312-25 Pricing (11 27 24).xlsx

XLSX spreadsheet 47 KB Posted

Attached to
312-25 District 10 REBUILD and/or REPAIR: Guardrail / End Treatments / Attenuator Parts
Solicitation number
SRC0000026397
Issued by
Allen County, Ohio

About this file

This is a pricing spreadsheet for ODOT District 10's contract for repair and/or rebuild of guardrail, end treatments, and attenuators. The document includes detailed line items for installation pricing across 70 items including guardrail removal, installation, rebuilding, anchor assemblies, bridge terminal assemblies, impact attenuators, and maintenance of traffic. The spreadsheet also contains sections for cable rail end repair and tensioning for various systems including Brifen, Gibraltar, Nucor, Trinity, and Safence.

The pricing structure includes both prevailing and non-prevailing wage rates, with separate pricing for 21-day and 72-hour response times. The document includes mobilization pricing requirements for different counties within District 10 (Monroe, Morgan, Noble, Washington, Athens, Gallia, Hocking, Meigs, and Vinton), and specifies that vendors must provide both hardcopy and electronic versions of their bid package. Mobilization costs are calculated based on distance to the first site, with subsequent inter-site travel compensated at hourly labor rates rounded up to the nearest quarter hour.

View the file

Other files

File Type Posted
312-25 Pricing (11 27 24).xlsx XLSX spreadsheet
ADENDUM (1).pdf PDF
Affirmation and Disclosure.docx DOCX document
ODOT Terms & Conditions with excel pricing.pdf PDF
312-25 spec (11 27 24)bid.pdf PDF
312-25 spec (11 27 24)bid.pdf PDF
Affirmation and Disclosure.docx DOCX document
ODOT Terms & Conditions with excel pricing.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR INFORMATION

312-25 PRICING District 10 REPAIR and/or REBUILD Guardrail / End Treatments / Attenuators

VENDOR INFORMATION
BE SURE TO INCLUDE BOTH A HARDCOPY PRINTOUT AND ELECTRONIC VERSION ON A MEDIA DEVICE

(I.E. CD, DVD, OR FLASH DRIVE) IN YOUR SUBMITTED BID PACKAGE.

Vendor Name ( Type here ----> ) VENDOR NAME HERE

Address
City
State
FOR ORDERS
Contact Name #1
Contact Number #1
Contact Name #2 ( If applicable)
Contact Number #2 (If applicable)

Complete Vendor Information above

Do NOT provide conditional information with your bid. This may be cause for rejection of your bid.

DO NOT DELETE ROWS, COLUMNS, OR TABS FROM THIS BID DOCUMENT

SUBMIT ANY QUESTIONS, CLARIFICATIONS AND INQUIRIES REGARDING THIS INVITATION TO BID THROUGH INQUIRY LINK IN OHIO BUYS

INSTALLATION PRICING

312-25 PRICING District 10 REPAIR and/or REBUILD Guardrail / End Treatments / Attenuators
Vendor Name:Complete on Vendor Information TAB
Line Item NbrItemDescriptionUNIT PRICEUnit
0001202E38000Guardrail RemovedFT
0002202E38300Guardrail Removed, Barrier DesignFT
0003202E42206Anchor Assembly RemovedEACH
0004202E47000Bridge Terminal Assembly RemovedEACH
0005202E47800Impact Attenuator RemovedEACH
0006606E13000Guardrail, Type 5FT
0007606E13030Guardrail, Type 5, Using 9 Foot PostsFT
0008606E13050Guardrail, Type 5aFT
0009606E14000Guardrail, Type 8FT
0010606E15050Guardrail, Type MGSFT
0011606E15400MGS Guardrail, Type 8FT
0012606E15500Guardrail, Barrier Design, Type 5FT
0013606E16501Guardrail Rebuilt, Type 5, Rail OnlyFT
0014606E16051Guardrail Rebuilt, Type MGS, Rail OnlyFT
0015606E17290Guardrail, Type 5, Long-SpanFT
0016606E17701Replace Existing Guardrail Blockout, Remove and ReplaceEACH
0017606E17751Replace Existing Guardrail Blockout, Type MGS, Remove and ReplaceEACH
0018606E17901Guardrail Post, Remove and ReplaceEACH
0019606E18501Guardrail Post, 9 Feet, Remove and ReplaceEACH
0020606E19001Guardrail Post, Steel, Remove and ReplaceEACH
0021606E25000Anchor Assembly, Type AEACH
0022606E25550Anchor Assembly, Mgs Type AEACH
0023606E26000Anchor Assembly, Type BEACH
0024606E26050Anchor Assembly, Mgs Type BEACH
0025606E26100Anchor Assembly, Type EEACH
0026606E26150Anchor Assembly, MGS Type E, MASH 2016 or NCHRP-350EACH
0027606E26500Anchor Assembly, Type TEACH
0028606E26550Anchor Assembly, Mgs Type TEACH
0029606E27801Anchor Assembly Rebuilt, Type AEACH
0030606E27841Anchor Assembly Rebuilt, MGS Type AEACH
0031606E98100Guardrail Misc.: 25 ft Rail Element (Type A Anchor)EACH
0032606E27841Anchor Assembly Rebuilt, Type BEACH
0033606E27847Anchor Assembly Rebuilt, Mgs Type BEACH
0034606E27851Anchor Assembly Rebuilt, Type E, Post 1-3EACH
0034.5606E27851Anchor Assembly Rebuilt, Type E, Beyond Post 3 ONLY (with no damage to Posts 1-3 and Extruder Head )EACH
0035606E27851Anchor Assembly Rebuilt, Type E, Beyond Post 3 (and to Post 1-3 or Extruder Head **)EACH**added for description purposes only.
0036606E27861Anchor Assembly Rebuilt, MGS Type E, Post 1-3EACH
0063.5606E27861Anchor Assembly Rebuilt, MGS Type E, Beyond Post 3 ONLY (with no damage to Posts 1-3 and Extruder Head )EACH
0037606E27861Anchor Assembly Rebuilt, MGS Type E, Beyond Post 3 (and to Post 1-3 or Extruder Head **)EACH**added for description purposes only.
0038606E32160Bridge Terminal Assembly, Type TSTEACH
0039606E35000Bridge Terminal Assembly, Type 1EACH
0040606E35002MGS Bridge Terminal Assembly, Type 1EACH
0041606E35100Bridge Terminal Assembly, Type 2EACH
0042606E35102MGS Bridge Terminal Assembly, Type 2EACH
0043606E35140Bridge Terminal Assembly, Type 4EACH
0044606E50000Reshaping BermFT
0045606E60002Impact Attenuator, Type 1 (Unidirectional)EACH
0046606E60012Impact Attenuator, Type 1 (Bidirectional)EACH
0047606E60022Impact Attenuator, Type 2 (Unidirectional) (Various Speed and Width)EACH
0048606E60028Impact Attenuator, Type 2 (Bidirectional) (Various Speed and Width)EACH
0049606E61000Impact Attenuator Misc.: Rebuilt, Type 1 (All Components Post #1 - #4, Excluding Posts, Blocks, Soil Plates and Foundation Tubes)EACH
0050606E61000Impact Attenuator Misc.: Rebuilt, Type 1 (All Components Post #4 - #6, Excluding Posts, Blocks, Soil Plates and Foundation Tubes)EACH
0051606E61000Impact Attenuator Misc.: Rebuilt, Type 1 (4'-6" Foundation Tube)EACH
0052606E61000Impact Attenuator Misc.: Rebuilt, Type 1 (1/4" X 18" X 24" Soil Plate)EACH
0053606E61000Impact Attenuator Misc.: Rebuilt, Type 1 (3'-6" Wood Post #1, 2, 3, 4, 5, 6 Cat)EACH
0054606E61000Impact Attenuator Misc.: Rebuilt, Type 1 (Wood Block 1'-2" #1, 2, 3, 4, 5, 6 Cat)EACH
0055606E61000Impact Attenuator, Misc.: Rebuilt, Type 2 (Belt Nose Assembly)EACH
0056606E61000Impact Attenuator, Misc.: Rebuilt, Type 2 (Cartridge Type I)EACH
0057606E61000Impact Attenuator, Misc.: Rebuilt, Type 2 (Cartridge Type II)EACH
0058606E61000Impact Attenuator, Misc.: Rebuilt, Type 2 (Quad Beam Fender Panel)EACH
0059606E98000Guardrail, Misc.: Tubular BackupFT
0060626E00110Barrier Reflector, Type 2 (Bidirectional)EACH
0061517E70001Railing (Twin Steel Tube), RebuiltFT
0062517E72201Railing (Deep Beam Rail with Steel Tubular Backup and Type 1 Steel Posts and Anchor Bolts), RebuiltFT
0063517E72301Railing (Deep Beam Rail with Steel Tubular Backup and Type 2 Steel Posts and Anchor Bolts), RebuiltFT
0064517E72751Railing (Thrie Beam Retrofit), RebuiltFT
0065614E13600Maintenance of Traffic, One Lane Closure on a Two Lane HighwayEACH
0066614E13800Maintenance of Traffic, One Lane Closure on a 4 Lane or Greater Divided HighwayEACH
0067614E13900Maintenance of Traffic for Shoulder ClosureEACH
0068624E15000Mobilization - Monroe, Morgan, Noble & Washington Counties (Refer to Section 11)EACH
0069624E15000Mobilization - Athens, Gallia, Hocking, Meigs & Vinton Counties (Refer to Section 11)EACH
0070606E98100Guardrail Misc.: Urgent RepairEACH

Cable Rail End Repair

312-25 PRICING District 10 REPAIR and/or REBUILD Guardrail / End Treatments / Attenuators
Vendor Name:Complete on Vendor Information TAB
REPAIR OF END TERMINAL SYSTEMS
Pricing for Complete or Partial End Terminal Repair of all systemsMATERIALS *EQUIPMENT
NON-PREVAILING WAGE RATEPREVAILING WAGE RATEEND ANCHOR POSTS and Incidental Materials
(See Description for number of posts)Hourly Rate of

Equipment to Re-Tension Cables

REFERENCE NUMBERUNIT OF MEASUREDESCRIPTIONHOURLY RATE / LABORER
(within 21 Days)HOURLY RATE / LABORER
(within 72 Hours)HOURLY RATE / LABORER
(within 21 Days)HOURLY RATE / LABORER

(within 72 Hours)

Brifen
BR-CEachComplete End Terminal Repair: This item will include all work necessary to remove and replace end anchor posts 1 through 5, re-tension each cable, and provide proper grading.
BR-PEachPartial End Terminal Repair : This item will include all work necessary to remove and replace 1 of the end anchor posts, re-tension each cable, and provide proper grading.
Gibraltar
GR-CEachComplete End Terminal Repair: This item will include all work necessary to remove and replace end anchor posts 1 through 5, re-tension each cable, and provide proper grading.
GR-PEachPartial End Terminal Repair : This item will include all work necessary to remove and replace 1 of the end anchor posts, re-tension each cable, and provide proper grading.
Nucor
NR-CEachComplete End Terminal Repair: This item will include all work necessary to remove and replace end anchor posts 1 through 9, re-tension each cable, and provide proper grading.
NR-PEachPartial End Terminal Repair : This item will include all work necessary to remove and replace 1 of the end anchor posts, re-tension each cable, and provide proper grading.
Trinity
TR-CEachComplete End Terminal Repair: This item will include all work necessary to remove and replace end anchor posts 1 through 9, re-tension each cable, and provide proper grading.
TR-PEachPartial End Terminal Repair : This item will include all work necessary to remove and replace 1 of the end anchor posts, re-tension each cable, and provide proper grading.
Safence
TR-CEachComplete End Terminal Repair: This item will include all work necessary to remove and replace end anchor posts 1 through 6, re-tension each cable, and provide proper grading.
TR-PEachPartial End Terminal Repair : This item will include all work necessary to remove and replace 1 of the end anchor posts, re-tension each cable, and provide proper grading.

* Materials may be supplied by ODOT through this contract.

Cable Rail End Tensioning

312-25 PRICING District 10 REPAIR and/or REBUILD Guardrail / End Treatments / Attenuators
Vendor Name:Complete on Vendor Information TAB
TENSIONING OF CABLES
Tensioning and Socketed Foundation (for High Tension Cable Barrier )
NON-PREVAILING WAGE RATEPREVAILING WAGE RATEMATERIALS *EQUIPMENT
REFERENCE NUMBERUNIT OF MEASUREDESCRIPTIONHOURLY RATE / LABORER
(within 21 Days)HOURLY RATE / LABORER
(within 72 Hours)HOURLY RATE / LABORER
(within 21 Days)HOURLY RATE / LABORER
(within 72 Hours)Incidental MaterialsHourly Rate of

Equipment to Re-Tension Cables

BRIFEN
BT-1EachPer Section 8 of the Requirements/Specifications, the vendor will measure and document each cable's tension and re-tension cables as necessary per manufacturers specifications. The documented cable tensions will be identified to each cable system run by recording the beginning Straight-Line- Mileage (SLM) and ending SLM for each run. The individual cables will be numbered from the top down. Therefore, the number 3 cable of a 3 cable system will be the bottom cable. Additionally, the ambient air temperature is to be recorded for each cable and associated to the individual cable of the cable run. The item shall include all work required to verify cable tension and re-tension cables if necessary. This cable specific data is to be supplied in a report and sent to the respective District Roadway Services Manager (RSM).
BT-2EachSocketed Foundation, Concrete Footing: This item shall include all work necessary to remove and replace a Socketed Foundation, Concrete Footing for the Brifen System.
Gibraltar
GT-1EachPer Section 8 of the Requirements/Specifications, the vendor will measure and document each cable's tension and re-tension cables as necessary per manufacturers specifications. The documented cable tensions will be identified to each cable system run by recording the beginning Straight-Line- Mileage (SLM) and ending SLM for each run. The individual cables will be numbered from the top down. Therefore, the number 3 cable of a 3 cable system will be the bottom cable. Additionally, the ambient air temperature is to be recorded for each cable and associated to the individual cable of the cable run. The item shall include all work required to verify cable tension and re-tension cables if necessary. This cable specific data is to be supplied in a report and sent to the respective District Roadway Services Manager (RSM).
GT-2EachSocketed Foundation, Concrete Footing: This item shall include all work necessary to remove and replace a Socketed Foundation, Concrete Footing for the Gibraltar system.
Nucor
NT-1EachPer Section 8 of the Requirements/Specifications, the vendor will measure and document each cable's tension and re-tension cables as necessary per manufacturers specifications. The documented cable tensions will be identified to each cable system run by recording the beginning Straight-Line- Mileage (SLM) and ending SLM for each run. The individual cables will be numbered from the top down. Therefore, the number 3 cable of a 3 cable system will be the bottom cable. Additionally, the ambient air temperature is to be recorded for each cable and associated to the individual cable of the cable run. The item shall include all work required to verify cable tension and re-tension cables if necessary. This cable specific data is to be supplied in a report and sent to the respective District Roadway Services Manager (RSM).
NT-2EachSocketed Foundation, Concrete Footing: This item shall include all work necessary to remove and replace a Socketed Foundation, Concrete Footing for the Nucor Barrier System
Trinity
TT-1EachPer Section 8 of the Requirements/Specifications, the vendor will measure and document each cable's tension and re-tension cables as necessary per manufacturers specifications. The documented cable tensions will be identified to each cable system run by recording the beginning Straight-Line- Mileage (SLM) and ending SLM for each run. The individual cables will be numbered from the top down. Therefore, the number 3 cable of a 3 cable system will be the bottom cable. Additionally, the ambient air temperature is to be recorded for each cable and associated to the individual cable of the cable run. The item shall include all work required to verify cable tension and re-tension cables if necessary. This cable specific data is to be supplied in a report and sent to the respective District Roadway Services Manager (RSM).
TT-2EachSocketed Foundation, Concrete Footing: This item shall include all work necessary to remove and replace a Socketed Foundation, Concrete Footing for Trinity CASS 350 System.
Safence
ST-1EachPer Section 8 of the Requirements/Specifications, the vendor will measure and document each cable's tension and re-tension cables as necessary per manufacturers specifications. The documented cable tensions will be identified to each cable system run by recording the beginning Straight-Line- Mileage (SLM) and ending SLM for each run. The individual cables will be numbered from the top down. Therefore, the number 3 cable of a 3 cable system will be the bottom cable. Additionally, the ambient air temperature is to be recorded for each cable and associated to the individual cable of the cable run. The item shall include all work required to verify cable tension and re-tension cables if necessary. This cable specific data is to be supplied in a report and sent to the respective District Roadway Services Manager (RSM).
ST-2EachSocketed Foundation, Concrete Footing: This item shall include all work necessary to remove and replace a Socketed Foundation, Concrete Footing for Safence 4RC Wire Rope Safety Fence System.

* Materials may be supplied by ODOT through this contract.

MOBILIZATION and MOT

312-25 PRICING District 10 REPAIR and/or REBUILD Guardrail / End Treatments / Attenuators
Vendor Name:Complete on Vendor Information TAB
Mobilization is to the first site of a project. This may vary based on the type and size of repair, and can result in different types of transports being sent.
If so, identify types of transports that may be used for the repair.MAINTENANCE OF TRAFFIC FOR VARIOUS TYPES OF CLOSURES
SHOULDER CLOSUREONE LANE
CLOSURE ON A TWO LANE HIGHWAYONE LANE

CLOSURE ON A

FOUR LANE

UNDIVIDED HIGHWAY ONE LANE

CLOSURE ON A

FOUR LANE or GREATER

DIVIDED HIGHWAY

MOBILIZATION
($ / Mile)MOBILIZATION
($ / Mile)MOBILIZATION

($ / Mile)

GuardrailGuardrail
Thrie Beam BullnoseThrie Beam Bullnose
Trinity - Softstop (MASH)Trinity - Softstop (MASH)
MSKT - SP -MGS (MASH)MSKT - SP -MGS (MASH)
Trinity ET-2000Trinity ET-2000
MGS, Type B, FLEATMGS, Type B, FLEAT
MGS, Type B, SRT-31MGS, Type B, SRT-31
MGS, Type E, SKTMGS, Type E, SKT
Type 5, Type B, FLEATType 5, Type B, FLEAT
Type 5, Type B, SRTType 5, Type B, SRT
Type 5, Type E, SKTType 5, Type E, SKT
Type 1, CATType 1, CAT
Type 1, FLEAT-MTType 1, FLEAT-MT
Type 2, QuadGuardType 2, QuadGuard
Type 2, TAU-IIType 2, TAU-II
Type 2, TRACC 2005Type 2, TRACC 2005
Type 3, REACT 350Type 3, REACT 350
Type 3, QuadGuard ELITEType 3, QuadGuard ELITE
Type 3, SCIType 3, SCI
Type 3, HEARTType 3, HEART
Workzone, Absorb 350Workzone, Absorb 350
Workzone, SLEDWorkzone, SLED
Sand Barrels, Various BrandsSand Barrels, Various Brands
BrifenBrifen
GibralterGibralter
NucorNucor
TrinityTrinity
SafenceSafence

When multiple sites exist, the vendor will be compensated for mobilization between sites at the hourly rates of the operators, as paid by the vendor. These rates will be compensated for the travel time.

For example: Hourly Rate / laborer for Repairs is $50.00/hr/laborer. Laborer A is paid $23.50/hr, and Laborer B is paid $24.25/hr. Therefore, the total hourly rate compensated is $47.25/hr for travel between sites.

The cumulative total time traveled will be rounded up to the 1/4 hour.

For example, Site 1 to Site 2 is 25 Minutes, Site 2 to 3 is 15 minutes, Site 3 to 4 is 30 minutes. A total of 70 minutes for travel between sites. This will be rounded up to 75 minutes.

(Vendor must provide proof of employee pay rates to determine hourly rate for compensation)

File details come from the government source that posted it. Updated .