31310020R0006_Amendment 00003.pdf

PDF 158 KB Posted

Attached to
TECHNICAL ASSISTANCE IN SUPPORT OF NRC’s REACTOR LICENSING
Solicitation number
31310020R0006
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

31310020R0006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCHQ

WASHINGTON DC 20555-0001

MAIL STOP TWFN-07B20M

ACQUISITION MANAGEMENT DIVISION

US NRC - HQ

07/10/20200003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/10/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See page two.

The proposal due date is extended to 7/17/2020 at 3:00pm ET.

All Offerors shall submit a signed copy of this amendment. If an offeror has already submitted their proposal, the Offeror Shall email a signed copy of this amendment.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Margo Katzper

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

31310020R00006 Amendment 0003

The purpose of this amendment is to:

a) Clarifications to the TSSA tables in Section 3.1 REACTOR LICENSING TECHNICAL ASSISTANCE, and 3.2 REACTOR OVERSIGHT TECHNICAL ASSISTANCE

3.1 REACTOR LICENSING TECHNICAL ASSISTANCE

Educational Requirements Required Experience Minimum Number of Years of Experience

Project Manager (PM)

Bachelor’s Degree in Engineering or Science

Direct project management experience in professional commercial nuclear support services related to:

· safety, and/or security, and/or environmental impact where judgments are made as to whether applicable codes and federal regulations are being, or have been, implemented and/or followed

· the design, and/or construction, and/or operation, and/or maintenance, security, and/or inspection and environmental review of nuclear power plants and non-nuclear facilities licensed by the NRC

10 years

Knowledge of regulations and guidance such as NUREGs, Regulatory Guides (RGs), SECYs and NRR Office Instructions to support the safety reviews

Subject Matter Expert’s (SME)/Senior Technical Experts, i.e. Senior Technical Reviewer, Senior Engineer.

Bachelor’s Degree in Engineering or Science

Direct nuclear power related experience related to the design, construction, operation, maintenance, security and inspection of nuclear power plants and non-nuclear facilities licensed by the NRC

10 years

Knowledge of regulations and guidance such as NUREGs, Regulatory Guides (RGs), SECYs and

In-depth experience relevant to the technical and/or scientific discipline and the NRC licensing or regulatory actions related to operating reactors, new large light water reactors, NPUFs, and advanced reactors, during the phases of the regulatory lifecycle, from construction through operation

3.2 REACTOR OVERSIGHT TECHNICAL ASSISTANCE

Educational Requirements Required Experience Minimum Number of Years of Experience

Project Manager (PM)

Bachelor’s Degree in Engineering or Science

Direct project management experience in professional commercial nuclear support services related to:

· safety, and/or security, and/or environmental impact where judgments are made as to whether applicable codes and federal regulations are being, or have been, implemented and/or followed.

· the design, and/or construction, and/or operation, and/or maintenance, security, and/or inspection and environmental review of nuclear power plants and non-nuclear facilities licensed by the NRC

10 years

Knowledge of regulations and guidance such as NUREGs, Regulatory Guides (RGs), SECYs and

Subject Matter Expert’s (SME) /Senior Technical Experts, i.e. Senior Technical Reviewer, Senior Engineer.

Bachelor’s Degree in Engineering or Science

Direct nuclear power related experience related to the design, construction, operation, maintenance, security and inspection and of nuclear

10 years power plants and non-nuclear facilities licensed by the NRC

In-depth experience and expertise relevant to the technical and/or scientific discipline and interrelated oversight activities related to operating reactors, new large light water reactors, NPUFs, and advanced reactors, during the phases of the regulatory lifecycle, from construction through operation

File details come from the government source that posted it. Updated .