31-2102_Project_Manual_Vol_1_.pdf
PDF 3 MB Posted
- Attached to
- 31-2102 Door Hardware
- Solicitation number
- 31-2102 Door Hardware
- Issued by
- Kittitas County, Washington
About this file
This document is a comprehensive Project Manual for the Lewis County Community Development Tenant Improvements project, prepared by KMB Architects located in Olympia, Washington. The project involves renovations to two existing adjacent buildings in downtown Chehalis, Washington, designated as Building No. 1 and Building No. 2. The scope of work includes replacing exterior window and door assemblies, modifying exterior wall assemblies with new insulation and finishes, cleaning and sealing exterior brick veneer, infilling an open space with a new roof structure, and completing interior tenant improvements for Building No. 1. The project manual is dated July 16, 2021, and contains detailed specifications across multiple divisions, including architectural, structural, mechanical, and electrical work.
The project manual provides extensive technical specifications for construction, including materials, installation methods, quality control, and performance requirements. It covers everything from structural steel framing and concrete work to finish carpentry, insulation, air barriers, and specialized treatments like water repellent application. The documents include comprehensive instructions for bidders, general conditions, submittal procedures, and testing requirements. The project appears to be funded by Lewis County and will require compliance with prevailing wage regulations, with an emphasis on quality craftsmanship, energy efficiency, and careful restoration of existing building elements. The specifications indicate a thorough approach to renovation that maintains the buildings' architectural integrity while updating their functionality and performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 31-2102_Door_Hardware.pdf | ||
| Door_and_Window_Index_and_Meassurements_2.0.xlsx | XLSX spreadsheet | |
| J2037C__LCDP__Rainer_Bldg_A-floorplan.pdf | ||
| 31-2102_Door_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
906 Columbia Street SW, Suite 400 Olympia, Washington 98501 360.352.8883 www.KMB-architects.com architects
LEWIS COUNTY COMMUNITY DEVELOPMENT
TENANT IMPROVEMENTS
LEWIS COUNTY FACILITIES DEPARTMENT
351 NW North Street Chehalis, Washington 98532
Project Manual – CD Review Set Volume 1 - Divisions 00 - 12
July 16, 2021
KMB Project No. J2037C
Project Manual Volume 1 - Specifications (Divisions 00 – 12)
LEWIS COUNTY COMMUNITY DEVELOPMENT
TENANT IMPROVEMENTS
KMB Project No. J2037C
Owner:
LEWIS COUNTY FACILITIES DEPARTMENT
351 NW North Street Chehalis, Washington 98532
Project Manager: Doug Carey
(360) 740-1337
Prepared by:
KMB architects
906 Columbia St. SW, Suite 400 Olympia, Washington 98501
James Hill, AIA, Partner Project Manager: Terina Owen
(360) 352-8883 Fax (360) 352-8853
SECTION 00 01 04
PROJECT DIRECTORY
Lewis Co. Community Development Tenant Improvement Lewis County Facilities Department 00 01 04 - 1
OWNER
LEWIS COUNTY FACILITIES DEPARTMENT
351 NW North Street
Chehalis, Washington 98532
Contact: Doug Carey (e-mail: doug.carey@lewiscounty.wa.gov)
Phone: 360.740.1337
ARCHITECT
KMB ARCHITECTS
906 Columbia St. SW, Suite 400
Olympia, Washington 98501
Principal: James Hill, RA (e-mail: JamesHill@kmb-architects.com)
Project Manager: Terina Owen (e-mail: TerinaOwen@kmb-architects.com)
Phone: 360.352.8883; Fax: 360.352.8853
STRUCTURAL ENGINEERING
TS1SK COLLABORATIVE
616 1st Avenue
Seattle, Washington 98104
Contact: Jason Tornquist, (e-mail: jtornquist@tk1sc.com
Phone: 206.641.6016
MECHANICAL ENGINEERING
HULTZ BHU
1111 Fawcett Avenue, Suite 100
Tacoma, Washington 98402
Contact: Rick Hultz (e-mail: rick@hultzbhu.com)
Phone: 253.383.3257
ELECTRICAL ENGINEERING
HARGIS ENGINEERS, INC.
1201 Third Ave., Suite 600
Seattle, WA 98101
Contact: Erik Stearns, P.E.(e-mail: Erik.Stearns@hargis.biz)
Phone: 206.448.3376
SECTION 00 01 04
PROJECT DIRECTORY
Lewis Co. Community Development Tenant Improvement Lewis County Facilities Department 00 01 04 - 2
SECURITY ELECTRONICS
HARGIS ENGINEERS, INC.
1201 Third Ave., Suite 600
Seattle, WA 98101
Contact: Ben Helms (e-mail: ben.helms@hargis.biz)
Phone: 206.448.3376
CIVIL ENGINEERING
RB ENGINEER
91 SW 13th Street
Chehalis, Washington 98532
Contact: Robert Balmelli, P.E. (e-mail: Robert@rbengineers.com)
Phone: 360.740.8919
BUILDING ENVELOPE
WETHERHOLT AND ASSOCIATES
2639 Parkmont Ln SW, STE A
Olympia, Washington 98502
Contact: Bob Card (e-mail: bob@wetherholt.com)
Phone: 206.200.4098
LANDSCAPE
ASPEN DESIGN
P.O. Box 2394
Issaquah, Washington 98027
Contact: Paul Dix (e-mail: aspendg@aol.com
Phone: 425.292.9845
END OF SECTION
SECTION 00 01 10
TABLE OF CONTENTS
Lewis Co. Community Development Tenant Improvement 00 01 10 - 1 Lewis County Facilities Department
SECTION DESCRIPTION NO. OF PAGES
VOLUME 1
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 PROJECT TITLE PAGE
00 01 04 PROJECT DIRECTORY
00 01 10 TABLE OF CONTENTS (THIS SECTION)
------------- ADVERTISEMENT FOR BIDS
00 21 13 INSTRUCTIONS TO BIDDERS
00 41 00 BID FORM
Form: Contractor Certification, Wage theft Prevention – Responsible Bidder Criteria 1 Form: Subcontractor List Form A – For HVAC, Plumbing, and Electrical 1 Form: Subcontractor List Form B – For Structural Steel and Rebar Installation 1
00 45 12 BIDDER RESPONSIBILITY CRITERIA
Form 1 - Contractor Experience Detail Form 2 - Resume of Key Personnel for Proposed Contract
00 72 00 GENERAL CONDITIONS OF THE CONTRACT
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT & COORDINATION
01 31 15 COMMUNICATION
01 31 19 PROJECT MEETINGS
01 33 00 SUBMITTAL PROCEDURES
01 35 00 PREVAILING WAGE RATES
01 42 00 STANDARDS & REGULATIONS
01 42 16 DEFINITIONS
01 45 29 TESTING LABORATORY SERVICES PROVIDED BY OWNER
01 50 00 TEMPORARY FACILITIES & CONTROLS
01 61 00 COMMON PRODUCT REQUIREMENTS
------------- Substitution Request Form
01 73 29 CUTTING AND PATCHING
01 74 00 CLEANING
01 77 00 CLOSEOUT PROCEDURES
01 78 00 CLOSEOUT SUBMITTALS
01 79 00 DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
02 41 19 SELECTIVE BUILDING REMODEL DEMOLITION
Lewis Co. Community Development Tenant Improvement 00 01 10 - 2 Lewis County Facilities Department
SECTION DESCRIPTION NO. OF PAGES
VOLUME 1
DIVISION 03 - CONCRETE
03 10 00 CONCRETE FORMING AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 39 00 CONCRETE CURING & SEALING
DIVISION 04 - MASONRY
04 01 00 MAINTENANCE OF MASONRY
04 05 11 MASONRY MORTAR & GROUT
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 31 00 STEEL DECKING
05 40 00 LIGHTGUAGE COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISHH CARPENTRY
06 41 00 ARCHITECTURAL WOOD CASEWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 30 WATER REPELLENT TREATMENT
07 21 00 BUILDING INSULATION
07 27 00 AIR BARRIERS
07 42 13 METAL WALL PANELS
07 54 00 THERMOPLASTIC MEMBRANE ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS & FRAMES
08 14 16 FLUSH WOOD DOORS
08 41 13 EXTERIOR ALUMINUM ENTRANCE & STOREFRONT WINDOW FRAMING
08 42 13 INTERIOR ALUMINUM FRAMED ENTRANCES
08 71 00 DOOR HARDWARE
08 80 00 GLASS AND GLAZING
Lewis Co. Community Development Tenant Improvement 00 01 10 - 3 Lewis County Facilities Department
SECTION DESCRIPTION NO. OF PAGES
VOLUME 1
DIVISION 09 - FINISHES
09 05 61 COMMON WORK RESULTS FOR FLOORING PREPARATION
09 22 26 METAL SUSPENSION SYSTEMS
09 29 00 GYPSUM BOARD
09 30 00 TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 72 26 PANEL WALL COVERINGS
09 84 00 ACOUSTICAL PANELS
09 91 00 PAINTS AND COATINGS
09 96 56 EPOXY COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00 SIGNAGE
10 28 00 ROOM ACCESSORIES
10 44 00 FIRE PROTECTION SPECIALTIES
10 51 33 PLASTIC LAMINATE LOCKERS
10 99 00 MISCELLANEOUS SPECIALTIES & EQUIPMENT
DIVISION 11 - EQUIPMENT
11 81 29 FACILITY FALL PROTECTION
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
DIVISIONS 13 THROUGH 19 (NOT USED)
Lewis Co. Community Development Tenant Improvement 00 01 10 - 4 Lewis County Facilities Department
SECTION DESCRIPTION NO. OF PAGES
Volume 2
DIVISION 20 – GENERAL MECHANICAL
20 02 00 OPERATION AND MAINTENANCE MANUAL FOR MECHANICAL
20 05 00 COMMON WORK RESULTS FOR MECHANICAL
20 05 19 PIPING SPECIALTIES FOR MECHANICAL
20 05 29 HANGERS AND SUPPORTS FOR MECHANICAL
20 05 30 SLEEVES AND SEALS FOR MECHANICAL
20 05 48 VIBRATION CONTROLS FOR MECHANICAL
20 05 90 UNDERGROUND UTILITIES EXCAVATION AND FILL FOR MECHANICAL
20 05 93 TESTING, ADJUSTING, BALANCING FOR MECHANICAL
20 07 00 MECHANICAL INSULATION
20 08 00 COMMISSIONING OF MECHANICAL SYSTEMS
DIVISION 21 - FIRE SUPPRESSION (NOT USED)
DIVISION 22 - PLUMBING
22 11 00 FACILITY WATER DISTRIBUTION
22 11 23 DOMESTIC WATER PUMPS
22 13 00 FACILITY SANITARY SEWERAGE
22 16 00 FACILITY NATURAL GAS PIPING SYSTEM
22 33 00 DOMESTIC WATER HEATERS
22 40 00 PLUMBING FIXTURES
22 66 00 LABORATORY PIPING SYSTEMS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 09 33 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 09 93 SEQUENCE OF OPERATION FOR HVAC CONTROLS
23 21 28 HVAC CONDENSATE PIPING
23 31 00 HVAC DUCTS AND CASINGS
23 33 00 DUCT ACCESSORIES
23 34 00 FANS
23 35 00 SPECIAL EXHAUST SYSTEMS
23 37 00 AIR OUTLETS AND INLETS
23 72 23 DOAS AND MAU UNITS
23 81 27 VRF SYSTEM AND HVAC CONTROLS 14
23 82 46 ELECTRIC HEATERS 4
DIVISION 24 (NOT USED)
DIVISION 25 INTEGRATED AUTOMATION (NOT USED)
Lewis Co. Community Development Tenant Improvement 00 01 10 - 5 Lewis County Facilities Department
SECTION DESCRIPTION NO. OF PAGES
Volume 2
DIVISION 26 - ELECTRICAL
26 00 00 GENERAL ELECTRICAL PROVISIONS
26 05 10 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 11 ELECTRICAL CONNECTIONS FOR EQUIPMENT
26 05 12 ELECTRICAL DEMOLITION
26 05 19 WIRES AND CABLES
26 05 21 METAL CLAD CABLES
26 05 26 GROUNDING AND BONDING
26 05 27 TELECOMMUNICATIONS GROUNDING SYSTEM
26 05 29 SUPPORTING DEVICES
26 05 33 RACEWAY SYSTEMS
26 05 34 OUTLET BOXES
26 05 35 FLOOR OUTLET DEVICES
26 05 36 CABLE TRAYS
26 05 43 UNDERGROUND VAULTS AND RACEWAYS
26 05 48 VIBRATION ISOLATION AND SEISMIC CONTROL FOR ELECTRICAL SYSTEMS
26 05 53 ELECTRICAL IDENTIFICATION
26 05 73 ELECTRICAL POWER STUDIES
26 08 10 ELECTRICAL TESTING
26 09 13 POWER MONITORING SYSTEM
26 09 23 LIGHTING AND RECEPTACLE CONTROLS
26 24 10 SERVICE ENTRANCE
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 13 OVERCURRENT PROTECTIVE DEVICES
26 28 16 DISCONNECTS SWITCHES AND ENCLOSED CIRCUIT BREAKERS
26 43 13 SURGE PROTECTIVE DEVICES………………………………………………
26 51 00 LIGHTING .......... ………………………………………………………………………………
DIVISION 27 - COMMUNICATIONS
27 00 00 COMMUNICATIONS WORK SPECIFIED IN DIVISION 26
27 11 00 TELECOMMUNICATIONS SYSTEM
Lewis Co. Community Development Tenant Improvement 00 01 10 - 6 Lewis County Facilities Department
SECTION DESCRIPTION NO. OF PAGES
Volume 2
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 00 00 ELECTRONIC SAFETY AND SECUTITY WORK SPECIFIED IN DIVISION 26
28 01 01 GENERAL PROVISIONS
28 13 00 ACCESS CONTROL SYSTEM
28 16 00 INTRUSION DETECTION SYSTEM
28 23 00 VIDEO SURVEILLANCE
28 31 11 FIRE ALARM AND DETECTIONS SYSTEMS
DIVISIONS 29 AND 30 (NOT USED)
DIVISION 31 – EARTHWORK
31 23 16 EXCAVATION
31 23 16.13 TRENCHING
31 23 23 FILL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 84 00 PLANTING IRRIGATION
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
DIVISION 33 – UTILITIES
33 14 16 SITE WATER UTILITY DISTRIBUTION PIPING
33 31 13 SITE SANITARY SEWERAGE GRAVITY PIPING
DIVISION 34 THROUGH DIVISION 49 – (NOT USED)
END OF TABLE OF CONTENTS
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
FOR LEWIS COUNTY FACILITIES CONSTRUCTION PROJECTS
00 21 13 - 1
PART 0 – GENERAL CONDITIONS
0.01 EXPLANATION TO PROSPECTIVE BIDDERS
A. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing to the Architect/Engineer (A/E) or owner if no A/E, 7 calendar days before the bid due date. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders by addendum to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
B. In accordance with the legislative findings and policies set forth in Chapter 39.19 RCW, the State of Washington encourages participation in all of its contracts by Minority and Women’s Business Enterprises (MWBE) firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Participation may be either on a direct basis in response to this invitation or as a subcontractor to a bidder. However, unless required by federal statutes, regulations, grants, or contract terms referenced in the contract documents, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis.
C. Any affirmative action requirements set forth in federal regulations or statutes included or referenced in the contract documents will apply.
D. In accordance with RCW 39.04.320 the State of Washington requires 15% Apprenticeship Participation for all projects estimated to cost one million dollars or more. On applicable projects the bid advertisement and Bid Proposal form shall establish a minimum required percentage of apprentice labor hours compared to the total labor hours. Bidders may contact the Department of Labor and Industries, Specialty Compliance Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530, by phone (360) 902-5320, and e-mail at thum235@lni.wa.gov, to obtain information on available apprenticeship programs.
0.02 PREPARATION OF BIDS – CONSTRUCTION
A. Bids must be: (1) submitted on the bid proposal forms, or copies of forms, furnished by the Owner or the Owner’s agent, and (2) signed in ink. The person signing a bid must initial each change appearing on any bid form. If the bid is made by a corporation, it shall be signed by the corporation’s authorized designee. The address of the bidder shall be typed or printed on the bid form in the space provided.
B. The bid form may require bidders to submit bid prices for one or more items on various bases, including: (1) lump sum base bid; (2) lump sum bid alternate prices; (3) unit prices; or (4) any combination of items (1) through (3) above.
C. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, bidders should insert the words “no bid” in the space provided for any item on which no price is submitted.
D. Substitute bid proposals will not be considered unless this solicitation authorizes their submission.
FOR LEWIS COUNTY FACILITIES CONSTRUCTION PROJECTS
00 21 13 - 2
0.03 BID GUARANTEE
A. When the sum of the base bid plus all additive bid alternates is $35,000.00 or less, bid security is not required. When the sum of the base bid plus all additive alternates is greater than $35,000.00, a bid guarantee in the amount of 5% of the base bid amount is required. Failure of the bidder to provide bid guarantee when required shall render the bid non-responsive.
B. Acceptable forms of bid guarantee are: A bid bond or postal money order, or certified check or cashier’s check made payable to the Lewis County Treasurer. The Owner will return bid guarantees (other than bid bond) to unsuccessful bidders as soon as practicable, but not sooner than the execution of a contract with the successful bidder.
The successful bidder’s bid guarantee will be returned to the successful bidder with its official notice to proceed with the work of the contract.
C. The bidder will allow 60 days from bid opening date for acceptance of its bid by the Owner. The bidder will return to the Owner a signed contract, insurance certificate and bond or bond waiver within 15 days after award of the contract. If the apparent successful bidder fails to sign all contractual documents or provide the bond and insurance as required or return the documents within 15 days after award of the contract, the Owner may terminate the award of the contract.
D. In the event a bidder discovers an error in its bid following the bid opening, the bidder may request to withdraw its bid under the following conditions:
1. Written notification is received by the Owner within 24 hours following bid opening.
2. The bidder provides written documentation of the claimed error to the satisfaction of the Owner within 72 hours following the bid opening. The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the bidder’s request for withdrawal of its bid is approved, the bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the bidder’s bid guarantee.
0.04 ADDITIVE OR DEDUCTIVE BID ITEMS
A. The low bidder, for purposes of award, shall be the responsive bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by the Owner, and within funds available for the project. The bidder agrees to hold all bid alternate prices until bid award and contract execution.
0.05 ACKNOWLEDGEMENT OF ADDENDA
A. Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers in the space provided for this purpose on the bid proposal form.
Failure to do so may result in the bid being declared non-responsive.
0.06 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
A. The bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2)
FOR LEWIS COUNTY FACILITIES CONSTRUCTION PROJECTS
00 21 13 - 3 the availability of labor, water, electric power, and road; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work. The bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner, as well as from the drawings and specifications made a part of this contract. Any failure of the bidder to take the actions described and acknowledged in this paragraph will not relieve the bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work.
0.07 BID AMOUNTS
A. The bid prices shown for each item on the bid proposal shall include all labor, material, equipment, overhead and compensation to complete all of the work for that item.
B. The actual cost of building permit (only) and the public utility hookup fees will be a direct reimbursement to the Contractor or paid directly to the permitting agency by the Owner.
Fees for these permits should not be included by the Bidder in the bid amount.
C. The Bidder agrees to hold the base bid prices until bid award and contract execution.
0.08 TAXES
A. The bid amounts shall not include Washington State Sales Tax (WSST). All other taxes imposed by law shall be included in the bid amount. The Owner will include WSST in progress payments. The Contractor shall pay the WSST to the Department of Revenue and shall furnish proof of payment to the Owner if requested. [NOTE: Contractor must bond for contract amount plus the WSST.]
0.09 SUBMISSION OF BIDS
A. Bid Proposals must be submitted on or before the time specified in the Advertisement for Bids.
B. If the base bid and the sum of the additive alternates is one million dollars or more, the Bid Proposal shall comply with the following requirements:
1. Pursuant to RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall provide names of the Subcontractors with whom the Bidder will subcontract for performance of heating, ventilation and air conditioning (HVAC), plumbing, and electrical.
2. The Bidder can name itself for the performance of the work.
3. The Bidder shall not list more than one Subcontractor for each category of work identified UNLESS Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate.
4. Failure of the Bidder to submit as part of the bid the NAMES of such Subcontractors or to name itself to perform such work shall render the Bidder's bid nonresponsive and, therefore, void.
C. The Bid Proposal shall be submitted in a sealed envelope addressed to the office specified in the Advertisement for Bids. The envelope shall have printed on the outside:
FOR LEWIS COUNTY FACILITIES CONSTRUCTION PROJECTS
00 21 13 - 4
1. The project number and description.
2. The name and address of the bidder.
3. Identification as Bid Proposal.
D. Prior to the bid opening, the Owner’s representative will designate the official bid clock.
Any part of the bid proposal or bid modification not received prior to the times specified, per the designated bid clock, will not be considered and the bid will be returned to the bidder unopened.
E. A bid may be withdrawn in person by a bidder’s authorized representative before the opening of the bids. Bidder(s) representative will be required to show ID and sign on bid summary sheet before it will be released.
F. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, Braille, etc.) need to contact the Owner ten (10) working days prior to the scheduled bid opening.
0.10 BID RESULTS
A. After the Bid Opening, Bidders may obtain the tabulation of apparent bids from Lewis County by calling (360) 740-1192 or accessing the project information page on the Lewis County website.
0.11 LOW RESPONSIBLE BIDDER
A. If applicable, it is the intent of the Owner to award a contract to the low responsible bidder. In determining the bidder’s responsibility, the Owner shall consider an overall accounting of the attached Document 00 45 12, Responsibility Criteria. Upon Owner’s request, the apparent low bidder must supply the requested information within two (2) business days of request by Owner. Withholding information or failure to submit all the information requested within the time provided shall render the bid nonresponsive. If the Owner determines that the apparent low bidder is not responsible, the Owner will notify the bidder of its preliminary determination in writing. Within three (3) days after receipt of the preliminary determination, the bidder may withdraw its bid or request a hearing. The Owner will schedule a hearing within three (3) working days of receipt of the bidder’s request. The hearing members will include the Central Services Director, Public Works Director and Central Services Project Manager. The Owner will issue a Final Determination after reviewing information presented at the hearing. The Owner’s Final Determination is specific to this project, and will have no effect on other or future projects.
B. “SUBCONTRACTOR RESPONSIBILITY CRITERIA” In accordance with SHB 2010 amending RCW 39.04 the Contractor shall include the language of this paragraph in each of its first tier subcontracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this paragraph apply to all subcontractors regardless of tier. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria:
FOR LEWIS COUNTY FACILITIES CONSTRUCTION PROJECTS
00 21 13 - 5
1. Have a current certificate of registration as a contractor in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal;
2. Have a current Washington Unified Business Identifier (UBI) number; and if applicable, have:
a. Have Industrial Insurance (workers’ compensation) coverage for the subcontractor’s employees working in Washington, as required in Title 51
RCW;
b. A Washington Employment Security Department number, as required in Title 50 RCW;
c. A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW;
d. An electrical contractor license, if required by Chapter 19.28 RCW;
e. An elevator contractor license, if required by Chapter 70.87 RCW.
f. Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065 (3).
0.12 CONTRACT AWARD
A. The Owner will evaluate bid responsiveness and bidder responsibility.
1. A bid will be considered responsive if it meets the following requirements:
a. It is received at the proper time and place.
b. It meets the stated requirements of the bid proposal.
c. It is submitted by a licensed/registered contractor within the State of
Washington at the time of bid opening and is not banned from bidding by the Department of Labor and Industries.
d. It is accompanied by a bid guarantee, if required.
2. A bid will be considered responsible if it meets the following requirements:
a. It meets an overall accounting of the responsibility criteria established for the project.
B. The Owner reserves the right to accept or reject any or all bid proposals and to waive informalities that do not affect the essential fairness of the bidding process.
C. The Owner may negotiate bid price adjustments with the low responsive bidder, including changes in the contract documents, to bring the bid within the available funding per RCW 39.04.015.
D. The apparent low bidder, for purpose of award, shall be the responsive bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.
E. The Contract will only become effective when signed by the Owner. Prior to the Owner’s signature, any and all costs incurred shall be the sole responsibility of the bidder.
END OF INSTRUCTIONS TO BIDDERS
Project Name: Lewis Co. Community Development Tenant Improvements Project No.: J2037C
Contractor Name:
DOCUMENT 00 41 00 - BID FORM Page 1 of 3
Document 00 41 00
B I D F O R M
In compliance with the contract documents, the following bid form is submitted:
1) BASE BID (Including Trench Excavation Safety Provisions)
(Please print dollar amount in space above) (do not include Washington State Sales Tax)
TRENCH EXCAVATION SAFETY PROVISIONS $
(Included also in Base Bid)
If the bid amount contains any work which requires trenching exceeding a depth of four feet, all costs for trench safety shall be included in the Base Bid and indicated above for adequate trench safety systems in compliance with Chapter 39.04 RCW. 49.17 RCW and WAC 296-155-650. Bidder must include a lump sum dollar amount in blank above (even if the value is $0.00) to be responsive.
2) BID ALTERNATES (Specify whether additive or deductive)
(1) $
(2) $
(3) $
(4) $
(5) $
(6) $
Do not include Washington State Sales Tax in alternate amounts.
The Owner reserves the right to accept or reject any or all bid prices within sixty (60) days of the bid date.
TIME FOR COMPLETION:
Contract Time - The undersigned hereby agrees to Substantially Complete all the work under the Base Bid (and accepted Alternates) within _______ calendar days after the date of Notice to Proceed.
Final Completion – All the Work shall be fully and finally completed in accordance with the contract documents within 45 calendar days after the date of Substantial Completion.
DOCUMENT 00 41 00 - BID FORM Page 2 of 3
SUBCONTRACTOR LISTING REQUIREMENTS
If the base bid and the sum of the additive alternates is one million dollars or more, the undersigned agrees to submit Subcontractor Listing Form A (HVAC, Plumbing, Electrical) within one hour of bid submittal time & Subcontractor Listing Form B (Structural Steel Install, Rebar Install) within 48 hours of the bid submittal time, as applicable to the work, according to RCW 39.30.060 and the Instructions to Bidders.
LIQUIDATED DAMAGES
The undersigned agrees to pay the Owner as liquidated damages the sum of $________ for each consecutive calendar day that is in default after the Contract Time. Liquidated damages shall be deducted from the contract invoice after taxes and retainage.
RECEIPT OF ADDENDA
Receipt of the following addenda is acknowledged:
Addendum No. Addendum No.
Addendum No. Addendum No.
Addendum No. Addendum No.
Name of Firm NOTE: If Bidder is a corporation, write State of Incorporation; if a partnership, give full names and addresses of all parties below.
Signed by Official Capacity
Print Name
Address
City State Zip Code
Date Telephone FAX
State of Washington Contractor's License No.
Federal Tax ID # E-mail address:
Employment Security Department No.
DOCUMENT 00 41 00 - BID FORM Page 3 of 3
CONTRACTOR CERTIFICATION
WAGE THEFT PREVENTION – RESPONSIBLE BIDDER CRITERIA
WASHINGTON STATE PUBLIC WORKS CONTRACTS
Return this signed “Contractor Certification” with your signed Bid Form or within two (2) business days of request by
Owner.
Prior to awarding a public works contract, the Owner is required to determine that a bidder meets the responsibility criteria to be considered a ‘responsible bidder’ and is qualified to be awarded a public works project. See RCW 39.04.350(1)(g) & (2). Pursuant to legislative enactment in 2017, the responsibility criteria include a contractor certification that the contractor has not willfully violated Washington’s wage laws. See Chap. 258, 2017 Laws (enacting SSB 5301).
Project No.: J2037C
Project Name: Lewis Co. Comm. Dev. Tenant Impr.
Procurement Solicitation Date:
I hereby certify, on behalf of the firm identified below, as follows (check one):
NO WAGE VIOLATIONS. This firm has NOT been determined by a final and binding citation and notice of assessment issued by the Washington Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three
(3) years prior to the date of the above-referenced procurement solicitation date.
OR
VIOLATIONS OF WAGE LAWS. This firm has been determined by a final and binding citation and notice of assessment issued by the Washington Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, a provision of RCW chapters 49.46, 49.48, or 49.52 within three (3) years prior to the date of the above-referenced procurement solicitation date.
I hereby certify, under penalty of perjury under the laws of the State of Washington, that the certifications herein are true and correct and that I am authorized to make these certifications on behalf of the firm listed herein.
FIRM NAME: _____________________________________________________
Name of Contractor/Bidder – Print full legal entity name of firm
By: ____________________________ Signature of authorized person
Title: ____________________________ Title of person signing certificate
Date: ____________________________
Print Name of person making certifications for firm
Place: ____________________________ Print city and state where signed http://app.leg.wa.gov/RCW/default.aspx?cite=39.04.350 http://app.leg.wa.gov/RCW/default.aspx?cite=49.48.082 http://app.leg.wa.gov/RCW/default.aspx?cite=49.46 http://app.leg.wa.gov/RCW/default.aspx?cite=49.48 http://app.leg.wa.gov/RCW/default.aspx?cite=49.52 http://app.leg.wa.gov/RCW/default.aspx?cite=49.48.082 http://app.leg.wa.gov/RCW/default.aspx?cite=49.46 http://app.leg.wa.gov/RCW/default.aspx?cite=49.48 http://app.leg.wa.gov/RCW/default.aspx?cite=49.52
LEWIS COUNTY
FACILITIES DEPARTMENT
Within One Hour of the Bid Submittal Time
In compliance with the contract documents, the following subcontractor list is submitted:
SUBCONTRACTOR LISTING – RCW 39.30.060
If the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall provide names of the subcontractors with whom the Bidder will directly subcontract for performance of the following work. If the Bidder intends to perform the work, the Bidder must enter its name for that category of work.
The Bidder shall not list more than one subcontractor for each category of work identified UNLESS subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate. Substitutions are prohibited except as outlined in
RCW 39.30.060.
Failure of the Bidder to submit the NAMES of such subcontractors or to name itself to perform such work shall render the Bidder’s bid nonresponsive and, therefore, VOID.
Bidders who name themselves to perform the work are expected to perform the work and the Owner reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.
Category of Work Alternate Bid # (if applicable) Firm Name
1. HVAC, Base Bid n/a
a. HVAC, Alternate Bid
2. Plumbing, Base Bid n/a
a. Plumbing, Alternate Bid
3. Electrical, Base Bid n/a
a. Electrical, Alternate Bid
Bidder may attach a separate sheet for additional alternate bid subcontractors.
Submitted By: __________________________________________________ Print Name and Title of Authorized Person
Subcontractor List Form A
For HVAC, Plumbing, and Electrical
LEWIS COUNTY
FACILITIES DEPARTMENT
Within 48 Hours of Bid Submittal Time
In compliance with the contract documents, the following subcontractor list is submitted:
SUBCONTRACTOR LISTING – RCW 39.30.060
If the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall provide names of the subcontractors with whom the Bidder will directly subcontract for performance of the following work. If the Bidder intends to perform the work, the Bidder must enter its name for that category of work.
The Bidder shall not list more than one subcontractor for each category of work identified UNLESS subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate. Substitutions are prohibited except as outlined in
RCW 39.30.060.
Failure of the Bidder to submit the NAMES of such subcontractors or to name itself to perform such work shall render the Bidder’s bid nonresponsive and, therefore, VOID.
Bidders who name themselves to perform the work are expected to perform the work and the Owner reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.
Category of Work Alternate Bid # (if applicable) Firm Name
1. Structural Steel Installation, Base Bid n/a
a. Structural Steel Installation, Alternate Bid
2. Rebar Installation, Base Bid n/a
a. Rebar Installation, Alternate Bid
Bidder may attach a separate sheet for additional alternate bid subcontractors.
Submitted By: __________________________________________________ Print Name and Title of Authorized Person
Subcontractor List Form B
For Structural Steel Installation and Rebar Installation
00 45 12 - 1
Document 00 45 12 Bidder Responsibility Criteria
Low Responsible Bidder
It is the intent of the Owner to award a contract to the low responsible bidder. In determining the bidder’s responsibility, the Owner shall consider an overall accounting of the items listed below. The bidder must submit the following information, demonstrating that they meet the listed criteria:
1. Capacity
Category Required Information / Criteria
Current Workload On a separate sheet, list all the major projects your firm has in progress or are projected to commence during the next 6 months, giving the name of project, Owner, architect, contract amount, percentage complete and scheduled completion date. Failure to list all major projects shall render the bid non-responsive.
List the current or projected workload for the next 12 months including this Contract, expressed in total contract value.
List actual contracted workload for the previous 12 months, expressed in total contract value.
The bidder’s current or projected workload, during the life of this contract, shall not exceed 150% of the actual contracted workload over the previous 12 months unless the bidder can demonstrate to the Owner’s satisfaction that it has the capacity to assume the additional work of this project, provide adequate staffing, and meet project demands.
00 45 12 - 2
2. Previous Experience
List of Completed Projects (Use Form 1)
On a separate sheet, list all the major projects ($75,000 and above) your firm has completed in each of the past five (5) years, giving the name of project, Owner (contact name and phone numbers, architect (contact name and phone numbers), contract amount, date of completion and percentage of the cost of the work performed with your own forces. This information will be used for references.
Experience of Superintendent or Project Manager (Use Form 2)
Submit resume and references if different than above, of the person proposed by the bidder to superintend the work. This person shall have managed projects of similar complexity and similar size, and successfully completed the project within the last three (3) years.
Superintendent and/or Project Manager shall not be replaced on the project without full consent of the Owner.
Equipment Submit affidavit that firm has equipment necessary to perform all phases of work, including HMA pavers, planning or grinding machines, asphalt saws, etc.
3. Ability to Perform Within Time Specified
Contractor’s Ability to Meet the Project Schedule
On a separate sheet, list the project titles, original contract time, and change order time extensions for three specific projects. Bidder shall document that it achieved substantial completion of three previous projects of similar size and scope within no more than 105% of the final contracted time for completion (including change ordered adjustments).
00 45 12 - 3
4. References
References from Owners of Previous Projects
Owner will check references by contacting owners of previous projects on bidder’s performance over the last five years. On average, such references shall be satisfactory or better on a five category scale with “satisfactory” at mid scale. A reference score sheet will be utilized for rating completed projects of similar scope and value.
Public Agency Debarment Bidder shall not have been debarred by any Public agency within the last two (2) years.
The apparent low bidder must provide the above required information within two (2) working days of receiving Owner notification. Failure to submit such information to the satisfaction of the Owner within the time provided shall render the bid non-responsive.
If the Owner determines that the apparent low bidder is not responsible, the Owner will notify the bidder of its preliminary determination in writing. Within three (3) days after receipt of the preliminary determination, the bidder may withdraw its bid or may request a hearing. The Owner will schedule a hearing within three (3) working days of receipt of the bidder’s request. The Owner will issue a Final Determination after reviewing information presented at the hearing. The Owner’s Final Determination is specific to this project and will have no effect on other or future projects.
Form 1 – Document 00 45 12
Bidder Responsibility Form 1 - Contractor Experience Detail
Project: Lewis County Community Development Tenant Improvements Business Contact Information Contractor Name: Total years in Business:
Mailing Address:
Business Phone: Former business name(s) & Dates:
Contact Name and Title:
Contact Phone: Contact Email: Reason for name change(s):
*List Projects Completed Within The Time Specified By Division 00, or Are In Progress
* Project Name &
Location: Description Of Project:
Owner:
Architect:
Project Manager Name:
Original Contract Amount: $ Is this project relevant to proposed project?
Yes
No
Final Contract Amount: $
Address:
Address:
Original Contract Days
Superintendent
Time Extensions Granted Days
Phone:
Phone:
Completion Date:
As Prime Or Sub:
Email:
Email:
1. Did this project require Apprenticeship Participation?
Yes No (If NO, stop here).
2. If yes, what was the Apprenticeship %? %
3. What was the actual % achieved? %
4. Was the apprenticeship requirement met?
Yes No
If NO to question 4 attach separate sheet to explain Why.
Form 2 – Document 00 45 12
Bidder Responsibility Form 2 - Resume of Key Personnel for Proposed Contract
Project: Lewis County Community Development Tenant Improvements
Role in this Contract:
Years Experience Total
With Current Firm
Firm Name and Location (City and State):
Training/Education/Specialization:
Years of Experience in the Proposed Role:
RELEVANT PROJECTS
Project Title: Year Completed
Project Owner:
Brief Description (Brief scope, size, cost, etc.) and specific role:
Check if project performed with current firm.
If performed with different firm list the firm name
Reference Name & Contact Information:
Project Owner: Project Architect:
Name: Name:
Phone: Phone:
E-mail E-mail:
If performed with different firm list the firm name
Reference Name & Contact Information:
Project Owner: Project Architect:
Name: Name:
Form 2 – Document 00 45 12
If performed with different firm list the firm Name
Reference Name & Contact Information:
Project Owner: Project Architect:
Name: Name:
If performed with different firm list the firm Name
Reference Name & Contact Information:
Project Owner: Project Architect:
Name: Name:
If performed with different firm list the firm Name
Reference Name & Contact Information:
Project Owner: Project Architect:
Name: Name:
DOCUMENT 00 72 00
GENERAL CONDITIONS OF THE CONTRACT
00 72 00 - 1
PART 1 - GENERAL PROVISIONS
1.01 DEFINITIONS
1.02 ORDER OF PRECEDENCE
1.03 EXECUTION AND INTENT
PART 2 – INSURANCE AND BONDS
2.01 CONTRACTOR’S LIABILITY INSURANCE
2.02 COVERAGE LIMITS
2.03 INSURANCE COVERAGE CERTIFICATES
2.04 PAYMENT AND PERFORMANCE BONDS
2.05 ALTERNATIVE SURETY
2.06 BUILDER’S RISK
PART 3 – TIME AND SCHEDULE
3.01 PROGRESS AND COMPLETION
3.02 CONSTRUCTION SCHEDULE
3.03 OWNER’S RIGHT TO SUSPEND THE WORK FOR CONVENIENCE
3.04 OWNER’S RIGHT TO STOP THE WORK FOR CAUSE
3.05 DELAY
3.06 NOTICE TO OWNER OF LABOR DISPUTES
3.07 DAMAGES FOR FAILURE TO ACHIEVE TIMELY COMPLETION
PART 4 – SPECIFICATIONS, DRAWINGS, AND OTHER DOCUMENTS
.. 4.01 DISCREPANCIES AND CONTRACT DOCUMENT REVIEW
.. 4.02 PROJECT RECORD
.. 4.03 SHOP DRAWINGS
.. 4.04 ORGANIZATION OF SPECIFICATIONS
.. 4.05 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS, AND OTHER DOCUMENTS .. 14
PART 5 – PERFORMANCE
5.01 CONTRACTOR CONTROL AND SUPERVISION
5.02 PERMITS, FEES, AND NOTICES
5.03 PATENTS AND ROYALTIES
5.04 PREVAILING WAGES
5.05 HOURS OF LABOR
5.06 NONDISCRIMINATION
5.07 SAFETY PRECAUTIONS
5.08 OPERATIONS, MATERIAL HANDLING, AND STORAGE AREAS
5.09 PRIOR NOTICE OF EXCAVATION
5.10 UNFORESEEN PHYSICAL CONDITIONS
5.11 PROTECTION OF EXISTING STRUCTURES, EQUIPMENT, VEGETATION, UTILITIES
AND IMPROVEMENTS
5.12 LAYOUT OF WORK
5.13 MATERIAL AND EQUIPMENT
5.14 AVAILABILITY AND USE OF UTILITY SERVICES
5.15 TESTS AND INSPECTION
5.16 CORRECTION OF NONCONFORMING WORK
5.17 CLEAN UP
5.18 ACCESS TO WORK
5.19 OTHER CONTRACTS
5.20 SUBCONTRACTORS AND SUPPLIERS
5.21 WARRANTY OF CONSTRUCTION
5.22 INDEMNIFICATION
PART 6 – PAYMENTS AND COMPLETION
6.01 CONTRACT SUM
00 72 00 - 2
6.02 SCHEDULE OF VALUES
6.03 APPLICATION FOR PAYMENT
6.04 PROGRESS PAYMENTS
6.05 PAYMENTS WITHHELD
6.06 RETAINAGE AND BOND CLAIM RIGHTS
6.07 SUBSTANTIAL COMPLETION
6.08 PRIOR OCCUPANCY
6.09 FINAL COMPLETION, ACCEPTANCE, AND PAYMENT
PART 7 – CHANGES
7.01 CHANGE IN THE WORK
7.02 CHANGE IN THE CONTRACT SUM
7.03 CHANGE IN THE CONTRACT TIME
PART 8 – CLAIMS AND DISPUTE RESOLUTION
8.01 CLAIMS PROCEDURE
8.02 ARBITRATION
8.03 CLAIMS AUDITS
PART 9 – TERMINATION OF THE WORK
9.01 TERMINATION BY OWNER FOR CAUSE
9.02 TERMINATION BY OWNER FOR CONVENIENCE
PART 10 – MISCELLANEOUS PROVISIONS
10.01 GOVERNING LAW
10.02 SUCCESSORS AND ASSIGNS
10.03 MEANING OF WORDS
10.04 RIGHTS AND REMEDIES
10.05 CONTRACTOR REGISTRATION
10.06 TIME COMPUTATIONS
10.07 RECORDS RETENTION
10.08 THIRD-PARTY AGREEMENTS
10.09 ANTITRUST ASSIGNMENT
10.10 HEADINGS AND CAPTIONS
10.11 SPECIAL CONDITIONS
00 72 00 - 3
PART 1 - GENERAL PROVISIONS
1.01 DEFINITIONS
A. “Application for Payment” means a written request submitted by Contractor to A/E for payment of Work completed in accordance with the Contract Documents and approved Schedule of Values, supported by such substantiating data as Owner or A/E may require.
B. “Architect,” “Engineer,” or “A/E” means a person or entity lawfully entitled to practice architecture or engineering, representing Owner within the limits of its delegated authority.
C. “Change Order” means a written instrument signed by Owner and Contractor stating their agreement upon all of the following: (1) a change in the Work; (2) the amount of the adjustment in the Contract Sum, if any, and (3) the extent of the adjustment in the Contract Time, if any.
D. “Claim” means Contractor’s exclusive remedy for resolving disputes with Owner regarding the terms of a Change Order or a request for equitable adjustment, as more fully set forth in Part 8.
E. “Contract Award Amount” is the sum of the Base Bid and any accepted Alternates.
F. “Contract Documents” means the Advertisement for Bids, Instructions for Bidders, completed Bid Form, General Conditions, Modifications to the General Conditions, Supplemental Conditions, Public Works Contract, other Special Forms, Drawings and Specifications, and all addenda and modifications thereof.
G. “Contract Sum” is the total amount payable by Owner to Contractor, for performance of the Work in accordance with the Contract Documents, including all taxes imposed by law and properly chargeable to the Work, except Washington State sales tax.
H. “Contract Time” is the number of calendar days allotted in the Contract Documents for achieving Substantial Completion of the Work.
I. “Contractor” means the person or entity who has agreed with Owner to perform the Work in accordance with the Contract Documents.
J. “Day(s): Unless otherwise specified, day(s) shall mean calendar day(s).”
K. “Drawings” are the graphic and pictorial portions of the Contract Documents showing the design, location, and dimensions of the Work, and may include plans, elevations, sections, details, schedules, and diagrams.
L. “Final Acceptance” means the written acceptance issued to Contractor by Owner after Contractor has completed the requirements of the Contract Documents, as more fully set forth in Section 6.09 B.
M. “Final Completion” means that the Work is fully and finally complete in accordance with the Contract Documents, as more fully set forth in Section 6.09 A.
N. “Force Majeure” means those acts entitling Contractor to request an equitable adjustment in the Contract Time, as more fully set forth in paragraph 3.05A.
O. “Notice” means a written notice that has been delivered to the authorized representative or officer of the addressed party by registered or certified mail, or by email as a PDF attachment. Notices should clearly identify the project number and date of notice.
P. “Notice to Proceed” means a notice from Owner to Contractor that defines the date on which the Contract Time begins to run.
Q. “Owner” means the state agency, institution, or its authorized representative with the authority to enter into, administer, and/or terminate the Work in accordance with the Contract Documents and make related determinations and findings.
00 72 00 - 4
R. “Person” means a corporation, partnership, business association of any kind, trust, company, or individual.
S. “Prior Occupancy” means Owner’s use of all or parts of the Project before Substantial Completion, as more fully set forth in Section 6.08 A.
T. “Progress Schedule” means a schedule of the Work, in a form satisfactory to Owner, as further set forth in Section 3.02.
U. “Project” means the total construction of which the Work performed in accordance with the Contract Documents may be the whole or a part and which may include construction by Owner or by separate contractors.
V. “Project Record” means the separate set of Drawings and Specifications as further set forth in paragraph 4.02A.
W. “Schedule of Values” means a written breakdown allocating the total Contract Sum to each principal category of Work, in such detail as requested by Owner.
X. “Specifications” are that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the Work, and performance of related services.
Y. “Subcontract” means a contract entered into by Subcontractor for the purpose of obtaining supplies, materials, equipment, or services of any kind for or in connection with the Work.
Z. “Subcontractor” means any person, other than Contractor, who agrees to furnish or furnishes any supplies, materials, equipment, or services of any kind in connection with the Work.
AA. “Substantial Completion” means that stage in the progress of the Work when the construction is sufficiently complete, as more fully set forth in Section 6.07.
AB. “Work” means the construction and services required by the Contract Documents, and includes, but is not limited to, labor, materials, supplies, equipment, services, permits, and the manufacture and fabrication of components, performed, furnished, or provided in accordance with the Contract Documents.
1.02 ORDER OF PRECEDENCE
Any conflict or inconsistency in the Contract Documents shall be resolved by giving the documents precedence in the following order:
1. Signed Public Works Contract, including any Change Orders.
2. Supplemental Conditions.
3. Modifications to the General Conditions.
4. General Conditions.
5. Specifications. Provisions in Division 1 shall take precedence over provisions of any other
Division.
6. Drawings. In case of conflict within the Drawings, large-scale drawings shall take precedence over small-scale drawings.
7. Signed and Completed Bid Form.
8. Instructions to Bidders.
9. Advertisement for Bids.
1.03 EXECUTION AND INTENT
Contractor Representations: Contractor makes the following representations to Owner:
1. Contract Sum reasonable: The Contract Sum is reasonable compensation for the Work and the Contract Time is adequate for the performance of the Work, as represented by the Contract Documents;
00 72 00 - 5
2. Contractor familiar with project: Contractor has carefully reviewed the Contract Documents, visited and examined the Project site, become familiar with the local conditions in which the Work is to be performed, and satisfied itself as to the nature, location, character, quality and quantity of the Work, the labor, materials, equipment, goods, supplies, work, services and other items to be furnished and all other requirements of the Contract Documents, as well as the surface and subsurface conditions and other matters that may be encountered at the Project site or affect performance of the Work or the cost or difficulty thereof;
3. Contractor financially capable: Contractor is financially solvent, able to pay its debts as they mature, and possesses sufficient working capital to complete the Work and perform Contractor’s obligations required by the Contract Documents; and
4. Contractor can complete Work: Contractor is able to furnish the plant, tools, materials, supplies, equipment and labor required to complete the Work and perform the obligations required by the Contract Documents and has sufficient experience and competence to do so.
PART 2 – INSURANCE AND BONDS
2.0…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .