3-SW-C1831 Anderson Lake New Day Use Trail Dev-Drwgs.pdf

PDF 19 MB Posted

Attached to
State Parks Project – New Day Use Facilities and Trail Development at Anderson Lake State Park
Solicitation number
SW-C1831
Issued by
Washington

About this file

This is a construction design document prepared by the Washington State Parks and Recreation Commission for the Anderson Lake State Park New Day Use Facilities and Trail Development project located at 1061 Anderson Lake Road, Chimacum, Washington 98325, in Jefferson County. The project encompasses comprehensive site improvements including paving the park's main entrance road with hot mixed asphalt (HMA), developing multi-use trails with both pedestrian and equestrian components, constructing approximately 380 linear feet of elevated boardwalk with concrete plank decking and steel beam support systems, establishing new day-use parking facilities with ADA-accessible spaces, installing signage and striping, removal of two existing vault restrooms, and construction of two new CXT modular restroom buildings. The design incorporates three distinct trail types: separated equestrian trails, separated pedestrian trails, and multi-use trails, with detailed specifications for trail widths ranging from 8 to 10 feet. The boardwalk section (stations 14+59 to 18+42) features W8X18 and W8X31 steel beams supported by 3.5-inch diameter galvanized steel pipe piles with concrete abutments and neoprene bearings, accommodating slopes up to 6.5 percent with 8-foot spacing between support lines. Site work includes stormwater management with silt fencing and vegetation buffers, tree removal and protection measures, and equipment access staging areas.

The design documents establish detailed specifications for materials and construction standards conforming to AASHTO guidelines, AISC structural steel standards, and WSDOT 2023 Standard Specifications. All structural steel components are hot-dipped galvanized per ASTM A-123 standards, concrete is specified at 6000 PSI minimum compressive strength at 28 days with prestressed deck panels utilizing ASTM A416 Grade 270 strands, and lumber components are pressure-treated Douglas fir or cedar. The project incorporates comprehensive details for concrete plank layouts with 47 special concrete panel configurations, railing systems using cedar hand rails and galvanized hog wire panels, and temporary construction specifications including equipment access mats and turnaround areas. Special inspection requirements are mandated for all concrete work, field welding, and high-strength bolting. Construction cost details and funding sources are not specified in the design documents, though the project is managed by the Washington State Parks and Recreation Commission with regional oversight from the Port Angeles area office, with design completion dated March 17, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRU 42

SPRU 44

CD

ALD

ALD

ALD

ALD

ALD

ALD ALD

ALD

ALD

ALD

254254 254254

255255255

256256

258 25

3.

5253.5

.5253.5253.5254.5

254.5 255.5

255.5 256.5

6.5 25

7.

5258.5

NORTH

PROJECT LOCATION

NORTH

VICINITY MAP

APPROVED FOR CONSTRUCTION

date date

CA

D#

: A

0-

-S

W 1_

PR

OJ

EC

T

TI

TL

E

N

EW

D

AY

U

SE

F

AC

IL

IT

IE

S

AN

D

TR

AI

L

DE

VE

LO

PM

EN

T

INDEX

DESCRIPTIONSHEET

1061 ANDERSON LAKE RD. CHIMACUM, WA 98325

SEC-09 T-29-N R-1-W

JEFFERSON COUNTY TAX PARCEL NO. 901094001

48° 01' 4.4" N & 122° 48' 14.0" W

ANDERSON LAKE STATE PARK

NEW DAY USE FACILITIES AND TRAIL DEVELOPMENT

REGION MANAGER

CAPITAL PROGRAM MANAGER

ANGELES

PORT

SEQUIM

U.S.A.

CANADA

SEATTLE

LYNNWOOD

BREMERTON

WINSLOW

POULSBO

BELLEVUE

REDMOND

BOTHEL

MONROE GOLD

BAR

STANWOOD

PORT

104104

TOWNSEND

MARYSVILLE

SNOHOMISH

EVERETT

ARLINGTON

ANACORTES

SEDRO WOOLLEY

BURLINGTON

CONCRETE

Area Manager: BRIAN HAGEMAN

WASHINGTON STATE PARKS

& RECREATION COMMISSION

SEE NEXT SHEET FOR INDEX

ALI RAAD

HOLLY WILLIAMS, CHAIR

SCOTT MERRIMAN LAURIE CONNELLY

ALFIE ALVARADO-RAMOS

DIANA DUPUIS, DIRECTOR

SOPHIA DANENBERG

17 March 2026

3/18/2026

AutoCAD SHX Text o

AutoCAD SHX Text p

AutoCAD SHX Text p

AutoCAD SHX Text o

AutoCAD SHX Text p

AutoCAD SHX Text

PROJECT LOCATION ANDERSON LAKE STATE PARK

AutoCAD SHX Text

PROJECT LOCATION ANDERSON LAKE STATE PARK

SITE PLAN EXISTING

COVER SHEET

GE 03

GE 01

INDEX

DESCRIPTIONSHEET

SITE PLAN PROPOSEDGE 04

ROAD/PARKING PLANRD 01

GENERAL (GE)

ROADS (RD)

SIGNAGE DETAILSRD 03

STRIPING DETAILSRD 04

SITE PLAN PROPOSEDTRL 01

TRAILS (TRL)

ENLARGED PLANTRL 02

ENLARGED PLANTRL 03

ENLARGED PLANTRL 04

ROAD/PARKING ENLARGED PLANSRD 02

PLANK LAYOUT PLANTR 21

DESCRIPTIONSHEET

BOARDWALK (TR)

BOARDWALK PLANTR 02

BOARDWALK (TR)

SHEET INDEXGE 02

ENLARGED PLANTR 03

ENLARGED PLANTR 04

ENLARGED PLANTR 05

PARTIAL FRAMING PLANTR 06

PARTIAL FRAMING PLANTR 07

PARTIAL FRAMING PLANTR 08

PARTIAL FRAMING PLANTR 09

PARTIAL FRAMING PLANTR 10

DETAILSTR 11

DETAILSTR 12

DETAILSTR 13

PROFILESTR 15

PROFILESTR 16

PROFILESTR 17

PROFILESTR 18

PROFILESTR 19

PROFILESTR 20

<RESERVED><RESERVED>

PLANK LAYOUT PLANTR 22

PLANK DETAILSTR 23

PLANK DETAILSTR 24

PLANK DETAILSTR 25

PLANK DETAILSTR 26

PLANK DETAILSTR 27

PLANK DETAILSTR 28

PLANK DETAILSTR 29

RAILINGTR 30

DETAILS (DT)

TEMP. CONSTRUCTION DETAILDT 01

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

GE 02 - SHEET 2

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

SHEET INDEX

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

NTS

CXT RESTROOMDT 02ODT CONNECTOR PLANTRL 05

BW2 LAYOUT PLANTR 31

BW2 LAYOUT PLANTR 32

BW2 PROFILETR 33

LEGEND

DESCRIPTIONSYMBOL

TREE PROTECTION FENCE

TREE REMOVAL

STUMP

MADRONA

MAPLE

FIRS

CEDAR

INDEX

STORMWATER PLANSWR 01

STORMWATER (SWR)

SWR 02

SWR 03

SWR 04

SWR 05

STORMWATER PLAN

STORMWATER PLAN

STORMWATER PLAN

STORMWATER PLAN

3/17/26

13+23

-0+70

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

X

XX

X

X

X

X

X

0+00

DF 36

ALD 24

ALD 24

DF 36

DF 36

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

GE 03 - SHEET 3

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

SITE PLAN

EXISTING

SITE PLAN EXISTING

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

UNPAVED EQUESTRIAN PARKING, HITCHING POSTS

2 RESIDENTIAL, MAINTENANCE BUILDINGS

3 PRIMARY TRAIL ACCESS PARKING

OLYMPIC TRAIL

GRAVEL ACCESS ROAD

10' WIDTH UNPAVED

EQUESTRIAN ACCESS

TRAIL

EDGE OF DENSE

FORESTATION

EDGE OF DENSE

FORESTATION

ANDERSON LAKE

EXISTING VEGETATION LIMITS

4 CONCRETE ELECTRICAL VAULT

EDGE OF VEGETATION

WL-2

WR-1

WR-2

WL-1

WL-2

WL-9

WR-3

WL-3

Feet 0 75 150

DELINEATED WETLAND

BOUNDARY, TYP.

EXISTING CULVERT 3/17/26

ATTEMP

X

XX

X

X

X

X

X

Curve Table: Alignments

Curve #

C145

C18

C12

C11

C10

C9

C8

C7

C6

C5

C4

C3

C2

C1

Radius

55.180

116.578

358.799

181.359

447.980

242.228

13.000

803.820

13.000

5021.945

2045.809

88.625

357.686

160.701

Length

115.492

47.107

129.558

18.501

26.476

109.159

0.056

46.320

0.023

54.903

32.144

82.463

120.748

93.120

Chord Direction

N63° 59' 20.13"E

N15° 36' 15.06"E

N12° 45' 26.30"E

N20° 10' 45.10"E

N18° 56' 59.25"E

N37° 04' 16.63"E

N49° 10' 45.57"E

N47° 41' 33.92"E

N46° 10' 59.12"E

N47° 15' 17.72"E

N42° 18' 35.85"E

N12° 17' 15.63"E

N07° 31' 35.73"W

N20° 39' 12.48"E

DF 36

ALD 24

ALD 24

DF 36

DF 36

ASPN 11

ASPN 5

ASPN 9

ASPN 7

Standard : 1 Area : 16505.12

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

GE 04 - SHEET 4

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

PROPOSED SITE

SITE PLAN PROPOSED

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

PAVED EQUESTRIAN PARKING LOOP

2 RESIDENTIAL, MAINTENANCE BUILDINGS

3 TRAILHEAD

OLYMPIC TRAIL

EQUESTRIAN ACCESS

TRAIL, CROSSWALK

EDGE OF DENSE

FORESTATION

ANDERSON LAKE

4 CONCRETE ELECTRICAL VAULT

EDGE OF VEGETATION

A

RD02

B

RD02

D

RD02

C

RD02

REMOVE EXISTING

BOLLARDS

WL-2

WR-1

WR-2

WL-1

WL-2

WL-9

WR-3

Feet 0 75 150

REMOVE TWO (2) EXISTING

VAULT RESTROOM

0+00

X

XX

X

X

X

X

X

Line Table: Alignments

Line #

L12

L10

L9

L8

L7

L6

L5

L4

L3

L2

L1

Length

34.496

71.105

55.237

0.743

19.532

14.377

66.635

26.421

26.692

25.080

74.034

Direction

N04° 01' 41.58"E

N23° 06' 06.13"E

N17° 15' 24.08"E

N20° 38' 34.43"E

N21° 36' 22.43"E

N23° 17' 25.24"E

N49° 27' 25.37"E

N44° 57' 09.42"E

N18° 20' 22.12"W

N34° 27' 55.11"E

N32° 13' 49.98"E

Curve Table: Alignments

Curve #

C145

C18

C12

C11

C10

C9

C8

C7

C6

C5

C4

C3

C2

C1

Radius

55.180

116.578

358.799

181.359

447.980

242.228

13.000

803.820

13.000

5021.945

2045.809

88.625

357.686

160.701

Length

115.492

47.107

129.558

18.501

26.476

109.159

0.056

46.320

0.023

54.903

32.144

82.463

120.748

93.120

Chord Direction

N63° 59' 20.13"E

N15° 36' 15.06"E

N12° 45' 26.30"E

N20° 10' 45.10"E

N18° 56' 59.25"E

N37° 04' 16.63"E

N49° 10' 45.57"E

N47° 41' 33.92"E

N46° 10' 59.12"E

N47° 15' 17.72"E

N42° 18' 35.85"E

N12° 17' 15.63"E

N07° 31' 35.73"W

N20° 39' 12.48"E

DF 36

ALD 24

ALD 24

DF 36

DF 36

ASPN 11

ASPN 5

ASPN 9

ASPN 7

STA:0+00.00

Standard : 1 Area : 16505.12

Elevation

Station

PR ENTRANCE CL - PROP SITE PROFILE

259260

259260

0+

1+

2+

3+

4+

5+

6+

7+

8+

9+

-9.00%

-9.87%

0.47%

6.5 8%

-2.36%

-8.00%

7.6 9%

-1.83% 6.5

3%

0.10%

-3.90% 2.96% -0.09%

6.2 1%

0.71%

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

RD 01 - SHEET 5

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

PROPOSED

SITE

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

PAVED EQUESTRIAN PARKING LOOP

2 RESIDENTIAL, MAINTENANCE BUILDINGS

3 TRAILHEAD

OLYMPIC TRAIL

EQUESTRIAN ACCESS

TRAIL, CROSSWALK

EDGE OF DENSE

FORESTATION

ANDERSON LAKE

4 CONCRETE ELECTRICAL VAULT

EDGE OF VEGETATION

A

RD02

B

RD02

D

RD02

C

RD02

SITE PLAN PROPOSED Feet 0 75 150

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

9+00

C1

Standard : 1 Area : 16505.12

0+00

1+

2+00

3+00

4+

5+

5+

0+00

11+00

12+00

13+00

+3

DF 36

DF 36

ASPN 11

ASPN 5

ASPN 9

ASPN 7

STA:0+00.00

C1

L1

C1

DF 36

ALD 24

ALD 24

Alignment=PR ENTRANCE CL - PROP SITE Station=2+17.32

Offset=-20.291

CROSSWALK END

Alignment=PR ENTRANCE CL - PROP SITE Station=1+72.52 Offset=13.018

CROSSWALK START

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

RD 02 - SHEET 6

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

ENLARGED PLANS

AS NOTED

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

PROPOSED ADDITIONAL

DAY-USE PARKING

EDGE OF VEGETATION

PROPOSED DOUBLE CXT, 6' ADA

ACCESSIBLE HMA PATH

TRAILHEAD PLANA

EQUESTRIAN PARKING PLANB

EQUESTRIAN CROSSING PLAND

ENTRANCE PLANC

EDGE OF VEGETATION

EXISTING FENCE

EXISTING SEPTIC DRAIN FIELD

EDGE OF VEGETATION

EXISTING GATE POST &

SWING SHOWN

EXISTING PARK

SIGN

EXISTING GRAVEL ROAD

TO BE HMA RESURFACED

SAVAGE MEMORIAL TRAIL

PROPOSED UNPAVED 10'

EQUESTRIAN TRAIL

ANDERSON TRAIL

STA: 00+00

CROSSING MARKINGS

FOR EQUESTRIAN TRAIL

PROPOSED ADDITIONAL 5x8' STANDARD

PICNIC TABLES WITHIN EXISTING

CLEARED AREA

PROPOSED SINGLE-STALL

CXT, 6' CSTC GRAVEL

ACCESS PATH

PAINTED ADA SYMBOL

SEE DETAIL

WL-9

WL-10

WL-11

WR-3

WL-2

WR-2

RELOCATED EXG.

HITCHING POSTS

Feet 0 40 80

Feet 0 20 40

Feet 0 20 40

Feet 0 20 40

D

RD03

9"

6'-0"

9"

4"3"

2'-6"

CENTER WHEELSTOP IN PARKING SPACE

3'-0"3'-0"

2" CLEARANCE TYP.

6"

8" MIN

10" MAX

7'-0"

3'-0"

3'-0" STOP

3'-0"

ACCESSIBLE

VAN

5'-0"

2'-0"

RESERVED

PARKING

STATE DISABLED

PARKING PERMIT

REQUIRED

CARRIAGE BOLT HOLES

EDGE OF CURB

AND/OR PAVEMENT

NON-SHRINK GROUT

5/8"∅x18" REBAR

GROUT TOP

3:1 SAND & CEMENT

GROUT TO 1" DEPTH

#3 REBAR (2)

BUMPER BLOCKA

4 x 4 P.T. POST

MATCH SURROUNDING

SURFACE

8" DIA. HDG HEX BOLTS

WITH NUTS & WASHERS

STANDARD 30" STOP

SIGN OR YIELD SIGN

PER MUTCD SPECS.

FINISH GRADE

CONCRETE

IN PLACE

4 x 4 P.T. POST

FASTEN EACH SIGN WITH TWO 3"

CORROSION RESISTANT DECKING

SCREWS WITH WASHERS

ADA SIGN FURNISHED AND

INSTALLED BY CONTRACTOR

STD 12"x6" "VAN ACCESSIBLE"

SIGN PER MUTCD SPECS.

STOP & YIELD SIGNB

ADA PARKING SIGNC

Inches 0 12 24

Inches 0 12 24

Inches 0 10 20

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

RD 03 - SHEET 7

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

SIGNAGE

DETAILS

AS NOTED

BUMPER BLOCK - YIELD-STOP-ADA SIGNAGE DTL

DB 4/24/2025

---- 4/24/2025

42"

29"

42"

24"

ADA SYMBOLD

- NTS

3/17/26

AutoCAD SHX Text

FINISH GRADE

Car

11'

0.

5'

Sh ou ld er

SINGLE LANE

Ed ge o f A sp ha lt

Ed ge o f A sp ha lt

Car CarPe d

11' 11'3' 2'

Sh ou ld er

2 WAY TRAFFIC

Ed ge o f A sp ha lt

Ed ge o f A sp ha lt

Bike Car CarPe d

6' 11' 11'3' 2'

Sh ou ld er

2 WAY TRAFFIC

Ed ge o f A sp ha lt

Ed ge o f A sp ha lt

Bike Car CarPe d

6' 11' 11'3' 2'

Sh ou ld er

Equ

8'

Ed ge o f A sp ha lt

Ed ge o f A sp ha lt

2 WAY TRAFFIC

Car CarPe d

11' 11'3' 2'

Sh ou ld er

Equ

8'

Ed ge o f A sp ha lt

Ed ge o f A sp ha lt

2 WAY TRAFFIC

27.00'

33.00' 41.00'

35.00'

12.00'

3' 6' 11' 11' 2' 8' 3' 6' 11' 11' 2'

8' 3' 11' 11' 2' 3' 11' 11' 2'

0.5' 11' 0.5'

VARIES

HMA EXTENTS

VARIES PER ROAD TYPE

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

RD 04 - SHEET 8

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

MISC. DETAILS

AS NOTED

A620-2022-SW1_1

DB 3/24/2026

PZ 3/24/2026

EQUESTRIAN CROSSINGB

Feet 0 10 20

STRIPING PATTERNS

Feet

0 8 16

TYPE - E

TYPE - DTYPE - C

TYPE - BTYPE - A

EDGE OF PAVEMENT

SHOULDER

PROPOSED ROAD CENTERLINE

EDGE OF PAVEMENT

SHOULDER

EDGE OF EQUESTRIAN PATH

UNPAVED, UNMARKED

9'x2" CROSSWALK MARKINGS

TYP.

EXISTING EDGE OF

VEGETATION

1.5:1 CUT/FILL

COMPACTED EXISTING GRADE

3" HMA SURFACING

4" COMPACTED

NATURAL SURFACE

LEVELING COURSE/CSTC

ADD ADDITIONAL BALLAST AS NECESSARY TO MAINTAIN

CONTINUOUS ROAD BASE & FINISH CROSS-SLOPE

TYP. ROAD SECTION

Feet

0 8 16

2% SLOPE AWAY FROM CROWN2% SLOPE AWAY FROM CROWN

PGzahn Image

ALD 12CD 16

CD 7 CD 8

CD 36

CD 12

CD 47

DF 33

DF 7

DF 5

DF 9

DF 12

DF 8

DF 12

CD 10

CD 6

CD 18CD 10

CD 52

CD 24

DF 33CD 24

CD 32

MAP 30

CD 30

DF 40

CD 50

ALD 16

ALD 14

MAP 33

CD 36

DF 32

CD 36

CD 28

CD 35

DF 29

MAP 2

DF 18

DF 22DF 28

DF 14

DF 30DF 22

DF 18

DF 22

DF 22

DF 27DF 12

DF 24

DF 12

DF 20

DF 31

CD 14

DF 26

DF 14

DF 27

DF 16

DF 24

DF 26

DF 19

STUMP

DF 23

DF 36

CD-DF 16

ALD 14

ALD 12

ALD 14

ALD 12

ALD 14

ALD 10

ALD 18

ALD 16

ALD 18

ALD 17

DF 28

STUMP

CD 36

CD 36CD 36

STUMP 35

ALD 14

CD

ALD

ALD

ALD

ALD

ALD

ALD ALD

ALD

ALD

ALD

Elevation

Station

EX TRAIL CL - EX SITE PROFILE

289290

289290

0+

1+

2+

3+

4+

5+

6+

7+

8+

9+

-2.77%

0.09%

3.51%

-0.73%

0.05%

0.31%

4.66%

-1.00%

-4.98%

3.10%

0.28%

4.57%

2.37%

3.98%

3.72%

4.93%

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TRL 01 - SHEET 9

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

SITE PLAN

PROPOSED

AS NOTED

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

OL

YM

PIC

TR

AI

L

AN

DE

RS

ON

T

RA

IL

LA

KE

SI

DE

T

RA

IL

A

TRL03

A

TRL02

A

TRL04

WL-4

WL-4

WR-4

WR-5

WR-6

WR-7

WL-5

WR-8

WL-6

WL-7

WR-9

WR-10

WR-11

WL-8

WL-11

WL-10

TRAIL ROUTE PLANB

Feet

0 100 200

A

TRL05

SEE TRAIL

SECTION

B

TRL05

SEE TRAIL

SECTION

C

TRL05

8+00

10+00

CD 52

CD 24

DF 33CD 24

CD 32

MAP 30

ALD

STA:8+02.00

BEGIN OFFSET

STA:8+80.80

END OFFSET

STA:9+25.00

BEGIN OFFSET

STA:10+54.83

END OFFSET

STA:11+22.00

END NARROWING

STA:10+72.00

BEGIN NARROWING

Elevation

Station

EX TRAIL CL - EX SITE PROFILE

7+

8+

9+

0.31%

4.66%

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TRL 02 - SHEET 10

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

ENLARGED PLAN

AS NOTED

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

EDGE OF PAVEMENT

EXISTING TRAIL CENTERLINE

TRAIL ROUTE PLANA

Feet 0 16 32

+0

16+00

ALD 16

ALD 14

MAP 33

CD 36

DF 32

CD 36

CD 28

CD 35

DF 29

MAP 2

DF 18

DF 22DF 28

DF 14

DF 30

CD 36

CD 36CD 36

STUMP 35

ALD 14

CD

ALD

ALD

ALD

ALD

ALD

ALD ALD

ALD

ALD

STA:13+78.39

BEGIN OFFSET

STA:14+58.37

END OFFSET

BEGIN BOARDWALK

STA:=13+58.14

OFFSET:=6.000

BEGIN STAGING

STA:=14+57.53

OFFSET:=6.739

END STAGING

STA:18+42.46

END BOARDWALK

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TRL 03 - SHEET 11

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

ENLARGED PLAN

AS NOTED

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

TRAIL ROUTE & BOARDWALK PLANA

NOTES:

1. SHOWN LOCATIONS OF PROPOSED BOARDWALK ARE INDICATIVE OF SATURATED SOILS. EQUIPMENT ACCESS MATS MUST

BE PLACED AT THIS LOCATIONS PRIOR TO TRAVERSAL OF MOTORIZED CONSTRUCTION EQUIPMENT ACROSS THESE AREAS, AND REMOVED WHEN SUCH TRAVERSAL IS NO LONGER DEEMED NECESSARY. SEE SPECIFICATION.

2. CLEARING AND GRUBBING LIMITED TO DESIGN WIDTH OF TRAIL.

REMOVE TWO (2) EXISTING CULVERTS

PRIOR TO CONSTRUCTION OF BOARDWALK

WL-7

WR-9

WL-6

WR-8

Feet 0 16 32

TEMP. CONSTRUCTION STAGING

LOCATION, SEE DETAIL

DT01

24+00

DF 23

DF 36

CD-DF 16

ALD 14

ALD 12

ALD 14

ALD 12

ALD 14

ALD 10

ALD 18

ALD 16

ALD 18

ALD 17

DF 28

STA:=22+41.80

OFFSET:=6.130

STA:=23+63.55

OFFSET:=-0.959

BEGIN BOARDWALK

STA:=24+71.25

OFFSET:=-18.746

END BOARDWALK

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TRL 04 - SHEET 12

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

ENLARGED PLAN

AS NOTED

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

TRAIL ROUTE & BOARDWALK PLANA

EXISTING TRAIL CENTERLINE

PROPOSED TRAIL EDGE OF PAVEMENT (EOP)

WR-7

WL-5

WL-5

Feet 0 10 20

DT01

TEMP. CONSTRUCTION

TURNAROUND, SEE DETAIL

TR31

NOTES:

1. SHOWN LOCATIONS OF PROPOSED BOARDWALK ARE INDICATIVE OF SATURATED SOILS. EQUIPMENT ACCESS MATS MUST

BE PLACED AT THIS LOCATIONS PRIOR TO TRAVERSAL OF MOTORIZED CONSTRUCTION EQUIPMENT ACROSS THESE AREAS, AND REMOVED WHEN SUCH TRAVERSAL IS NO LONGER DEEMED NECESSARY. SEE SPECIFICATION.

2. CLEARING AND GRUBBING LIMITED TO DESIGN WIDTH OF TRAIL.

3/17/2

10.00'

8' AS NOTED

25+60

Line Table: Alignments

Line #

L197

L196

L195

L194

L193

L192

L191

L190

L189

L188

L187

L186

L185

L184

L183

L182

L181

Length

7.503

43.931

23.582

22.482

14.970

25.687

28.620

9.955

24.658

27.798

15.524

4.875

27.352

7.851

15.590

6.757

43.123

Direction

N14° 14' 59.66"E

S88° 17' 39.51"W

N31° 35' 18.33"W

N58° 45' 54.56"W

N09° 49' 33.24"W

S61° 45' 16.74"W

N04° 28' 39.23"W

N45° 11' 47.42"W

N28° 45' 32.19"W

N44° 03' 04.30"W

N16° 25' 44.90"W

N68° 43' 50.55"W

N07° 47' 40.95"W

N29° 49' 12.54"W

N45° 20' 16.62"W

N56° 09' 58.06"W

N38° 49' 46.39"W

Curve Table: Alignments

Curve #

C163

C162

C161

C160

C159

C158

C157

C156

C155

C154

C153

C152

C151

C150

C149

C148

C164

Radius

6.781

17.437

22.865

29.556

6.781

93.737

6.781

6.781

21.849

6.781

6.862

13.216

21.133

47.531

47.531

49.248

51.683

Length

3.217

14.894

43.267

58.688

4.819

26.892

1.810

5.640

40.405

3.631

6.264

14.055

8.124

12.873

8.983

14.901

55.600

Chord Direction

N45° 10' 36.44"W

N34° 17' 43.90"W

N64° 02' 08.25"W

N61° 21' 41.25"W

N24° 50' 13.33"W

N36° 58' 39.81"W

N36° 24' 18.25"W

N67° 52' 42.40"W

N38° 43' 40.42"W

N01° 05' 22.62"W

N42° 34' 47.73"W

N38° 15' 45.75"W

N18° 48' 26.74"W

N37° 34' 44.58"W

N50° 45' 07.34"W

N47° 29' 52.22"W

S21° 52' 04.18"E

ALD 12CD 16

CD 7 CD 8

CD 36

CD 12

CD 47

DF 33

DF 7

DF 5

DF 9

DF 12

DF 8

DF 12

CD 10

CD 6

CD 18CD 10

ALD 18

ALD 16

ALD 18

ALD 17

DF 28

L181

L182

L183

L184

L185

L186

L187

L188

L189

L190

L191

L192

L193

L194

L195

L196

L1

C148

C149

C150

C151

C152

C153

C154

C155

C156

C157

C158

C159

C160

C161

C162

C163

C164

0+

1+00

2+00

3+

4+00

5+

6+00

6+19

OFFSET:=-0.959

BEGIN BOARDWALK

STA:=24+71.25

OFFSET:=-18.746

END BOARDWALK

4.00' 10.00'

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TRL 05 - SHEET 13

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

ODT CONNECTOR

PLAN

SITE PLAN PROPOSED

A620-2022-SW1_1

DB 3/24/2026

PZ 3/24/2026

Feet 0 30 60

ODT CONNECTOR TRAIL

TERMINATES AT PARK BOUNDARY PARK BOUNDARY

TRAIL SECTIONA

TYP. TRAIL SECTIONB

4" COMPACTED

NATURAL SURFACE

1.5:1 CUT/FILL

1.5:1 CUT/FILL

COMPACTED

EXISTING GRADE

3" HMA SURFACING

6" CSBC COMPACTED

EXISTING GRADE A

SEPARATED EQUESTRIAN

TRAIL, SEE DETAIL

B

SEPARATED PEDESTRIAN

TRAIL, SEE DETAIL

MULTI-USE TRAIL

SEE DETAIL

C

TRAIL SECTIONC

1.5:1 CUT/FILL

6" CSBC COMPACTED

EXISTING GRADE

3" HMA SURFACING

4" COMPACTED

NATURAL SURFACE

1 PEDESTRIAN TRAIL

2 EQUESTRIAN TRAIL

4 EXISTING TRAIL

3 MULTI-USE TRAIL

AS NOTED

FIELD-FLAGGED DESIGN

CENTERLINE

10" LEVELING COURSE/CSTC

10" LEVELING COURSE/CSTC

XX

X

X

X

X

X

DF 36

ALD 24

ALD 24

DF 36

DF 36

ASPN 11

ASPN 5

ASPN 9

ASPN 7

Standard : 1 Area : 16505.12-9.55%

-4.97%

-1 1.

-7 .20

-3 .2

2%

-9.

-8

.00

-9 .1

6% -1

4.

-1

0.

-8 .8

9%

-9.1 9%

-6.64%

-20.89%

-4.63%

-20 .49

-3 .5

4%

-3.

31%

-2.10%

-0 .6

6%

-2.30%

-8 .3

2%

-20.03%

-8.10%

-1 .4

6%

-9.17% -14.51% -11.30%

-11.98%

-7.17%

-12.48%

-10.18%

-8.09%

-4.85%

-6.15%

-4.64%

-10.47%

-4.39%

-6.26%

-4.64%

-3 .0

5%

-6 .5

2%

-5.51%

-7.23%

-6.81% -7.86%

-5.25%

-9.82%

-8.24%

-147.53%

-16.60%

-8 .2

9%

-2.99%

-18.57%

-19.62%

-20.03%

-9.62%

-10.56%

-11.32%

-5.47%

-7.97%

-10.77%

-14.01%

-14.02%

-13.62%

-7.65%

-5.28%

-4.85%

-7.16%

-8.12%

-9.67% -10.80%

-9.93%-12.10%

-15.07%

-9.57%

-11.30% -11.99%

-10.54%

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

SWR 01 - SHEET 14

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

STORMWATER

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

EDGE OF DENSE

FORESTATION

ANDERSON LAKE

EDGE OF VEGETATION

Feet 0 75 150

SITE PLAN PROPOSED

SILT FENCING TYP.

SEE DETAIL

B

DT01

WETLAND, BUFFER ZONE TYP.

EXISTING CONTINUOUS

VEGETATION FILTER STRIP

STORMWATER PATH

DF 36

DF 36

ASPN 11

ASPN 5

ASPN 9

ASPN 7

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

SWR 02 - SHEET 15

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

STORMWATER

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

SITE PLAN PROPOSED

SILT FENCING TYP.

SEE DETAIL

B

DT01

WETLAND, BUFFER ZONE TYP.

Feet 0 30 60

CD 52

CD 24

DF 33CD 24

CD 32

MAP 30

CD 30

DF 40

CD 50

ALD 16

ALD 14

MAP 33

ALD 14

ALD

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

SWR03 - SHEET 16

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

STORMWATER

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

Feet 0 30 60

SITE PLAN PROPOSED

SILT FENCING TYP.

SEE DETAIL

B

ALD 16

ALD 14

MAP 33

CD 36

DF 32

CD 36

CD 28

CD 35

DF 29

MAP 2

DF 18

DF 22DF 28

DF 14

DF 30DF 22

DF 18

DF 22

DF 22

DF 27DF 12

DF 24

DF 12

DF 20

DF 31

CD 14

DF 26

DF 14

DF 27

DF 16

DF 24

DF 26

DF 19

STUMP

DF 23

DF 36

CD-DF 16

ALD 14

STUMP

CD 36

CD 36CD 36

STUMP 35

CD

ALD

ALD

ALD

ALD

ALD

ALD ALD

ALD

ALD

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

SWR04 - SHEET 17

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

STORMWATER

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

SITE PLAN PROPOSED

SILT FENCING TYP.

SEE DETAIL

B

DT01

TEMP. CONSTRUCTION

TURNAROUND TYP.

A

DT01

Feet 0 30 60

ALD 12CD 16

CD 7 CD 8

CD 36

CD 12

CD 47

DF 33

DF 7

DF 5

DF 9

DF 12

DF 8

DF 12

CD 10

CD 6

CD 18CD 10

DF 24

DF 26

DF 19

STUMP

DF 23

DF 36

CD-DF 16

ALD 14

ALD 12

ALD 14

ALD 12

ALD 14

ALD 10

ALD 18

ALD 16

ALD 18

ALD 17

DF 28

STUMP

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

SWR05 - SHEET 18

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

STORMWATER

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

Feet 0 30 60

SITE PLAN PROPOSED

SILT FENCING TYP.

SEE DETAIL

B

DT01

TEMP. CONSTRUCTION

TURNAROUND TYP.

A

15+00

16+00

+0

18+00

MAP 33

CD 36

DF 32

CD 36

CD 28

CD 35

DF 29

MAP 2

DF 18

DF 22DF 28

DF 30

CD 36

CD 36CD 36

STUMP 35

CD

ALD

ALD

ALD

ALD

ALD

ALD

3+77

0+00

1+

2+00

3+

322.38

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-28A

322.98

332.09

CP

322.90

CP

322.13

CP

322.36

CP

333.03

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-1

SL-2

SL-

SL-4

SL-

SL

-6

SL

-7

SL

-8

SL

-9

SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

4SL

-1

SL

-1

SL

-1

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

1SL

-4

2SL

-4

3SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

REMOVE TREE

Station=1+21.70

Offset=-4.163

REMOVE TREE

Station=0+54.78 Offset=2.975

CP

322.90

CP

322.13

CP

322.36

CP

333.03

ElevationEl ev at io n Station

Station

Boardwalk PROFILE

0+001+002+003+003+77

0+001+002+003+003+77

SL 12SL 13SL 14SL 15SL 16SL 17SL 18SL 19SL 20SL 21SL 22SL 23SL 24SL 25SL 26SL 27SL 28SL 29SL 30SL 31SL 32SL 33SL 34SL 35SL 36SL 37SL 38SL 39SL 40SL 41SL 42SL 43SL 44SL 45SL 46SL 47SL 48 SL 11 SL 10 SL 09 SL 08 SL 07 SL 06 SL 05 SL 04 SL 03 SL 02 SL 01

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 02 - SHEET 19

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PLAN & PROFILE

(STA. 14+59 TO

STA. 18+42)

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

BOARDWALK PLAN - OVERVIEWA

EX. TRAIL ALIGNMENT STA. 14+59 =

BOARDWALK ALIGNMENT STA. 0+00

EXISTING ALIGNMENT STA. 17+40.65 =

BOARDWALK ALIGNMENT STA. 2+75

EX. GROUND ELEV =322.0

EXISTING GROUND SURFACE

EXISTING TRAIL ALIGNMENT

EX. TRAIL ALIGNMENT STA. 14+83 =

BOARDWALK ALIGNMENT STA. 0+24

BEGINNING OF SPLIT ALIGNMENTS

SAMPLE LINES (SL) 8'

O.C. TYP.

CONCRETE FOOTING

SEE DETAIL

EX. ALIGNMENT STA. 18+42 =

BOARDWALK ALIGNMENT STA. 3+77

EX. GROUND ELEV. = 328.9

END OF BOARDWALK

EX. ALIGNMENT STA. 17+65.65 =

BOARDWALK ALIGNMENT STA. 3+00

EX. GROUND ELEV =322.0

AS NOTED

Feet

0 16 32

16+00

MAP 33

CD 36

CD 36

CD 36

STUMP 35

ALD

ALD

ALD

ALD

TP

F

TPF

TPF

TPF

TP

F

TPF

TPF

TPF

TP

F

TPF

TPF

TPF

14.7'

16.0'

15.2'

16.5'

16.5'

15.2'

15.2'

16.5'

16.5'

15.2' 15.6'

16.1'

15.8'

15.8'

15.8'

15.8'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

CP

322.90

CP

333.03

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 03 - SHEET 20

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

LAYOUT PLAN

(STA. 14+59 TO

STA. 18+42)

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

BOARDWALK LAYOUT PLAN

SL04 TO SL18

LAYOUT COORDINATE TABLE

PIER NORTHING EASTING

1086228.7

1086232.4

1086224.8

1086223.3

1086220.4

395164.0

PP ELEV

1086220.1

1086214.9

1086208.8

1086202.5

1086211.3

16395178.5

395181.6

395167.2

395160.8

395170.0

395167.2

395177.3

395172.4 17

395180.5

NORTHING EASTING

1086206.8

1086195.9

1086197.7

1086188.9

1086192.0

395188.4

PP ELEV

1086181.7

1086183.0

1086174.1

1086166.8

1086176.4

395191.4

395194.7

395185.4

395189.0

395188.6

395196.0

395192.5

395195.2

395202.219

PIER

DESCRIPTION

CTR. PT. - VERTICAL TUBE

INT. OF SL. AND BW. ALIG

CTR. PT. - VERTICAL TUBE

DESCRIPTION

INT. OF SL. AND BW. ALIG

PT. ON SL

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

EDGE OF CONC. FOOTING

LAYOUT COORDINATE TABLE

NORTHING EASTING

1086167.4

1086159.2

1086159.8

1086151.4

1086151.5

395198.9

PP ELEV

1086143.4

1086143.6

1086135.4

1086127.4

1086135.5

395196.3

395195.6

395195.8

395203.8

395196.1

395200.19

395196.4

395204.3

395200.429

PIER DESCRIPTION

INT. OF SL. AND BW. ALIG

1086127.5

1086127.6395205.6

395200.6 --

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

EDGE OF CONC. FOOTING

EDGE OF CONC. FOOTING

EDGE OF CONC. FOOTING

EDGE OF CONC. FOOTING

EDGE OF CONC. FOOTING

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

ABBREVIATIONS:

CTR = CENTER

PT. = POINT

BW ALIG.- BOARDWALK ALIGNMENT

VRT = VERTICAL

INT. = INTERSECTION

NOTE:

1. PP ELEV. = PROPOSED ELEVATION AT

TOP OF PIER (SEE PROFILE)

2. SL REFERS TO REFERENCES LINE

Feet 0 5 10

CD 36

DF 32

CD 36

CD 28

CD 35

CD

TP

F

TPF

TPF

TPF

TP

F

TPF

TPF

TPF

2+00

322.38

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL-28A

CP

322.36

15.8'

15.8'14.7'

16.8'

17.3'

14.1'

.3'

.1'

.4

.2

2.

8'

4.

0'

.6'

.8'

.3'

.3'

1.1

3.5

15.

8'

15.

8'

15.

8'

15.

8'

12.

8'

12.

8'

4.4'

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL L

ENGTH

HALF OF FULL L

ENGTH

HALF OF FULL L

ENGTH

HALF OF FULL L

ENGTH

HA

LF

O F F

UL

L L

EN

GT

H

HA

LF

O F F

UL

L L

EN

GT

H

HA

LF

O F F

UL

L L

EN

GT

H

HA

LF

O F F

UL

L L

EN

GT

H

HA

LF

O F

FU

LL

L

EN

GT

H

HA

LF

O F

FU

LL

L

EN

GT

H

HA

LF

O F

FU

LL

L

EN

GT

H

HA

LF

O F

FU

LL

L

EN

GT

H

7.9

7.9

HA

LF

O F F

UL

L L

EN

GT

H

HA

LF

O F F

UL

L L

EN

GT

H

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

7.9

7.9

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HA

LF

O F F

UL

L L

EN

GT

H

HA

LF

O F F

UL

L L

EN

GT

H

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

SL

-1

9SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL-25

SL-26

SL-27

SL-28

SL-29

SL-30

SL-31

SL-32

SL-33

SL-34

SL-35

SL-36

SL-37

CP

322.36

CP

322.36

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 04 - SHEET 21

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

LAYOUT PLAN

(STA. 14+59 TO

STA. 18+42)

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

BOARDWALK LAYOUT PLAN

SL19 TO SL37

NTS

LAYOUT COORDINATE TABLE

PIER NORTHING EASTING

1086119.4

1086119.5

1086111.5

PP ELEV

1086111.6

1086103.7

1086103.5

1086094.6

1086096.6

46395204.9

395203.7

395196.7

395200.7

395196.8

395200.9

395196.9 47

395195.9

NORTHING EASTING

1086089.8

1086088.1

1086083.7

1086078.9

1086078.4

395193.4

PP ELEV

1086075.4

1086074.2

1086067.3

1086067.4

1086071.1

395187.5

395173.7

395197.0

395189.7

395196.1

395184.9

395183.0

395179.0

395172.349

PIER

DESCRIPTION

INT. OF SL. AND BW. ALIG

CTR. PT. - VERTICAL TUBE

LAYOUT COORDINATE TABLE

NORTHING EASTING

1086068.3

1086060.8

1086066.7

1086059.7

1086063.6

395164.9

PP ELEV

1086060.5

1086058.6

1086052.3

1086050.4

1086053.6

395159.5

395147.0

395167.7

395161.0

395165.0

395157.0

395155.7

395150.8

395144.559

PIER DESCRIPTION

1086050.1

1086043.9395145.2

395140.2 --

1086047.4

1086043.0

1086040.8

1086038.6

1086034.1

1086029.7

1086025.2

1086027.4

395136.6

395127.8

395137.6

395144.3

395133.3

395135.5

395128.8

395124.469

DESCRIPTION

1086020.7

1086016.3

1086011.8

1086014.0

395119.0

395126.8

395120.0

395115.673

PT. ON SL

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

INT. OF SL. AND BW. ALIG

PT. ON SL

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

PT. ON SL

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

ABBREVIATIONS:

CTR = CENTER

PT. = POINT

BW ALIG.- BOARDWALK ALIGNMENT

VRT = VERTICAL

INT. = INTERSECTION

NOTE:

1. PP ELEV. = PROPOSED ELEVATION AT

TOP OF PIER (SEE PROFILE)

2. SL REFERS TO REFERENCES LINE

18+00

DF 29

MAP 2

DF 18

DF 22DF 28

DF 14

DF 30

TP

F

TPF

TPF

TPF

TP

F

TPF

TPF

TPF

TPF

3+77

3+

322.38

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

CP

322.13

12.

8'

12.

8'

1.2'

4.4'

15.8'

15.8'

4.9'

5.7' 10.8'

9.9' 15.8'

15.8'

16.5'

15.1'

15.8'

15.8'

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HALF

OF F

ULL L

ENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

7.9' 7.9'

FULL OF FULL LENGTH

FULL OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL-37

SL

-3

SL

-3

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

CP

322.13

CP

322.13

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 05 - SHEET 22

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

LAYOUT PLAN

(STA. 14+59 TO

STA. 18+42)

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

BOARDWALK LAYOUT PLAN

SL36 TO SL48

NTS

ABBREVIATIONS:

CTR = CENTER

PT. = POINT

BW ALIG.- BOARDWALK ALIGNMENT

VRT = VERTICAL

INT. = INTERSECTION

NOTE:

1. PP ELEV. = PROPOSED ELEVATION AT

TOP OF PIER (SEE PROFILE)

2. SL REFERS TO REFERENCES LINE

LAYOUT COORDINATE TABLE

NORTHING EASTING

1086009.9

1086005.5

1086005.7

1086004.3

1085997.8

395112.9

PP ELEV

1085997.1

1085990.0

1085988.6

1085983.6

1085984.1

395113.6

395115.2

395119.6

395111.0

395118.9

395109.6

395116.1

395150.8

395107.283

PIER DESCRIPTION

1085981.2

1085981.3395111.3

395107.3 --

1085973.2

1085973.5

1085965.2

1085965.3

1085957.2

1085957.5

1085949.5

1085948.6

395112.0

395113.8

395107.6

395115.6

395108.0

395116.3

395108.3

395109.993

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

INT. OF SL. AND BW. ALIG

INT. OF SL. AND BW. ALIG

PT. ON SL

PT. ON SL

PT. ON SL

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

1085940.7

1085941.7

1085942.8

1085933.9

1085933.0

395110.6

395117.2

395120.4

395115.5

395113.298

INT. OF SL. AND BW. ALIG

EDGE OF CONC. FOOTING

EDGE OF CONC. FOOTING

INT. OF SL. AND BW. ALIG

PT. ON SL

1085926.0

1085925.0

395118.8

395113.9100

101 --

INT. OF SL. AND BW. ALIG

EDGE OF CONC. FOOTING

1085927.1395123.7102 -- EDGE OF CONC. FOOTING

INT. OF SL. AND BW. ALIG

CTR. PT. - VERTICAL TUBE

CTR. PT. - VERTICAL TUBE

PT. ON SL

INT. OF SL. AND BW. ALIG

14.7'

16.0'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

CD 36

STUMP 35

15.2'

16.5'

16.5'

15.2'

15.2'

16.5'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 06 - SHEET 23

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PARTIAL FRAMING

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

M

AT

C H

L

IN

E

- S

EE

B

EL

O

W

PROVIDE

CONCRETE

ABUTMENT

8.

0'

W8X18 M

ATC

H

LIN

E - SEE ABO

VE

BO

AR

DW

AL

K

BO

UN

DA

RY

SL

-6

SL

-4

SL

-3

SL

-2

SL

-1

SL

-5

.0

C OF BOARDWALK ALIGNMENTL

A

REFERENCE LINE FOR STEEL BEAM

REFERENCE LINE FOR STEEL BEAM

W8X18

W 8X31

PROVIDE 12" NEOPRENE

60 DUROMETER

INTERMEDIATE SUPPORT -

3.5 INCHES O.D STEEL PILE

PARTIAL FRAMING PLAN BOARDWALK

(STA. 0+40 TO 0+88) SL06 TO SL12

PARTIAL FRAMING PLAN BOARDWALK

(STA. 0+00TO 0+40) SL01 TO SL06

Feet 0 2 4

AS NOTED

Feet 0 2 4

A

TR 10

SL

-6

SL

-7

SL

-8SL

-9

SL

-1

SL

-1

SL

-1

A

TR 10

CONSTRUCTION NOTE:

1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION

OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE

CENTERLINE OF BOARDWALK ALIGNMENT.

END SUPPORT

M

AT

C H

L

IN

E

- S

EE

T

R

PROVIDE

CONCRETE

ABUTMENT

C OF BOARDWALK ALIGNMENTL

SEE CONSTRUCTION NOTE #1

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

INTERMEDIATE SUPPORT -

3.5 INCHES O.D STEEL PILE(TYP.)

ALD

TP

FTPF

TPF TPF TPF TPF

16.5'

15.2'

15.6'

16.1' 15.8'

15.8'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

CD

15.8'

15.8'14.7'

16.8'

17.3'

14.1'

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL L

ENGTH

HALF OF FULL L

ENGTH

HALF OF FULL L

ENGTH

HALF OF FULL L

ENGTH

HA

LF

O F F

UL

L L

EN

GT

H

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 07 - SHEET 24

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PARTIAL FRAMING

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

M

ATC

H

LIN

E SEE TR

M

AT

C H

L

IN

E

- S

EE

B

EL

O

W

PARTIAL FRAMING PLAN BOARDWALK

(STA. 0+88 TO 1+35) SL12 TO SL18

PARTIAL FRAMING PLAN BOARDWALK

(STA. 1+35 TO 1+84) SL18 TO SL24

SL

-1

SL

-1

3SL

-1

4SL

-1

SL

-1

SL

-1

PROVIDE

CONCRETE

ABUTMENT

PROVIDE

CONCRETE

ABUTMENT

PROVIDE

CONCRETE

ABUTMENT

SL

-1

SL

-1

SL

-2

SL

-2

SL

-2

SL-23

SL-24

SL

-1

M

ATC

H

LIN

E - SEE ABO

VE

MAT

CH LI

NE

SE

E

TR

C OF BOARDWALK ALIGNMENTL

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W 8X31

PROVIDE 12" NEOPRENE

60 DUROMETER

W 8X31

W 8X31W

8X31

W 8X31

PROVIDE 12" NEOPRENE

60 DUROMETER

PROVIDE 12" NEOPRENE

60 DUROMETER

PROVIDE INTERMEDIATE SUPPORT -

3.5 INCHES O.D STEEL PILE(TYP.)

W8X18

W8X18

W8X18

W8X18 W8X18

W8X18

CONSTRUCTION NOTE:

1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION

OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE

CENTERLINE OF BOARDWALK ALIGNMENT.

Feet 0 2 4

F

TP

F

TP

F

TPF

TPF

TPF

TPF

2+

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

CP

22322.36

17.3'

14.1'

17.3'

14.1'

16.4'

15.2'

4.0'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

SL

-2

SL

-2

SL

-2

SL

-2

SL-27

CP

22322.36

17+00

CD 28

CD 35

SL

-2

SL

-3

SL

-3

SL-28A

CP

22322.36 2.8

4.0

11.6'

12.8'

13.3'

13.3'

1.1'

3.5'

15.8'

15.8'

HALF

OF F

ULL

LEN

GTH

7.9'

7.9'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

SL

-2

SL

-3

SL

-3

CP

22322.36

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 08 - SHEET 25

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PARTIAL FRAMING

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

M

AT

CH

L

IN

E

SE

E

TR

PARTIAL FRAMING PLAN BOARDWALK

(STA. 1+84 TO 2+16) SL24 TO SL28

PARTIAL FRAMING PLAN BOARDWALK

(STA. 2+16 TO 2+64) SL28 TO SL34

M

AT

C H

L

IN

E

- S

EE

B

EL

O

W

W 8X31

W 8X31

W 8X31

W 8X31

W 8X31

W 8X31

W 8X

W 8X

W 8X31

W 8X

SL

-3

SL

-3

SL

-3

SL-31

SL-31A

ADDITIONAL

SUPPORT - SL-31A

ADDITIONAL

SUPPORT - SL-28A

SL-30

SL-29

SL-28

PROVIDE INTERMEDIATE SUPPORT -

3.5 INCHES O.D STEEL PILE(TYP.)

SL-27

SL-26

SL-25

SL

-2

SL

-2

SL

-2

SL-28

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

W8X18

CONSTRUCTION NOTE:

1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION

OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE

CENTERLINE OF BOARDWALK ALIGNMENT.

Feet

DF 29

3+

322.38

SL

-3

15.8'

15.8'

12.8'

12.8'

1.2'

4.4'

15.8'

15.8'

4.9'

HALF OF FULL LENGTH HALF OF FULL LENGTH

7.9' 7.9'

HALF OF FULL LENGTHHALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

SL

-3

18+00

MAP 2

DF 18

DF 22

TP

F

TP

F

TP

F

TPFTPFTPFTPF

TPF

TPF

TPF

SL

-4

SL

-4

4.9'

5.7'10.8'

9.9'15.8'

15.8'

16.5'

15.1'

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

7.9' 7.9'

FULL OF FULL LENGTH

FULL OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH HALF OF FULL LENGTH

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 09 - SHEET 26

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PARTIAL FRAMING

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

M

AT

C H

L

IN

E

- S

EE

B

EL

O

W

PARTIAL FRAMING PLAN BOARDWALK

(STA. 2+64 TO 3+12) SL34 TO SL40

PARTIAL FRAMING PLAN BOARDWALK

(STA. 3+12 TO 3+60) SL40 TO SL46

M

AT

C H

L

IN

E

SE

E

AB

O

VE

W 8X31

W8X18 W8X18

W8X18

W 8X31

W 8X31W

8X31

W 8X31

W 8X31

W 8X31

W 8X

W8X18W8X18

W8X18

W8X18

W8X18

W8X18W8X18

W8X18W8X18

W8X18

W8X18

W8X18

W8X18

C OF BOARDWALK ALIGNMENTL

C OF BOARDWALK ALIGNMENT L

PROVIDE

CONCRETE

ABUTMENT

PROVIDE 12" NEOPRENE

60 DUROMETER

M

AT

C H

L

IN

E

SE

E

TR

M

ATC

H

LIN

E SEE TR

CONSTRUCTION NOTE:

1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION

OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE

CENTERLINE OF BOARDWALK ALIGNMENT.

Feet

DF 28

F

TP

F

TP

F

TPFTPFTPFTPF

TPF

TPF

SL

-4

SL

-4

SL

-4

15.8'

15.8'

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

HALF OF FULL LENGTH

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

SL

-4

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 10 - SHEET 27

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PARTIAL FRAMING

PLAN

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

SL

-4

PARTIAL FRAMING PLAN BOARDWALK

(STA. 3+60 TO 3+77) SL46 TO SL48

INTERMEDIATE SUPPORT -

3.5 INCHES O.D STEEL PILE

W8X18

W8X18

C OF BOARDWALK ALIGNMENT

L

M

ATC

H

LIN

E SEE TR

PROVIDE

CONCRETE

ABUTMENT

PROVIDE 12" NEOPRENE

60 DUROMETER

PROVIDE

CONCRETE

ABUTMENT

PROVIDE 12" NEOPRENE

60 DUROMETER

SL

-4

SL

-4

CONSTRUCTION NOTE:

1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION

OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE

CENTERLINE OF BOARDWALK ALIGNMENT.

Feet

1"

10'-0"

3'-0" 1'-0"

1"

2'-0"

1'-0"

3'-0"

4"

1'-0"

1'-0"

2"

6"

6"

6" 11"

1"

1"

4'-6"

1'-6"

2'-4"

6'-0"

1'-4"

6"

6"

2"

1'-0"

2"

2'-0"

1'-6"

2"

1'-4"

2'-4"

6'-0" 2"

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 11 - SHEET 28

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

DETAILS

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

AS NOTED

W8X18

PROVIDE

CONCRETE

ABUTMENT

REFERENCE LINE FOR

STEEL BEAM

REFERENCE LINE FOR

STEEL BEAM

CENTER LINE FOR STEEL

BEAM

SET BEAM 1" OFF FROM

VERTICAL WALL

INTERSECTION POINT

FOR REFERENCE LINE

AND CENTERLINE OF

STEEL BEAM

B X X

C OF BOARDWALK ALIGNMENT L

C OF CONC. ABUTMENTL

C OF CONC. ABUTMENTL

SECTION

CONCRETE ABUTMENT AT SL4

Inches

0 24 48

#3 DIA. BARS AT

8" O.C EACH WAY

COVER (TYP.)

Inches 0 8 16

#3 L SHAPE REBAR

AT 16" O.C

#3 REBAR HOOP

TYPICAL DETAILS

CONCRETE ABUTMENT AT SL12

#3 REBAR HOOP

#3 L SHAPE REBAR

AT 16" O.C

#3 DIA. BARS AT

8" O.C EACH WAY

C X X

OFFSET FROM CENTER LINE (TYP.)

SECTION

STEEL BEAM NOT SHOWN FOR CLARITY

CE

NT

ER

L

IN

E

CONCRETE ABUTMENT AT SL18

#3 DIA. BARS AT

8" O.C EACH WAY

C X X

B X X

A X X

Inches 0 12 24

Inches 0 12 24

Inches 0 16 32

Inches 0 12 24

VARIES

3 FEET MIN. STEEL PIPE

INTO THE GROUND AND

PIPE IS REQUIRED TO

OBTAIN XX LB RESISTANCE

Ø 9 16"

Ø 9 16"

Ø 9 16"

Ø 9 16"

Ø31 2"

Ø4"

8"

4"

1"

16"

8"

4"

Ø 9 16"

Ø 9 16"

16"

4"

8"

4"

4"

VARIES

2 FEET MIN. STEEL PIPE

INTO THE GROUND AND

PIPE IS REQUIRED TO

OBTAIN XX LB RESISTANCE

2"

1'-0"

8'-0"

1"

8"

1'-0"

1"

8"

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 12 - SHEET 29

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

DETAILS

AS NOTED

W8X18

PROVIDE NEOPRENE

AS SHIM

INTERMEDIATE SUPPORT

AT END SUPPORT

D X X

4"

16 " BOLT HOLE

HOT DIPPED GALVANIZED

4 OD x .125 wall x 3.75 ID

1020 DOM A513 Round Steel Tube. WELD TO 38" HDG STEEL

PLATE.

HOT DIPPED GALVANIZED 3-1/2

OD x .250 wall x 3.00 ID 1020 DOM A513 Round Steel Tube

TELESCOPING INTO 4" PIPE

THEORETICAL GAP BETWEEN

PIPES FOR TELESCOPING

SECTION

GROUND

4 " STEEL PLATE -

CLOSED ENDED PIPE

E X X

SECTION

NUT WELD TO 4" OD DOM

ROUND STEEL TUBE

FOR FITTING 12" BOLT

4"

4"

SEE DETAIL

DETAIL

SHORT

SLOT 9

16" X 11 16"

SHORT

SLOT 9

16" X 11 16"

16" DIA. BOLT HOLE

END SUPPORT

GROUND

W8X18 W8X18

W8X35

OFFSET FROM CENTER LINE (TYP.)

CL

4 " STEEL PLATE -

CLOSED ENDED PIPE

F X X

STEEL STIFFENER

3" x 14" thick steel plate (TYP.)

4"1

4"

HDG HEX. 12"

MACHINE

BOLT

HDG 12" x 2"

STRUCTURAL

BOLT (TYP.)

SECTION

GUARD RAIL SHOWN

AS BACKGROUND SEE

SHEET TD XX FOR

DETAILS

STEEL STIFFENER

3" x 14" thick steel plate (TYP.)

PROVIDE SCREWBOLT SCREW

ANCHOR 38" X 2" (TYP.). AT

ALTERNATE CONCRETE PLANK

INSTALL SCREW PER

MANUFACTURER

PRE-DRILLED HOLE.

DETAILS

HDG 12" x 2"

STRUCTURAL

BOLT (TYP.)

A X X

C X X

A X X

C X X

F X X

G X X

G X X

E X X

D X X

Inches 0 8 16

Inches 0 8 16

Inches 0 8 16

Inches 0 2 4

Inches 0 2 4

Inches 0 2 4

Inches 0 4 8

6"

8"

W8X18 REFERENCE LINE FOR STEEL BEAM

W8X18 REFERENCE LINE FOR STEEL BEAM

6"

8"

EQ. EQ.

*REFERENCE LINE OF STEEL BEAM

MAY NOT ALIGN WITH CENTER OF

STEEL BEAM - REFER TO STEEL

FRAMING PLAN

3" 3"

C4 x7

.5

C4 x7.

5 C4x7.5

C4 x7

.5

C4 x7

.5

W8X18

8'-8"

5'-41 2"

4"

1"

4"

1" 4"

3"

4"

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 13 - SHEET 30

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

BRACING DETAILS

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

AS NOTED

TYPICAL BRACING FOR STEEL BEAMS

4" STEEL PLATE

WELD TO STEEL BEAM

B X X

4"1

4"1 4"1

4" 1 4"1

4" 4"

SECTION

MINIMUM EDGE DISTANCE

MINIMUM OVERLAPPED

DISTANCE

MINIMUM EDGE DISTANCE

MINIMUM DISTANCE

MINIMUM DISTANCE

PROVIDE 14"

STEEL PLATE

PROVIDE NUT

AND WASHER (TYP.)

THE CONTRACTOR SHALL

VERIFY ACTUAL BRACING

LENGTH ON SITE AFTER

ERECTION OF W8X18

C X X

D X X

A X X

B X X

CONNECTION DTL.C

X X

CONNECTION DTL.D

X X

Inches 0 2 4

Inches 0 2 4

Inches 0 8 16

Inches 0 8 16

2 DIA. x 2" long A325 elev=332.0

SL 4

STA. 0+24

5% SLOPE

SL 5

STA. 0+32

SL 7

STA. 0+48

SL 6

STA. 0+40

SL 8

STA. 0+56

5% SLOPE

SL 9

STA. 0+64

SL 11

STA. 0+80

SL 8

STA. 0+56

SL 10

STA. 0+72

5% SLOPE

5% SLOPE

SL 12

STA. 0+88

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 15 - SHEET 31

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PROFILE

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

BOARDWALK PROFILE

(STA. 0+24 TO 0+56) SL04 TO SL08

NTS

M

AT

C H

L

IN

E

- S

EE

T

R

M

AT

C H

L

IN

E

SE

E

BE

LO

W

M

ATC

H

LIN

E - SEE ABO

VE

BOARDWALK PROFILE

(STA. 0+56 TO 0+88) SL08 TO SL12

EXISTING GRADE

3 FEET EMBEDMENT

EXISTING GRADE

3 FEET EMBEDMENT

ELEV. = 332.5

ELEV. = 328.50

INTERMEDIATE SUPPORT

(TYP.)

END SUPPORT

(TYP.)

INTERMEDIATE SUPPORT

(TYP.)

END SUPPORT

(TYP.)

CONSTRUCTION NOTE:

1. STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO THIS PROFILE SHEET FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO

ERECTION OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG

THE CENTERLINE OF BOARDWALK ALIGNMENT.

SL 13

STA. 1+04

SL 15

STA. 1+20

SL 14

STA. 1+12

SL 16

STA. 1+28

5% SLOPE

5% SLOPE

SL 12

STA. 0+88

2% SLOPE

SL 17

STA. 1+36

SL 19

STA. 1+44

SL 16

STA. 1+28

SL 20

STA. 1+52 5% SLOPE

SL 18

STA. 1+36

PARKS FILE#

SCALE

PARKS

STATE

RECREATION

WASHINGTON

COMMISSION

AND

RE

VI

SI

ON

S

CHECKED (HDQTS.)

REGISTERED STAMP

DESIGNED

CHECKED (FIELD)

DRAWN

ACTION BY DATE

NO

CAD NO.

AP

P.

IN

T.

DA

TE

TR 16 - SHEET 32

ANDERSON LAKE

STATE PARK

NEW DAY USE

FACILITIES &

TRAIL DEVELOPMENT

BOARDWALK

PROFILE

A620-2022-SW1_1

DB 9/29/2025

PZ 9/29/2025

BOARDWALK PROFILE

(STA. 0+96 TO 1+28) SL12 TO SL16

NTS

M

AT

C H

L

IN

E

- S

EE

T

R

M

AT

C H

L

IN

E

SE

E

BE

LO

W

M

ATC

H

LIN

E - SEE ABO

VE

BOARDWALK PROFILE

(STA. 1+28 TO 1+60) SL16 TO SL20

EXISTING GRADE

3 FEET EMBEDMENT

EXISTING GRADE

3 FEET EMBEDMENT

ELEV. = 328.50

ELEV. = 325.80

CONSTRUCTION NOTE:

1. STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,

NOT THE SLOPE DISTANCE. REFER TO THIS PROFILE SHEET FOR DIFFERENT SLOPE.

2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO

ERECTION OF STEEL BEAMS.

3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.

4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS

UNLESS NOTED OTHERWISE.

5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG

SL 21

STA. 1+60SL 23

S…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .