BASE Seattle - VSS Enclosure 1 V.2 - 03JUN24.pdf
PDF 428 KB Posted
- Attached to
- Video Surveillance System Installation Federal contract opportunity
- Solicitation number
- 31010PR240014100
About this file
This document appears to be a set of slides related to a Video Surveillance System (VSS) installation project at the U.S. Coast Guard (USCG) Base in Seattle, Washington. The slides detail the proposed fiber optic and camera installations, including the quantity and model numbers of the cameras to be removed and replaced.
The related federal contract opportunity is a Request for Quotation (RFQ) solicitation number 31010PR240014100 for the Video Surveillance System Installation project at USCG Base Seattle. The contractor shall provide all labor, tools, materials, and services to install the camera security system, including cameras, monitors, control centers, software, hardware warranty, and onsite training for USCG personnel. This is a 100% small business set-aside acquisition with a quote due date of June 12, 2024 by 4:00pm PST. A site visit is available for interested offerors on June 5, 2024 at 9:00am. The government intends to award to the low cost, responsible, and responsive offeror.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VSS Project Site Visit Questions.docx | DOCX document | |
| SF1449-31010PR240014100.pdf | ||
| Encl. 2 - NDAA Compliant VSS Whitelist 8-12-2020.pdf | ||
| SF1449-31010PR240014100.pdf | ||
| Enclosure (1) NFPA Standards and Codes.xlsx | XLSX spreadsheet | |
| Wage Determination 15-5535 King County.txt | TXT text file | |
| SOW VSS- USCG Base Seattle.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG Base Seattle Seattle, WA
VSS Project
USCG Base Seattle
Building 7
Building 4
B1
Building 3 B2
VSS Project 5.1.1
Demolished
Bypass Fiber From Bldg 4 to Bldg 10
SFP
SFP
* Proposed fiber has been installed.
VSS Project 5.1.2
Demolished
AXIS Q6135-LE
Quantity: 05
Q6100-E Quantity: 05
VSS Project 5.1.3
Demolished
AXIS- M4308-PLE
Quantity: 03
Gym 2nd deck
Existing CCTV
VSS Project 5.1.4
Demolished
PTZ – AXIS Q6225-LE
Quantity: 02
PTZ –AXIS Q6100-E
Quantity: 02
Axis Q6225-LE PTZ
Axis Q6100-E 360
Axis Q6100-E 360
Axis Q6135-LE PTZ
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
File details come from the government source that posted it. Updated .