33-44955915801-ESTIMATES-QUANTITIES.pdf

PDF 189 KB Posted

Attached to
Royal Palm Boulevard from East of University Drive to Riverside Drive
Solicitation number
TRN2132636C1
Issued by
Broward County, Florida

About this file

This is an Estimated Quantities Report prepared by WGI, Inc. for the City of Coral Springs, Florida in coordination with Broward County Highway Construction and Engineering Division (HCED) and the Florida Department of Transportation (FDOT). The project, titled "Pedestrian Safety Improvement, from East University Drive to Riverside Drive," encompasses roadway widening, milling and resurfacing, construction of raised curb medians, sidewalk replacement, ADA curb ramp upgrades, signage and pavement marking upgrades, pedestrian crossing signal upgrades, and mast arm installation along Royal Palm Boulevard. The report documents comprehensive estimated quantities across multiple construction phases (I through IV) with a total construction duration of approximately 250 days. Key work items include temporary traffic control measures totaling 31,100 channelizing devices and 6,050 work zone signs; clearing, grubbing and removal operations including 6 tree removals and 1,101 square yards of concrete removal; earthwork consisting of 154.11 cubic yards of regular excavation and 490.54 cubic yards of embankment; drainage and pavement work including approximately 10,000 square yards of milling and asphalt paving across multiple locations; and erosion control measures such as sediment barriers and inlet protection systems distributed throughout the project corridor.

The estimated quantities reflect work distributed across three primary alignments: Royal Palm Boulevard, Riverside Drive, and NW 89th Drive, with detailed specifications for each pay item including materials, equipment requirements, and construction staging. The project is funded through Federal Highway Administration (FHWA) appropriations via the State of Florida Department of Transportation and Broward County Transportation Surtax Funds. County and State licensing and bonding requirements apply to all vendors submitting proposals. All solicitation responses must be submitted electronically through BPRO with a Submission Receipt required, and vendors are required to review the complete solicitation documentation beyond this summary to ensure compliance with all requirements, including questions and clarifications submitted through the specified BPRO timeframe.

View the file

Other files

File Type Posted
engrupd.gif GIF image
BRO2021_307946.xml XML file
28-44955915801-PLANS-01-ROADWAY-COREBORINGS.pdf PDF
BRO2021_307948.sdw SDW file
PLANSG01-Josue.dgn —
4-Lobbyist Registration Requirement Certification.docx DOCX document
5-Trench Safety Act Requirement.docx DOCX document
ProposedSlopesPointNames.xml XML file
MODLRD_ExistingUtilitiesVerizon05.dgn —
TEXTUW01.dgn —
BRO2021_308248.sdw SDW file
PayitemDB.xml XML file
ABORRD00.dgn —
BRO2021_307948.sid SID file
SIGNRD01.dgn —
MODLRD01.dgn —
MODLRD_ExistingUtilitiesCrownCastle04.dgn —
CTLSRD01.dgn —
38-44955915801-PLANS-01-ROADWAY.pdf PDF
GDTMRD01.dgn —
MODLRD04.dgn —
KEYSSG01.dgn —
34-44955915801-PLANS-03-SIGNALIZATION-COREBORINGS.pdf PDF
SBVHRD00.dgn —
1-Summary of Vendor Rights for Broward County Competitive Solicitations.docx DOCX document
bluprebd.gif GIF image
7-Standard Instructions to Vendors (Construction BCF 170 Agreements Only).docx DOCX document
32-44955915801-SPECS.pdf PDF
BRO2021_307946.sdw SDW file
engrhomd.gif GIF image
17-Non-Collusion Declaration (FDOT Form No. 575-060-13).pdf PDF
TYPDRD01.dgn —
Controller_Timings.xlsx XLSX spreadsheet
MODLRD_ExistingUtilitiesFPL03.dgn —
TEXTDR01.dgn —
ABORRD02.dgn —
document.css CSS file
ALGNRD01.dgn —
9-Vendor Questionnaire - Quotes and Bids.docx DOCX document
PLANRD01-2.dgn —
engrvbd.gif GIF image
MastArmTab01.dgn —
3-Criminal History Screening Practices Certification.docx DOCX document
bluvbusd.gif GIF image
PLANRD00.dgn —
DRDTRD01.dgn —
16-FDOT - Required Addendum to the Special Instructions to Vendors.pdf PDF
UTADUW01.dgn —
UTEXUW01.dgn —
DRPRRD99.dgn —
Show 40 more

Latest 50 of 198 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This item has been digitally signed and sealed by:

on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

WGI, Inc.

11410 NW 20th Street, Suite 101

Miami, FL 33172

Josue A. Menendez, P.E. No. 86757

ESTIMATED QUANTITIES REPORT

3. Match the pay item numbers and quantities in Designer Interface for AASHTOWare Project Preconstruction™.

Financial Project ID: 449559-1-58-01

Contract Number: CAL73

Project Description: Pedestrian Safety Improvement, from East Unitversity Drive to Riverside Drive

The estimated quantities contained in this document:

1. Were developed in compliance with Florida Department of Transportation procedures, processes, and requirements.

2. Contain no known errors or omissions.

7/27/2026 7:53:08 AM Page 1 of 51

Summary of Lump Sum Items

Quantity Total QuantityPay Item

Number Pay Item Description

Units of

Measure P F P F Design Notes Construction Remarks

0101 1 MOBILIZATION LS 1 1

0108 1 MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT

MONITORING

LS 1 1 See General Notes For Locations

0108 2 MONITOR EXISTING STRUCTURES- VIBRATION MONITORING LS 1 1 See General Notes For Locations

7/27/2026 7:53:08 AM Page 2 of 51

Summary of Temporary Traffic Control Plan Items

Quantity Total Quantity Secondary Quantity Location Pay Item

Number Pay Item Description

Units of

Measure

Number

Required

Duration

(Days) P F P F Units P F Const.

Phase

Design Notes Construction Remarks

0102 1 MAINTENANCE OF TRAFFIC LS 1 1 DA 250 250 DAYS OF

CONSTRUCTION

0102 14 TRAFFIC CONTROL OFFICER HR 56 248 I 14 APPROACH LANES

x 1 LIFT x 4 HRS

(ROYAL PALM BLVD

AND RIVERSIDE DR

INTERSECTION)

56 II 14 APPROACH LANES

x 1 LIFT x 4 HRS

(ROYAL PALM BLVD

AND RIVERSIDE DR

INTERSECTION)

68 III 17 APPROACH LANES

x 1 LIFT x 4 HRS

(ROYAL PALM BLVD

AND RIVERSIDE DR

INTERSECTION)

68 IV 17 APPROACH LANES

x 1 LIFT x 4 HRS

(ROYAL PALM BLVD

AND RIVERSIDE DR

INTERSECTION)

0102 60 WORK ZONE SIGN ED 29 100 2900 6050 I

23 50 1150 II

20 50 1000 III

20 50 1000 IV

0102 71 13 TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE LF 1660.0 1660 IV 200 LF RELOCATED

FROM PHASE I

0102 71 23 TEMPORARY BARRIER, RELOCATE, LOW PROFILE

CONCRETE

LF 200.0 200 I

0102 74 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR

LCD

ED 86 100 8600 31100 I

86 50 4300 II

182 50 9100 III

182 50 9100 IV

0102 76 ARROW BOARD / ADVANCE WARNING ARROW PANEL ED 4 100 400 1000 I

7/27/2026 7:53:08 AM Page 3 of 51

Summary of Temporary Traffic Control Plan Items

Pay Item

Number Pay Item Description

Units of

Measure

Number

Required

Duration

(Days) P F P F Units P F Const.

Phase

Design Notes Construction Remarks

4 50 200 II

4 50 200 III

4 50 200 IV

0102 99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 2 114 228 528 I INCLUDES 14 DAYS

PRIOR TO

CONSTRUCTION

2 50 100 II

2 50 100 III

2 50 100 IV

0102 115 TYPE III BARRICADE ED 12 100 1200 2600 I

12 50 600 II

8 50 400 III

8 50 400 IV

0706 1 3 RAISED PAVEMENT MARKER, TYPE B EA 18 36 I

18 II

11201

PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW,

SOLID, 6"

GM 0.1326 0.265 I

0.1326 II

7/27/2026 7:53:08 AM Page 4 of 51

Summary of Special Detours

Pay Item

Number Pay Item Description

Units of

Measure Length (FT) Width (FT)

P F P F Units P F Const.

Phase Alignment

Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0102 4 1 PEDESTRIAN OR BICYCLE SPECIAL

DETOUR

LS 1 1 SY 17.1 IV BL_RYLPLMBLVD 23+28.00 23+36.99 RT 24805 46 Total SY

14.5 IV BL_RYLPLMBLVD 32+99.15 33+08.16 LT 24807

15.0 IV BL_RYLPLMBLVD 34+59.03 34+68.02 LT 24810

7/27/2026 7:53:08 AM Page 5 of 51

Summary of Pedestrian Longitudinal Channelizing Devices

Quantity Total Quantity Location Pay Item

Number Pay Item Description

Units of

Measure

Duration

(Days)

Length

(FT) P F P F

Const.

Phase Alignment

Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0102 74 8 CHANNELIZING DEVICE- PEDESTRIAN LCD

(LONGITUDINAL CHANNELIZING DEVICE)

FD 20 6 120 19718 I BL_NW89DR 12+81.88 12+81.89 RT 8450

20 6 120 I BL_RIVERSD-DR 11+88.49 11+88.50 LT 8443

20 6 120 I BL_RIVERSD-DR 12+58.66 12+63.01 RT 11703

20 6 120 I BL_RIVERSD-DR 14+10.46 14+10.47 RT 8448

20 6 120 I BL_RIVERSD-DR 17+55.38 17+61.38 LT 8446

20 6 120 I BL_RIVERSD-DR 18+38.78 18+43.28 LT 8444

20 6 120 I BL_RYLPLMBLVD 27+11.89 27+11.89 RT 8439

20 6 120 I BL_RYLPLMBLVD 54+29.61 54+29.61 RT 8442

20 6 120 I BL_RYLPLMBLVD 54+39.89 54+39.89 LT 8445

20 6 120 I BL_RYLPLMBLVD 56+33.16 56+33.31 RT 11704

20 6 120 I BL_RYLPLMBLVD 58+05.64 58+05.78 LT 8449

20 6 120 II BL_RIVERSD-DR 14+45.82 14+45.83 RT 8522

20 6 120 II BL_RIVERSD-DR 14+97.88 14+97.89 RT 8921

20 6 120 II BL_RYLPLMBLVD 25+74.76 25+74.76 RT 8516

20 6 120 II BL_RYLPLMBLVD 26+88.33 26+88.33 RT 8920

20 24.9 498 IV BL_RYLPLMBLVD 21+07.12 21+07.14 RT 24080

20 125.2 2504 IV BL_RYLPLMBLVD 21+07.14 22+32.35 RT 24078

20 24.8 496 IV BL_RYLPLMBLVD 21+12.12 21+12.14 RT 24079

20 120.2 2404 IV BL_RYLPLMBLVD 21+12.14 22+32.35 RT 24075

20 6 120 IV BL_RYLPLMBLVD 22+32.36 22+32.36 RT 24081

20 65 1300 IV BL_RYLPLMBLVD 22+65.02 23+30.00 RT 24083

20 70 1400 IV BL_RYLPLMBLVD 22+65.02 23+35.00 RT 24082

20 20.5 410 IV BL_RYLPLMBLVD 23+30.00 23+30.01 RT 24076

20 24.2 484 IV BL_RYLPLMBLVD 23+34.97 23+35.00 RT 24077

20 23.5 470 IV BL_RYLPLMBLVD 33+01.15 33+01.15 LT 24071

20 5 100 IV BL_RYLPLMBLVD 33+01.15 33+06.15 LT 24068

20 159.9 3198 IV BL_RYLPLMBLVD 33+06.15 34+66.02 LT 24067

20 23.5 470 IV BL_RYLPLMBLVD 33+06.16 33+06.16 LT 23663

20 154.9 3098 IV BL_RYLPLMBLVD 33+06.16 34+61.03 LT 24063

20 24.1 482 IV BL_RYLPLMBLVD 34+61.03 34+61.06 LT 24064

20 24.2 484 IV BL_RYLPLMBLVD 34+66.02 34+66.02 LT 24070

7/27/2026 7:53:08 AM Page 6 of 51

Summary of Pedestrian Longitudinal Channelizing Devices

Pay Item

Number Pay Item Description

Units of

Measure

Duration

(Days)

Length

(FT) P F P F

Const.

Phase Alignment

Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

7/27/2026 7:53:08 AM Page 7 of 51

Summary of Temporary Signalization and Detection

Pay Item

Number Pay Item Description

Units of

Measure

Existing (E) or

Temp/New

(T)

Number

Required

Duration

(Days) P F P F Const.

Phase

Design Notes Construction Remarks

102104 TEMPORARY SIGNALIZATION AND MAINTENANCE,

INTERSECTION

ED E 1 250 250 250 ALL

0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE,

INTERSECTION

ED E 1 250 250 250 ALL

7/27/2026 7:53:08 AM Page 8 of 51

Summary of Erosion Control and Sediment Control Devices

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0104 10 3 Sediment Barrier LF 347.5 6328 BL_NW89DR 9+52.35 12+99.88 RT 21274

347.5 BL_NW89DR 9+52.47 13+00.00 LT 21281

310.7 BL_NW89DR 14+30.85 17+56.01 RT 21389

120.1 BL_NW89DR 14+31.13 15+17.82 LT 21385

226.2 BL_NW89DR 15+61.42 17+56.01 LT 21391

88.7 BL_RIVERSD-DR 11+90.11 12+64.37 RT 21379

95.3 BL_RIVERSD-DR 11+90.11 12+71.06 LT 21380

613.9 BL_RIVERSD-DR 13+77.38 18+99.93 RT 21372

367.1 BL_RIVERSD-DR 14+02.07 17+54.90 LT 21370

79.4 BL_RIVERSD-DR 18+34.96 19+00.00 LT 21371

831.9 BL_RYLPLMBLVD 14+80.07 23+11.94 RT 21397

354.8 BL_RYLPLMBLVD 14+80.12 18+20.45 LT 21393

455.7 BL_RYLPLMBLVD 18+70.59 23+11.94 LT 21395

17.9 BL_RYLPLMBLVD 25+67.35 25+85.25 LT 21338

57.6 BL_RYLPLMBLVD 25+77.20 26+20.42 RT 21381

43.9 BL_RYLPLMBLVD 26+80.56 27+10.07 RT 21383

9.4 BL_RYLPLMBLVD 27+15.25 27+24.66 LT 21278

301.7 BL_RYLPLMBLVD 32+17.35 35+19.07 LT 21336

301.7 BL_RYLPLMBLVD 32+17.35 35+19.07 RT 21337

89.9 BL_RYLPLMBLVD 53+60.00 54+49.94 RT 21259

129.4 BL_RYLPLMBLVD 53+60.00 54+75.15 LT 21369

592.0 BL_RYLPLMBLVD 55+98.31 61+85.36 LT 21373

546.0 BL_RYLPLMBLVD 56+34.94 61+80.31 RT 21375

0104 18 Inlet Protection System EA 1 18 BL_NW89DR 12+94.91 12+97.84 RT 14095

1 BL_NW89DR 12+95.01 12+98.02 LT 14090

1 BL_NW89DR 14+57.69 14+60.53 LT 14100

1 BL_NW89DR 14+57.83 14+61.03 RT 14105

1 BL_NW89DR 17+61.40 17+61.40 LT 14110

1 BL_NW89DR 17+64.28 17+64.28 RT 14115

1 BL_RIVERSD-DR 17+50.09 17+52.08 RT 14131

1 BL_RYLPLMBLVD 17+90.62 17+93.69 LT 14067

7/27/2026 7:53:08 AM Page 9 of 51

Summary of Erosion Control and Sediment Control Devices

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

1 BL_RYLPLMBLVD 18+44.48 18+47.38 RT 14073

1 BL_RYLPLMBLVD 18+93.04 18+95.94 LT 14078

1 BL_RYLPLMBLVD 19+35.09 19+38.02 RT 14085

1 BL_RYLPLMBLVD 33+26.46 33+29.33 RT 21226

1 BL_RYLPLMBLVD 33+28.67 33+31.74 LT 21227

1 BL_RYLPLMBLVD 36+46.57 36+49.42 RT 21225

1 BL_RYLPLMBLVD 58+69.08 58+79.03 LT 11356

1 BL_RYLPLMBLVD 59+64.36 59+67.30 RT 14125

1 BL_RYLPLMBLVD 59+67.00 59+70.13 LT 14120

1 BL_RYLPLMBLVD 60+89.31 60+92.39 LT 11355

7/27/2026 7:53:08 AM Page 10 of 51

Summary of Litter Removal and Mowing

Pay Item

Number Pay Item Description

Units of

Measure

Duration

(Days)

Frequency

(Days)

Length

(FT)

Width

(FT)

Cycles AC /

Cycle P F P F

Const.

Phase Alignment

Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0107 1 Litter Removal And Disposal AC 250 30 8 6.446 51.571 83.04 ALL BL_RYLPLMBLVD 13+03.05 35+19.00 LT/RT 22373

250 30 8 3.934 31.471 ALL BL_RYLPLMBLVD 53+60.04 61+85.31 LT/RT 22379

0107 2 Mowing AC 250 30 8 6.446 51.571 83.04 ALL BL_RYLPLMBLVD 13+03.05 35+19.00 LT/RT 22493

250 30 8 3.934 31.471 ALL BL_RYLPLMBLVD 53+60.04 61+85.31 LT/RT 22514

7/27/2026 7:53:08 AM Page 11 of 51

Summary of Clearing Grubbing and Removal Items

Pay Item

Number Pay Item Description

Units of

Measure Length (FT) Width (FT)

P F P F Units P F Alignment Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0110 1 1 Clearing & Grubbing LS 1 1 AC 0.021 BL_RIVERSD-DR 11+90.15 12+61.58 LT 20724 0.78 Total AC

0.001 BL_RIVERSD-DR 12+35.34 12+38.94 LT 20714

0.003 BL_RIVERSD-DR 12+43.77 12+69.07 LT 20711

0.004 BL_RIVERSD-DR 12+60.40 12+80.09 LT 20708

0.001 BL_RIVERSD-DR 13+56.35 13+59.45 LT 21144

0.001 BL_RIVERSD-DR 13+58.83 13+64.19 LT 21102

0.001 BL_RIVERSD-DR 13+59.30 13+70.11 LT 21106

0.002 BL_RIVERSD-DR 13+69.29 13+92.06 LT 21103

0.069 BL_RIVERSD-DR 13+96.05 17+18.67 LT 21143

0.076 BL_RIVERSD-DR 13+99.94 17+62.11 LT 21133

0.005 BL_RIVERSD-DR 14+95.15 15+63.64 RT 20989

0.010 BL_RIVERSD-DR 15+00.88 15+63.94 RT 20986

0.001 BL_RIVERSD-DR 15+58.93 15+75.76 RT 21024

0.022 BL_RIVERSD-DR 15+58.93 17+46.75 LT/RT 21025

0.002 BL_RIVERSD-DR 15+68.58 15+98.47 RT 20990

0.003 BL_RIVERSD-DR 15+68.68 15+98.39 RT 20991

0.011 BL_RIVERSD-DR 17+18.11 17+65.32 LT 24567

0.040 BL_RYLPLMBLVD 14+80.07 17+74.59 RT 33602

0.026 BL_RYLPLMBLVD 15+19.17 17+83.42 LT/RT 20471

0.002 BL_RYLPLMBLVD 16+72.32 17+25.64 LT 20417

0.003 BL_RYLPLMBLVD 17+25.79 17+97.88 LT 33582

0.001 BL_RYLPLMBLVD 18+68.65 19+37.87 RT 33611

0.030 BL_RYLPLMBLVD 21+21.62 22+28.88 RT 20515

0.001 BL_RYLPLMBLVD 22+14.52 22+30.23 RT 20491

0.004 BL_RYLPLMBLVD 23+28.04 23+36.96 RT 32154

0.026 BL_RYLPLMBLVD 25+77.23 26+35.70 RT 24952

0.011 BL_RYLPLMBLVD 26+28.89 26+76.86 LT/RT 24907

0.017 BL_RYLPLMBLVD 26+66.03 27+09.99 RT 20580

0.009 BL_RYLPLMBLVD 32+17.37 34+39.99 LT/RT 20669

0.075 BL_RYLPLMBLVD 32+17.40 34+36.87 LT/RT 20662

0.003 BL_RYLPLMBLVD 32+99.20 33+08.10 LT 32155

7/27/2026 7:53:08 AM Page 12 of 51

Pay Item

Number Pay Item Description

Units of

Measure Length (FT) Width (FT)

P F P F Units P F Alignment Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0.051 BL_RYLPLMBLVD 33+33.27 34+68.44 LT 20629

0.003 BL_RYLPLMBLVD 55+62.95 55+76.11 LT 20914

0.001 BL_RYLPLMBLVD 55+68.68 55+80.76 LT 20904

0.024 BL_RYLPLMBLVD 55+81.07 56+43.50 LT 20917

0.064 BL_RYLPLMBLVD 56+08.88 58+04.03 LT 20897

0.023 BL_RYLPLMBLVD 56+18.11 61+85.36 RT 20801

0.001 BL_RYLPLMBLVD 56+81.59 58+04.00 LT 20860

0.004 BL_RYLPLMBLVD 58+10.33 59+59.04 LT/RT 20805

0.114 BL_RYLPLMBLVD 58+12.34 61+94.29 RT 20806

0.016 BL_RYLPLMBLVD 59+64.89 61+00.00 LT 20804

0110 4 10 Removal Of Existing Concrete SY 65.8 1101 BL_RIVERSD-DR 14+11.60 17+14.81 LT 20431 Gutter

115.7 BL_RIVERSD-DR 14+88.89 17+44.43 LT/RT 20336 Traffic Separator

1.4 BL_RIVERSD-DR 15+63.60 15+68.51 RT 20339 Sidewalk

3.1 BL_RIVERSD-DR 15+63.71 15+68.87 RT 20338 Sidewalk

13.2 BL_RIVERSD-DR 17+18.40 17+63.17 LT 20337 Curb and Gutter

98.9 BL_RYLPLMBLVD 14+80.07 17+97.78 LT/RT 20323 Curb and Gutter

34.1 BL_RYLPLMBLVD 18+95.06 19+72.48 RT 33542 Traffic Separator

59.2 BL_RYLPLMBLVD 21+24.05 22+30.29 RT 24915 Sidewalk

86.6 BL_RYLPLMBLVD 21+48.15 23+40.70 LT/RT 25616 Traffic Separator

16.0 BL_RYLPLMBLVD 21+58.13 22+30.24 RT 20325 Curb and Gutter

9.9 BL_RYLPLMBLVD 26+01.79 26+20.76 RT 24922 Sidewalk

0.3 BL_RYLPLMBLVD 26+32.37 26+35.77 RT 20327 Curb and Gutter

7.3 BL_RYLPLMBLVD 26+82.26 26+97.55 RT 20326 Sidewalk

17.5 BL_RYLPLMBLVD 32+17.40 34+37.47 LT/RT 20328 Curb

72.0 BL_RYLPLMBLVD 54+32.19 54+92.53 RT 20332 Sidewalk, Curb

and Gutter

120.1 BL_RYLPLMBLVD 54+42.91 54+94.21 LT 20334 Sidewalk, Curb and Gutter

165.5 BL_RYLPLMBLVD 55+63.17 58+04.02 LT 20333 Sidewalk, Curb and Gutter

42.7 BL_RYLPLMBLVD 55+88.42 56+22.60 RT 33536 Sidewalk, Curb

and Gutter

7/27/2026 7:53:08 AM Page 13 of 51

Pay Item

Number Pay Item Description

Units of

Measure Length (FT) Width (FT)

P F P F Units P F Alignment Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

12.2 BL_RYLPLMBLVD 56+04.87 56+21.07 LT 20350 Sidewalk

159.6 BL_RYLPLMBLVD 58+10.35 61+85.28 RT 20344 Curb and Gutter

0110 23 Tree Removal EA 1 6 BL_RYLPLMBLVD 21+53.71 21+53.71 RT 22054

1 BL_RYLPLMBLVD 33+04.21 33+04.21 LT 22065

1 BL_RYLPLMBLVD 33+48.93 33+48.93 LT 22076

1 BL_RYLPLMBLVD 33+90.54 33+90.54 RT 22087

1 BL_RYLPLMBLVD 34+26.98 34+26.98 LT 22098

1 BL_RYLPLMBLVD 59+57.78 59+57.78 RT 32141

7/27/2026 7:53:08 AM Page 14 of 51

Summary of Earthwork

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0120 1 Regular Excavation CY 154.11 154.1 BL_RYLPLMBLVD 14+80.07 61+94.32 LT/RT 9358 Includes Royal Palm

Blvd, NW 89 Dr, and

Riverside Dr

0120 4 Subsoil Excavation CY 3.22 354.0 BL_NW89DR 12+97.04 13+24.45 RT 8274 5" DEPTH

5.35 BL_NW89DR 13+00.30 13+24.34 LT 8261 5" DEPTH

12.04 BL_RIVERSD-DR 11+90.11 12+49.93 LT 8324 5" DEPTH

0.09 BL_RIVERSD-DR 12+35.27 12+38.95 LT 8333 5" DEPTH

2.14 BL_RIVERSD-DR 12+43.73 12+69.14 LT 8344 5" DEPTH

0.35 BL_RIVERSD-DR 13+69.29 13+92.06 LT 8529 5" DEPTH

1.58 BL_RIVERSD-DR 13+88.46 13+98.51 RT 8454 5" DEPTH

0.42 BL_RIVERSD-DR 13+95.67 14+08.07 RT 8443 5" DEPTH

46.19 BL_RIVERSD-DR 13+95.97 17+18.71 LT 8601 5" DEPTH

2.10 BL_RIVERSD-DR 13+96.08 14+08.09 RT 8467 5" DEPTH

3.69 BL_RIVERSD-DR 13+99.93 17+55.53 LT 8564 5" DEPTH

12.51 BL_RIVERSD-DR 14+03.58 16+93.34 LT 8579 5" DEPTH

3.39 BL_RIVERSD-DR 14+95.14 15+63.64 RT 8478 5" DEPTH

6.74 BL_RIVERSD-DR 15+00.87 15+63.97 RT 8511 5" DEPTH

1.32 BL_RIVERSD-DR 15+68.54 15+98.55 RT 8488 5" DEPTH

1.83 BL_RIVERSD-DR 15+68.64 15+98.39 RT 8499 5" DEPTH

4.88 BL_RIVERSD-DR 16+99.78 17+47.30 LT 8543 5" DEPTH

12.31 BL_RYLPLMBLVD 16+06.97 17+83.43 LT/RT 8226 5" DEPTH

16.56 BL_RYLPLMBLVD 21+24.03 22+28.97 RT 8239 5" DEPTH

7.08 BL_RYLPLMBLVD 25+77.20 26+06.59 RT 8248 5" DEPTH

1.16 BL_RYLPLMBLVD 27+03.90 27+10.12 RT 8283 5" DEPTH

50.25 BL_RYLPLMBLVD 32+17.35 34+36.90 LT/RT 8313 5" DEPTH

30.71 BL_RYLPLMBLVD 33+33.24 34+68.48 LT 8293 5" DEPTH

1.62 BL_RYLPLMBLVD 54+31.15 54+52.37 RT 8358 5" DEPTH

0.34 BL_RYLPLMBLVD 54+42.87 54+47.31 LT 8521 5" DEPTH

6.51 BL_RYLPLMBLVD 55+82.40 56+43.57 LT 8431 5" DEPTH

42.81 BL_RYLPLMBLVD 56+08.85 58+04.08 LT 8420 5" DEPTH

76.83 BL_RYLPLMBLVD 58+12.29 61+94.32 LT/RT 8403 5" DEPTH

7/27/2026 7:53:08 AM Page 15 of 51

Summary of Earthwork

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0120 6 Embankment CY 490.54 490.5 BL_RYLPLMBLVD 14+80.07 61+94.32 LT/RT 9382 Includes Royal Palm

Blvd, NW 89 Dr, and

Riverside Dr

7/27/2026 7:53:08 AM Page 16 of 51

Summary of Pavement

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station

Location

Description Side

Element

ID

Design Notes Construction

Remarks

0121 70 FLOWABLE FILL CY 47.49 47.5 BL_RYLPLMBLVD 33+33.60 34+48.09 LT 31155

0160 4 Type B Stabilization SY 42.0 1901 BL_RIVERSD-DR 11+90.19 12+61.58 LT 18210

590.1 BL_RIVERSD-DR 13+59.37 17+62.44 LT 18247

1.1 BL_RIVERSD-DR 14+03.84 14+08.03 RT 18252

190.9 BL_RIVERSD-DR 15+58.93 17+46.75 LT/RT 18316

52.5 BL_RIVERSD-DR 17+18.10 17+65.32 LT 24610

25.7 BL_RYLPLMBLVD 16+72.30 17+25.66 LT 18138

38.5 BL_RYLPLMBLVD 17+39.16 17+97.89 LT 34664

86.5 BL_RYLPLMBLVD 18+68.62 20+49.21 LT/RT 34656

124.3 BL_RYLPLMBLVD 21+21.62 22+30.27 RT 18162

5.6 BL_RYLPLMBLVD 25+77.26 25+98.78 RT 18229

1.0 BL_RYLPLMBLVD 27+06.23 27+10.05 RT 18228

304.9 BL_RYLPLMBLVD 32+17.37 34+39.99 LT/RT 18198

22.5 BL_RYLPLMBLVD 33+50.88 34+35.85 LT 18179

4.3 BL_RYLPLMBLVD 54+31.30 54+47.87 RT 18215

170.3 BL_RYLPLMBLVD 55+68.74 58+04.05 LT 18291

240.9 BL_RYLPLMBLVD 56+18.10 59+59.40 RT 18338

0285706 Optional Base, Base Group 06 SY 165.0 165 BL_RYLPLMBLVD 33+33.65 34+48.02 LT 18585

0285709 Optional Base, Base Group 09 SY 42.0 1879 BL_RIVERSD-DR 11+90.19 12+61.58 LT 38438

590.1 BL_RIVERSD-DR 13+59.37 17+62.44 LT 38494

1.1 BL_RIVERSD-DR 14+03.84 14+08.03 RT 38489

190.9 BL_RIVERSD-DR 15+58.93 17+46.75 LT/RT 38508

52.5 BL_RIVERSD-DR 17+18.10 17+65.32 LT 38526

25.7 BL_RYLPLMBLVD 16+72.30 17+25.66 LT 38373

38.5 BL_RYLPLMBLVD 17+39.16 17+97.89 LT 38539

86.5 BL_RYLPLMBLVD 18+68.62 20+49.21 LT/RT 38544

124.3 BL_RYLPLMBLVD 21+21.62 22+30.27 RT 38378

5.6 BL_RYLPLMBLVD 25+77.26 25+98.78 RT 38393

1.0 BL_RYLPLMBLVD 27+06.23 27+10.05 RT 38400

304.9 BL_RYLPLMBLVD 32+17.37 34+39.99 LT/RT 38414

4.3 BL_RYLPLMBLVD 54+31.30 54+47.87 RT 38433

7/27/2026 7:53:08 AM Page 17 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station

Location

Description Side

Element

ID

Design Notes Construction

Remarks

170.3 BL_RYLPLMBLVD 55+68.74 58+04.05 LT 38455

240.9 BL_RYLPLMBLVD 56+18.10 59+59.40 RT 38445

0327 70 6 Milling Exist Asph Pavt, 1 1/2 Avg Depth SY 1250.7 16009 BL_NW89DR 10+00.00 13+46.59 LT 20145

944.2 BL_NW89DR 14+10.26 17+55.93 RT 20162

1061.6 BL_NW89DR 14+10.32 17+55.93 LT/RT 20151

933.9 BL_RIVERSD-DR 11+90.13 12+80.48 LT/RT 20171

2175.4 BL_RIVERSD-DR 13+56.43 18+99.97 LT 24675

2302.7 BL_RIVERSD-DR 13+57.63 18+99.96 RT 20216

52.4 BL_RIVERSD-DR 14+54.96 14+95.77 RT 20250

58.9 BL_RYLPLMBLVD 17+68.83 18+13.08 LT/RT 33484

277.4 BL_RYLPLMBLVD 18+13.13 20+42.51 LT/RT 33467

127.0 BL_RYLPLMBLVD 21+62.63 23+11.87 RT 20144

74.5 BL_RYLPLMBLVD 26+01.49 26+52.19 LT/RT 20148

86.3 BL_RYLPLMBLVD 26+53.56 27+10.02 LT/RT 20146

170.2 BL_RYLPLMBLVD 34+40.01 35+19.06 LT 20150

6493.9 BL_RYLPLMBLVD 53+60.01 61+85.31 RT 20178

0334 1 13 Superpave Asphaltic Conc, Traffic C TN 106.62 106.6 BL_RYLPLMBLVD 56+19.16 60+04.08 LT/RT 19171 LT Left Turn Lanes, 3"

Avg Overbuild

0334 1 53 Superpave Asphaltic Concrete, Traffic C, PG 76-22 TN 1.96 137.8 BL_RIVERSD-DR 11+90.15 12+61.58 LT 18777 1.5" Lift

39.93 BL_RIVERSD-DR 13+59.30 17+62.44 LT 18780 1.5" Lift

15.75 BL_RIVERSD-DR 15+58.93 17+46.75 LT/RT 18802 1.5" Lift

4.21 BL_RIVERSD-DR 17+16.13 17+65.32 LT 24647 1.5" Lift

0.98 BL_RYLPLMBLVD 16+72.32 17+25.64 LT 18726 1.5" Lift

2.53 BL_RYLPLMBLVD 17+39.11 17+97.88 LT 33465 1.5" Lift

5.48 BL_RYLPLMBLVD 18+68.62 20+49.21 LT/RT 33466 1.5" Lift

7.98 BL_RYLPLMBLVD 21+21.62 22+30.27 RT 18728 1.5" Lift

23.37 BL_RYLPLMBLVD 32+17.37 34+39.99 RT 18729 1.5" Lift

9.80 BL_RYLPLMBLVD 33+33.66 34+48.02 LT 18730 1.25" Lift

8.96 BL_RYLPLMBLVD 55+68.68 58+04.00 LT 18779 1.5" Lift

16.87 BL_RYLPLMBLVD 56+18.11 59+58.99 LT/RT 18778 1.5" Lift

0337 7 82 Asphalt Concrete Friction Course, Traffic C, FC-9.5, PG 76-

TN 103.18 1434.7 BL_NW89DR 10+00.00 13+46.59 LT 19431 1.5" Lift

7/27/2026 7:53:08 AM Page 18 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station

Location

Description Side

Element

ID

Design Notes Construction

Remarks

79.55 BL_NW89DR 14+10.22 17+55.93 RT 19519 1.5" Lift

85.99 BL_NW89DR 14+10.27 17+56.01 LT 19499 1.5" Lift

79.01 BL_RIVERSD-DR 11+90.17 12+80.48 LT/RT 19818 1.5" Lift

226.14 BL_RIVERSD-DR 13+56.60 18+99.97 LT 19879 1.5" Lift

193.75 BL_RIVERSD-DR 13+60.45 18+99.96 RT 19902 1.5" Lift

4.32 BL_RIVERSD-DR 14+54.96 14+95.77 RT 19804 1.5" Lift

0.98 BL_RYLPLMBLVD 16+72.32 17+25.64 LT 19424 1.5" Lift

7.38 BL_RYLPLMBLVD 17+39.11 18+13.08 LT 34724 1.5" Lift

26.46 BL_RYLPLMBLVD 18+13.13 20+49.23 LT 34717 1.5" Lift

18.46 BL_RYLPLMBLVD 21+21.62 23+11.90 RT 19427 1.5" Lift

6.14 BL_RYLPLMBLVD 26+01.49 26+52.19 LT/RT 19429 1.5" Lift

7.11 BL_RYLPLMBLVD 26+53.56 27+10.02 RT 19430 1.5" Lift

37.42 BL_RYLPLMBLVD 32+17.37 35+19.06 LT/RT 19450 1.5" Lift

9.80 BL_RYLPLMBLVD 33+33.66 34+48.02 LT 19451 1.25" Lift

549.01 BL_RYLPLMBLVD 53+60.01 61+85.31 RT 19807 1.5" Lift

7/27/2026 7:53:08 AM Page 19 of 51

Summary of Drainage

Pay Item

Number Label Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0425 1201 S-02 Inlets, Curb, Type 9, <10' EA 1 1 BL_RYLPLMBLVD 34+30.48 34+30.48 LT 23209

0425 1204 S-05 Inlets, Curb, Type 9, J Bot, >10' EA 1 1 BL_RIVERSD-DR 14+40.00 14+40.00 LT 36004

0425 1351 S-06 Inlets, Curb, Type P-5, <10' EA 1 2 BL_RIVERSD-DR 17+34.15 17+34.15 LT 24884

S-01A 1 BL_RYLPLMBLVD 21+50.00 21+50.00 RT 24856

0425 1361 S-03 Inlets, Curb, Type P-6, <10' EA 1 1 BL_RYLPLMBLVD 56+76.18 56+76.18 LT 23343

0425 2 61 S-01B Manholes, P-8, <10' EA 1 1 BL_RYLPLMBLVD 21+52.00 21+52.00 RT 23506

0425 2 62 S-04 Manholes, P-8, >10' EA 1 1 BL_RYLPLMBLVD 56+76.18 56+76.18 RT 23701

0425 2 92 S-02B Manholes, J-8, >10' EA 1 1 BL_RYLPLMBLVD 34+30.48 34+30.48 LT 36092

0430175118 P-05NW Pipe Culvert,Optional Material,Round, 18"S/CD LF 4.0 264 BL_RIVERSD-DR 14+34.25 14+38.25 LT 36011

P-06SW 140.7 BL_RIVERSD-DR 15+91.74 17+32.39 LT 23098

P-01AS 35.8 BL_RYLPLMBLVD 21+50.00 21+52.00 RT 23093

P-02N 33.9 BL_RYLPLMBLVD 34+30.48 34+30.48 LT 31457

P-03NW 50.0 BL_RYLPLMBLVD 56+76.18 56+76.18 LT/RT 23096

0443 70 3 F-05 French Drain, 18 LF 150.0 576 BL_RIVERSD-DR 14+41.75 15+91.74 LT 22987

F-01 178.0 BL_RYLPLMBLVD 21+54.00 23+32.00 RT 22984

F-02 90.0 BL_RYLPLMBLVD 33+38.48 34+28.48 LT 22985

F-03 30.0 BL_RYLPLMBLVD 34+32.48 34+62.48 LT 31461

F-04 128.0 BL_RYLPLMBLVD 56+78.18 58+06.18 RT 22986

7/27/2026 7:53:08 AM Page 20 of 51

Summary of Utility Adjustments - 2

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0425 5 1 Manhole, Adjust, Utilities EA 1 7 BL_NW89DR 15+41.01 15+41.01 RT 32894

1 BL_NW89DR 16+88.95 16+88.95 RT 32906

1 BL_RIVERSD-DR 18+14.37 18+14.37 RT 32942

1 BL_RYLPLMBLVD 22+31.72 22+31.72 RT 32870

1 BL_RYLPLMBLVD 26+51.95 26+51.95 RT 32882

1 BL_RYLPLMBLVD 55+27.64 55+27.64 RT 32930

1 BL_RYLPLMBLVD 55+70.72 55+70.72 LT 32918

0425 6 Valve Boxes, Adjust EA 1 11 BL_RIVERSD-DR 17+53.28 17+53.28 RT 32530

1 BL_RIVERSD-DR 17+59.03 17+59.03 RT 32488

1 BL_RIVERSD-DR 17+62.31 17+62.31 RT 32496

1 BL_RIVERSD-DR 17+93.53 17+93.53 RT 32504

1 BL_RIVERSD-DR 18+64.00 18+64.00 RT 32512

1 BL_RYLPLMBLVD 21+36.98 21+36.98 RT 33041

1 BL_RYLPLMBLVD 21+37.52 21+37.52 RT 33051

1 BL_RYLPLMBLVD 26+25.17 26+25.17 LT 32454

1 BL_RYLPLMBLVD 26+28.06 26+28.06 LT 32465

1 BL_RYLPLMBLVD 26+58.68 26+58.68 LT 32477

1 BL_RYLPLMBLVD 54+48.95 54+48.95 LT 32520

7/27/2026 7:53:08 AM Page 21 of 51

Summary of Utility Adjustments

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0425 5 Manhole, Adjust EA 1 3 BL_RYLPLMBLVD 26+64.00 26+64.00 RT 11314

1 BL_RYLPLMBLVD 54+86.99 54+86.99 LT 11302

1 BL_RYLPLMBLVD 54+96.72 54+96.72 LT 30886

7/27/2026 7:53:08 AM Page 22 of 51

Summary of Railing

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0515 1 2 Pipe Handrail - Guiderail, Aluminum LF 330.0 330 BL_RIVERSD-

DR

14+00.00 17+30.00 LT 14413

7/27/2026 7:53:08 AM Page 23 of 51

Summary of Curbs

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0520 1 10 Concrete Curb & Gutter, Type F LF 131.9 2468 BL_RIVERSD-DR 11+90.18 12+78.65 LT 14469

436.9 BL_RIVERSD-DR 13+57.88 17+61.61 LT 14464

289.6 BL_RYLPLMBLVD 14+80.06 17+69.66 RT 33275

66.9 BL_RYLPLMBLVD 16+72.22 17+39.10 LT 33272

34.0 BL_RYLPLMBLVD 17+39.10 17+71.36 LT/RT 33273

9.1 BL_RYLPLMBLVD 17+69.69 17+73.08 RT 33274

77.4 BL_RYLPLMBLVD 19+72.77 20+49.25 LT/RT 36177

211.1 BL_RYLPLMBLVD 21+26.05 22+30.25 RT 14455

83.1 BL_RYLPLMBLVD 25+77.20 26+34.20 RT 14416

99.9 BL_RYLPLMBLVD 26+30.41 26+75.35 LT/RT 14418

66.8 BL_RYLPLMBLVD 26+67.55 27+10.09 RT 14417

173.6 BL_RYLPLMBLVD 33+50.94 34+35.87 LT 14451

266.1 BL_RYLPLMBLVD 55+64.40 58+04.08 LT 14473

42.9 BL_RYLPLMBLVD 55+89.80 56+21.32 RT 33271

197.8 BL_RYLPLMBLVD 59+04.08 61+00.00 LT/RT 14425

281.2 BL_RYLPLMBLVD 59+04.08 61+85.28 RT 5386

0520 2 2 Concrete Curb, Type B LF 4.9 88 BL_RYLPLMBLVD 18+10.92 18+13.05 LT 33404

8.5 BL_RYLPLMBLVD 18+11.35 18+15.13 LT/RT 33403

35.9 BL_RYLPLMBLVD 18+13.10 18+48.99 LT 33405

4.1 BL_RYLPLMBLVD 18+15.30 18+18.53 RT 33408

32.7 BL_RYLPLMBLVD 18+18.69 18+48.96 LT/RT 33407

2.0 BL_RYLPLMBLVD 18+48.99 18+49.56 LT 33406

0520 2 4 Concrete Curb, Type D LF 193.5 270 BL_RYLPLMBLVD 32+17.41 34+04.66 LT/RT 17248

76.9 BL_RYLPLMBLVD 33+25.48 34+02.35 LT 26002

0520 5 41 Traffic Separator, Concrete, Type IV, 4' Wide LF 259.9 456 BL_RIVERSD-DR 14+88.89 17+44.88 LT/RT 13127

196.1 BL_RYLPLMBLVD 21+48.15 23+40.70 LT/RT 26222

0520 70 Concrete Traffic Separator, Special - Variable Width SY 22.0 86 BL_RYLPLMBLVD 18+68.64 19+72.48 RT 33409 2-FT WIDTH

63.5 BL_RYLPLMBLVD 56+18.10 59+04.00 RT 26350 2-FT WIDTH

7/27/2026 7:53:08 AM Page 24 of 51

Summary of Sidewalk and Detectable Warnings

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0522 2 Sidewalk Concrete And Driveways, 6" Thick SY 227.9 738 BL_RIVERSD-DR 13+94.74 17+36.58 LT 6071

11.6 BL_RIVERSD-DR 15+17.04 15+43.10 RT 13016

4.3 BL_RIVERSD-DR 15+34.61 15+52.17 RT 13015

21.5 BL_RIVERSD-DR 17+36.72 17+62.14 LT 10924

25.3 BL_RYLPLMBLVD 18+10.92 18+49.56 LT 33067

6.6 BL_RYLPLMBLVD 21+24.08 21+35.89 RT 25049

52.7 BL_RYLPLMBLVD 21+35.96 22+30.29 RT 25015

15.6 BL_RYLPLMBLVD 26+01.76 26+27.61 RT 10881

32.4 BL_RYLPLMBLVD 26+31.32 26+74.43 LT/RT 25016

14.0 BL_RYLPLMBLVD 26+74.38 26+97.55 RT 10876

62.8 BL_RYLPLMBLVD 33+33.39 34+48.04 LT 25014

3.8 BL_RYLPLMBLVD 54+40.88 54+51.79 RT 24245

6.8 BL_RYLPLMBLVD 54+42.87 54+48.30 LT 11085

61.4 BL_RYLPLMBLVD 54+47.79 54+81.17 LT 12904

47.7 BL_RYLPLMBLVD 54+51.24 54+88.31 RT 12971

7.5 BL_RYLPLMBLVD 54+76.95 54+86.97 RT 11093

73.6 BL_RYLPLMBLVD 55+65.69 56+20.64 LT 12956

27.1 BL_RYLPLMBLVD 55+90.28 56+22.78 RT 33064

12.2 BL_RYLPLMBLVD 56+04.87 56+21.07 LT 17799

7.0 BL_RYLPLMBLVD 56+06.91 56+19.04 RT 5985

15.9 BL_RYLPLMBLVD 56+20.69 56+44.44 LT 11088

0527 2 Detectable Warnings SF 12.0 191 BL_RIVERSD-DR 17+46.24 17+52.40 LT 6239

10.0 BL_RYLPLMBLVD 13+03.08 13+04.99 RT 6195

10.0 BL_RYLPLMBLVD 13+51.39 13+53.30 RT 6196

10.0 BL_RYLPLMBLVD 15+14.90 15+16.81 RT 6197

9.8 BL_RYLPLMBLVD 15+63.21 15+65.12 RT 6198

9.6 BL_RYLPLMBLVD 17+88.11 17+90.02 RT 6199

9.8 BL_RYLPLMBLVD 18+22.42 18+24.33 RT 6200

15.7 BL_RYLPLMBLVD 26+20.26 26+26.99 RT 6207

16.4 BL_RYLPLMBLVD 26+75.13 26+82.29 RT 6201

12.0 BL_RYLPLMBLVD 54+57.57 54+63.82 LT 6234

7/27/2026 7:53:08 AM Page 25 of 51

Summary of Sidewalk and Detectable Warnings

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

12.0 BL_RYLPLMBLVD 54+58.27 54+64.40 RT 6218

8.0 BL_RYLPLMBLVD 54+78.54 54+81.03 LT 6229

12.0 BL_RYLPLMBLVD 54+82.04 54+86.30 RT 6213

12.0 BL_RYLPLMBLVD 55+68.78 55+73.39 LT 6224

9.9 BL_RYLPLMBLVD 55+93.63 55+98.05 RT 33062

12.0 BL_RYLPLMBLVD 56+07.17 56+13.00 LT 6223

9.7 BL_RYLPLMBLVD 56+10.42 56+15.52 RT 33061

919528100 DIRECTIONAL INDICATORS SF 24.2 24 BL_RIVERSD-DR 15+36.57 15+52.17 RT 17986

7/27/2026 7:53:08 AM Page 26 of 51

Summary of Performance Turf

Pay Item

Number Pay Item Description

Units of

Measure Length (FT) Width (FT)

P F P F Alignment Begin

Station

End

Station Side

Element

ID

Design Notes Construction

Remarks

0570 1

Performance Turf, Sod SY 65.3 1971 BL_RIVERSD-DR 11+90.11 12+47.86 LT 17637

12.5 BL_RIVERSD-DR 12+35.35 12+68.62 LT 17638

13.6 BL_RIVERSD-DR 13+96.29 14+08.05 RT 17642

14.9 BL_RIVERSD-DR 14+95.15 15+40.07 RT 17644

13.6 BL_RIVERSD-DR 15+00.94 15+31.20 RT 17645

39.8 BL_RIVERSD-DR 15+28.00 15+98.39 RT 17646

16.4 BL_RIVERSD-DR 15+46.49 15+98.47 RT 17647

7.2 BL_RIVERSD-DR 17+29.98 17+55.43 LT 17648

310.0 BL_RYLPLMBLVD 14+80.10 17+72.57 RT 33074

55.9 BL_RYLPLMBLVD 19+72.87 20+49.18 LT/RT 34508

42.0 BL_RYLPLMBLVD 21+26.75 22+28.88 RT 17629

17.1 BL_RYLPLMBLVD 23+28.04 23+36.96 RT 32153

60.0 BL_RYLPLMBLVD 25+77.24 26+20.60 RT 17630

43.4 BL_RYLPLMBLVD 26+01.82 26+33.70 RT 17631

33.4 BL_RYLPLMBLVD 26+68.12 26+91.22 RT 17632

29.2 BL_RYLPLMBLVD 26+82.02 27+10.05 RT 17633

127.2 BL_RYLPLMBLVD 32+17.40 34+04.66 LT 17634

14.5 BL_RYLPLMBLVD 32+99.20 33+08.10 LT 32152

84.9 BL_RYLPLMBLVD 33+33.27 34+68.43 LT 25011

9.0 BL_RYLPLMBLVD 54+31.16 54+52.44 RT 17639

12.0 BL_RYLPLMBLVD 54+43.21 54+73.04 LT 17643

121.2 BL_RYLPLMBLVD 55+81.23 56+43.50 LT 17641

217.0 BL_RYLPLMBLVD 56+25.70 58+04.04 LT 17640

611.0 BL_RYLPLMBLVD 59+04.13 61+94.29 RT 17636

7/27/2026 7:53:08 AM Page 27 of 51

Summary of Landscape Items

Pay Item

Number Label Pay Item Description

Max.

Maint.

Size

Units of

Measure P F P F Units P F Site No.

Location

Description

Design Notes Construction

Remarks

590-70-5 IRRIGATION SYSTEM- MODIFY EXISTING SYSTEM LS 1 1

EA 80 Irrigation Heads

EA 80 Swing Assembly

LF 800.0 Lateral - Schedule

40PVC Pipe

LF 150.0 Main Line - Schedule

40PVC Pipe

LF 150.0 Wireing

LF 20.0 Sleeves - Schedule 40

PVC Pipe

EA 2 Junction Box

EA 2 Valves

7/27/2026 7:53:08 AM Page 28 of 51

Summary of Signalization Items

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0630 2 11 Conduit, Furnish & Install, Open Trench LF 16.8 341 BL_RYLPLMBLVD 54+46.68 54+62.94 RT 13616

39.8 BL_RYLPLMBLVD 54+46.68 54+78.64 RT 13617

26.0 BL_RYLPLMBLVD 54+47.18 54+70.20 LT 16146

18.0 BL_RYLPLMBLVD 54+54.84 54+70.01 LT 16147

6.0 BL_RYLPLMBLVD 54+65.65 54+70.37 LT 16145

10.0 BL_RYLPLMBLVD 54+70.42 54+72.73 LT 16143

6.3 BL_RYLPLMBLVD 54+76.29 54+78.72 RT 13618

11.2 BL_RYLPLMBLVD 55+79.98 55+86.50 LT 13627

25.5 BL_RYLPLMBLVD 55+86.50 56+11.22 LT 13628

34.7 BL_RYLPLMBLVD 55+86.50 56+21.17 LT 13655

28.3 BL_RYLPLMBLVD 55+86.52 56+10.92 LT 13658

22.8 BL_RYLPLMBLVD 55+89.65 56+12.10 LT 13619

45.0 BL_RYLPLMBLVD 55+94.65 56+13.99 LT 16752

20.3 BL_RYLPLMBLVD 55+94.70 56+10.87 LT 13657

20.0 BL_RYLPLMBLVD 55+97.39 56+15.56 RT 16368

5.0 BL_RYLPLMBLVD 56+10.00 56+14.99 RT 17493

5.0 BL_RYLPLMBLVD 56+15.51 56+16.28 RT 16372

0630 2 12 Conduit, Furnish & Install, Directional Bore LF 58.0 346 BL_RYLPLMBLVD 54+46.68 54+46.68 LT/RT 13637

33.0 BL_RYLPLMBLVD 54+46.68 54+46.68 LT 13645

142.0 BL_RYLPLMBLVD 54+69.77 56+10.93 LT 13656

45.0 BL_RYLPLMBLVD 56+15.73 56+21.09 RT 16373

67.5 BL_RYLPLMBLVD 56+21.17 56+21.17 LT/RT 13654

0632 7 1 Signal Cable, New Or Reconstructed Intersection, Furnish &

Install

PI 1 1 BL_RYLPLMBLVD 56+16.06 56+19.56 LT 18035

0632 7 6 Signal Cable, Remove - Intersection PI 1 1 BL_RYLPLMBLVD 56+16.07 56+19.57 LT 18034

0635 2 11 Pull & Splice Box, F&I, 13 X 24 Cover Size EA 1 26 BL_RYLPLMBLVD 54+43.55 54+43.55 RT 13507

1 BL_RYLPLMBLVD 54+45.63 54+45.63 RT 13521

1 BL_RYLPLMBLVD 54+46.68 54+46.68 LT 13638

1 BL_RYLPLMBLVD 54+47.72 54+47.72 RT 13500

1 BL_RYLPLMBLVD 54+49.80 54+49.80 RT 13514

1 BL_RYLPLMBLVD 54+68.96 54+68.96 LT 13479

1 BL_RYLPLMBLVD 54+68.96 54+68.96 LT 13472

7/27/2026 7:53:08 AM Page 29 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

1 BL_RYLPLMBLVD 54+71.04 54+71.04 LT 13486

1 BL_RYLPLMBLVD 54+71.04 54+71.04 LT 13493

1 BL_RYLPLMBLVD 55+86.50 55+86.50 LT 13620

1 BL_RYLPLMBLVD 55+92.56 55+92.56 LT 14173

1 BL_RYLPLMBLVD 55+96.73 55+96.73 LT 14166

1 BL_RYLPLMBLVD 56+08.98 56+08.98 LT 16616

1 BL_RYLPLMBLVD 56+09.89 56+09.89 LT 13591

1 BL_RYLPLMBLVD 56+09.89 56+09.89 LT 13584

1 BL_RYLPLMBLVD 56+11.69 56+11.69 LT 16641

1 BL_RYLPLMBLVD 56+11.97 56+11.97 LT 13563

1 BL_RYLPLMBLVD 56+11.97 56+11.97 LT 13556

1 BL_RYLPLMBLVD 56+13.31 56+13.31 RT 13528

1 BL_RYLPLMBLVD 56+14.05 56+14.05 LT 13570

1 BL_RYLPLMBLVD 56+14.05 56+14.05 LT 13577

1 BL_RYLPLMBLVD 56+14.20 56+14.20 LT 16648

1 BL_RYLPLMBLVD 56+14.38 56+14.38 RT 13549

1 BL_RYLPLMBLVD 56+15.10 56+15.10 RT 13535

1 BL_RYLPLMBLVD 56+16.17 56+16.17 RT 13542

1 BL_RYLPLMBLVD 56+21.17 56+21.17 LT 13647

0635 2 12 Pull & Splice Box, F&I, 24 X 36 Cover Size EA 1 1 BL_RYLPLMBLVD 56+07.80 56+07.80 LT 13598

0635 2 30 Pull & Splice Box, Install EA 1 1 BL_RYLPLMBLVD 55+94.64 55+94.64 LT 14159

0639 1122 Electrical Power Service, F&I, Underground, Meter Furnished

By Contractor

AS 1 1 BL_RYLPLMBLVD 56+11.77 56+11.77 LT 16638

0639 1620 Electrical Power Service, Remove, Undergound AS 1 1 BL_RYLPLMBLVD 56+16.45 56+19.26 LT 19369

0639 2 1 Electrical Service Wire, Furnish & Install LF 45.0 45 BL_RYLPLMBLVD 55+94.65 56+13.99 LT 16752

0639 2 6 Electrical Service Wire, Remove LF 20.0 20 BL_RYLPLMBLVD 56+17.38 56+22.32 LT 19370

0639 3 11 Electrical Service Disconnect, F&I, Pole Mount EA 1 1 BL_RYLPLMBLVD 56+11.07 56+12.45 LT 16640

0641 2 12 Prestressed Concrete Pole, F&I, Type P-II Service Pole EA 1 1 BL_RYLPLMBLVD 56+11.77 56+11.77 LT 16638

0641 2 60 Prestressed Concrete Pole, Complete Pole Removal -

Pedestal/Service Pole

EA 1 1 BL_RYLPLMBLVD 56+04.16 56+04.16 LT 16551

0646 1 11 Aluminum Signals Pole, Furnish & Install, Pedestal EA 1 8 BL_RYLPLMBLVD 54+54.30 54+54.30 LT 12671

1 BL_RYLPLMBLVD 54+62.28 54+62.28 RT 12641

7/27/2026 7:53:08 AM Page 30 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

1 BL_RYLPLMBLVD 54+72.80 54+72.80 LT 12626

1 BL_RYLPLMBLVD 54+78.84 54+78.84 RT 12686

1 BL_RYLPLMBLVD 55+79.98 55+79.98 LT 12611

1 BL_RYLPLMBLVD 55+98.20 55+98.20 RT 16180

1 BL_RYLPLMBLVD 56+11.22 56+11.22 LT 12652

1 BL_RYLPLMBLVD 56+16.04 56+16.04 RT 16157

0646 1 60 Aluminum Signals Pole, Remove EA 1 8 BL_RYLPLMBLVD 54+56.52 54+56.52 LT 18108

1 BL_RYLPLMBLVD 54+67.90 54+67.90 RT 18124

1 BL_RYLPLMBLVD 54+77.12 54+77.12 RT 18140

1 BL_RYLPLMBLVD 54+80.35 54+80.35 LT 18092

1 BL_RYLPLMBLVD 55+77.30 55+77.30 LT 18076

1 BL_RYLPLMBLVD 56+03.47 56+03.47 RT 18156

1 BL_RYLPLMBLVD 56+10.28 56+10.28 LT 18060

1 BL_RYLPLMBLVD 56+14.71 56+14.71 RT 18172

0649 21 15 Mast Arm Assembly, Furnish & Install, Single Arm 70' EA 1 1 BL_RYLPLMBLVD 54+65.65 54+65.65 LT 12282

0649 26 5 Mast Arm Assembly, Remove, Deep Foundation, Bolt On

Attachment

EA 1 1 BL_RYLPLMBLVD 54+76.13 54+78.15 LT 19366

0650 1 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 Way

AS 1 14 BL_RYLPLMBLVD 54+67.31 54+67.31 RT 13770

1 BL_RYLPLMBLVD 54+67.36 54+67.36 LT 13694

1 BL_RYLPLMBLVD 54+67.43 54+67.43 LT 12526

1 BL_RYLPLMBLVD 54+67.49 54+67.49 LT 12450

1 BL_RYLPLMBLVD 54+67.55 54+67.55 LT 12374

1 BL_RYLPLMBLVD 54+93.49 54+93.49 RT 12298

1 BL_RYLPLMBLVD 55+14.67 55+14.67 RT 13846

1 BL_RYLPLMBLVD 55+24.67 55+24.67 RT 13926

1 BL_RYLPLMBLVD 55+33.64 55+33.64 LT 14083

1 BL_RYLPLMBLVD 55+45.14 55+45.14 LT 12859

1 BL_RYLPLMBLVD 55+79.00 55+79.00 LT 12957

1 BL_RYLPLMBLVD 56+08.04 56+08.04 RT 13143

1 BL_RYLPLMBLVD 56+08.17 56+08.17 RT 13222

1 BL_RYLPLMBLVD 56+08.24 56+08.24 RT 14007

7/27/2026 7:53:08 AM Page 31 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0650 1 70 Vehicular Traffic Signal, Relocate- Includes Removal And

Reinstallation

AS 1 3 BL_RYLPLMBLVD 55+04.17 55+04.17 RT 13321

1 BL_RYLPLMBLVD 55+56.46 55+56.46 LT 12771

1 BL_RYLPLMBLVD 56+08.43 56+08.43 RT 13058

0650 2109 Vehicular Signal Auxiliaries, Repair/Replace/Retrofit, Furnish &

Install, Backplate, Flexible Required

EA 1 3 BL_RYLPLMBLVD 55+02.59 55+02.59 RT 19821

1 BL_RYLPLMBLVD 55+54.52 55+54.52 LT 19811

1 BL_RYLPLMBLVD 56+06.84 56+06.84 RT 19816

0653 1 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way AS 1 8 BL_RYLPLMBLVD 54+54.30 54+54.30 LT 12662

1 BL_RYLPLMBLVD 54+62.28 54+62.28 RT 12632

1 BL_RYLPLMBLVD 54+73.77 54+73.77 LT 12617

1 BL_RYLPLMBLVD 54+79.70 54+79.70 RT 12677

1 BL_RYLPLMBLVD 55+79.12 55+79.12 LT 12602

1 BL_RYLPLMBLVD 55+97.34 55+97.34 RT 16167

1 BL_RYLPLMBLVD 56+11.22 56+11.22 LT 12643

1 BL_RYLPLMBLVD 56+15.98 56+15.98 RT 16148

0660 4 11 Vehicle Detection System - Video, Furnish & Install, Cabinet

Equipment

EA 1 2 BL_RYLPLMBLVD 56+16.95 56+18.45 LT 18601

1 BL_RYLPLMBLVD 56+17.17 56+18.66 LT 18600

0660 4 12 Vehicle Detection System - Video, Furnish & Install, Above

Ground Equipment

EA 1 2 BL_RYLPLMBLVD 54+66.06 54+66.06 RT 12733

1 BL_RYLPLMBLVD 54+66.24 54+66.24 LT 12739

0660 4 42 Vehicle Detection System - Video, Relocate, Above Ground

Equipment

EA 1 3 BL_RYLPLMBLVD 55+09.72 55+09.72 RT 18304

1 BL_RYLPLMBLVD 55+50.65 55+50.65 LT 18278

1 BL_RYLPLMBLVD 56+06.83 56+06.83 RT 18294

0665 1 12 Pedestrian Detector, Furnish & Install, Accessible EA 1 8 BL_RYLPLMBLVD 54+54.30 54+54.30 LT 12673

1 BL_RYLPLMBLVD 54+62.88 54+62.88 RT 12658

1 BL_RYLPLMBLVD 54+75.80 54+75.80 LT 12628

1 BL_RYLPLMBLVD 54+82.98 54+82.98 RT 12688

1 BL_RYLPLMBLVD 55+75.46 55+75.46 LT 12613

1 BL_RYLPLMBLVD 55+95.11 55+95.11 RT 16176

7/27/2026 7:53:08 AM Page 32 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

1 BL_RYLPLMBLVD 56+11.22 56+11.22 LT 12654

1 BL_RYLPLMBLVD 56+16.44 56+16.44 RT 16159

0676 1500 Traffic Signal Controller Cabinet, Adjust/Modify EA 1 1 BL_RYLPLMBLVD 56+17.83 56+17.83 LT 18036

0700 3201 Sign Panel, Furnish & Install Overhead Mount, Up To 12 SF EA 1 4 BL_RYLPLMBLVD 54+66.83 54+66.83 LT 17282

1 BL_RYLPLMBLVD 54+98.95 54+98.95 RT 17490

1 BL_RYLPLMBLVD 55+67.43 55+67.43 LT 17484

1 BL_RYLPLMBLVD 56+08.80 56+08.80 RT 17487

0700 3601 Sign Panel, Remove, Up To 12 SF EA 1 3 BL_RYLPLMBLVD 54+89.24 54+91.21 RT 19375

1 BL_RYLPLMBLVD 55+60.75 55+62.72 LT 19373

1 BL_RYLPLMBLVD 56+09.17 56+11.14 RT 19374

0700 5 22 Internally Illuminated Sign, F&I, Overhead Mount, 12 - 18 SF EA 1 1 BL_RYLPLMBLVD 54+65.53 54+67.49 LT 19377

0700 5 50 Internally Illuminated Sign, Relocate EA 1 1 BL_RYLPLMBLVD 55+83.11 55+85.07 LT 19376

7/27/2026 7:53:08 AM Page 33 of 51

Summary of Signing and Pavement Marking

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0700 1111 Single Column Ground Sign Assembly, F&I Ground Mount, Less Than 12 SF

EA 1 7 BL_RIVERSD-DR 9+55.69 9+55.69 LT 6636

1 BL_RIVERSD-DR 15+17.59 15+17.59 RT 5025

1 BL_RIVERSD-DR 17+10.11 17+10.11 LT 5779

1 BL_RYLPLMBLVD 26+44.17 26+44.17 RT 6106

1 BL_RYLPLMBLVD 26+61.40 26+61.40 LT 6103

1 BL_RYLPLMBLVD 53+71.74 53+71.74 RT 5814

1 BL_RYLPLMBLVD 17+40.00 17+40.00 LT/RT 6963

0700 1112 Single Column Ground Sign Assembly, F&I Ground Mount, 12.0-20.0 SF

EA 1 5 BL_NW91AVE 10+55.88 10+55.88 LT 5074

1 BL_RYLPLMBLVD 18+26.19 18+26.19 LT 6826

1 BL_RYLPLMBLVD 26+08.13 26+08.13 LT 2653

1 BL_RYLPLMBLVD 26+51.46 26+51.46 RT 5642

1 BL_RYLPLMBLVD 26+77.33 26+77.33 LT/RT 2422

0700 1600 Single Column Ground Sign Assembly, Remove EA 1 18 BL_NW89DR 13+08.92 13+08.92 RT 8092

1 BL_NW89DR 14+36.27 14+36.27 RT 8052

1 BL_NW89DR 14+37.98 14+37.98 LT 8049

1 BL_NW89DR 14+43.66 14+43.66 LT 8046

1 BL_RIVERSD-DR 16+28.24 16+28.24 LT 8901

1 BL_RIVERSD-DR 16+28.95 16+28.95 LT 8904

1 BL_RIVERSD-DR 17+36.60 17+36.60 LT 8950

1 BL_RIVERSD-DR 17+40.37 17+40.37 LT 8953

1 BL_RYLPLMBLVD 18+25.95 18+25.95 LT 8623

1 BL_RYLPLMBLVD 54+45.64 54+45.64 RT 8409

1 BL_RYLPLMBLVD 54+46.25 54+46.25 LT 8420

1 BL_RYLPLMBLVD 54+86.86 54+86.86 LT 8423

1 BL_RYLPLMBLVD 55+32.01 55+32.01 LT 8664

1 BL_RYLPLMBLVD 55+92.28 55+92.28 RT 8961

1 BL_RYLPLMBLVD 56+00.22 56+00.22 RT 8429

1 BL_RYLPLMBLVD 56+13.92 56+13.92 LT 8426

1 BL_RYLPLMBLVD 59+12.82 59+12.82 RT 8933

1 BL_RYLPLMBLVD 59+12.82 59+12.82 LT 9030

7/27/2026 7:53:08 AM Page 34 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0700 3501 Sign Panel, Relocate, Up To 12 SF EA 1 3 BL_RYLPLMBLVD 18+24.43 18+25.97 LT 5077

1 BL_RYLPLMBLVD 26+07.36 26+08.90 LT 5647

1 BL_RYLPLMBLVD 26+76.56 26+78.10 RT 6307

0700 13 15 Retroreflective Sign Strip, Furnish & Install 5' EA 1 3 BL_RYLPLMBLVD 18+25.38 18+27.00 LT 6821

1 BL_RYLPLMBLVD 26+50.65 26+52.27 RT 5029

1 BL_RYLPLMBLVD 26+50.74 26+52.17 RT 6699

0706 1 3 Raised Pavement Marker, Type B EA 256 726 BL_NW89DR 10+09.48 17+33.32 LT 8450

211 BL_RIVERSD-DR 12+06.59 18+97.36 RT 6961

259 BL_RYLPLMBLVD 17+37.76 61+84.79 RT 17094

0710 12290 Painted Pavement Markings, Durable Paint, Yellow, Island

Nose

SF 1.1 34 BL_NW89DR 14+32.25 14+38.25 RT 12439

1.2 BL_NW89DR 14+98.97 15+05.43 LT 14551

1.1 BL_NW89DR 15+75.79 15+82.05 LT/RT 14552

1.1 BL_RIVERSD-DR 12+47.45 12+50.23 LT 12146

1.2 BL_RIVERSD-DR 13+91.28 13+92.49 RT 12148

1.1 BL_RIVERSD-DR 13+91.28 13+92.49 RT 12165

1.2 BL_RIVERSD-DR 17+42.84 17+44.74 LT 14564

1.1 BL_RIVERSD-DR 17+88.37 18+02.09 LT 14571

1.1 BL_RIVERSD-DR 18+13.40 18+21.14 RT 19067

1.0 BL_RIVERSD-DR 18+36.50 18+40.97 RT 19066

1.0 BL_RIVERSD-DR 18+41.13 18+42.73 RT 14567

1.2 BL_RYLPLMBLVD 17+37.91 17+71.37 LT/RT 18973

3.5 BL_RYLPLMBLVD 17+69.69 17+73.08 RT 17721

1.8 BL_RYLPLMBLVD 18+68.64 18+69.59 RT 17981

1.1 BL_RYLPLMBLVD 26+01.59 26+02.91 LT 14383

1.2 BL_RYLPLMBLVD 26+01.59 26+02.99 LT 14387

1.0 BL_RYLPLMBLVD 27+08.59 27+09.98 RT 14377

1.2 BL_RYLPLMBLVD 27+08.67 27+09.98 RT 14379

1.5 BL_RYLPLMBLVD 34+02.38 34+05.00 LT 15059

1.5 BL_RYLPLMBLVD 35+17.96 35+19.35 RT 14987

1.0 BL_RYLPLMBLVD 35+18.04 35+19.47 RT 19476

1.5 BL_RYLPLMBLVD 54+52.89 54+54.39 LT 12147

7/27/2026 7:53:08 AM Page 35 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

3.5 BL_RYLPLMBLVD 54+52.89 54+54.39 LT 12170

1.0 BL_RYLPLMBLVD 56+18.13 56+19.04 RT 12160

1.0 BL_RYLPLMBLVD 56+18.31 56+19.14 RT 12149

0710 90 Painted Pavement Markings, Final Surface LS 1 1 BL_RYLPLMBLVD 13+03.00 61+94.32 LT/RT 13978

0711 11102 Thermoplastic, Standard, White, Solid, 8 For Interchange And

Urban Island

GM 0.0011 0.092 BL_RIVERSD-DR 18+11.20 18+11.42 RT 4375

0.0028 BL_RIVERSD-DR 18+21.55 18+36.36 RT 4373

0.0011 BL_RIVERSD-DR 18+40.24 18+42.54 RT 4371

0.0050 BL_RYLPLMBLVD 17+99.14 18+17.34 LT/RT 18948

0.0069 BL_RYLPLMBLVD 18+17.48 18+49.88 LT/RT 18949

0.0224 BL_RYLPLMBLVD 18+49.08 19+67.31 LT 17871

0.0222 BL_RYLPLMBLVD 18+49.94 19+67.31 LT 4345

0.0012 BL_RYLPLMBLVD 19+67.36 19+69.24 LT 19059

0.0057 BL_RYLPLMBLVD 26+05.23 26+35.36 RT 10640

0.0087 BL_RYLPLMBLVD 26+05.25 26+46.52 LT/RT 10641

0.0086 BL_RYLPLMBLVD 26+59.19 27+00.11 LT/RT 10639

0.0059 BL_RYLPLMBLVD 26+68.87 27+00.14 LT 10638

0711 11123 Thermoplastic, Standard, White, Solid, 12 For Crosswalk And

Roundabout

LF 39.4 1618 BL_RIVERSD-DR 14+55.58 14+94.96 RT 3730

27.1 BL_RIVERSD-DR 14+61.87 14+88.92 RT 3731

99.7 BL_RIVERSD-DR 17+45.68 18+45.18 LT 3733

75.5 BL_RIVERSD-DR 17+58.72 18+34.11 LT 3732

44.3 BL_RIVERSD-DR 17+66.89 18+11.18 RT 14558

38.0 BL_RIVERSD-DR 17+74.72 18+12.74 RT 14559

11.8 BL_RIVERSD-DR 18+37.99 18+49.75 RT 14560

12.5 BL_RIVERSD-DR 18+40.24 18+52.73 RT 14561

43.3 BL_RYLPLMBLVD 13+06.55 13+49.83 RT 3771

40.0 BL_RYLPLMBLVD 13+08.18 13+48.20 RT 3770

43.3 BL_RYLPLMBLVD 15+18.36 15+61.65 RT 3773

40.0 BL_RYLPLMBLVD 15+19.99 15+60.02 RT 3772

31.2 BL_RYLPLMBLVD 17+91.93 18+23.13 RT 3775

26.0 BL_RYLPLMBLVD 17+93.66 18+19.68 RT 3774

7/27/2026 7:53:08 AM Page 36 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

47.9 BL_RYLPLMBLVD 18+16.50 18+64.30 LT 19545

30.3 BL_RYLPLMBLVD 18+26.30 18+56.57 LT 19544

90.1 BL_RYLPLMBLVD 26+04.78 26+94.91 LT 3769

75.9 BL_RYLPLMBLVD 26+12.21 26+88.07 LT 3768

56.5 BL_RYLPLMBLVD 26+22.80 26+79.34 RT 3734

41.1 BL_RYLPLMBLVD 26+30.27 26+71.34 RT 3736

74.7 BL_RYLPLMBLVD 54+56.92 54+56.92 LT/RT 3721

80.8 BL_RYLPLMBLVD 54+66.92 54+66.92 LT/RT 3723

90.5 BL_RYLPLMBLVD 54+81.17 55+71.66 LT 3728

83.1 BL_RYLPLMBLVD 54+83.37 55+66.43 LT 3729

107.7 BL_RYLPLMBLVD 54+85.41 55+93.09 RT 3725

97.6 BL_RYLPLMBLVD 54+89.52 55+87.13 RT 3724

87.0 BL_RYLPLMBLVD 56+05.08 56+05.08 LT/RT 3726

83.0 BL_RYLPLMBLVD 56+15.08 56+15.08 LT/RT 3727

0711 11124 Thermoplastic, Standard, White, Solid, 18 For Diagonals And

Chevrons

LF 8.5 425 BL_RIVERSD-DR 11+92.32 12+00.28 RT 8294

8.5 BL_RIVERSD-DR 11+92.32 12+00.27 RT 8298

8.5 BL_RIVERSD-DR 12+12.32 12+20.28 RT 8295

8.5 BL_RIVERSD-DR 12+12.32 12+20.26 RT 8299

8.5 BL_RIVERSD-DR 12+32.33 12+40.27 RT 8296

8.5 BL_RIVERSD-DR 12+32.33 12+40.26 RT 8300

2.9 BL_RYLPLMBLVD 18+69.52 18+71.60 LT 17997

2.8 BL_RYLPLMBLVD 18+69.63 18+71.55 LT 17998

2.8 BL_RYLPLMBLVD 18+89.55 18+91.60 LT 17999

2.8 BL_RYLPLMBLVD 18+89.60 18+91.55 LT 18000

2.8 BL_RYLPLMBLVD 19+09.42 19+11.47 LT 18003

2.8 BL_RYLPLMBLVD 19+09.47 19+11.42 LT 18004

2.8 BL_RYLPLMBLVD 19+29.42 19+31.47 LT 18005

2.8 BL_RYLPLMBLVD 19+29.47 19+31.42 LT 18006

2.8 BL_RYLPLMBLVD 19+49.44 19+51.44 LT 18008

2.8 BL_RYLPLMBLVD 19+49.44 19+51.44 LT 18007

11.7 BL_RYLPLMBLVD 33+41.56 33+49.78 LT 15398

7/27/2026 7:53:08 AM Page 37 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

16.2 BL_RYLPLMBLVD 33+61.56 33+72.90 LT 15390

16.2 BL_RYLPLMBLVD 33+81.56 33+92.89 LT 15392

16.1 BL_RYLPLMBLVD 34+01.56 34+12.89 LT 15394

12.8 BL_RYLPLMBLVD 34+21.57 34+30.57 LT 15396

3.2 BL_RYLPLMBLVD 34+41.57 34+43.78 LT 18910

11.9 BL_RYLPLMBLVD 56+15.90 56+22.00 RT 16719

7.9 BL_RYLPLMBLVD 56+38.77 56+42.82 RT 16713

7.9 BL_RYLPLMBLVD 56+59.62 56+63.65 RT 16714

7.9 BL_RYLPLMBLVD 56+80.42 56+84.48 RT 16715

9.5 BL_RYLPLMBLVD 57+00.44 57+05.30 RT 16716

12.0 BL_RYLPLMBLVD 57+20.00 57+26.13 RT 16717

9.4 BL_RYLPLMBLVD 57+39.63 57+44.45 RT 16718

4.2 BL_RYLPLMBLVD 57+85.94 57+87.75 LT 16918

6.6 BL_RYLPLMBLVD 58+04.24 58+07.10 LT 16917

5.7 BL_RYLPLMBLVD 58+09.12 58+12.03 RT 16771

6.5 BL_RYLPLMBLVD 58+24.23 58+27.05 LT 16902

6.5 BL_RYLPLMBLVD 58+24.23 58+27.05 LT 16903

5.7 BL_RYLPLMBLVD 58+28.86 58+31.76 RT 16772

6.1 BL_RYLPLMBLVD 58+44.25 58+46.90 LT 16904

5.7 BL_RYLPLMBLVD 58+48.60 58+51.48 RT 16773

5.8 BL_RYLPLMBLVD 58+64.26 58+66.77 LT 16905

5.6 BL_RYLPLMBLVD 58+68.34 58+71.21 RT 16774

5.6 BL_RYLPLMBLVD 58+84.27 58+86.68 LT 16906

5.6 BL_RYLPLMBLVD 58+88.07 58+90.94 RT 16775

5.5 BL_RYLPLMBLVD 59+04.29 59+06.67 LT 16907

5.6 BL_RYLPLMBLVD 59+07.81 59+10.66 RT 16776

5.6 BL_RYLPLMBLVD 59+24.24 59+26.66 LT 16908

5.6 BL_RYLPLMBLVD 59+27.55 59+30.39 RT 16777

5.9 BL_RYLPLMBLVD 59+44.19 59+46.73 LT 16909

5.5 BL_RYLPLMBLVD 59+47.28 59+50.11 RT 16778

5.7 BL_RYLPLMBLVD 59+64.14 59+66.60 LT 16910

7/27/2026 7:53:08 AM Page 38 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

5.5 BL_RYLPLMBLVD 59+67.02 59+69.84 RT 16779

5.7 BL_RYLPLMBLVD 59+84.09 59+86.55 LT 16911

5.6 BL_RYLPLMBLVD 59+87.50 59+90.38 RT 16780

5.7 BL_RYLPLMBLVD 60+04.04 60+06.49 LT 16912

5.4 BL_RYLPLMBLVD 60+08.17 60+10.94 RT 16781

5.4 BL_RYLPLMBLVD 60+24.07 60+26.43 LT 16913

4.7 BL_RYLPLMBLVD 60+29.13 60+31.51 RT 16782

5.1 BL_RYLPLMBLVD 60+44.10 60+46.29 LT 16914

4.0 BL_RYLPLMBLVD 60+50.05 60+52.07 RT 16783

4.5 BL_RYLPLMBLVD 60+64.13 60+66.07 LT 16915

4.7 BL_RYLPLMBLVD 60+70.26 60+72.64 RT 16784

4.0 BL_RYLPLMBLVD 60+84.16 60+85.87 LT 16916

6.2 BL_RYLPLMBLVD 60+90.02 60+93.20 RT 16785

7.4 BL_RYLPLMBLVD 61+09.79 61+13.57 RT 16786

7.2 BL_RYLPLMBLVD 61+29.48 61+33.14 RT 16787

6.9 BL_RYLPLMBLVD 61+49.21 61+52.72 RT 16788

6.6 BL_RYLPLMBLVD 61+68.94 61+72.29 RT 16789

0711 11125 Thermoplastic, Standard, White, Solid, 24 For Stop Line And

Crosswalk

LF 14.5 283 BL_NW89DR 13+19.38 13+19.57 RT 3641

29.9 BL_NW89DR 14+34.33 14+34.38 LT 3639

26.2 BL_RIVERSD-DR 17+61.27 17+87.42 LT 3648

14.6 BL_RYLPLMBLVD 18+30.25 18+44.81 LT 18063

44.0 BL_RYLPLMBLVD 54+52.92 54+52.92 LT/RT 3642

46.8 BL_RYLPLMBLVD 54+83.38 55+30.18 LT 3647

56.7 BL_RYLPLMBLVD 55+27.85 55+84.54 RT 3645

50.6 BL_RYLPLMBLVD 56+19.08 56+19.08 LT/RT 3646

0711 11141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10

Gap Extension, 6"

GM 0.0130 0.248 BL_RIVERSD-DR 14+41.49 15+10.37 RT 4540

0.0133 BL_RIVERSD-DR 14+41.50 15+11.51 RT 4539

0.0144 BL_RIVERSD-DR 15+60.71 16+36.70 RT 9208

0.0241 BL_RIVERSD-DR 15+65.42 16+92.67 LT 18914

0.0163 BL_RIVERSD-DR 15+68.72 16+54.60 RT 9209

7/27/2026 7:53:08 AM Page 39 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

0.0028 BL_RIVERSD-DR 18+86.46 19+01.07 RT 14825

0.0152 BL_RYLPLMBLVD 19+69.18 20+49.21 LT 17501

0.0078 BL_RYLPLMBLVD 21+19.95 21+52.20 RT 15494

0.0106 BL_RYLPLMBLVD 22+54.36 23+10.42 RT 15490

0.0141 BL_RYLPLMBLVD 32+23.08 32+97.35 RT 18064

0.0195 BL_RYLPLMBLVD 55+09.48 55+86.06 RT 17414

0.0236 BL_RYLPLMBLVD 55+21.37 56+05.08 LT/RT 17413

0.0031 BL_RYLPLMBLVD 55+88.81 56+05.08 RT 17415

0.0142 BL_RYLPLMBLVD 57+29.27 58+04.20 LT 18913

0.0118 BL_RYLPLMBLVD 57+35.37 57+97.44 RT 4396

0.0179 BL_RYLPLMBLVD 59+08.55 60+02.97 LT 9212

0.0259 BL_RYLPLMBLVD 59+72.49 61+09.03 RT 4397

0711 11160 Thermoplastic, Standard, White, Message Or Symbol EA 1 5 BL_NW89DR 17+43.31 17+43.31 LT 18820

1 BL_RYLPLMBLVD 21+52.33 21+52.33 RT 15404

1 BL_RYLPLMBLVD 22+10.33 22+10.33 RT 15448

1 BL_RYLPLMBLVD 57+97.44 57+97.44 RT 4404

1 BL_RYLPLMBLVD 58+37.44 58+37.44 RT 4446

0711 11170 Thermoplastic, Standard, White, Arrow EA 1 32 BL_NW89DR-1 7+09.85 7+09.85 RT 18896

1 BL_RIVERSD-DR 12+14.18 12+14.18 RT 4663

1 BL_RIVERSD-DR 12+14.39 12+14.39 RT 4650

1 BL_RIVERSD-DR 14+25.61 14+25.61 LT 4722

1 BL_RIVERSD-DR 14+25.61 14+25.61 LT 6596

1 BL_RIVERSD-DR 14+83.15 14+83.15 LT 6610

1 BL_RIVERSD-DR 14+83.17 14+83.17 LT 4753

1 BL_RIVERSD-DR 15+40.85 15+40.85 LT 6627

1 BL_RIVERSD-DR 15+40.87 15+40.87 LT 4736

1 BL_RIVERSD-DR 16+51.66 16+51.66 RT 4855

1 BL_RIVERSD-DR 17+09.79 17+09.79 RT 4870

1 BL_RIVERSD-DR 17+20.56 17+20.56 RT 4840

1 BL_RIVERSD-DR 18+75.10 18+75.10 LT 4821

1 BL_RYLPLMBLVD 18+37.32 18+37.32 LT 14364

7/27/2026 7:53:08 AM Page 40 of 51

Pay Item

Number Pay Item Description

Units of

Measure P F P F Alignment Begin

Station

End

Station Side Element ID

Design Notes Construction Remarks

1 BL_RYLPLMBLVD 19+02.67 19+02.67 LT 4564

1 BL_RYLPLMBLVD 19+54.54 19+54.54 LT 19046

1 BL_RYLPLMBLVD 25+68.22 25+68.22 RT 16414

1 BL_RYLPLMBLVD 26+26.56 26+26.56 LT 4579

1 BL_RYLPLMBLVD 26+60.98 26+60.98 RT 10777

1 BL_RYLPLMBLVD 27+43.26 27+43.26 LT 16401

1 BL_RYLPLMBLVD 33+12.38 33+22.29 RT 15370

1 BL_RYLPLMBLVD 33+67.38 33+77.29 RT 15261

1 BL_RYLPLMBLVD 54+19.79 54+19.79 RT 4622

1 BL_RYLPLMBLVD 54+19.81 54+19.81…

This is the start of the file's text. The full file is on GovTribe.