QA Water Tower.docx

DOCX document 16 KB Posted

Attached to
Water tower cleaning/inspection
Solicitation number
31030PR240000196
Issued by

About this file

This document appears to be a Q&A regarding a federal contract opportunity for cleaning and inspecting a 300,000-gallon potable water storage tank at USCG Base Elizabeth City in North Carolina.

The key details are: the contract is a small business set-aside, the award will be made using the Lowest Price Technically Acceptable (LPTA) evaluation criteria, a site visit is highly encouraged but not mandatory, DOL Wage Determination 2015-4405 prevailing wages apply, and the contractor must commence work within 30 days of notice of award. There are no liquidated damages or bid bond requirements. The agency is the U.S. Coast Guard, and the solicitation number is 31030PR240000196.

View the file

Other files

File Type Posted
SF18-BEC Water tower.pdf PDF
SF-18 PG2.pdf PDF
Wage determination 2015-4405.txt TXT text file
SF18-BEC Water tower.pdf PDF
Final SOW - CASREP BEC 300K Gal Water Tower Clean and Inspect.pdf PDF
Service Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A- BEC Water tower

1. The North Carolina Drinking Water Operator Certification Board (WTFOCB) to informed that this certification is not for inspection or cleaning companies, but only for the actual operators of the water facility. This is notated in line item 5 of the SOW. Can you please confirm this certification is necessary?

· Certification is desired but not necessary, quotes from vendors without the certification will be considered and evaluated as per the RFQ

2. Is the tank welded or riveted?

· The tank is welded

3. Is there any lead paint detected on the tank?

· No lead paint has been detected on the tank

4. Is there a pre-bid meeting and if so, is it mandatory?

· Site visit has been scheduled for Sept 6th at 1000, highly encouraged but not mandatory.

5. Is this a prevailing wage job and if so, what is the scale?

· As per the RFQ, DOL Wage Determination 2015-4405 prevailing.

6. What is the project start and completion date?

· As per SOW, upon acceptance, the contractor shall commence work NLT thirty (30) calendar days after notice.

7. What is the engineering firm and their contact information?

· There is no AE firm identified to perform this work

8. What is the cost for the specification and is it online or a paper copy?

· An electronic copy of the specs and drawings will be provided at the bid and with the award documentation.

9. Are there any liquidated damages?

· CEUC does not usually become involved in liquidated damages.

10. What is the bid bond amount?

· No bod amount set for this project

File details come from the government source that posted it. Updated .