3-Van Horn ACAP Addendum 1 Plans.pdf

PDF 29 MB Posted

Attached to
Van Horn - Agricultural Conservation Assistance Program (ACAP) Project
Solicitation number
US.238181
Issued by
Indiana County, Pennsylvania

About this file

This is an addendum to construction plans for the Gregg Van Horn Agricultural Conservation Assistance Program (ACAP) project, prepared by W.J. Young & Associates, Inc., for the Indiana County Conservation District (ICCD) in Washington Township, Indiana County, Pennsylvania. The project encompasses farmstead improvements at 426 Hudson Road, Creekside, PA 15732, including a 12-foot wide access road improvement totaling approximately 742 linear feet, a 1.5-inch AWWA C901 HDPE waterline installation with stream crossing capabilities, storm water drainage infrastructure with 12-inch HDPE pipes and drainage outlets, cattle exclusion fencing, a livestock watering gravel pad, water deflectors spaced 75 feet apart along the access road, and related erosion and sediment control measures. The sealed bid submission deadline is 9:00 AM Eastern Time on Thursday, July 2, 2026, with a mandatory site visit scheduled for Wednesday, June 17, 2026, at 9:00 AM. Bidders must submit proposals through PennBid and provide a bid bond equal to 10 percent of the total bid amount.

The project requires compliance with Pennsylvania Department of Transportation specifications (PUB 408), Pennsylvania Department of Environmental Protection erosion and sedimentation control regulations (Title 25, Part 1, Subpart C, Article II, Chapter 102), and a PennDOT Highway Occupancy Permit pursuant to Section 420 of the State Highway Law. All materials and workmanship must conform to the latest edition of applicable specifications. The contractor is responsible for verifying utility locations and invert elevations prior to construction, maintaining traffic on adjoining roads and drives, and notifying the engineer immediately of any design conflicts. A final erosion and sedimentation control plan and permit must be in place before earthwork commences. The project is subject to prevailing minimum wage requirements. The ICCD reserves the right to reject any or all proposals. Construction plans include detailed site plans, utility and drainage layouts, access road improvement specifications, and erosion control details across multiple sheets prepared as of December 11, 2024, with Addendum No. 1 issued May 11, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .