Van Horn Agricultural Conservation Assistance Program Project - Bid Package Summary

This is a bid package issued by the Indiana County Conservation District (ICCD) for the Gregg Van Horn Agricultural Conservation Assistance Program (ACAP) project located at 426 Hudson Road, Creekside, Pennsylvania 15732. The project encompasses farmstead improvements including installation of animal trails with water bars and stream crossing, grated drop boxes, underground outlets, a watering system, concrete heavy use area (HUA) protection pad, gutters on existing buildings, and streambank fencing. A mandatory site showing and pre-bid meeting will be held on Thursday, April 30, 2026, at 10:00 AM ET at the project location. Sealed bids must be submitted by Friday, May 15, 2026, at 9:00 AM ET to the Indiana County Conservation District Office at 435 Hamill Road, Indiana, Pennsylvania 15701. All written inquiries concerning the solicitation must be submitted prior to Friday, May 8, 2026, at 3:00 PM ET. The contract will be awarded to the lowest responsible bidder, with the commencement date on or after Monday, June 1, 2026, and all work must be completed, approved, and accepted by the District within sixty calendar days of mobilization, with a final completion deadline of Friday, October 2, 2026. The bid submittal must include all materials invoices and certified payroll documentation as applicable.

The project is subject to Pennsylvania Prevailing Wage Act requirements, with wage rates and fringe benefits specified for various classifications of laborers, operators, carpenters, and other trades. All work must be bid as a "not to exceed" amount for the entire project, with the contractor responsible for providing all equipment, labor, and materials. A performance bond and payment bond, each at 100% of the contract amount, are required from the awarded bidder within twenty days of contract award or prior to construction start. The contractor must obtain certificates of insurance including public liability, property damage, and automobile bodily injury coverage. Materials must be approved by the District inspector prior to use and must be in new condition unless otherwise specified. The District will withhold 30% of all payments until satisfactory final inspection is completed, with progress payments made on a per line item completion basis. All invoices must be received within 30 days of project completion, and final payment will be made within 60 days of receiving complete invoices and documentation. The contractor is solely responsible for site safety conditions, utility location and protection, compliance with erosion and sediment control requirements, OSHA regulations, and all local and state road bonds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREGG VAN HORN

AGRICULTURAL CONSERVATION ASSITANCE PROGRAM PROJECT

WASHINGTON TOWNSHIP, INDIANA COUNTY

BID PACKAGE

Site Showing & Pre-bid Meeting: Mandatory Date: Thursday, April 30th, 2026 Time: 10:00 AM ET Project Location:

426 Hudson Rd. Creekside PA. 15732

Bid Opening Date: Friday, May 15th, 2026 Time: 9:00 AM ET Location: Indiana County Conservation District Office

435 Hamill Road, Indiana, PA 15701

PROJECT DESCRIPTION

Project will include installation of animal trails with water bars and a stream crossing, grated drop boxes, underground outlets, watering system, concrete HUA protection pad, gutters on existing buildings, and streambank fencing.

INQUIRIES

All inquiries and correspondence concerning this solicitation should be submitted in writing to the District prior Friday, May 8th at 3 PM to allow adequate time for the issuance of Addenda and bid adjustments. Bidders are instructed specifically to contact only the District issuing the solicitation about any aspect of these instructions prior to the bid opening. Questions on the scope of work may be directed to Nathan Edwards, Indiana County Conservation District at n.edwards@iccdpa.org or 724-471-4751 x103.

BID PACKAGE CONTENTS

The following items are part of the solicitation for bids.

I. General Instruction for Bidders II. Prevailing Wage Determination

III. Materials Notes IV. Project Design

a. Design Information/Special Conditions

b. Construction Information

c. Drawings

V. Bid Submittal Packet

I. GENERAL INSTRUCTION FOR BIDDERS

A. BID SUBMITTAL GUIDELINES

B. GENERAL PROVISIONS

1. All work is to be bid as a NOT TO EXCEED for the entire project.

2. The Contractor shall provide all equipment, labor, and materials necessary to complete the work. All materials are at the cost of the Contractor.

3. Materials shall be approved by the District inspector prior to use. Stone used must be state-approved. All materials are to be in new condition unless otherwise specified.

4. According to the Regulations for Pennsylvania Prevailing Wage Act, Subchapter E

§9.101, contracts where the estimated cost of the total project is in excess of $25,000 shall be paid following prevailing wage standards as determined by the Secretary of Labor and Industry.

5. The Contractor submit a OR shall follow the included Erosion and Sediment Pollution Control Plan included within this Bid Package. If the Contractor plans any deviations from the approved plan, the Contractor shall submit a revised Erosion and Sediment Pollution Control Plan to meet PA Ch. 102 requirements for a Cold Water Fishery Stream to the Indiana County Conservation District (District) for approval prior to the start of construction. The Contractor shall be responsible for implementing the plan and maintaining the controls including any additional measures, which may be required to minimize sedimentation. The District will assist the Contractor to register for any necessary permits to complete work to meet PA Ch. 105 requirements.

6. The Contractor shall comply with all provisions of Pennsylvania Act 287, as amended by Act 121 of 2006 requiring a three (3) day notice to all utilities through the One-Call System. Contractor shall be responsible for locating and protecting all utilities and is required to register with Pennsylvania One-Call System (Dial 8-1-1 or 1-800-242-1776) prior to excavation.

The Contractor recognizes the problem in identifying exact locations of reputed underground utility pipe lines, structures, and/or appurtenances and in classifying, during the bidding period, the subsurface conditions which will be encountered during construction and, in submitting this bid, has included any and all costs in connection therewith and shall not seek extra compensation for performing work because of those actual prevailing conditions. Furthermore, the landowner(s)/District does not represent, warrant, or obligate itself that the location, number, size, character, or condition of any underground structures shown in this package are correct. Information shown on plans, as to such underground structures, is based on such information as has been reasonably obtained from records, surveys, and other sources to the maximum extent possible. The bidder shall make its own independent investigations of these conditions, and no claim for extra compensation will be considered by reason of any error in its information. Any damage to utilities as a result of the project will be the responsibility of the contractor to repair.

The Contractor shall be responsible to contact the District should an Alleged Violation Report (AVR) be filed for a mismarked/damaged utility no more than five (5) business days after the report is filed. The Contractor shall also be responsible to contact the District should a Facility Owner file an AVR on the Contractor for a utility strike on a project no more than two (2) business days after receipt.

7. The Contractor shall comply with the US Department of Labor Safety and Health Regulations for construction promulgated under the Occupational Safety and Health Act (OSHA) of 1970. The Contractor shall be solely and completely responsible for conditions for the job site, including safety of all persons and property directly or indirectly by its operations during the performance of the work. This requirement will apply continuously, for twenty-four hours per day, until acceptance of the work by the District and shall not be limited to normal working hours. Construction inspections by the District and its representatives is not intended to include adequacy of the Contractor on, or near the construction site.

8. The Contractor shall be responsible for obtaining road bonds with all local and state roads impacted by the project.

9. Projects including the placement of concrete of 3 yards or more in a single location shall require slump testing to be done by a third party at the expense of the Contractor and results submitted to the District.

10. All work at the site shall be performed during regular working hours, except in connection with safety or protection of persons or the work or property at the site. The contractor (and subcontractors) working hours are Monday through Friday between the hours of 7:00AM and 5:00PM, excluding federal holidays. Work outside this time frame must be approved by District.

11. Bidder is presumed to have investigated and examined the plans and all other contract understanding of the conditions of the work.

C. AWARD OF CONTRACT

1. The contract shall be awarded based on the Landowners/ lowest responsible bid. In the event no satisfactory bids are received, all bidders shall be notified within a 24-hour period.

2. The District/Landowner may accept or reject any or all bids or any part of any bid for just cause and waive informalities/minor irregularities/technical defects in bids received if, in its judgment, the best interest of the District/Landowner are thereby served.

3. Award of a contract shall be made at the earliest possible date from the bid opening date.

D. CONSTRUCTION INSPECTION

The District and cooperating agencies and/or partners will provide staff to inspect and adequately supervise all construction work in accordance with the approved plans and specifications. Final inspection will be conducted by the District and cooperating agencies including independent engineering firms. The Contractor covenants and warrants that all work and labor pursuant to this agreement shall be done and performed in the best and most workman like manner, that prompt payment shall be made in full for all labor and materials used in the work and that all materials and labor shall conform strictly and fully in every respect to the plans and specifications.

Contractors are required to have a pre-project/pre-construction meeting with the District, Landowner, and its cooperating agencies prior to the beginning of a project to review the scope of work, payment terms, and Contractor responsibilities. This meeting must include any subcontractors. Contractors are required to notify the District 24 hours prior to commencement or conclusion of construction. Contractors are also required to notify the District 24 hours prior to the construction or installation of key steps in project construction including, but not limited to: concrete placement, back fill of pipelines and culverts, spring developments, water reservoirs, pump and pressure systems, roofs and covers, in stream or streambank construction, stream pump around systems, and departure from the site. A representative from the district or engineering firm may be required to be onsite at the time of construction for key steps in the project construction.

E. INSURANCE AND CERTIFICATES

The Contractor to whom award is made shall provide the following information to the District within twenty (20) days (or prior to starting construction if sooner) after notice that a contract has been awarded and Contract documents are prepared for signature:

A. Standard Acord Certificate(s) of Insurance. (Contractual Liability Type) 1.

2. Public Liability and Property Damage Insurance

3. Automobile Bodily Injury and Property Damage Insurance

B. Bonds

1. Performance Bond: The awarded bidder will be required to furnish a performance bond of 100% of the contract amount conditioned upon a faithful performance of the contract in accordance with the specifications and conditions of the contract.

2. Payment Bond: The awarded bidder will be required to furnish a payment bond at 100% of the contract amount conditioned upon the prompt payment of all materials furnished or labor supplied or performed in the prosecution of the contract.

3. All bonds shall be executed by one or more surety companies legally authorized to do business in the Commonwealth of Pennsylvania. Such bonds shall be payable to District.

C. A W-9 taxpayer identification certification.

F. INDEMNIFICATION

The Contractor shall indemnify, save harmless and defend (if requested) the District and all of their officers, agents and employees, from all suits, actions, or claims of any character, name or description, brought for or on account of any injuries to or damages received or sustained by any person, or property, arising out of, resulting from or connected with the preliminary engineering, final design right-of-way acquisition, utility relocation, construction, operation or maintenance of the project, by the Contractor, its consultants or sub-Contractors, or their officers, agents and employees, whether the same be due to the use of defective materials, defective workmanship, neglect in safeguarding the work, or by or on account of any act, omission, neglect or misconduct of the Contractor, their consultants or sub-Contractors, and their officers, agents and employees, during the performance of the work or thereafter, or to any other cause whatsoever.

G. TERMINATION OF PROJECT

The Landowner/District reserves the right to postpone or terminate this agreement, upon written notice to the Contractor, for any reason. Upon termination of the project by the Landowner/District, prior to completion of the project, the Contractor shall not receive payment for any and all incomplete work.

H. COMPLETION OF WORK

The commencement date for the work to be performed under this agreement shall be on or after Monday June 1st 2026.The Contractor shall complete the work under this agreement and submit all bills no later than Friday, October 2nd, 2026 The actual performance dates will be entered on the contract at the time of award. Execution of the contract agreement serves as a notice to proceed with the project. The entire work must be completed, approved, and accepted by the District within sixty (60) calendar days of mobilization. In the event that Contracts 1 and 2 are awarded to separate Contractors, reasonable allowances will be made for delays caused by other Contractor. However, separate Contractors are required to coordinate and cooperate to the satisfaction of the District. The failure to commence or complete work by these given dates, without written amendments to project dates, would be sufficient justification for the District to terminate the agreement. The parties recognize that the Owner will incur damages if the project is not completed within the time period specified above, but also recognize that these damages would be difficult to ascertain or quantify. The parties agree that additional engineering fees and/or inspection costs caused by damages/delays shall be recoverable by the Landowner/District.

I. PAYMENTS

Contractor may invoice the Landowner/District no more frequently than on a 30 day basis. The Landowner/District shall withhold 30% of payment as specified in Final Inspection section.

Progress payments may be made on a per line item completion basis. Materials invoices and certified payroll (as applicable) must be submitted with request for payments. All invoices must be received from Contractor within 30 days of completion.

J. FINAL INSPECTION

Upon acceptance of the work at the final inspection, the Contractor shall submit an invoice for the entire amount due to the Landowner/District. The Landowner/District reserves the right to hold 30% of project total until a satisfactory final inspection is made and all materials receipts and certified payrolls are deemed satisfactory, upon which full payment will be made. Payment shall be made by the District no later than 60 days after receiving all invoices/receipts and after a satisfactory final inspection.

II. PREVAILING WAGE DETERMINATION

Attached is the prevailing wage determination Contractor will be required to submit a completed weekly payroll certification on PA

Department of Labor & Industry forms with notarization as applicable.

Project Name: Van Horn ACAP project

General Description: Project will include installation of access road with water bars, grated drop boxes, and underground outlet. Farmstead construction will include the improvement of two access roads; one will contain a stream crossing. The installation of gutters and underground outlet for existing barn. And the installation of a waterline from existing well to a watering facility with heavy use protection pad in the pasture.

Project Locality Washington

Awarding Agency: Indiana County Conservation District

Contract Award Date: 3/19/2024

Serial Number: 26-03712

Project Classification: Heavy/Highway

Determination Date: 4/16/2026

Assigned Field Office: Altoona

Field Office Phone Number: (814)940-6224

Toll Free Phone Number:

Project County: Indiana County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 4/16/2026 Page 1 of 5

Project: 26-03712 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 8/1/2025 $45.10 $30.31 $75.41

Boilermakers 6/1/2016 $40.90 $27.61 $68.51

Bricklayer 6/1/2025 $41.05 $25.86 $66.91

Bricklayer 12/1/2025 $41.55 $26.36 $67.91

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2025 $34.76 $20.91 $55.67

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $34.76 $23.41 $58.17

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $34.76 $25.66 $60.42

Cement Masons 7/1/2024 $34.57 $25.09 $59.66

Cement Masons 6/1/2025 $35.52 $25.64 $61.16

Drywall Finisher 1/1/2025 $34.01 $24.63 $58.64

Drywall Finisher 6/1/2025 $35.16 $25.98 $61.14

Electricians & Telecommunications Installation Technician

12/27/2024 $50.86 $32.69 $83.55

Electricians & Telecommunications Installation Technician

12/26/2025 $53.11 $33.72 $86.83

Elevator Constructor 1/1/2025 $61.07 $40.05 $101.12

Elevator Constructor 1/1/2026 $63.71 $40.89 $104.60

Glazier 9/1/2024 $26.00 $26.95 $52.95

Glazier 9/1/2025 $28.00 $27.67 $55.67

Iron Workers 6/1/2024 $39.89 $36.47 $76.36

Iron Workers 6/1/2025 $41.50 $37.36 $78.86

Laborers (Class 01 - See notes) 1/1/2024 $26.82 $19.46 $46.28

Laborers (Class 01 - See notes) 1/1/2025 $27.32 $19.96 $47.28

Laborers (Class 01 - See notes) 1/1/2026 $27.82 $20.46 $48.28

Laborers (Class 02 - See notes) 1/1/2024 $26.97 $19.46 $46.43

Laborers (Class 02 - See notes) 1/1/2025 $27.47 $19.96 $47.43

Laborers (Class 02 - See notes) 1/1/2026 $27.97 $20.46 $48.43

Laborers (Class 03 - See notes) 1/1/2024 $29.97 $19.46 $49.43

Laborers (Class 03 - See notes) 1/1/2025 $30.47 $19.96 $50.43

Laborers (Class 03 - See notes) 1/1/2026 $30.97 $20.46 $51.43

Laborers (Class 04 - See notes) 1/1/2021 $23.57 $19.32 $42.89

Landscape Laborer (Skilled) 1/1/2025 $25.79 $18.78 $44.57

Landscape Laborer (Skilled) 1/1/2026 $26.79 $19.03 $45.82

Landscape Laborer (Tractor Operator) 1/1/2025 $26.09 $18.78 $44.87

Landscape Laborer (Tractor Operator) 1/1/2026 $27.09 $19.03 $46.12

Landscape Laborer 1/1/2025 $25.37 $18.78 $44.15

Landscape Laborer 1/1/2026 $26.37 $19.03 $45.40

Millwright 6/1/2020 $41.68 $20.32 $62.00

Operators (Class 01 - see notes) 6/1/2024 $41.69 $24.39 $66.08

Operators (Class 01 - see notes) 6/1/2025 $42.72 $24.79 $67.51

Operators (Class 01 - see notes) 6/1/2026 $43.74 $25.29 $69.03

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/16/2026 Page 2 of 5

Project: 26-03712 - Building Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Class 02 -see notes) 6/1/2024 $35.62 $24.39 $60.01

Operators (Class 02 -see notes) 6/1/2025 $36.67 $24.79 $61.46

Operators (Class 02 -see notes) 6/1/2026 $37.67 $25.29 $62.96

Operators (Class 03 - See notes) 6/1/2024 $32.83 $24.39 $57.22

Operators (Class 03 - See notes) 6/1/2025 $33.88 $24.79 $58.67

Operators (Class 03 - See notes) 6/1/2026 $34.88 $25.29 $60.17

Painters Class 6 (see notes) 6/1/2024 $32.14 $24.93 $57.07

Painters Class 6 (see notes) 6/1/2025 $34.16 $25.81 $59.97

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 6/1/2024 $33.14 $21.04 $54.18

Plumbers and Steamfitters 6/1/2025 $41.47 $27.71 $69.18

Plumbers and Steamfitters 6/1/2026 $42.92 $28.45 $71.37

Pointers, Caulkers, Cleaners 6/1/2025 $40.66 $21.99 $62.65

Pointers, Caulkers, Cleaners 12/1/2025 $41.50 $22.50 $64.00

Roofers 6/1/2025 $39.91 $20.76 $60.67

Roofers 12/1/2025 $41.21 $21.46 $62.67

Sheet Metal Workers 7/1/2024 $43.00 $33.96 $76.96

Sheet Metal Workers 7/1/2025 $45.00 $35.16 $80.16

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Stone Masons 12/1/2022 $38.56 $23.61 $62.17

Terrazzo Finisher 6/1/2025 $41.73 $19.03 $60.76

Terrazzo Finisher 12/1/2025 $42.75 $19.51 $62.26

Terrazzo Mechanics 6/1/2025 $41.13 $21.28 $62.41

Terrazzo Mechanics 12/1/2025 $42.15 $21.76 $63.91

Tile Finisher 6/1/2025 $33.24 $18.36 $51.60

Tile Finisher 12/1/2025 $33.99 $18.71 $52.70

Tile Setter 6/1/2025 $40.15 $22.80 $62.95

Tile Setter 12/1/2025 $40.80 $23.25 $64.05

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

Window Film / Tint Installer 10/1/2019 $25.00 $2.63 $27.63

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/16/2026 Page 3 of 5

Project: 26-03712 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 1/1/2025 $41.10 $22.09 $63.19

Carpenter 1/1/2026 $42.35 $22.84 $65.19

Carpenter Welder 1/1/2025 $42.60 $22.09 $64.69

Carpenter Welder 1/1/2026 $43.85 $22.84 $66.69

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Cement Finishers 1/1/2025 $35.94 $27.50 $63.44

Cement Masons 1/1/2020 $32.84 $21.10 $53.94

Electric Lineman 6/3/2024 $53.97 $31.05 $85.02

Electric Lineman 6/2/2025 $57.10 $31.63 $88.73

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2024 $39.89 $36.47 $76.36

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

6/1/2025 $41.50 $37.36 $78.86

Laborers (Class 01 - See notes) 1/1/2024 $32.20 $25.50 $57.70

Laborers (Class 01 - See notes) 1/1/2025 $33.70 $26.00 $59.70

Laborers (Class 01 - See notes) 1/1/2026 $34.70 $27.00 $61.70

Laborers (Class 02 - See notes) 1/1/2024 $32.36 $25.50 $57.86

Laborers (Class 02 - See notes) 1/1/2025 $33.86 $26.00 $59.86

Laborers (Class 02 - See notes) 1/1/2026 $34.86 $27.00 $61.86

Laborers (Class 03 - See notes) 1/1/2024 $32.75 $25.50 $58.25

Laborers (Class 03 - See notes) 1/1/2025 $34.25 $26.00 $60.25

Laborers (Class 03 - See notes) 1/1/2026 $35.25 $27.00 $62.25

Laborers (Class 04 - See notes) 1/1/2024 $33.20 $25.50 $58.70

Laborers (Class 04 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 04 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 05 - See notes) 1/1/2024 $33.61 $25.50 $59.11

Laborers (Class 05 - See notes) 1/1/2025 $35.11 $26.00 $61.11

Laborers (Class 05 - See notes) 1/1/2026 $36.11 $27.00 $63.11

Laborers (Class 06 - See notes) 1/1/2024 $30.45 $25.50 $55.95

Laborers (Class 06 - See notes) 1/1/2025 $31.95 $26.00 $57.95

Laborers (Class 06 - See notes) 1/1/2026 $32.95 $27.00 $59.95

Laborers (Class 07 - See notes) 1/1/2024 $33.20 $25.50 $58.70

Laborers (Class 07 - See notes) 1/1/2025 $34.70 $26.00 $60.70

Laborers (Class 07 - See notes) 1/1/2026 $35.70 $27.00 $62.70

Laborers (Class 08 - See notes) 1/1/2024 $34.70 $25.50 $60.20

Laborers (Class 08 - See notes) 1/1/2025 $36.20 $26.00 $62.20

Laborers (Class 08 - See notes) 1/1/2026 $37.20 $27.00 $64.20

Millwright 6/1/2024 $47.59 $23.72 $71.31

Millwright 6/1/2025 $49.72 $23.72 $73.44

Operators (Class 01 - see notes) 1/1/2024 $38.59 $24.03 $62.62

Operators (Class 01 - see notes) 1/1/2025 $40.39 $24.23 $64.62

Operators (Class 01 - see notes) 1/1/2026 $41.96 $24.66 $66.62

Operators (Class 02 -see notes) 1/1/2024 $38.33 $24.03 $62.36

Operators (Class 02 -see notes) 1/1/2025 $40.13 $24.23 $64.36

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/16/2026 Page 4 of 5

Project: 26-03712 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Class 02 -see notes) 1/1/2026 $41.70 $24.66 $66.36

Operators (Class 03 - See notes) 1/1/2024 $34.68 $24.03 $58.71

Operators (Class 03 - See notes) 1/1/2025 $36.48 $24.23 $60.71

Operators (Class 03 - See notes) 1/1/2026 $38.05 $24.66 $62.71

Operators (Class 04 - See notes) 1/1/2024 $34.22 $24.03 $58.25

Operators (Class 04 - See notes) 1/1/2025 $36.02 $24.23 $60.25

Operators (Class 04 - See notes) 1/1/2026 $37.59 $24.66 $62.25

Operators (Class 05 - See notes) 1/1/2024 $33.97 $24.03 $58.00

Operators (Class 05 - See notes) 1/1/2025 $35.77 $24.23 $60.00

Operators (Class 05 - See notes) 1/1/2026 $37.34 $24.66 $62.00

Operators Class 1-A 1/1/2024 $41.59 $24.03 $65.62

Operators Class 1-A 1/1/2025 $43.39 $24.23 $67.62

Operators Class 1-A 1/1/2026 $44.96 $24.66 $69.62

Operators Class 1-B 1/1/2024 $40.59 $24.03 $64.62

Operators Class 1-B 1/1/2025 $42.39 $24.23 $66.62

Operators Class 1-B 1/1/2026 $43.96 $24.66 $68.62

Painters Class 1 (see notes) 6/1/2022 $34.45 $22.82 $57.27

Painters Class 2 (see notes) 6/1/2024 $38.09 $24.93 $63.02

Painters Class 2 (see notes) 6/1/2025 $40.36 $25.81 $66.17

Painters Class 3 (see notes) 6/1/2024 $40.66 $24.93 $65.59

Painters Class 3 (see notes) 6/1/2025 $43.68 $25.81 $69.49

Painters Class 4 (see notes) 6/1/2019 $28.20 $20.06 $48.26

Painters Class 5 (see notes) 6/1/2019 $22.91 $20.06 $42.97

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 1/1/2025 $36.43 $23.21 $59.64

Truckdriver class 1(see notes) 1/1/2026 $37.93 $23.71 $61.64

Truckdriver class 2 (see notes) 1/1/2025 $36.89 $23.52 $60.41

Truckdriver class 2 (see notes) 1/1/2026 $38.39 $24.02 $62.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 4/16/2026 Page 5 of 5

III. MATERIALS NOTES

Materials to be supplied by the Contractor:

Please see attached design package and equipment and materials list for materials to be supplied and estimated quantities.

Quantity estimates listed are the maximum to be installed. The Contractor is expected to take field measurements to verify quantity estimates when preparing their bid.

If quantities needed are less than estimated, Contractor to be paid based on actual quantity installed. Savings resulting from cost underruns are returned to the District.

Contractor is responsible for cost-overruns, unless the Contractor has been provided with a written contract amendment for additional costs covering materials/equipment/labor (only as a result of additional scope from ICCD, not price overruns, errors, or omissions) PRIOR to installation of project component.

All materials invoices are required to be submitted with requests for payment.

Specified Brands of Materials

All Materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufactures, fabricator or processors, except as otherwise provided in the Contract Documents. Whenever a material, article or piece of equipment is identified on the Plans or in the Specifications by reference to manufacturers' or vendors' names, trade names, catalogue numbers and such other, it is intended to establish a standard for bidding; and, any material, article or equipment of other manufacturers and vendors which will perform adequately the duties imposed by the general design will be considered equally acceptable provided the material, article or equipment so proposed is, in the opinion of the Engineer, of equal substance and function, and is submitted for approval in accordance with the Instruction to Bidders at least ten days before the Bid Opening. It shall not be purchased or installed by the Contractor without the Engineer's written approval.

If it is indicated in the Specifications that the Contractor may furnish or use a substitute that is equal to any material or equipment specified, and if the Contractor wishes to furnish or use a proposed substitute, it will, promptly submit the item at least ten (10) days before the bid opening by written application to the Engineer for approval of such a substitute certifying in writing that the proposed substitute will perform adequately the duties imposed by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified.

No substitute shall be ordered or installed without the written approval of the Engineer who shall be the judge of equality, in its sole and absolute discretion.

The cost of all tests and the expense of the Engineer in witnessing tests and modifying Plans to suit approved substitute equipment shall be borne by the Contractor.

Should it be necessary to modify the Work under this Contract or any other Contract to house or install the substitute equipment, it shall be the Contractor's responsibility to complete all arrangements, including payment therefore, in order that the substitute equipment may be properly incorporated into the overall Contract Work.

No claim for additional compensation shall be made against the Owner for any damages incurred while such tests are conducted, or the substitute equipment furnished to the Project.

IV. PROJECT DESIGN & SPECIFICATIONS

S ou th th S tr ee t In di an a, P

A

1-

Ph on e:

4)

-7

Fa cs im ile

(7

) 4

-7 w w w

.w jy ae ng in ee rs .c om

VAN HORN FARM ACAP PROJECT

PERMITTING & CONSTRUCTION PLANS

GREGG VAN HORN

GREGG VAN HORN

AutoCAD SHX Text GENERAL NOTES: 1. TRAFFIC SHALL BE MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT TRAFFIC SHALL BE MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT SHALL BE MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT SHALL BE MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT BE MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT BE MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT MAINTAINED ON ALL ADJOINING STREETS AND DRIVES AT ON ALL ADJOINING STREETS AND DRIVES AT ON ALL ADJOINING STREETS AND DRIVES AT ALL ADJOINING STREETS AND DRIVES AT ALL ADJOINING STREETS AND DRIVES AT ADJOINING STREETS AND DRIVES AT ADJOINING STREETS AND DRIVES AT STREETS AND DRIVES AT STREETS AND DRIVES AT AND DRIVES AT AND DRIVES AT DRIVES AT DRIVES AT AT AT ALL TIMES. TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH TIMES. TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH TIMES. TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH SHALL BE MAINTAINED IN ACCORDANCE WITH SHALL BE MAINTAINED IN ACCORDANCE WITH BE MAINTAINED IN ACCORDANCE WITH BE MAINTAINED IN ACCORDANCE WITH MAINTAINED IN ACCORDANCE WITH MAINTAINED IN ACCORDANCE WITH IN ACCORDANCE WITH IN ACCORDANCE WITH ACCORDANCE WITH ACCORDANCE WITH WITH WITH PENNDOT'S REQUIREMENTS. 2. CONTRACTOR SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL CONTRACTOR SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL THE LOCATION AND INVERT ELEVATION OF ALL THE LOCATION AND INVERT ELEVATION OF ALL LOCATION AND INVERT ELEVATION OF ALL LOCATION AND INVERT ELEVATION OF ALL AND INVERT ELEVATION OF ALL AND INVERT ELEVATION OF ALL INVERT ELEVATION OF ALL INVERT ELEVATION OF ALL ELEVATION OF ALL ELEVATION OF ALL OF ALL OF ALL ALL ALL EXISTING UTILITIES WITH PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION UTILITIES WITH PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION UTILITIES WITH PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION WITH PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION WITH PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION PROPOSED CONNECTIONS PRIOR TO CONSTRUCTION CONNECTIONS PRIOR TO CONSTRUCTION CONNECTIONS PRIOR TO CONSTRUCTION PRIOR TO CONSTRUCTION PRIOR TO CONSTRUCTION TO CONSTRUCTION TO CONSTRUCTION CONSTRUCTION CONSTRUCTION AND GRADING OF THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED GRADING OF THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED GRADING OF THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED OF THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED OF THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED THE SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED SITE. THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED THE ENGINEER SHALL BE IMMEDIATELY NOTIFIED ENGINEER SHALL BE IMMEDIATELY NOTIFIED ENGINEER SHALL BE IMMEDIATELY NOTIFIED SHALL BE IMMEDIATELY NOTIFIED SHALL BE IMMEDIATELY NOTIFIED BE IMMEDIATELY NOTIFIED BE IMMEDIATELY NOTIFIED IMMEDIATELY NOTIFIED IMMEDIATELY NOTIFIED NOTIFIED NOTIFIED OF ANY DESIGN CONFLICTS. 3. ALL MATERIALS AND WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE ALL MATERIALS AND WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE MATERIALS AND WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE MATERIALS AND WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE AND WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE AND WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE WORKMANSHIP INVOLVED IN THIS SITE WORK SHALL BE INVOLVED IN THIS SITE WORK SHALL BE INVOLVED IN THIS SITE WORK SHALL BE IN THIS SITE WORK SHALL BE IN THIS SITE WORK SHALL BE THIS SITE WORK SHALL BE THIS SITE WORK SHALL BE SITE WORK SHALL BE SITE WORK SHALL BE WORK SHALL BE WORK SHALL BE SHALL BE SHALL BE BE BE IN ACCORDANCE WITH THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF ACCORDANCE WITH THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF ACCORDANCE WITH THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF WITH THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF WITH THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF THE LATEST EDITION, INCLUDING SUPPLEMENTS, OF LATEST EDITION, INCLUDING SUPPLEMENTS, OF LATEST EDITION, INCLUDING SUPPLEMENTS, OF EDITION, INCLUDING SUPPLEMENTS, OF EDITION, INCLUDING SUPPLEMENTS, OF INCLUDING SUPPLEMENTS, OF INCLUDING SUPPLEMENTS, OF SUPPLEMENTS, OF SUPPLEMENTS, OF OF OF THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS PUB. PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS PUB. PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS PUB. DEPARTMENT OF TRANSPORTATION SPECIFICATIONS PUB. DEPARTMENT OF TRANSPORTATION SPECIFICATIONS PUB. OF TRANSPORTATION SPECIFICATIONS PUB. OF TRANSPORTATION SPECIFICATIONS PUB. TRANSPORTATION SPECIFICATIONS PUB. TRANSPORTATION SPECIFICATIONS PUB. SPECIFICATIONS PUB. SPECIFICATIONS PUB. PUB. PUB. FORM 408, UNLESS OTHERWISE NOTED. 4. A PENNDOT HIGHWAY OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF A PENNDOT HIGHWAY OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF PENNDOT HIGHWAY OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF PENNDOT HIGHWAY OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF HIGHWAY OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF HIGHWAY OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF OCCUPANCY PERMIT, PURSUANT TO SECTION 420 OF PERMIT, PURSUANT TO SECTION 420 OF PERMIT, PURSUANT TO SECTION 420 OF PURSUANT TO SECTION 420 OF PURSUANT TO SECTION 420 OF TO SECTION 420 OF TO SECTION 420 OF SECTION 420 OF SECTION 420 OF 420 OF 420 OF OF OF THE ACT OF JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE ACT OF JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE ACT OF JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE OF JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE OF JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE JUNE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE 1, 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE 1945 (P.L. 1242 NO. 428), KNOWN AS THE "STATE (P.L. 1242 NO. 428), KNOWN AS THE "STATE (P.L. 1242 NO. 428), KNOWN AS THE "STATE 1242 NO. 428), KNOWN AS THE "STATE 1242 NO. 428), KNOWN AS THE "STATE NO. 428), KNOWN AS THE "STATE NO. 428), KNOWN AS THE "STATE 428), KNOWN AS THE "STATE 428), KNOWN AS THE "STATE KNOWN AS THE "STATE KNOWN AS THE "STATE AS THE "STATE AS THE "STATE THE "STATE THE "STATE "STATE "STATE HIGHWAY LAW" IS REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE LAW" IS REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE LAW" IS REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE IS REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE IS REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE REQUIRED FOR DRIVEWAY ACCESS TO ANY STATE FOR DRIVEWAY ACCESS TO ANY STATE FOR DRIVEWAY ACCESS TO ANY STATE DRIVEWAY ACCESS TO ANY STATE DRIVEWAY ACCESS TO ANY STATE ACCESS TO ANY STATE ACCESS TO ANY STATE TO ANY STATE TO ANY STATE ANY STATE ANY STATE STATE STATE ROADWAY. 5. A FINAL EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT A FINAL EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT FINAL EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT FINAL EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT EROSION AND SEDIMENTATION CONTROL PLAN AND PERMIT AND SEDIMENTATION CONTROL PLAN AND PERMIT AND SEDIMENTATION CONTROL PLAN AND PERMIT SEDIMENTATION CONTROL PLAN AND PERMIT SEDIMENTATION CONTROL PLAN AND PERMIT CONTROL PLAN AND PERMIT CONTROL PLAN AND PERMIT PLAN AND PERMIT PLAN AND PERMIT AND PERMIT AND PERMIT PERMIT PERMIT PURSUANT TO THE RULES AND REGULATIONS OF THE PENNSYLVANIA TO THE RULES AND REGULATIONS OF THE PENNSYLVANIA TO THE RULES AND REGULATIONS OF THE PENNSYLVANIA THE RULES AND REGULATIONS OF THE PENNSYLVANIA THE RULES AND REGULATIONS OF THE PENNSYLVANIA RULES AND REGULATIONS OF THE PENNSYLVANIA RULES AND REGULATIONS OF THE PENNSYLVANIA AND REGULATIONS OF THE PENNSYLVANIA AND REGULATIONS OF THE PENNSYLVANIA REGULATIONS OF THE PENNSYLVANIA REGULATIONS OF THE PENNSYLVANIA OF THE PENNSYLVANIA OF THE PENNSYLVANIA THE PENNSYLVANIA THE PENNSYLVANIA PENNSYLVANIA PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (TITLE 25, PART 1, SUBPART OF ENVIRONMENTAL PROTECTION (TITLE 25, PART 1, SUBPART OF ENVIRONMENTAL PROTECTION (TITLE 25, PART 1, SUBPART ENVIRONMENTAL PROTECTION (TITLE 25, PART 1, SUBPART ENVIRONMENTAL PROTECTION (TITLE 25, PART 1, SUBPART PROTECTION (TITLE 25, PART 1, SUBPART PROTECTION (TITLE 25, PART 1, SUBPART (TITLE 25, PART 1, SUBPART (TITLE 25, PART 1, SUBPART 25, PART 1, SUBPART 25, PART 1, SUBPART PART 1, SUBPART PART 1, SUBPART 1, SUBPART 1, SUBPART SUBPART SUBPART C, ARTICLE II, CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO ARTICLE II, CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO ARTICLE II, CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO II, CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO II, CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO CHAPTER 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO 102 OF THE PENNSYLVANIA CODE) IS REQUIRED TO OF THE PENNSYLVANIA CODE) IS REQUIRED TO OF THE PENNSYLVANIA CODE) IS REQUIRED TO THE PENNSYLVANIA CODE) IS REQUIRED TO THE PENNSYLVANIA CODE) IS REQUIRED TO PENNSYLVANIA CODE) IS REQUIRED TO PENNSYLVANIA CODE) IS REQUIRED TO CODE) IS REQUIRED TO CODE) IS REQUIRED TO IS REQUIRED TO IS REQUIRED TO REQUIRED TO REQUIRED TO TO TO BE ON SITE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE ON SITE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE ON SITE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE SITE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE SITE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE BEFORE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE ANY EARTH MOVING ACTIVITIES ON THE SITE ARE EARTH MOVING ACTIVITIES ON THE SITE ARE EARTH MOVING ACTIVITIES ON THE SITE ARE MOVING ACTIVITIES ON THE SITE ARE MOVING ACTIVITIES ON THE SITE ARE ACTIVITIES ON THE SITE ARE ACTIVITIES ON THE SITE ARE ON THE SITE ARE ON THE SITE ARE THE SITE ARE THE SITE ARE SITE ARE SITE ARE ARE ARE ALLOWED. 6. CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES, INCLUDING CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES, INCLUDING IS RESPONSIBLE FOR VERIFYING QUANTITIES, INCLUDING IS RESPONSIBLE FOR VERIFYING QUANTITIES, INCLUDING RESPONSIBLE FOR VERIFYING QUANTITIES, INCLUDING RESPONSIBLE FOR VERIFYING QUANTITIES, INCLUDING FOR VERIFYING QUANTITIES, INCLUDING FOR VERIFYING QUANTITIES, INCLUDING VERIFYING QUANTITIES, INCLUDING VERIFYING QUANTITIES, INCLUDING QUANTITIES, INCLUDING QUANTITIES, INCLUDING INCLUDING INCLUDING EARTHWORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE OF THE CONTRACTOR TO NOTIFY THE OF THE CONTRACTOR TO NOTIFY THE THE CONTRACTOR TO NOTIFY THE THE CONTRACTOR TO NOTIFY THE CONTRACTOR TO NOTIFY THE CONTRACTOR TO NOTIFY THE TO NOTIFY THE TO NOTIFY THE NOTIFY THE NOTIFY THE THE THE OWNER AND ENGINEER DURING THE BIDDING PROCESS OF ANY QUANTITY AND ENGINEER DURING THE BIDDING PROCESS OF ANY QUANTITY AND ENGINEER DURING THE BIDDING PROCESS OF ANY QUANTITY ENGINEER DURING THE BIDDING PROCESS OF ANY QUANTITY ENGINEER DURING THE BIDDING PROCESS OF ANY QUANTITY DURING THE BIDDING PROCESS OF ANY QUANTITY DURING THE BIDDING PROCESS OF ANY QUANTITY THE BIDDING PROCESS OF ANY QUANTITY THE BIDDING PROCESS OF ANY QUANTITY BIDDING PROCESS OF ANY QUANTITY BIDDING PROCESS OF ANY QUANTITY PROCESS OF ANY QUANTITY PROCESS OF ANY QUANTITY OF ANY QUANTITY OF ANY QUANTITY ANY QUANTITY ANY QUANTITY QUANTITY QUANTITY DISCREPANCIES IN THE BID DOCUMENTS. ONCE THE CONSTRUCTION IN THE BID DOCUMENTS. ONCE THE CONSTRUCTION IN THE BID DOCUMENTS. ONCE THE CONSTRUCTION THE BID DOCUMENTS. ONCE THE CONSTRUCTION THE BID DOCUMENTS. ONCE THE CONSTRUCTION BID DOCUMENTS. ONCE THE CONSTRUCTION BID DOCUMENTS. ONCE THE CONSTRUCTION DOCUMENTS. ONCE THE CONSTRUCTION DOCUMENTS. ONCE THE CONSTRUCTION ONCE THE CONSTRUCTION ONCE THE CONSTRUCTION THE CONSTRUCTION THE CONSTRUCTION CONSTRUCTION CONSTRUCTION CONTRACT IS ISSUED, THE CONTRACTOR ACKNOWLEDGES THE CONTRACT IS ISSUED, THE CONTRACTOR ACKNOWLEDGES THE CONTRACT IS ISSUED, THE CONTRACTOR ACKNOWLEDGES THE CONTRACT ISSUED, THE CONTRACTOR ACKNOWLEDGES THE CONTRACT ISSUED, THE CONTRACTOR ACKNOWLEDGES THE CONTRACT THE CONTRACTOR ACKNOWLEDGES THE CONTRACT THE CONTRACTOR ACKNOWLEDGES THE CONTRACT CONTRACTOR ACKNOWLEDGES THE CONTRACT CONTRACTOR ACKNOWLEDGES THE CONTRACT ACKNOWLEDGES THE CONTRACT ACKNOWLEDGES THE CONTRACT THE CONTRACT THE CONTRACT CONTRACT CONTRACT PRICE COVERS ALL LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE COVERS ALL LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE COVERS ALL LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE ALL LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE ALL LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE LABOR AND MATERIALS TO SUBSTANTIALLY COMPLETE AND MATERIALS TO SUBSTANTIALLY COMPLETE AND MATERIALS TO SUBSTANTIALLY COMPLETE MATERIALS TO SUBSTANTIALLY COMPLETE MATERIALS TO SUBSTANTIALLY COMPLETE TO SUBSTANTIALLY COMPLETE TO SUBSTANTIALLY COMPLETE SUBSTANTIALLY COMPLETE SUBSTANTIALLY COMPLETE COMPLETE COMPLETE THE PROJECT ACCORDING TO THE CONSTRUCTION PLANS.

AutoCAD SHX Text

WASHINGTON TOWNSHIP, INDIANA COUNTY, PA

AutoCAD SHX Text

426 HUDSON ROAD CREEKSIDE, PA

AutoCAD SHX Text

SHEET NO.:

AutoCAD SHX Text

VAN HORN FARM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DATE

AutoCAD SHX Text

NO.

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text 25360

AutoCAD SHX Text COPYRIGHT STATEMENT: This document is the intellectual and creative property of W.J.Young & Associates, Inc. STATEMENT: This document is the intellectual and creative property of W.J.Young & Associates, Inc. STATEMENT: This document is the intellectual and creative property of W.J.Young & Associates, Inc. This document is the intellectual and creative property of W.J.Young & Associates, Inc. This document is the intellectual and creative property of W.J.Young & Associates, Inc. document is the intellectual and creative property of W.J.Young & Associates, Inc. document is the intellectual and creative property of W.J.Young & Associates, Inc. is the intellectual and creative property of W.J.Young & Associates, Inc. is the intellectual and creative property of W.J.Young & Associates, Inc. the intellectual and creative property of W.J.Young & Associates, Inc. the intellectual and creative property of W.J.Young & Associates, Inc. intellectual and creative property of W.J.Young & Associates, Inc. intellectual and creative property of W.J.Young & Associates, Inc. and creative property of W.J.Young & Associates, Inc. and creative property of W.J.Young & Associates, Inc. creative property of W.J.Young & Associates, Inc. creative property of W.J.Young & Associates, Inc. property of W.J.Young & Associates, Inc. property of W.J.Young & Associates, Inc. of W.J.Young & Associates, Inc. of W.J.Young & Associates, Inc. W.J.Young & Associates, Inc. W.J.Young & Associates, Inc. & Associates, Inc. & Associates, Inc. Associates, Inc. Associates, Inc. Inc. Inc. (WJYA). The recipient agrees to protect the contents from distribution and dissemination except as required for this The recipient agrees to protect the contents from distribution and dissemination except as required for this The recipient agrees to protect the contents from distribution and dissemination except as required for this recipient agrees to protect the contents from distribution and dissemination except as required for this recipient agrees to protect the contents from distribution and dissemination except as required for this agrees to protect the contents from distribution and dissemination except as required for this agrees to protect the contents from distribution and dissemination except as required for this to protect the contents from distribution and dissemination except as required for this to protect the contents from distribution and dissemination except as required for this protect the contents from distribution and dissemination except as required for this protect the contents from distribution and dissemination except as required for this the contents from distribution and dissemination except as required for this the contents from distribution and dissemination except as required for this contents from distribution and dissemination except as required for this contents from distribution and dissemination except as required for this from distribution and dissemination except as required for this from distribution and dissemination except as required for this distribution and dissemination except as required for this distribution and dissemination except as required for this and dissemination except as required for this and dissemination except as required for this dissemination except as required for this dissemination except as required for this except as required for this except as required for this as required for this as required for this required for this required for this for this for this this this specified project. The contents of this document shall not be altered, reproduced, or copied in whole or in part project. The contents of this document shall not be altered, reproduced, or copied in whole or in part project. The contents of this document shall not be altered, reproduced, or copied in whole or in part The contents of this document shall not be altered, reproduced, or copied in whole or in part The contents of this document shall not be altered, reproduced, or copied in whole or in part contents of this document shall not be altered, reproduced, or copied in whole or in part contents of this document shall not be altered, reproduced, or copied in whole or in part of this document shall not be altered, reproduced, or copied in whole or in part of this document shall not be altered, reproduced, or copied in whole or in part this document shall not be altered, reproduced, or copied in whole or in part this document shall not be altered, reproduced, or copied in whole or in part document shall not be altered, reproduced, or copied in whole or in part document shall not be altered, reproduced, or copied in whole or in part shall not be altered, reproduced, or copied in whole or in part shall not be altered, reproduced, or copied in whole or in part not be altered, reproduced, or copied in whole or in part not be altered, reproduced, or copied in whole or in part be altered, reproduced, or copied in whole or in part be altered, reproduced, or copied in whole or in part altered, reproduced, or copied in whole or in part altered, reproduced, or copied in whole or in part reproduced, or copied in whole or in part reproduced, or copied in whole or in part or copied in whole or in part or copied in whole or in part copied in whole or in part copied in whole or in part in whole or in part in whole or in part whole or in part whole or in part or in part or in part in part in part part part without the express, written consent of WJYA.

AutoCAD SHX Text

DYLAN ROBERT DIIULIO

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

PE094126

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text

AutoCAD SHX Text 4/20/2026

AutoCAD SHX Text

ISSUED FOR BID

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text C.00.1

AutoCAD SHX Text

DRD

AutoCAD SHX Text

JTJ

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text 12/09/2024

AutoCAD SHX Text 04/20/2026

AutoCAD SHX Text

CALL BEFORE YOU DIG IN PENNSYLVANIA 1-800-242-1776

AutoCAD SHX Text THE GENERAL CONTRACTOR SHALL NOTIFY ALL GENERAL CONTRACTOR SHALL NOTIFY ALL GENERAL CONTRACTOR SHALL NOTIFY ALL CONTRACTOR SHALL NOTIFY ALL CONTRACTOR SHALL NOTIFY ALL SHALL NOTIFY ALL SHALL NOTIFY ALL NOTIFY ALL NOTIFY ALL ALL ALL UTILITY COMPANIES INVOLVED IN THE SITE NO COMPANIES INVOLVED IN THE SITE NO COMPANIES INVOLVED IN THE SITE NO INVOLVED IN THE SITE NO INVOLVED IN THE SITE NO IN THE SITE NO IN THE SITE NO THE SITE NO THE SITE NO SITE NO SITE NO NO NO MORE TEN DAYS AND NO LESS THAN THREE DAYS TEN DAYS AND NO LESS THAN THREE DAYS TEN DAYS AND NO LESS THAN THREE DAYS DAYS AND NO LESS THAN THREE DAYS DAYS AND NO LESS THAN THREE DAYS AND NO LESS THAN THREE DAYS AND NO LESS THAN THREE DAYS NO LESS THAN THREE DAYS NO LESS THAN THREE DAYS LESS THAN THREE DAYS LESS THAN THREE DAYS THAN THREE DAYS THAN THREE DAYS THREE DAYS THREE DAYS DAYS DAYS IN ADVANCE OF EXCAVATION (PA ACT 287 0F ADVANCE OF EXCAVATION (PA ACT 287 0F ADVANCE OF EXCAVATION (PA ACT 287 0F OF EXCAVATION (PA ACT 287 0F OF EXCAVATION (PA ACT 287 0F EXCAVATION (PA ACT 287 0F EXCAVATION (PA ACT 287 0F (PA ACT 287 0F (PA ACT 287 0F ACT 287 0F ACT 287 0F 287 0F 287 0F 0F 0F 1974 AS AMENDED).