3064_SQSR.pdf

PDF 391 KB Posted

Attached to
REPAIR SERVICES FOR THE MUTES PROGRAM
Solicitation number
FA825026R000401
Issued by

About this file

This is a Justification for Qualification Requirements document for the repair and overhaul of an Oscillating Group component (NSN 5955-01-097-3064, Part Number 654VE4851-2) used in the AN/MST-T1A system. The document is issued by the Air Force and dated November 13, 2025, under RMSC Category C pursuant to FAR 9.202(a) and DoD 4120.24-M Defense Standardization Program procedures. The Engineering Support Activity (415 SCMS/GUEA) requires that all potential repair sources meet specific qualification requirements prior to contract award due to the criticality, complexity, and close tolerance matching requirements of the component. Failure to procure from a fully qualified source could negatively affect mission performance of the AN/MST-T1A system.

Prospective offerors seeking to qualify must satisfy multiple pre-award requirements including: notification of intent to qualify to the contracting officer; certification of adequate facilities, testing, and inspection capabilities; verification of a complete technical data package including Lockheed Martin drawing 654VE4851 and all applicable procedures; demonstration of repair process compliance with government requirements and Unique Identification (DFARS 211.274) standards; and submission of a detailed qualification test plan for government approval. The estimated cost for qualification is $0.00, with an estimated completion time of 30 days. Offerors may not be denied the opportunity to submit offers if they can demonstrate capability to meet qualification standards before the contract award date, though award will not be delayed for qualification purposes. Once fully qualified, offerors are listed as approved repair sources, though qualification does not guarantee subsequent contract award. Alternative sources may apply for qualification waivers if they meet specific criteria, including prior government supply history, mirror-image equivalency, assembly-to-subassembly relationships, or prior qualification under equivalent ownership structures.

View the file

Other files

File Type Posted
PWS.pdf PDF
TRNSPDATA_REPORT.pdf PDF
6222_RDL_REPORT.pdf PDF
6222_ITMDESC_REPORT.pdf PDF
6222_UIIEC_REPORT.pdf PDF
6223_RDL_REPORT.pdf PDF
FA825026R0004.pdf PDF
6222_SQSR.pdf PDF
CAVAF.pdf PDF
FA825026R000400001.pdf PDF
SOW.pdf PDF
3064_UIIEC_REPORT.pdf PDF
3064_RDL_REPORT.pdf PDF
6223_UIIEC_REPORT.pdf PDF
6223_ITMDESC_REPORT.pdf PDF
CDRLS.pdf PDF
SQSR.pdf PDF
PKGRQMT_REPORT.pdf PDF
3064_ITMDESC_REPORT.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) Policy and DoD 4120.24-M Defense Standardization Program, Policy and Procedures

13 Nov 2025 Section A & Section B & Section D

RMSC: C (AFMCI 21-113, Contract Maintenance Program for Depot Maintenance Activity Group)

SECTION A: ITEM IDENTIFICATION

1. National Stock Number (NSN): 5955-01-097-3064

2. Part Number (P/N): 654VE4851-2

3. Noun: Oscillating Group

4. Application: AN/MST-T1A

SECTION B:

1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT

a. Criticality: Repair/overhaul of this Oscillating Group requires engineering source approval by the engineering support activity 415 SCMS/GUEA in order to maintain the quality of the part.

Failure to procure this Oscillating Group from a fully qualified repair source could negatively affect the mission of the AN/MST-T1A.

b. Complexity, Repair Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining, repair, and processing of this Oscillating Group can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Oscillating Group to assure compliance with specified acceptance test requirements.

c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Oscillating Group being procured.

2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT

AWARD

a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of repairing the Oscillating Group in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award.

b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.

c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days. This is based on complexity of the Oscillating Group and other factors.

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

13 Nov 2025 Section A & Section B & Section D

SECTION D: SIGNATURES

X Chief of Contracting Office (COCO)

X 415 SCMS/GUEA Lead Engineer Engineer Support Activity (ESA)

X 415 SCMS/GUEA Engineer Engineer Support Activity (ESA)

REPAIR QUALIFICATION REQUIREMENTS

NSN: 5955-01-097-3064

P/N: 654VE4851-2

Noun: Oscillating Group Application: AN/MST-T1A

13 Nov 2025 Supporting Information

Qualification Requirement Cost Estimate Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified. This is a requirement of FAR 9.202(a)(1)(ii) and 10USC2319(b)(3) (The following categories may not apply in all cases. The product engineer should identify the costs applicable to the project and indicate N/A on all sections that do not apply.)

Total cost is $ 0.00 Section A. Shipping, if required, use DD Form 1654, Evaluation of Transportation Cost Factors to develop the information. Refer any questions to the Procurement Contracting Officer for cost estimation.

N/A

Section B. Dimensional/Electronic Verification. Contact the science/engineering laboratory to obtain cost estimates (bids) for tests such as:

$ 0.00

a. Chemical N/A

b. Metallurgical $ 0.00

(1) Destructive N/A

(2) Non-Destructive N/A

c. Dimensional N/A

d. Electronic N/A

e. Mechanical N/A

f. Non-Destructive Inspection N/A Section C. Nuclear Hardness [This includes cost of shock, vibration, and Electro-Magnetic Pulse (EMP)]. Contact Systems Engineering Integration and Test Division for hourly rate.

N/A

Section D. Form, Fit, Function and Interface. Contact your organizational Production Management Specialist (PMS) to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206, Temporary Work Request.

N/A

Section E. Original Equipment Manufacturer (OEM) Qualification Testing (If required) $ 0.00

a. Laboratory Costs (Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing. For example, landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from $25,000 to $500,000 depending on the depth of testing. Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing).

N/A

b. Flight/Data Reduction & Analysis Costs. N/A Section F. Travel by Contractor to Test Site (if required) $ 0.00

a. Lodging N/A

b. Per Diem N/A

c. Rental Cars N/A

d. Incidentals (Verified) N/A Section G. SAR Package Development/Evaluation Cost: A potential new source’s development of a Source Approval (SAR) package may cost as much as:

$10,000

In addition, the cost incurred for Government evaluation of their SAR may be as much as: $3,000 Evaluation cost may be born by the government if it is in the best interest of the Government to qualify alternate sources.

P/N: 654VE4851-2

13 Nov 2025 Supporting Information

AFMCI 23-113

13 Nov 2025 C 5955-01-097-3064

654VE4851-2

Oscillating Group

AN/MST-T1A

415 SCMS/GUEA

0.00 (cost estimate) 30 (time completion estimate)

P/N: 654VE4851-2

13 Nov 2025 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Oscillating Group.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Lockheed Martin (General Dynamic) (81755) drawing 654VE4851. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS/GUEA. The offeror shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS/GUEA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 654VE4851.

f. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.

g. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days. This is based on complexity of the Oscillating Group and other factors.

P/N: 654VE4851-2

13 Nov 2025 Section C 2/3

h. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

i. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: 654VE4851-2

13 Nov 2025 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: N/A

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.

Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified This is a requirement of FAR 9202a1ii and 10USC2319b3 The following categories may not apply in all cases The product engineer should identify the costs applicable to the project and indicate NA on all sections that do not apply:
Total cost is:
000:
a Chemical:
b Metallurgical:
1 Destructive:
2 NonDestructive:
c Dimensional:
d Electronic:
e Mechanical:
f NonDestructive Inspection:
NA:
NA_2:
b FlightData Reduction Analysis Costs:
Section F Travel by Contractor to Test Site if required:
a Lodging:
b Per Diem:
c Rental Cars:
d Incidentals Verified:
3000Evaluation cost may be born by the government if it is in the best interest of the Government to qualify alternate sources:
2025-11-20T11:02:32-0700
KINCAID.JAMES.RYAN.1247004943
2025-11-20T11:35:42-0700
KLEMM.VAL.REID.1286909821
2025-11-24T12:21:22-0700
STARK.DAVID.J.1254575271

File details come from the government source that posted it. Updated .