task orders awarded under the terms of this contract or contained in reports to be furnished pursuant to this contract without the prior written approval of the Contracting Officer.
I - Contract Clauses
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-7 Anti-Kickback Procedures. (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
(MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.203-13 Contractor Code of Business Ethics and Conduct. (OCT 2015)
52.203-14 Display of Hotline Poster(s). (OCT 2015)
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)-
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting
Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from https://www.oig.dhs.gov/assets/Hotline/DHS_OIG_Hotline-optimized.jpg
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed $5.5 million, except when the subcontract-
(1) Is for the acquisition of a commercial item; or
(2) Is performed entirely outside the United States.
(End of clause)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)
52.204-7 System for Award Management. (OCT 2018)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2018)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)
52.215-2 Audit and Records - Negotiation. (OCT 2010)
52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data. (AUG 2011)
52.215-11 Price Reduction for Defective Certified Cost or Pricing Data - Modifications.
(AUG 2011)
52.215-12 Subcontractor Certified Cost or Pricing Data. (OCT 2010)
52.215-13 Subcontractor Certified Cost or Pricing Data - Modifications. (OCT 2010)
52.216-7 Allowable Cost and Payment. (AUG 2018)
(a) Invoicing. (1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the 30thday after the designated billing office receives a proper payment request.
In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs. (1) For the purpose of reimbursing allowable costs (except as provided in paragraph (b)(2) of the clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term costs includes only-
(i) Those recorded costs that, at the time of the request for reimbursement, the
Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for-
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made-
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the
Contractor's payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless-
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) below, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) below.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates. (1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool).
Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records
(Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of
Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of
Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General organizational information and limitation on allowability of compensation for certain contractor personnel. See 31.205-6(p).
Additional salary reference information is available at https://www.whitehouse.gov/wpcontent/uploads/2017/11/ContractorCompensationCapContracts AwardedBeforeJune24.pdf.
https://www.whitehouse.gov/wpcontent/uploads/2017/11/ContractorCompensationCapContracts Award edafterJune24.pdf.
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the description of the accounting system has not changed from the previous year's submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph (G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: Contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within
60 days after settlement of final indirect cost rates.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify
(i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply,
(iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, the Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.
(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may-
(A) Determine the amounts due to the Contractor under the contract;
and
(B) Record this determination in a unilateral modification to the contract.
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates-
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.
(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in
FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be (1) reduced by amounts found by the Contracting Officer not to constitute allowable costs or (2) adjusted for prior overpayments or underpayments.
(h) Final payment. (1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractor's compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver-
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except-
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the
Contractor gives notice of the claims in writing to the Contracting
Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.
(End of clause)
52.216-8 Fixed Fee. (JUN 2011)
(a) The Government shall pay the Contractor for performing this contract the fixed fee specified in the Schedule.
(b) Payment of the fixed fee shall be made as specified in the Schedule; provided that the Contracting Officer withholds a reserve not to exceed 15 percent of the total fixed fee or $100,000, whichever is less, to protect the Government's interest. The Contracting Officer shall release 75 percent of all fee withholds under this contract after receipt of an adequate certified final indirect cost rate proposal covering the year of physical completion of this contract, provided the Contractor has satisfied all other contract terms and conditions, including the submission of the final patent and royalty reports, and is not delinquent in submitting final vouchers on prior years' settlements. The Contracting Officer may release up to 90 percent of the fee withholds under this contract based on the Contractor's past performance related to the submission and settlement of final indirect cost rate proposals.
(End of clause)
52.216-21 Requirements. (OCT 1995)
(a) This is requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as estimated or maximum in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the
Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the
Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after close of contract to be determined.
(End of clause)
52.219-8 Utilization of Small Business Concerns (Sep 2023)
(a) Definitions. As used in this contract—
HUBZone small business concern means a small business concern that meets the requirements described in 13 CFR 126.200, certified by the Small Business Administration (SBA) and designated by SBA as a HUBZone small business concern in the Dynamic Small Business Search (DSBS) and SAM.
Service-disabled veteran-owned small business concern—
(1) Means a small business concern-
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C.101(2), with a disability that is service-connected, as defined in 38 U.S.C.101(16).
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation and qualified as a small business under the criteria and size standards in 13 CFR part 121, including the size standard that corresponds to the NAICS code assigned to the contract or subcontract.
Small disadvantaged business concern, consistent with 13 CFR 124.1001, means a small business concern under the size standard applicable to the acquisition, that-
(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by-
(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States;
and
(ii) Each individual claiming economic disadvantage has a net worth not exceeding the threshold at 13 CFR 124.104(c)(2) after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.
Veteran-owned small business concern means a small business concern-
(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C.101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.
Women-owned small business concern means a small business concern-
(1) That is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and
(2) Whose management and daily business operations are controlled by one or more women.
(b) It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns.
(c)
(1) A joint venture qualifies as a small business concern if—
(i) Each party to the joint venture qualifies as small under the size standard for the solicitation; or
(ii) The protégé is small under the size standard for the solicitation in a joint venture comprised of a mentor and protégé with an approved mentor-protégé agreement under a SBA mentor-protégé program.
(2) A joint venture qualifies as—
(i) A service-disabled veteran-owned small business concern if it complies with the requirements in 13 CFR part 125; or
(ii) A HUBZone small business concern if it complies with the requirements in 13 CFR 126.616(a) through (c).
(d) The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance. The Contractor further agrees to cooperate in any studies or surveys as may be conducted by the United States Small Business Administration or the awarding agency of the United States as may be necessary to determine the extent of the Contractor's compliance with this clause.
(e)
(1) The Contractor may accept a subcontractor's written representations of its size and socioeconomic status as a small business, small disadvantaged business, veteran-owned small business, service-disabled veteran-owned small business, or a…