This is a specification document (Section 32 31 13) for a Hydraulic Vertical Pivot Gate System detailing technical requirements, components, materials, and installation procedures for federal construction projects.
The specification requires a manufacturer's standard hydraulic vertical pivot gate system capable of minimum 2,900 open and close operations per day, with gate dimensions matching project drawings. The system must include manufacturer's standard safety devices: a pressure relief valve to prevent crushing obstructions in either direction, a shut-off power device if the balance system fails, and a manual bypass system allowing operation during power failure. The hydraulic system consists of a 3,000 psi hydraulic cylinder, limit switches, cushioned slow-down mechanisms, and adjustable stops with lock-down capability. The balance system must allow hand operation with 12 to 15 pounds of pressure and include a built-in safety control switch. Required additional features include cold weather package, stanchion, radio controls with open-close-stop functionality, detector system for free exit/safety operation, reversing edge system, magnetic lock, photo eye, stainless steel fasteners, electrical box heater, ice scrapers, and weather guard package. Access control must incorporate key switches and pedestals. Barrier options include steel construction (up to 20-foot-wide opening) with 9-gauge galvanized chain link fabric and aluminum construction (up to 25-foot-wide opening) with 6063-T5 alloy diamond screen fabric, both with sway bracing.
Installation requirements mandate manufacturer-approved installers or those with minimum five years' experience. All materials must be delivered undamaged and stored off-ground to prevent oxidation. Concrete support must conform to ASTM C94/C94M with 4,000 psi minimum 28-day compressive strength. Finishes require factory-applied DTM epoxy prime coat and acrylic urethane topcoat. Submittals requiring government approval (designated "G" to Project Officer) include shop drawings, product data, certificates of compliance, and manufacturer's instructions. Training on programmable features, operation, maintenance, and reprogramming must be provided to owner personnel. Warranty coverage must be a minimum of three years against failure from normal use.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 31 13
HYDRAULIC VERTICAL PIVOT GATE SYSTEM
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Location of Gate; G, PO
Gate Assembly; G, PO
Gate Hardware and Accessories; G, PO Erection/Installation
Drawings; G, PO
SD-03 Product Data
Gate Assembly; G, PO
Gate Hardware and Accessories; G, PO
Wiring Diagrams; G,PO
Concrete; G, PO
SD-07 Certificates Certificates of
Compliance
SD-08 Manufacturer's Instructions
Manufacturers Operating Manual
Manufacturers Part Diagram
QUALITY CONTROL
1.2.1 Certificates of Compliance
Submit certificates of compliance indicating system provided is in accordance with the applicable reference standards and descriptions of this section.
1.2.2 Installer Qualifications
Installer shall be approved by manufacturer or have a minimum of five years experience installing vertical pivot gates similar to that required.
1.2.3 Project Site Conditions
Verify dimensions and component layout by field measurements prior to beginning installation.
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to site in an undamaged condition. Store materials off the ground to provide protection against oxidation caused by ground contact.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.1.1 Performance Requirements
Provide manufacturer’s standard safety devices as follows:
a. Provide pressure relief valve to avoid crushing obstruction encountered in either direction of travel.
b. Provide shut off power device if balance system fails.
Provide a manual bypass system which allows barrier to be opened and closed in event of power failure.
Design system to all for a minimum 2900 open and close operations per day.
Gate Height: Gate height shall match fence height as indicated on the drawings.
Gate Width: Gate width shall be as indicated on the drawings.
2.1.2 Additional Features
The following addition features shall be provided:
a. Cold Weather Package
b. Stanchion
c. Radio Controls – Provide standard open-close-stop commercial transmitters/receivers systems.
d. Provide detector system to allow free exit/safety, safety or close gate operation; system to be factory wired inside electrical box and tested.
e. Reversing Edge - Provide manufacturers standard reversing edge system.
f. Locks – Provide magnetic lock to secure gate in closed position
g. Photo Eye
h. Stainless steel fasteners
i. Heater for Electrical Box
j. Ice Scrappers
k. Weather Guard Package
2.2.3 Access Control Systems
The following access control shall be incorporated into the system:
a. Key switches
b. Pedestals
2.2 COMPONENTS
2.2.1 Hydraulic Power Unit
Hydraulic pump, motor, and reservoir will be all as one unit with fluid thermometer and fluid level sight gauge. The hydraulic system shall be designed to keep the gate locked in the closed position preventing a person from lifting the gate open when it’s in the closed position.
2.2.2 Hydraulic System
The hydraulic system shall consist of a 3000 psi hydraulic cylinder, limit switches and cushioned slow down on each end of travel, and adjustable stops with lock down in any position. Hydraulic fluid shall be the manufacturers standard fluid, factory checked, filled, and tested.
2.2.3 Balance System
Balance system shall be designed to allow barrier to be hand raised and to be hand lowered with 12 to 15 pounds of pressure. Provide built-in safety control switch capable of stopping barrier in any position should the balance system fails. Factory test and adjust the balance system to ensure gate may be manually raised and lowered with specified pressure. Signage to be added to the gate barrier must be declared at the time of order so the manufacturer can add the signs on the barrier to ensure the manufacturer can balance the operator correctly at the time of manufacturing.
2.2.4 Electrical System
Wire shall be oil and gas resistant. Provide Overload Protection relay to protect motor. Provide a Reversing Controller as required to operate motor and solenoid valves. Limit Switches shall be adjustable snap action style capable of stopping barrier at each end of travel. Provide a programmable logic board with manufacturer’s full range of available functions. All gates shall be equipped with a dry contactor to accommodate all types of access equipment.
2.2.5 Barrier System (Gates)
The gate system shall be designed to resist twist and sway.
Type: Manufacturer’s standard steel barrier (up to 20-foot-wide opening per gate leaf); minimum 9 gage galvanized chain link fence fabric, with sway bracing. Leading member of a steel barrier 4” schedule 20 round tube, sway braces- 1 ¼ x 1 ¼ x .087 square tube, uprights- 2 x 2 x .120 square tube. Sway braces bolted to barrier.
Type: Manufacturer’s standard aluminum barrier (up to 25-foot-wide opening per gate leaf), nominal 3.125” by 2.875” diamond 6063-T5 alloy aluminum screen fabric (amplimesh) welded both sides completely, with sway bracing.
Leading member of an aluminum barrier 4” schedule 40 round tube, sway braces- 1 ¼ x 1 ¼ x 1/8 square tube uprights- 2 x 2 x .188 square tube.
Sway braces bolted to barrier.
Type: Custom barrier as indicated on Drawings, with sway bracing.
Options: Provide stanchion to contain free end for severe crash applications; match barrier.
2.2.6 Accessories
Provide any additional accessories as required for a complete operational installation.
2.3 MATERIALS
2.3.1 Finishes
Finish shall be factory applied using a DTM epoxy prime coat and acrylic urethane topcoat.
2.3.2 Concrete
Provide concrete conforming to ASTM C94/C94M and obtaining a minimum 28-day compressive strength of 4,000 psi.
PART 3 EXECUTION
Submit manufacturer's erection/installation drawings and instructions that detail proper assembly and materials in the design for fence, gate, hardware and accessories.
3.1 PREPARATION
Verify concrete support slab complies with requirements and verify anchors and conduits are properly installed. Ensure alignment with adjacent construction, fencing, and paving meets installation requirements.
3.2 INSTALLATION
Installation shall be in accordance with manufacturer’s recommendations and installation instructions. Install vertical pivot gate system to provide rigid and secure installation as indicated, straight and true to lines and grades indicated, for free, easy operation. Install components square and level, accurately fitted and free from distortion and free from defects.
3.3 PROTECTION
Protect vertical pivot gate system form damage during all construction operations, replace components damaged by subsequent construction operations. Touch up minor scratched and/or damaged surfaces using the same primer and finish system applied by the manufacturer.
3.4 TRAINING
Provide training to owner personnel regarding programmable features and controls and preset controls according to Owner requirements. Provide training on proper operation, maintenance, and reprogramming of system.
3.5 WARRANTY
Provide manufacturer’s standard warranty for system and system components against failure resulting from normal use. Warranty period shall be a minimum of three years.
-- End of Section --