331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf

PDF 1 MB Posted

Attached to
Beach Amusements and Activities
Solicitation number
25-26
Issued by
Walton County, Florida

About this file

This is a Joint Powers Agreement (JPA) document between Walton County, Florida, and the Florida Department of Transportation (FDOT) for the SR 83 (US 331) Landscaping Improvements project. The project encompasses sod replacement and irrigation installation along the scenic corridor median from SR 30 (US 98) to north of Chat Holley Road, covering approximately 256,500 square feet. The scope includes Zoysia sod installation, irrigation system components and installation, site preparation, removal of existing sod, maintenance of traffic, and mobilization. A mandatory pre-bid conference is scheduled for October 27, 2025, at 10:00 am, with bid responses due on November 17, 2025, at 3:00 pm. The contract is structured as a lump sum bid with six line items and is divided into two phases: Phase 1 from Coastal Centre Drive to Chat Holley Road and Phase 2 from SR 30 to Coastal Centre Drive. The contract duration is 60 days for substantial completion with an additional 30 days for punch list completion, with liquidated damages assessed at $1,685 per calendar day for project delays.

The total project cost is estimated at approximately $670,000, with payment structured in two progress payments upon substantial completion of each phase. Contractors are required to provide performance and payment bonds, maintain a full-time on-site superintendent, and comply with federal, state, and local regulations. Technical specifications include Rain Bird pressure compensating emitters, PVC piping, and 100% coverage of planted and sod areas. Contractors must obtain all necessary licenses, permits, and insurance. The file does not indicate explicit set-aside designations for disadvantaged enterprises. The project emphasizes ecological sustainability and Florida-friendly landscaping principles as part of the Highway 331 gateway corridor beautification initiative.

View the file

Other files

File Type Posted
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Beach_Amusements_and_Activities.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Attachment_B.pdf PDF
Attachment_A.pdf PDF
Attachment_A.pdf PDF
Attachment_B.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
Contract_No._25-26.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
SR_83_(US_331)_Landscaping_Improvements.pdf PDF
Contract_No._25-26.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
331_Landscaping_ITB_25-26_JPA_Agreement_with_FDOT.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
FDOT_Hwy_331_Approved_Permit_Package.pdf PDF
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
Public_Construction_Bond_(25).doc DOC document
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR_83_US_331_Irrigation_Layout_FINAL.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
SR83_US331-PLANS-EXISTING_LANDSCAPE-AS_BUILTS.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Contract_Plans.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

cpd-cutjason Highlight cpd-cutjason Highlight cpd-cutjason Highlight

File details come from the government source that posted it. Updated .