31310020R0006_Amendment 00003.pdf
PDF 158 KB Posted
- Solicitation number
- 31310020R0006
- Issued by
-
Nuclear Regulatory Commission
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
31310020R0006 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCHQ
WASHINGTON DC 20555-0001
MAIL STOP TWFN-07B20M
ACQUISITION MANAGEMENT DIVISION
US NRC - HQ
07/10/20200003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/10/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See page two.
The proposal due date is extended to 7/17/2020 at 3:00pm ET.
All Offerors shall submit a signed copy of this amendment. If an offeror has already submitted their proposal, the Offeror Shall email a signed copy of this amendment.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Margo Katzper
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
31310020R00006 Amendment 0003
The purpose of this amendment is to:
a) Clarifications to the TSSA tables in Section 3.1 REACTOR LICENSING TECHNICAL ASSISTANCE, and 3.2 REACTOR OVERSIGHT TECHNICAL ASSISTANCE
3.1 REACTOR LICENSING TECHNICAL ASSISTANCE
Educational Requirements Required Experience Minimum Number of Years of Experience
Project Manager (PM)
Bachelor’s Degree in Engineering or Science
Direct project management experience in professional commercial nuclear support services related to:
· safety, and/or security, and/or environmental impact where judgments are made as to whether applicable codes and federal regulations are being, or have been, implemented and/or followed
· the design, and/or construction, and/or operation, and/or maintenance, security, and/or inspection and environmental review of nuclear power plants and non-nuclear facilities licensed by the NRC
10 years
Knowledge of regulations and guidance such as NUREGs, Regulatory Guides (RGs), SECYs and NRR Office Instructions to support the safety reviews
Subject Matter Expert’s (SME)/Senior Technical Experts, i.e. Senior Technical Reviewer, Senior Engineer.
Bachelor’s Degree in Engineering or Science
Direct nuclear power related experience related to the design, construction, operation, maintenance, security and inspection of nuclear power plants and non-nuclear facilities licensed by the NRC
10 years
Knowledge of regulations and guidance such as NUREGs, Regulatory Guides (RGs), SECYs and
In-depth experience relevant to the technical and/or scientific discipline and the NRC licensing or regulatory actions related to operating reactors, new large light water reactors, NPUFs, and advanced reactors, during the phases of the regulatory lifecycle, from construction through operation
3.2 REACTOR OVERSIGHT TECHNICAL ASSISTANCE
Educational Requirements Required Experience Minimum Number of Years of Experience
Project Manager (PM)
Bachelor’s Degree in Engineering or Science
Direct project management experience in professional commercial nuclear support services related to:
· safety, and/or security, and/or environmental impact where judgments are made as to whether applicable codes and federal regulations are being, or have been, implemented and/or followed.
· the design, and/or construction, and/or operation, and/or maintenance, security, and/or inspection and environmental review of nuclear power plants and non-nuclear facilities licensed by the NRC
10 years
Knowledge of regulations and guidance such as NUREGs, Regulatory Guides (RGs), SECYs and
Subject Matter Expert’s (SME) /Senior Technical Experts, i.e. Senior Technical Reviewer, Senior Engineer.
Bachelor’s Degree in Engineering or Science
Direct nuclear power related experience related to the design, construction, operation, maintenance, security and inspection and of nuclear
10 years power plants and non-nuclear facilities licensed by the NRC
In-depth experience and expertise relevant to the technical and/or scientific discipline and interrelated oversight activities related to operating reactors, new large light water reactors, NPUFs, and advanced reactors, during the phases of the regulatory lifecycle, from construction through operation
File details come from the government source that posted it. Updated .