3-SW-C1831 Anderson Lake New Day Use Trail Dev-Drwgs.pdf
PDF 19 MB Posted
- Attached to
- State Parks Project – New Day Use Facilities and Trail Development at Anderson Lake State Park
- Solicitation number
- SW-C1831
- Issued by
- Washington
About this file
This is a construction design document prepared by the Washington State Parks and Recreation Commission for the Anderson Lake State Park New Day Use Facilities and Trail Development project located at 1061 Anderson Lake Road, Chimacum, Washington 98325, in Jefferson County. The project encompasses comprehensive site improvements including paving the park's main entrance road with hot mixed asphalt (HMA), developing multi-use trails with both pedestrian and equestrian components, constructing approximately 380 linear feet of elevated boardwalk with concrete plank decking and steel beam support systems, establishing new day-use parking facilities with ADA-accessible spaces, installing signage and striping, removal of two existing vault restrooms, and construction of two new CXT modular restroom buildings. The design incorporates three distinct trail types: separated equestrian trails, separated pedestrian trails, and multi-use trails, with detailed specifications for trail widths ranging from 8 to 10 feet. The boardwalk section (stations 14+59 to 18+42) features W8X18 and W8X31 steel beams supported by 3.5-inch diameter galvanized steel pipe piles with concrete abutments and neoprene bearings, accommodating slopes up to 6.5 percent with 8-foot spacing between support lines. Site work includes stormwater management with silt fencing and vegetation buffers, tree removal and protection measures, and equipment access staging areas.
The design documents establish detailed specifications for materials and construction standards conforming to AASHTO guidelines, AISC structural steel standards, and WSDOT 2023 Standard Specifications. All structural steel components are hot-dipped galvanized per ASTM A-123 standards, concrete is specified at 6000 PSI minimum compressive strength at 28 days with prestressed deck panels utilizing ASTM A416 Grade 270 strands, and lumber components are pressure-treated Douglas fir or cedar. The project incorporates comprehensive details for concrete plank layouts with 47 special concrete panel configurations, railing systems using cedar hand rails and galvanized hog wire panels, and temporary construction specifications including equipment access mats and turnaround areas. Special inspection requirements are mandated for all concrete work, field welding, and high-strength bolting. Construction cost details and funding sources are not specified in the design documents, though the project is managed by the Washington State Parks and Recreation Commission with regional oversight from the Port Angeles area office, with design completion dated March 17, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPRU 42
SPRU 44
CD
ALD
ALD
ALD
ALD
ALD
ALD ALD
ALD
ALD
ALD
254254 254254
255255255
256256
258 25
3.
5253.5
.5253.5253.5254.5
254.5 255.5
255.5 256.5
6.5 25
7.
5258.5
NORTH
PROJECT LOCATION
NORTH
VICINITY MAP
APPROVED FOR CONSTRUCTION
date date
CA
D#
: A
0-
-S
W 1_
PR
OJ
EC
T
TI
TL
E
N
EW
D
AY
U
SE
F
AC
IL
IT
IE
S
AN
D
TR
AI
L
DE
VE
LO
PM
EN
T
INDEX
DESCRIPTIONSHEET
1061 ANDERSON LAKE RD. CHIMACUM, WA 98325
SEC-09 T-29-N R-1-W
JEFFERSON COUNTY TAX PARCEL NO. 901094001
48° 01' 4.4" N & 122° 48' 14.0" W
ANDERSON LAKE STATE PARK
NEW DAY USE FACILITIES AND TRAIL DEVELOPMENT
REGION MANAGER
CAPITAL PROGRAM MANAGER
ANGELES
PORT
SEQUIM
U.S.A.
CANADA
SEATTLE
LYNNWOOD
BREMERTON
WINSLOW
POULSBO
BELLEVUE
REDMOND
BOTHEL
MONROE GOLD
BAR
STANWOOD
PORT
104104
TOWNSEND
MARYSVILLE
SNOHOMISH
EVERETT
ARLINGTON
ANACORTES
SEDRO WOOLLEY
BURLINGTON
CONCRETE
Area Manager: BRIAN HAGEMAN
WASHINGTON STATE PARKS
& RECREATION COMMISSION
SEE NEXT SHEET FOR INDEX
ALI RAAD
HOLLY WILLIAMS, CHAIR
SCOTT MERRIMAN LAURIE CONNELLY
ALFIE ALVARADO-RAMOS
DIANA DUPUIS, DIRECTOR
SOPHIA DANENBERG
17 March 2026
3/18/2026
AutoCAD SHX Text o
AutoCAD SHX Text p
AutoCAD SHX Text p
AutoCAD SHX Text o
AutoCAD SHX Text p
AutoCAD SHX Text
PROJECT LOCATION ANDERSON LAKE STATE PARK
AutoCAD SHX Text
PROJECT LOCATION ANDERSON LAKE STATE PARK
SITE PLAN EXISTING
COVER SHEET
GE 03
GE 01
INDEX
DESCRIPTIONSHEET
SITE PLAN PROPOSEDGE 04
ROAD/PARKING PLANRD 01
GENERAL (GE)
ROADS (RD)
SIGNAGE DETAILSRD 03
STRIPING DETAILSRD 04
SITE PLAN PROPOSEDTRL 01
TRAILS (TRL)
ENLARGED PLANTRL 02
ENLARGED PLANTRL 03
ENLARGED PLANTRL 04
ROAD/PARKING ENLARGED PLANSRD 02
PLANK LAYOUT PLANTR 21
DESCRIPTIONSHEET
BOARDWALK (TR)
BOARDWALK PLANTR 02
BOARDWALK (TR)
SHEET INDEXGE 02
ENLARGED PLANTR 03
ENLARGED PLANTR 04
ENLARGED PLANTR 05
PARTIAL FRAMING PLANTR 06
PARTIAL FRAMING PLANTR 07
PARTIAL FRAMING PLANTR 08
PARTIAL FRAMING PLANTR 09
PARTIAL FRAMING PLANTR 10
DETAILSTR 11
DETAILSTR 12
DETAILSTR 13
PROFILESTR 15
PROFILESTR 16
PROFILESTR 17
PROFILESTR 18
PROFILESTR 19
PROFILESTR 20
<RESERVED><RESERVED>
PLANK LAYOUT PLANTR 22
PLANK DETAILSTR 23
PLANK DETAILSTR 24
PLANK DETAILSTR 25
PLANK DETAILSTR 26
PLANK DETAILSTR 27
PLANK DETAILSTR 28
PLANK DETAILSTR 29
RAILINGTR 30
DETAILS (DT)
TEMP. CONSTRUCTION DETAILDT 01
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
GE 02 - SHEET 2
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
SHEET INDEX
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
NTS
CXT RESTROOMDT 02ODT CONNECTOR PLANTRL 05
BW2 LAYOUT PLANTR 31
BW2 LAYOUT PLANTR 32
BW2 PROFILETR 33
LEGEND
DESCRIPTIONSYMBOL
TREE PROTECTION FENCE
TREE REMOVAL
STUMP
MADRONA
MAPLE
FIRS
CEDAR
INDEX
STORMWATER PLANSWR 01
STORMWATER (SWR)
SWR 02
SWR 03
SWR 04
SWR 05
STORMWATER PLAN
STORMWATER PLAN
STORMWATER PLAN
STORMWATER PLAN
3/17/26
13+23
-0+70
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
X
XX
X
X
X
X
X
0+00
DF 36
ALD 24
ALD 24
DF 36
DF 36
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
GE 03 - SHEET 3
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
SITE PLAN
EXISTING
SITE PLAN EXISTING
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
UNPAVED EQUESTRIAN PARKING, HITCHING POSTS
2 RESIDENTIAL, MAINTENANCE BUILDINGS
3 PRIMARY TRAIL ACCESS PARKING
OLYMPIC TRAIL
GRAVEL ACCESS ROAD
10' WIDTH UNPAVED
EQUESTRIAN ACCESS
TRAIL
EDGE OF DENSE
FORESTATION
EDGE OF DENSE
FORESTATION
ANDERSON LAKE
EXISTING VEGETATION LIMITS
4 CONCRETE ELECTRICAL VAULT
EDGE OF VEGETATION
WL-2
WR-1
WR-2
WL-1
WL-2
WL-9
WR-3
WL-3
Feet 0 75 150
DELINEATED WETLAND
BOUNDARY, TYP.
EXISTING CULVERT 3/17/26
ATTEMP
X
XX
X
X
X
X
X
Curve Table: Alignments
Curve #
C145
C18
C12
C11
C10
C9
C8
C7
C6
C5
C4
C3
C2
C1
Radius
55.180
116.578
358.799
181.359
447.980
242.228
13.000
803.820
13.000
5021.945
2045.809
88.625
357.686
160.701
Length
115.492
47.107
129.558
18.501
26.476
109.159
0.056
46.320
0.023
54.903
32.144
82.463
120.748
93.120
Chord Direction
N63° 59' 20.13"E
N15° 36' 15.06"E
N12° 45' 26.30"E
N20° 10' 45.10"E
N18° 56' 59.25"E
N37° 04' 16.63"E
N49° 10' 45.57"E
N47° 41' 33.92"E
N46° 10' 59.12"E
N47° 15' 17.72"E
N42° 18' 35.85"E
N12° 17' 15.63"E
N07° 31' 35.73"W
N20° 39' 12.48"E
DF 36
ALD 24
ALD 24
DF 36
DF 36
ASPN 11
ASPN 5
ASPN 9
ASPN 7
Standard : 1 Area : 16505.12
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
GE 04 - SHEET 4
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
PROPOSED SITE
SITE PLAN PROPOSED
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
PAVED EQUESTRIAN PARKING LOOP
2 RESIDENTIAL, MAINTENANCE BUILDINGS
3 TRAILHEAD
OLYMPIC TRAIL
EQUESTRIAN ACCESS
TRAIL, CROSSWALK
EDGE OF DENSE
FORESTATION
ANDERSON LAKE
4 CONCRETE ELECTRICAL VAULT
EDGE OF VEGETATION
A
RD02
B
RD02
D
RD02
C
RD02
REMOVE EXISTING
BOLLARDS
WL-2
WR-1
WR-2
WL-1
WL-2
WL-9
WR-3
Feet 0 75 150
REMOVE TWO (2) EXISTING
VAULT RESTROOM
0+00
X
XX
X
X
X
X
X
Line Table: Alignments
Line #
L12
L10
L9
L8
L7
L6
L5
L4
L3
L2
L1
Length
34.496
71.105
55.237
0.743
19.532
14.377
66.635
26.421
26.692
25.080
74.034
Direction
N04° 01' 41.58"E
N23° 06' 06.13"E
N17° 15' 24.08"E
N20° 38' 34.43"E
N21° 36' 22.43"E
N23° 17' 25.24"E
N49° 27' 25.37"E
N44° 57' 09.42"E
N18° 20' 22.12"W
N34° 27' 55.11"E
N32° 13' 49.98"E
Curve Table: Alignments
Curve #
C145
C18
C12
C11
C10
C9
C8
C7
C6
C5
C4
C3
C2
C1
Radius
55.180
116.578
358.799
181.359
447.980
242.228
13.000
803.820
13.000
5021.945
2045.809
88.625
357.686
160.701
Length
115.492
47.107
129.558
18.501
26.476
109.159
0.056
46.320
0.023
54.903
32.144
82.463
120.748
93.120
Chord Direction
N63° 59' 20.13"E
N15° 36' 15.06"E
N12° 45' 26.30"E
N20° 10' 45.10"E
N18° 56' 59.25"E
N37° 04' 16.63"E
N49° 10' 45.57"E
N47° 41' 33.92"E
N46° 10' 59.12"E
N47° 15' 17.72"E
N42° 18' 35.85"E
N12° 17' 15.63"E
N07° 31' 35.73"W
N20° 39' 12.48"E
DF 36
ALD 24
ALD 24
DF 36
DF 36
ASPN 11
ASPN 5
ASPN 9
ASPN 7
STA:0+00.00
Standard : 1 Area : 16505.12
Elevation
Station
PR ENTRANCE CL - PROP SITE PROFILE
259260
259260
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
-9.00%
-9.87%
0.47%
6.5 8%
-2.36%
-8.00%
7.6 9%
-1.83% 6.5
3%
0.10%
-3.90% 2.96% -0.09%
6.2 1%
0.71%
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
RD 01 - SHEET 5
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
PROPOSED
SITE
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
PAVED EQUESTRIAN PARKING LOOP
2 RESIDENTIAL, MAINTENANCE BUILDINGS
3 TRAILHEAD
OLYMPIC TRAIL
EQUESTRIAN ACCESS
TRAIL, CROSSWALK
EDGE OF DENSE
FORESTATION
ANDERSON LAKE
4 CONCRETE ELECTRICAL VAULT
EDGE OF VEGETATION
A
RD02
B
RD02
D
RD02
C
RD02
SITE PLAN PROPOSED Feet 0 75 150
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
9+00
C1
Standard : 1 Area : 16505.12
0+00
1+
2+00
3+00
4+
5+
5+
0+00
11+00
12+00
13+00
+3
DF 36
DF 36
ASPN 11
ASPN 5
ASPN 9
ASPN 7
STA:0+00.00
C1
L1
C1
DF 36
ALD 24
ALD 24
Alignment=PR ENTRANCE CL - PROP SITE Station=2+17.32
Offset=-20.291
CROSSWALK END
Alignment=PR ENTRANCE CL - PROP SITE Station=1+72.52 Offset=13.018
CROSSWALK START
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
RD 02 - SHEET 6
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
ENLARGED PLANS
AS NOTED
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
PROPOSED ADDITIONAL
DAY-USE PARKING
EDGE OF VEGETATION
PROPOSED DOUBLE CXT, 6' ADA
ACCESSIBLE HMA PATH
TRAILHEAD PLANA
EQUESTRIAN PARKING PLANB
EQUESTRIAN CROSSING PLAND
ENTRANCE PLANC
EDGE OF VEGETATION
EXISTING FENCE
EXISTING SEPTIC DRAIN FIELD
EDGE OF VEGETATION
EXISTING GATE POST &
SWING SHOWN
EXISTING PARK
SIGN
EXISTING GRAVEL ROAD
TO BE HMA RESURFACED
SAVAGE MEMORIAL TRAIL
PROPOSED UNPAVED 10'
EQUESTRIAN TRAIL
ANDERSON TRAIL
STA: 00+00
CROSSING MARKINGS
FOR EQUESTRIAN TRAIL
PROPOSED ADDITIONAL 5x8' STANDARD
PICNIC TABLES WITHIN EXISTING
CLEARED AREA
PROPOSED SINGLE-STALL
CXT, 6' CSTC GRAVEL
ACCESS PATH
PAINTED ADA SYMBOL
SEE DETAIL
WL-9
WL-10
WL-11
WR-3
WL-2
WR-2
RELOCATED EXG.
HITCHING POSTS
Feet 0 40 80
Feet 0 20 40
Feet 0 20 40
Feet 0 20 40
D
RD03
9"
6'-0"
9"
4"3"
2'-6"
CENTER WHEELSTOP IN PARKING SPACE
3'-0"3'-0"
2" CLEARANCE TYP.
6"
8" MIN
10" MAX
7'-0"
3'-0"
3'-0" STOP
3'-0"
ACCESSIBLE
VAN
5'-0"
2'-0"
RESERVED
PARKING
STATE DISABLED
PARKING PERMIT
REQUIRED
CARRIAGE BOLT HOLES
EDGE OF CURB
AND/OR PAVEMENT
NON-SHRINK GROUT
5/8"∅x18" REBAR
GROUT TOP
3:1 SAND & CEMENT
GROUT TO 1" DEPTH
#3 REBAR (2)
BUMPER BLOCKA
4 x 4 P.T. POST
MATCH SURROUNDING
SURFACE
8" DIA. HDG HEX BOLTS
WITH NUTS & WASHERS
STANDARD 30" STOP
SIGN OR YIELD SIGN
PER MUTCD SPECS.
FINISH GRADE
CONCRETE
IN PLACE
4 x 4 P.T. POST
FASTEN EACH SIGN WITH TWO 3"
CORROSION RESISTANT DECKING
SCREWS WITH WASHERS
ADA SIGN FURNISHED AND
INSTALLED BY CONTRACTOR
STD 12"x6" "VAN ACCESSIBLE"
SIGN PER MUTCD SPECS.
STOP & YIELD SIGNB
ADA PARKING SIGNC
Inches 0 12 24
Inches 0 12 24
Inches 0 10 20
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
RD 03 - SHEET 7
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
SIGNAGE
DETAILS
AS NOTED
BUMPER BLOCK - YIELD-STOP-ADA SIGNAGE DTL
DB 4/24/2025
---- 4/24/2025
42"
29"
42"
24"
ADA SYMBOLD
- NTS
3/17/26
AutoCAD SHX Text
FINISH GRADE
Car
11'
0.
5'
Sh ou ld er
SINGLE LANE
Ed ge o f A sp ha lt
Ed ge o f A sp ha lt
Car CarPe d
11' 11'3' 2'
Sh ou ld er
2 WAY TRAFFIC
Ed ge o f A sp ha lt
Ed ge o f A sp ha lt
Bike Car CarPe d
6' 11' 11'3' 2'
Sh ou ld er
2 WAY TRAFFIC
Ed ge o f A sp ha lt
Ed ge o f A sp ha lt
Bike Car CarPe d
6' 11' 11'3' 2'
Sh ou ld er
Equ
8'
Ed ge o f A sp ha lt
Ed ge o f A sp ha lt
2 WAY TRAFFIC
Car CarPe d
11' 11'3' 2'
Sh ou ld er
Equ
8'
Ed ge o f A sp ha lt
Ed ge o f A sp ha lt
2 WAY TRAFFIC
27.00'
33.00' 41.00'
35.00'
12.00'
3' 6' 11' 11' 2' 8' 3' 6' 11' 11' 2'
8' 3' 11' 11' 2' 3' 11' 11' 2'
0.5' 11' 0.5'
VARIES
HMA EXTENTS
VARIES PER ROAD TYPE
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
RD 04 - SHEET 8
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
MISC. DETAILS
AS NOTED
A620-2022-SW1_1
DB 3/24/2026
PZ 3/24/2026
EQUESTRIAN CROSSINGB
Feet 0 10 20
STRIPING PATTERNS
Feet
0 8 16
TYPE - E
TYPE - DTYPE - C
TYPE - BTYPE - A
EDGE OF PAVEMENT
SHOULDER
PROPOSED ROAD CENTERLINE
EDGE OF PAVEMENT
SHOULDER
EDGE OF EQUESTRIAN PATH
UNPAVED, UNMARKED
9'x2" CROSSWALK MARKINGS
TYP.
EXISTING EDGE OF
VEGETATION
1.5:1 CUT/FILL
COMPACTED EXISTING GRADE
3" HMA SURFACING
4" COMPACTED
NATURAL SURFACE
LEVELING COURSE/CSTC
ADD ADDITIONAL BALLAST AS NECESSARY TO MAINTAIN
CONTINUOUS ROAD BASE & FINISH CROSS-SLOPE
TYP. ROAD SECTION
Feet
0 8 16
2% SLOPE AWAY FROM CROWN2% SLOPE AWAY FROM CROWN
PGzahn Image
ALD 12CD 16
CD 7 CD 8
CD 36
CD 12
CD 47
DF 33
DF 7
DF 5
DF 9
DF 12
DF 8
DF 12
CD 10
CD 6
CD 18CD 10
CD 52
CD 24
DF 33CD 24
CD 32
MAP 30
CD 30
DF 40
CD 50
ALD 16
ALD 14
MAP 33
CD 36
DF 32
CD 36
CD 28
CD 35
DF 29
MAP 2
DF 18
DF 22DF 28
DF 14
DF 30DF 22
DF 18
DF 22
DF 22
DF 27DF 12
DF 24
DF 12
DF 20
DF 31
CD 14
DF 26
DF 14
DF 27
DF 16
DF 24
DF 26
DF 19
STUMP
DF 23
DF 36
CD-DF 16
ALD 14
ALD 12
ALD 14
ALD 12
ALD 14
ALD 10
ALD 18
ALD 16
ALD 18
ALD 17
DF 28
STUMP
CD 36
CD 36CD 36
STUMP 35
ALD 14
CD
ALD
ALD
ALD
ALD
ALD
ALD ALD
ALD
ALD
ALD
Elevation
Station
EX TRAIL CL - EX SITE PROFILE
289290
289290
0+
1+
2+
3+
4+
5+
6+
7+
8+
9+
-2.77%
0.09%
3.51%
-0.73%
0.05%
0.31%
4.66%
-1.00%
-4.98%
3.10%
0.28%
4.57%
2.37%
3.98%
3.72%
4.93%
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TRL 01 - SHEET 9
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
SITE PLAN
PROPOSED
AS NOTED
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
OL
YM
PIC
TR
AI
L
AN
DE
RS
ON
T
RA
IL
LA
KE
SI
DE
T
RA
IL
A
TRL03
A
TRL02
A
TRL04
WL-4
WL-4
WR-4
WR-5
WR-6
WR-7
WL-5
WR-8
WL-6
WL-7
WR-9
WR-10
WR-11
WL-8
WL-11
WL-10
TRAIL ROUTE PLANB
Feet
0 100 200
A
TRL05
SEE TRAIL
SECTION
B
TRL05
SEE TRAIL
SECTION
C
TRL05
8+00
10+00
CD 52
CD 24
DF 33CD 24
CD 32
MAP 30
ALD
STA:8+02.00
BEGIN OFFSET
STA:8+80.80
END OFFSET
STA:9+25.00
BEGIN OFFSET
STA:10+54.83
END OFFSET
STA:11+22.00
END NARROWING
STA:10+72.00
BEGIN NARROWING
Elevation
Station
EX TRAIL CL - EX SITE PROFILE
7+
8+
9+
0.31%
4.66%
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TRL 02 - SHEET 10
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
ENLARGED PLAN
AS NOTED
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
EDGE OF PAVEMENT
EXISTING TRAIL CENTERLINE
TRAIL ROUTE PLANA
Feet 0 16 32
+0
16+00
ALD 16
ALD 14
MAP 33
CD 36
DF 32
CD 36
CD 28
CD 35
DF 29
MAP 2
DF 18
DF 22DF 28
DF 14
DF 30
CD 36
CD 36CD 36
STUMP 35
ALD 14
CD
ALD
ALD
ALD
ALD
ALD
ALD ALD
ALD
ALD
STA:13+78.39
BEGIN OFFSET
STA:14+58.37
END OFFSET
BEGIN BOARDWALK
STA:=13+58.14
OFFSET:=6.000
BEGIN STAGING
STA:=14+57.53
OFFSET:=6.739
END STAGING
STA:18+42.46
END BOARDWALK
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TRL 03 - SHEET 11
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
ENLARGED PLAN
AS NOTED
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
TRAIL ROUTE & BOARDWALK PLANA
NOTES:
1. SHOWN LOCATIONS OF PROPOSED BOARDWALK ARE INDICATIVE OF SATURATED SOILS. EQUIPMENT ACCESS MATS MUST
BE PLACED AT THIS LOCATIONS PRIOR TO TRAVERSAL OF MOTORIZED CONSTRUCTION EQUIPMENT ACROSS THESE AREAS, AND REMOVED WHEN SUCH TRAVERSAL IS NO LONGER DEEMED NECESSARY. SEE SPECIFICATION.
2. CLEARING AND GRUBBING LIMITED TO DESIGN WIDTH OF TRAIL.
REMOVE TWO (2) EXISTING CULVERTS
PRIOR TO CONSTRUCTION OF BOARDWALK
WL-7
WR-9
WL-6
WR-8
Feet 0 16 32
TEMP. CONSTRUCTION STAGING
LOCATION, SEE DETAIL
DT01
24+00
DF 23
DF 36
CD-DF 16
ALD 14
ALD 12
ALD 14
ALD 12
ALD 14
ALD 10
ALD 18
ALD 16
ALD 18
ALD 17
DF 28
STA:=22+41.80
OFFSET:=6.130
STA:=23+63.55
OFFSET:=-0.959
BEGIN BOARDWALK
STA:=24+71.25
OFFSET:=-18.746
END BOARDWALK
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TRL 04 - SHEET 12
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
ENLARGED PLAN
AS NOTED
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
TRAIL ROUTE & BOARDWALK PLANA
EXISTING TRAIL CENTERLINE
PROPOSED TRAIL EDGE OF PAVEMENT (EOP)
WR-7
WL-5
WL-5
Feet 0 10 20
DT01
TEMP. CONSTRUCTION
TURNAROUND, SEE DETAIL
TR31
NOTES:
1. SHOWN LOCATIONS OF PROPOSED BOARDWALK ARE INDICATIVE OF SATURATED SOILS. EQUIPMENT ACCESS MATS MUST
BE PLACED AT THIS LOCATIONS PRIOR TO TRAVERSAL OF MOTORIZED CONSTRUCTION EQUIPMENT ACROSS THESE AREAS, AND REMOVED WHEN SUCH TRAVERSAL IS NO LONGER DEEMED NECESSARY. SEE SPECIFICATION.
2. CLEARING AND GRUBBING LIMITED TO DESIGN WIDTH OF TRAIL.
3/17/2
10.00'
8' AS NOTED
25+60
Line Table: Alignments
Line #
L197
L196
L195
L194
L193
L192
L191
L190
L189
L188
L187
L186
L185
L184
L183
L182
L181
Length
7.503
43.931
23.582
22.482
14.970
25.687
28.620
9.955
24.658
27.798
15.524
4.875
27.352
7.851
15.590
6.757
43.123
Direction
N14° 14' 59.66"E
S88° 17' 39.51"W
N31° 35' 18.33"W
N58° 45' 54.56"W
N09° 49' 33.24"W
S61° 45' 16.74"W
N04° 28' 39.23"W
N45° 11' 47.42"W
N28° 45' 32.19"W
N44° 03' 04.30"W
N16° 25' 44.90"W
N68° 43' 50.55"W
N07° 47' 40.95"W
N29° 49' 12.54"W
N45° 20' 16.62"W
N56° 09' 58.06"W
N38° 49' 46.39"W
Curve Table: Alignments
Curve #
C163
C162
C161
C160
C159
C158
C157
C156
C155
C154
C153
C152
C151
C150
C149
C148
C164
Radius
6.781
17.437
22.865
29.556
6.781
93.737
6.781
6.781
21.849
6.781
6.862
13.216
21.133
47.531
47.531
49.248
51.683
Length
3.217
14.894
43.267
58.688
4.819
26.892
1.810
5.640
40.405
3.631
6.264
14.055
8.124
12.873
8.983
14.901
55.600
Chord Direction
N45° 10' 36.44"W
N34° 17' 43.90"W
N64° 02' 08.25"W
N61° 21' 41.25"W
N24° 50' 13.33"W
N36° 58' 39.81"W
N36° 24' 18.25"W
N67° 52' 42.40"W
N38° 43' 40.42"W
N01° 05' 22.62"W
N42° 34' 47.73"W
N38° 15' 45.75"W
N18° 48' 26.74"W
N37° 34' 44.58"W
N50° 45' 07.34"W
N47° 29' 52.22"W
S21° 52' 04.18"E
ALD 12CD 16
CD 7 CD 8
CD 36
CD 12
CD 47
DF 33
DF 7
DF 5
DF 9
DF 12
DF 8
DF 12
CD 10
CD 6
CD 18CD 10
ALD 18
ALD 16
ALD 18
ALD 17
DF 28
L181
L182
L183
L184
L185
L186
L187
L188
L189
L190
L191
L192
L193
L194
L195
L196
L1
C148
C149
C150
C151
C152
C153
C154
C155
C156
C157
C158
C159
C160
C161
C162
C163
C164
0+
1+00
2+00
3+
4+00
5+
6+00
6+19
OFFSET:=-0.959
BEGIN BOARDWALK
STA:=24+71.25
OFFSET:=-18.746
END BOARDWALK
4.00' 10.00'
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TRL 05 - SHEET 13
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
ODT CONNECTOR
PLAN
SITE PLAN PROPOSED
A620-2022-SW1_1
DB 3/24/2026
PZ 3/24/2026
Feet 0 30 60
ODT CONNECTOR TRAIL
TERMINATES AT PARK BOUNDARY PARK BOUNDARY
TRAIL SECTIONA
TYP. TRAIL SECTIONB
4" COMPACTED
NATURAL SURFACE
1.5:1 CUT/FILL
1.5:1 CUT/FILL
COMPACTED
EXISTING GRADE
3" HMA SURFACING
6" CSBC COMPACTED
EXISTING GRADE A
SEPARATED EQUESTRIAN
TRAIL, SEE DETAIL
B
SEPARATED PEDESTRIAN
TRAIL, SEE DETAIL
MULTI-USE TRAIL
SEE DETAIL
C
TRAIL SECTIONC
1.5:1 CUT/FILL
6" CSBC COMPACTED
EXISTING GRADE
3" HMA SURFACING
4" COMPACTED
NATURAL SURFACE
1 PEDESTRIAN TRAIL
2 EQUESTRIAN TRAIL
4 EXISTING TRAIL
3 MULTI-USE TRAIL
AS NOTED
FIELD-FLAGGED DESIGN
CENTERLINE
10" LEVELING COURSE/CSTC
10" LEVELING COURSE/CSTC
XX
X
X
X
X
X
DF 36
ALD 24
ALD 24
DF 36
DF 36
ASPN 11
ASPN 5
ASPN 9
ASPN 7
Standard : 1 Area : 16505.12-9.55%
-4.97%
-1 1.
-7 .20
-3 .2
2%
-9.
-8
.00
-9 .1
6% -1
4.
-1
0.
-8 .8
9%
-9.1 9%
-6.64%
-20.89%
-4.63%
-20 .49
-3 .5
4%
-3.
31%
-2.10%
-0 .6
6%
-2.30%
-8 .3
2%
-20.03%
-8.10%
-1 .4
6%
-9.17% -14.51% -11.30%
-11.98%
-7.17%
-12.48%
-10.18%
-8.09%
-4.85%
-6.15%
-4.64%
-10.47%
-4.39%
-6.26%
-4.64%
-3 .0
5%
-6 .5
2%
-5.51%
-7.23%
-6.81% -7.86%
-5.25%
-9.82%
-8.24%
-147.53%
-16.60%
-8 .2
9%
-2.99%
-18.57%
-19.62%
-20.03%
-9.62%
-10.56%
-11.32%
-5.47%
-7.97%
-10.77%
-14.01%
-14.02%
-13.62%
-7.65%
-5.28%
-4.85%
-7.16%
-8.12%
-9.67% -10.80%
-9.93%-12.10%
-15.07%
-9.57%
-11.30% -11.99%
-10.54%
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
SWR 01 - SHEET 14
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
STORMWATER
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
EDGE OF DENSE
FORESTATION
ANDERSON LAKE
EDGE OF VEGETATION
Feet 0 75 150
SITE PLAN PROPOSED
SILT FENCING TYP.
SEE DETAIL
B
DT01
WETLAND, BUFFER ZONE TYP.
EXISTING CONTINUOUS
VEGETATION FILTER STRIP
STORMWATER PATH
DF 36
DF 36
ASPN 11
ASPN 5
ASPN 9
ASPN 7
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
SWR 02 - SHEET 15
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
STORMWATER
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
SITE PLAN PROPOSED
SILT FENCING TYP.
SEE DETAIL
B
DT01
WETLAND, BUFFER ZONE TYP.
Feet 0 30 60
CD 52
CD 24
DF 33CD 24
CD 32
MAP 30
CD 30
DF 40
CD 50
ALD 16
ALD 14
MAP 33
ALD 14
ALD
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
SWR03 - SHEET 16
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
STORMWATER
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
Feet 0 30 60
SITE PLAN PROPOSED
SILT FENCING TYP.
SEE DETAIL
B
ALD 16
ALD 14
MAP 33
CD 36
DF 32
CD 36
CD 28
CD 35
DF 29
MAP 2
DF 18
DF 22DF 28
DF 14
DF 30DF 22
DF 18
DF 22
DF 22
DF 27DF 12
DF 24
DF 12
DF 20
DF 31
CD 14
DF 26
DF 14
DF 27
DF 16
DF 24
DF 26
DF 19
STUMP
DF 23
DF 36
CD-DF 16
ALD 14
STUMP
CD 36
CD 36CD 36
STUMP 35
CD
ALD
ALD
ALD
ALD
ALD
ALD ALD
ALD
ALD
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
SWR04 - SHEET 17
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
STORMWATER
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
SITE PLAN PROPOSED
SILT FENCING TYP.
SEE DETAIL
B
DT01
TEMP. CONSTRUCTION
TURNAROUND TYP.
A
DT01
Feet 0 30 60
ALD 12CD 16
CD 7 CD 8
CD 36
CD 12
CD 47
DF 33
DF 7
DF 5
DF 9
DF 12
DF 8
DF 12
CD 10
CD 6
CD 18CD 10
DF 24
DF 26
DF 19
STUMP
DF 23
DF 36
CD-DF 16
ALD 14
ALD 12
ALD 14
ALD 12
ALD 14
ALD 10
ALD 18
ALD 16
ALD 18
ALD 17
DF 28
STUMP
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
SWR05 - SHEET 18
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
STORMWATER
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
Feet 0 30 60
SITE PLAN PROPOSED
SILT FENCING TYP.
SEE DETAIL
B
DT01
TEMP. CONSTRUCTION
TURNAROUND TYP.
A
15+00
16+00
+0
18+00
MAP 33
CD 36
DF 32
CD 36
CD 28
CD 35
DF 29
MAP 2
DF 18
DF 22DF 28
DF 30
CD 36
CD 36CD 36
STUMP 35
CD
ALD
ALD
ALD
ALD
ALD
ALD
3+77
0+00
1+
2+00
3+
322.38
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-28A
322.98
332.09
CP
322.90
CP
322.13
CP
322.36
CP
333.03
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-1
SL-2
SL-
SL-4
SL-
SL
-6
SL
-7
SL
-8
SL
-9
SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
4SL
-1
SL
-1
SL
-1
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
1SL
-4
2SL
-4
3SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
REMOVE TREE
Station=1+21.70
Offset=-4.163
REMOVE TREE
Station=0+54.78 Offset=2.975
CP
322.90
CP
322.13
CP
322.36
CP
333.03
ElevationEl ev at io n Station
Station
Boardwalk PROFILE
0+001+002+003+003+77
0+001+002+003+003+77
SL 12SL 13SL 14SL 15SL 16SL 17SL 18SL 19SL 20SL 21SL 22SL 23SL 24SL 25SL 26SL 27SL 28SL 29SL 30SL 31SL 32SL 33SL 34SL 35SL 36SL 37SL 38SL 39SL 40SL 41SL 42SL 43SL 44SL 45SL 46SL 47SL 48 SL 11 SL 10 SL 09 SL 08 SL 07 SL 06 SL 05 SL 04 SL 03 SL 02 SL 01
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 02 - SHEET 19
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PLAN & PROFILE
(STA. 14+59 TO
STA. 18+42)
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
BOARDWALK PLAN - OVERVIEWA
EX. TRAIL ALIGNMENT STA. 14+59 =
BOARDWALK ALIGNMENT STA. 0+00
EXISTING ALIGNMENT STA. 17+40.65 =
BOARDWALK ALIGNMENT STA. 2+75
EX. GROUND ELEV =322.0
EXISTING GROUND SURFACE
EXISTING TRAIL ALIGNMENT
EX. TRAIL ALIGNMENT STA. 14+83 =
BOARDWALK ALIGNMENT STA. 0+24
BEGINNING OF SPLIT ALIGNMENTS
SAMPLE LINES (SL) 8'
O.C. TYP.
CONCRETE FOOTING
SEE DETAIL
EX. ALIGNMENT STA. 18+42 =
BOARDWALK ALIGNMENT STA. 3+77
EX. GROUND ELEV. = 328.9
END OF BOARDWALK
EX. ALIGNMENT STA. 17+65.65 =
BOARDWALK ALIGNMENT STA. 3+00
EX. GROUND ELEV =322.0
AS NOTED
Feet
0 16 32
16+00
MAP 33
CD 36
CD 36
CD 36
STUMP 35
ALD
ALD
ALD
ALD
TP
F
TPF
TPF
TPF
TP
F
TPF
TPF
TPF
TP
F
TPF
TPF
TPF
14.7'
16.0'
15.2'
16.5'
16.5'
15.2'
15.2'
16.5'
16.5'
15.2' 15.6'
16.1'
15.8'
15.8'
15.8'
15.8'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
CP
322.90
CP
333.03
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 03 - SHEET 20
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
LAYOUT PLAN
(STA. 14+59 TO
STA. 18+42)
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
BOARDWALK LAYOUT PLAN
SL04 TO SL18
LAYOUT COORDINATE TABLE
PIER NORTHING EASTING
1086228.7
1086232.4
1086224.8
1086223.3
1086220.4
395164.0
PP ELEV
1086220.1
1086214.9
1086208.8
1086202.5
1086211.3
16395178.5
395181.6
395167.2
395160.8
395170.0
395167.2
395177.3
395172.4 17
395180.5
NORTHING EASTING
1086206.8
1086195.9
1086197.7
1086188.9
1086192.0
395188.4
PP ELEV
1086181.7
1086183.0
1086174.1
1086166.8
1086176.4
395191.4
395194.7
395185.4
395189.0
395188.6
395196.0
395192.5
395195.2
395202.219
PIER
DESCRIPTION
CTR. PT. - VERTICAL TUBE
INT. OF SL. AND BW. ALIG
CTR. PT. - VERTICAL TUBE
DESCRIPTION
INT. OF SL. AND BW. ALIG
PT. ON SL
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
EDGE OF CONC. FOOTING
LAYOUT COORDINATE TABLE
NORTHING EASTING
1086167.4
1086159.2
1086159.8
1086151.4
1086151.5
395198.9
PP ELEV
1086143.4
1086143.6
1086135.4
1086127.4
1086135.5
395196.3
395195.6
395195.8
395203.8
395196.1
395200.19
395196.4
395204.3
395200.429
PIER DESCRIPTION
INT. OF SL. AND BW. ALIG
1086127.5
1086127.6395205.6
395200.6 --
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
EDGE OF CONC. FOOTING
EDGE OF CONC. FOOTING
EDGE OF CONC. FOOTING
EDGE OF CONC. FOOTING
EDGE OF CONC. FOOTING
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
ABBREVIATIONS:
CTR = CENTER
PT. = POINT
BW ALIG.- BOARDWALK ALIGNMENT
VRT = VERTICAL
INT. = INTERSECTION
NOTE:
1. PP ELEV. = PROPOSED ELEVATION AT
TOP OF PIER (SEE PROFILE)
2. SL REFERS TO REFERENCES LINE
Feet 0 5 10
CD 36
DF 32
CD 36
CD 28
CD 35
CD
TP
F
TPF
TPF
TPF
TP
F
TPF
TPF
TPF
2+00
322.38
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL-28A
CP
322.36
15.8'
15.8'14.7'
16.8'
17.3'
14.1'
.3'
.1'
.4
.2
2.
8'
4.
0'
.6'
.8'
.3'
.3'
1.1
3.5
15.
8'
15.
8'
15.
8'
15.
8'
12.
8'
12.
8'
4.4'
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL L
ENGTH
HALF OF FULL L
ENGTH
HALF OF FULL L
ENGTH
HALF OF FULL L
ENGTH
HA
LF
O F F
UL
L L
EN
GT
H
HA
LF
O F F
UL
L L
EN
GT
H
HA
LF
O F F
UL
L L
EN
GT
H
HA
LF
O F F
UL
L L
EN
GT
H
HA
LF
O F
FU
LL
L
EN
GT
H
HA
LF
O F
FU
LL
L
EN
GT
H
HA
LF
O F
FU
LL
L
EN
GT
H
HA
LF
O F
FU
LL
L
EN
GT
H
7.9
7.9
HA
LF
O F F
UL
L L
EN
GT
H
HA
LF
O F F
UL
L L
EN
GT
H
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
7.9
7.9
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HA
LF
O F F
UL
L L
EN
GT
H
HA
LF
O F F
UL
L L
EN
GT
H
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
SL
-1
9SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL-25
SL-26
SL-27
SL-28
SL-29
SL-30
SL-31
SL-32
SL-33
SL-34
SL-35
SL-36
SL-37
CP
322.36
CP
322.36
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 04 - SHEET 21
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
LAYOUT PLAN
(STA. 14+59 TO
STA. 18+42)
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
BOARDWALK LAYOUT PLAN
SL19 TO SL37
NTS
LAYOUT COORDINATE TABLE
PIER NORTHING EASTING
1086119.4
1086119.5
1086111.5
PP ELEV
1086111.6
1086103.7
1086103.5
1086094.6
1086096.6
46395204.9
395203.7
395196.7
395200.7
395196.8
395200.9
395196.9 47
395195.9
NORTHING EASTING
1086089.8
1086088.1
1086083.7
1086078.9
1086078.4
395193.4
PP ELEV
1086075.4
1086074.2
1086067.3
1086067.4
1086071.1
395187.5
395173.7
395197.0
395189.7
395196.1
395184.9
395183.0
395179.0
395172.349
PIER
DESCRIPTION
INT. OF SL. AND BW. ALIG
CTR. PT. - VERTICAL TUBE
LAYOUT COORDINATE TABLE
NORTHING EASTING
1086068.3
1086060.8
1086066.7
1086059.7
1086063.6
395164.9
PP ELEV
1086060.5
1086058.6
1086052.3
1086050.4
1086053.6
395159.5
395147.0
395167.7
395161.0
395165.0
395157.0
395155.7
395150.8
395144.559
PIER DESCRIPTION
1086050.1
1086043.9395145.2
395140.2 --
1086047.4
1086043.0
1086040.8
1086038.6
1086034.1
1086029.7
1086025.2
1086027.4
395136.6
395127.8
395137.6
395144.3
395133.3
395135.5
395128.8
395124.469
DESCRIPTION
1086020.7
1086016.3
1086011.8
1086014.0
395119.0
395126.8
395120.0
395115.673
PT. ON SL
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
INT. OF SL. AND BW. ALIG
PT. ON SL
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
PT. ON SL
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
ABBREVIATIONS:
CTR = CENTER
PT. = POINT
BW ALIG.- BOARDWALK ALIGNMENT
VRT = VERTICAL
INT. = INTERSECTION
NOTE:
1. PP ELEV. = PROPOSED ELEVATION AT
TOP OF PIER (SEE PROFILE)
2. SL REFERS TO REFERENCES LINE
18+00
DF 29
MAP 2
DF 18
DF 22DF 28
DF 14
DF 30
TP
F
TPF
TPF
TPF
TP
F
TPF
TPF
TPF
TPF
3+77
3+
322.38
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
CP
322.13
12.
8'
12.
8'
1.2'
4.4'
15.8'
15.8'
4.9'
5.7' 10.8'
9.9' 15.8'
15.8'
16.5'
15.1'
15.8'
15.8'
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HALF
OF F
ULL L
ENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
7.9' 7.9'
FULL OF FULL LENGTH
FULL OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL-37
SL
-3
SL
-3
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
CP
322.13
CP
322.13
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 05 - SHEET 22
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
LAYOUT PLAN
(STA. 14+59 TO
STA. 18+42)
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
BOARDWALK LAYOUT PLAN
SL36 TO SL48
NTS
ABBREVIATIONS:
CTR = CENTER
PT. = POINT
BW ALIG.- BOARDWALK ALIGNMENT
VRT = VERTICAL
INT. = INTERSECTION
NOTE:
1. PP ELEV. = PROPOSED ELEVATION AT
TOP OF PIER (SEE PROFILE)
2. SL REFERS TO REFERENCES LINE
LAYOUT COORDINATE TABLE
NORTHING EASTING
1086009.9
1086005.5
1086005.7
1086004.3
1085997.8
395112.9
PP ELEV
1085997.1
1085990.0
1085988.6
1085983.6
1085984.1
395113.6
395115.2
395119.6
395111.0
395118.9
395109.6
395116.1
395150.8
395107.283
PIER DESCRIPTION
1085981.2
1085981.3395111.3
395107.3 --
1085973.2
1085973.5
1085965.2
1085965.3
1085957.2
1085957.5
1085949.5
1085948.6
395112.0
395113.8
395107.6
395115.6
395108.0
395116.3
395108.3
395109.993
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
INT. OF SL. AND BW. ALIG
INT. OF SL. AND BW. ALIG
PT. ON SL
PT. ON SL
PT. ON SL
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
1085940.7
1085941.7
1085942.8
1085933.9
1085933.0
395110.6
395117.2
395120.4
395115.5
395113.298
INT. OF SL. AND BW. ALIG
EDGE OF CONC. FOOTING
EDGE OF CONC. FOOTING
INT. OF SL. AND BW. ALIG
PT. ON SL
1085926.0
1085925.0
395118.8
395113.9100
101 --
INT. OF SL. AND BW. ALIG
EDGE OF CONC. FOOTING
1085927.1395123.7102 -- EDGE OF CONC. FOOTING
INT. OF SL. AND BW. ALIG
CTR. PT. - VERTICAL TUBE
CTR. PT. - VERTICAL TUBE
PT. ON SL
INT. OF SL. AND BW. ALIG
14.7'
16.0'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
CD 36
STUMP 35
15.2'
16.5'
16.5'
15.2'
15.2'
16.5'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 06 - SHEET 23
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PARTIAL FRAMING
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
M
AT
C H
L
IN
E
- S
EE
B
EL
O
W
PROVIDE
CONCRETE
ABUTMENT
8.
0'
W8X18 M
ATC
H
LIN
E - SEE ABO
VE
BO
AR
DW
AL
K
BO
UN
DA
RY
SL
-6
SL
-4
SL
-3
SL
-2
SL
-1
SL
-5
.0
C OF BOARDWALK ALIGNMENTL
A
REFERENCE LINE FOR STEEL BEAM
REFERENCE LINE FOR STEEL BEAM
W8X18
W 8X31
PROVIDE 12" NEOPRENE
60 DUROMETER
INTERMEDIATE SUPPORT -
3.5 INCHES O.D STEEL PILE
PARTIAL FRAMING PLAN BOARDWALK
(STA. 0+40 TO 0+88) SL06 TO SL12
PARTIAL FRAMING PLAN BOARDWALK
(STA. 0+00TO 0+40) SL01 TO SL06
Feet 0 2 4
AS NOTED
Feet 0 2 4
A
TR 10
SL
-6
SL
-7
SL
-8SL
-9
SL
-1
SL
-1
SL
-1
A
TR 10
CONSTRUCTION NOTE:
1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION
OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE
CENTERLINE OF BOARDWALK ALIGNMENT.
END SUPPORT
M
AT
C H
L
IN
E
- S
EE
T
R
PROVIDE
CONCRETE
ABUTMENT
C OF BOARDWALK ALIGNMENTL
SEE CONSTRUCTION NOTE #1
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
INTERMEDIATE SUPPORT -
3.5 INCHES O.D STEEL PILE(TYP.)
ALD
TP
FTPF
TPF TPF TPF TPF
16.5'
15.2'
15.6'
16.1' 15.8'
15.8'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
CD
15.8'
15.8'14.7'
16.8'
17.3'
14.1'
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL L
ENGTH
HALF OF FULL L
ENGTH
HALF OF FULL L
ENGTH
HALF OF FULL L
ENGTH
HA
LF
O F F
UL
L L
EN
GT
H
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 07 - SHEET 24
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PARTIAL FRAMING
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
M
ATC
H
LIN
E SEE TR
M
AT
C H
L
IN
E
- S
EE
B
EL
O
W
PARTIAL FRAMING PLAN BOARDWALK
(STA. 0+88 TO 1+35) SL12 TO SL18
PARTIAL FRAMING PLAN BOARDWALK
(STA. 1+35 TO 1+84) SL18 TO SL24
SL
-1
SL
-1
3SL
-1
4SL
-1
SL
-1
SL
-1
PROVIDE
CONCRETE
ABUTMENT
PROVIDE
CONCRETE
ABUTMENT
PROVIDE
CONCRETE
ABUTMENT
SL
-1
SL
-1
SL
-2
SL
-2
SL
-2
SL-23
SL-24
SL
-1
M
ATC
H
LIN
E - SEE ABO
VE
MAT
CH LI
NE
SE
E
TR
C OF BOARDWALK ALIGNMENTL
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W 8X31
PROVIDE 12" NEOPRENE
60 DUROMETER
W 8X31
W 8X31W
8X31
W 8X31
PROVIDE 12" NEOPRENE
60 DUROMETER
PROVIDE 12" NEOPRENE
60 DUROMETER
PROVIDE INTERMEDIATE SUPPORT -
3.5 INCHES O.D STEEL PILE(TYP.)
W8X18
W8X18
W8X18
W8X18 W8X18
W8X18
CONSTRUCTION NOTE:
1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION
OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE
CENTERLINE OF BOARDWALK ALIGNMENT.
Feet 0 2 4
F
TP
F
TP
F
TPF
TPF
TPF
TPF
2+
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
CP
22322.36
17.3'
14.1'
17.3'
14.1'
16.4'
15.2'
4.0'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
SL
-2
SL
-2
SL
-2
SL
-2
SL-27
CP
22322.36
17+00
CD 28
CD 35
SL
-2
SL
-3
SL
-3
SL-28A
CP
22322.36 2.8
4.0
11.6'
12.8'
13.3'
13.3'
1.1'
3.5'
15.8'
15.8'
HALF
OF F
ULL
LEN
GTH
7.9'
7.9'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
SL
-2
SL
-3
SL
-3
CP
22322.36
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 08 - SHEET 25
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PARTIAL FRAMING
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
M
AT
CH
L
IN
E
SE
E
TR
PARTIAL FRAMING PLAN BOARDWALK
(STA. 1+84 TO 2+16) SL24 TO SL28
PARTIAL FRAMING PLAN BOARDWALK
(STA. 2+16 TO 2+64) SL28 TO SL34
M
AT
C H
L
IN
E
- S
EE
B
EL
O
W
W 8X31
W 8X31
W 8X31
W 8X31
W 8X31
W 8X31
W 8X
W 8X
W 8X31
W 8X
SL
-3
SL
-3
SL
-3
SL-31
SL-31A
ADDITIONAL
SUPPORT - SL-31A
ADDITIONAL
SUPPORT - SL-28A
SL-30
SL-29
SL-28
PROVIDE INTERMEDIATE SUPPORT -
3.5 INCHES O.D STEEL PILE(TYP.)
SL-27
SL-26
SL-25
SL
-2
SL
-2
SL
-2
SL-28
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
W8X18
CONSTRUCTION NOTE:
1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION
OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE
CENTERLINE OF BOARDWALK ALIGNMENT.
Feet
DF 29
3+
322.38
SL
-3
15.8'
15.8'
12.8'
12.8'
1.2'
4.4'
15.8'
15.8'
4.9'
HALF OF FULL LENGTH HALF OF FULL LENGTH
7.9' 7.9'
HALF OF FULL LENGTHHALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
SL
-3
18+00
MAP 2
DF 18
DF 22
TP
F
TP
F
TP
F
TPFTPFTPFTPF
TPF
TPF
TPF
SL
-4
SL
-4
4.9'
5.7'10.8'
9.9'15.8'
15.8'
16.5'
15.1'
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
7.9' 7.9'
FULL OF FULL LENGTH
FULL OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH HALF OF FULL LENGTH
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 09 - SHEET 26
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PARTIAL FRAMING
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
M
AT
C H
L
IN
E
- S
EE
B
EL
O
W
PARTIAL FRAMING PLAN BOARDWALK
(STA. 2+64 TO 3+12) SL34 TO SL40
PARTIAL FRAMING PLAN BOARDWALK
(STA. 3+12 TO 3+60) SL40 TO SL46
M
AT
C H
L
IN
E
SE
E
AB
O
VE
W 8X31
W8X18 W8X18
W8X18
W 8X31
W 8X31W
8X31
W 8X31
W 8X31
W 8X31
W 8X
W8X18W8X18
W8X18
W8X18
W8X18
W8X18W8X18
W8X18W8X18
W8X18
W8X18
W8X18
W8X18
C OF BOARDWALK ALIGNMENTL
C OF BOARDWALK ALIGNMENT L
PROVIDE
CONCRETE
ABUTMENT
PROVIDE 12" NEOPRENE
60 DUROMETER
M
AT
C H
L
IN
E
SE
E
TR
M
ATC
H
LIN
E SEE TR
CONSTRUCTION NOTE:
1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION
OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE
CENTERLINE OF BOARDWALK ALIGNMENT.
Feet
DF 28
F
TP
F
TP
F
TPFTPFTPFTPF
TPF
TPF
SL
-4
SL
-4
SL
-4
15.8'
15.8'
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
HALF OF FULL LENGTH
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
SL
-4
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 10 - SHEET 27
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PARTIAL FRAMING
PLAN
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
SL
-4
PARTIAL FRAMING PLAN BOARDWALK
(STA. 3+60 TO 3+77) SL46 TO SL48
INTERMEDIATE SUPPORT -
3.5 INCHES O.D STEEL PILE
W8X18
W8X18
C OF BOARDWALK ALIGNMENT
L
M
ATC
H
LIN
E SEE TR
PROVIDE
CONCRETE
ABUTMENT
PROVIDE 12" NEOPRENE
60 DUROMETER
PROVIDE
CONCRETE
ABUTMENT
PROVIDE 12" NEOPRENE
60 DUROMETER
SL
-4
SL
-4
CONSTRUCTION NOTE:
1. THE STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO PROFILE SHEET XX. FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO ERECTION
OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG THE
CENTERLINE OF BOARDWALK ALIGNMENT.
Feet
1"
10'-0"
3'-0" 1'-0"
1"
2'-0"
1'-0"
3'-0"
4"
1'-0"
1'-0"
2"
6"
6"
6" 11"
1"
1"
4'-6"
1'-6"
2'-4"
6'-0"
1'-4"
6"
6"
2"
1'-0"
2"
2'-0"
1'-6"
2"
1'-4"
2'-4"
6'-0" 2"
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 11 - SHEET 28
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
DETAILS
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
AS NOTED
W8X18
PROVIDE
CONCRETE
ABUTMENT
REFERENCE LINE FOR
STEEL BEAM
REFERENCE LINE FOR
STEEL BEAM
CENTER LINE FOR STEEL
BEAM
SET BEAM 1" OFF FROM
VERTICAL WALL
INTERSECTION POINT
FOR REFERENCE LINE
AND CENTERLINE OF
STEEL BEAM
B X X
C OF BOARDWALK ALIGNMENT L
C OF CONC. ABUTMENTL
C OF CONC. ABUTMENTL
SECTION
CONCRETE ABUTMENT AT SL4
Inches
0 24 48
#3 DIA. BARS AT
8" O.C EACH WAY
COVER (TYP.)
Inches 0 8 16
#3 L SHAPE REBAR
AT 16" O.C
#3 REBAR HOOP
TYPICAL DETAILS
CONCRETE ABUTMENT AT SL12
#3 REBAR HOOP
#3 L SHAPE REBAR
AT 16" O.C
#3 DIA. BARS AT
8" O.C EACH WAY
C X X
OFFSET FROM CENTER LINE (TYP.)
SECTION
STEEL BEAM NOT SHOWN FOR CLARITY
CE
NT
ER
L
IN
E
CONCRETE ABUTMENT AT SL18
#3 DIA. BARS AT
8" O.C EACH WAY
C X X
B X X
A X X
Inches 0 12 24
Inches 0 12 24
Inches 0 16 32
Inches 0 12 24
VARIES
3 FEET MIN. STEEL PIPE
INTO THE GROUND AND
PIPE IS REQUIRED TO
OBTAIN XX LB RESISTANCE
Ø 9 16"
Ø 9 16"
Ø 9 16"
Ø 9 16"
Ø31 2"
Ø4"
8"
4"
1"
16"
8"
4"
Ø 9 16"
Ø 9 16"
16"
4"
8"
4"
4"
VARIES
2 FEET MIN. STEEL PIPE
INTO THE GROUND AND
PIPE IS REQUIRED TO
OBTAIN XX LB RESISTANCE
2"
1'-0"
8'-0"
1"
8"
1'-0"
1"
8"
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 12 - SHEET 29
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
DETAILS
AS NOTED
W8X18
PROVIDE NEOPRENE
AS SHIM
INTERMEDIATE SUPPORT
AT END SUPPORT
D X X
4"
16 " BOLT HOLE
HOT DIPPED GALVANIZED
4 OD x .125 wall x 3.75 ID
1020 DOM A513 Round Steel Tube. WELD TO 38" HDG STEEL
PLATE.
HOT DIPPED GALVANIZED 3-1/2
OD x .250 wall x 3.00 ID 1020 DOM A513 Round Steel Tube
TELESCOPING INTO 4" PIPE
THEORETICAL GAP BETWEEN
PIPES FOR TELESCOPING
SECTION
GROUND
4 " STEEL PLATE -
CLOSED ENDED PIPE
E X X
SECTION
NUT WELD TO 4" OD DOM
ROUND STEEL TUBE
FOR FITTING 12" BOLT
4"
4"
SEE DETAIL
DETAIL
SHORT
SLOT 9
16" X 11 16"
SHORT
SLOT 9
16" X 11 16"
16" DIA. BOLT HOLE
END SUPPORT
GROUND
W8X18 W8X18
W8X35
OFFSET FROM CENTER LINE (TYP.)
CL
4 " STEEL PLATE -
CLOSED ENDED PIPE
F X X
STEEL STIFFENER
3" x 14" thick steel plate (TYP.)
4"1
4"
HDG HEX. 12"
MACHINE
BOLT
HDG 12" x 2"
STRUCTURAL
BOLT (TYP.)
SECTION
GUARD RAIL SHOWN
AS BACKGROUND SEE
SHEET TD XX FOR
DETAILS
STEEL STIFFENER
3" x 14" thick steel plate (TYP.)
PROVIDE SCREWBOLT SCREW
ANCHOR 38" X 2" (TYP.). AT
ALTERNATE CONCRETE PLANK
INSTALL SCREW PER
MANUFACTURER
PRE-DRILLED HOLE.
DETAILS
HDG 12" x 2"
STRUCTURAL
BOLT (TYP.)
A X X
C X X
A X X
C X X
F X X
G X X
G X X
E X X
D X X
Inches 0 8 16
Inches 0 8 16
Inches 0 8 16
Inches 0 2 4
Inches 0 2 4
Inches 0 2 4
Inches 0 4 8
6"
8"
W8X18 REFERENCE LINE FOR STEEL BEAM
W8X18 REFERENCE LINE FOR STEEL BEAM
6"
8"
EQ. EQ.
*REFERENCE LINE OF STEEL BEAM
MAY NOT ALIGN WITH CENTER OF
STEEL BEAM - REFER TO STEEL
FRAMING PLAN
3" 3"
C4 x7
.5
C4 x7.
5 C4x7.5
C4 x7
.5
C4 x7
.5
W8X18
8'-8"
5'-41 2"
4"
1"
4"
1" 4"
3"
4"
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 13 - SHEET 30
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
BRACING DETAILS
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
AS NOTED
TYPICAL BRACING FOR STEEL BEAMS
4" STEEL PLATE
WELD TO STEEL BEAM
B X X
4"1
4"1 4"1
4" 1 4"1
4" 4"
SECTION
MINIMUM EDGE DISTANCE
MINIMUM OVERLAPPED
DISTANCE
MINIMUM EDGE DISTANCE
MINIMUM DISTANCE
MINIMUM DISTANCE
PROVIDE 14"
STEEL PLATE
PROVIDE NUT
AND WASHER (TYP.)
THE CONTRACTOR SHALL
VERIFY ACTUAL BRACING
LENGTH ON SITE AFTER
ERECTION OF W8X18
C X X
D X X
A X X
B X X
CONNECTION DTL.C
X X
CONNECTION DTL.D
X X
Inches 0 2 4
Inches 0 2 4
Inches 0 8 16
Inches 0 8 16
2 DIA. x 2" long A325 elev=332.0
SL 4
STA. 0+24
5% SLOPE
SL 5
STA. 0+32
SL 7
STA. 0+48
SL 6
STA. 0+40
SL 8
STA. 0+56
5% SLOPE
SL 9
STA. 0+64
SL 11
STA. 0+80
SL 8
STA. 0+56
SL 10
STA. 0+72
5% SLOPE
5% SLOPE
SL 12
STA. 0+88
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 15 - SHEET 31
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PROFILE
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
BOARDWALK PROFILE
(STA. 0+24 TO 0+56) SL04 TO SL08
NTS
M
AT
C H
L
IN
E
- S
EE
T
R
M
AT
C H
L
IN
E
SE
E
BE
LO
W
M
ATC
H
LIN
E - SEE ABO
VE
BOARDWALK PROFILE
(STA. 0+56 TO 0+88) SL08 TO SL12
EXISTING GRADE
3 FEET EMBEDMENT
EXISTING GRADE
3 FEET EMBEDMENT
ELEV. = 332.5
ELEV. = 328.50
INTERMEDIATE SUPPORT
(TYP.)
END SUPPORT
(TYP.)
INTERMEDIATE SUPPORT
(TYP.)
END SUPPORT
(TYP.)
CONSTRUCTION NOTE:
1. STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO THIS PROFILE SHEET FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO
ERECTION OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG
THE CENTERLINE OF BOARDWALK ALIGNMENT.
SL 13
STA. 1+04
SL 15
STA. 1+20
SL 14
STA. 1+12
SL 16
STA. 1+28
5% SLOPE
5% SLOPE
SL 12
STA. 0+88
2% SLOPE
SL 17
STA. 1+36
SL 19
STA. 1+44
SL 16
STA. 1+28
SL 20
STA. 1+52 5% SLOPE
SL 18
STA. 1+36
PARKS FILE#
SCALE
PARKS
STATE
RECREATION
WASHINGTON
COMMISSION
AND
RE
VI
SI
ON
S
CHECKED (HDQTS.)
REGISTERED STAMP
DESIGNED
CHECKED (FIELD)
DRAWN
ACTION BY DATE
NO
CAD NO.
AP
P.
IN
T.
DA
TE
TR 16 - SHEET 32
ANDERSON LAKE
STATE PARK
NEW DAY USE
FACILITIES &
TRAIL DEVELOPMENT
BOARDWALK
PROFILE
A620-2022-SW1_1
DB 9/29/2025
PZ 9/29/2025
BOARDWALK PROFILE
(STA. 0+96 TO 1+28) SL12 TO SL16
NTS
M
AT
C H
L
IN
E
- S
EE
T
R
M
AT
C H
L
IN
E
SE
E
BE
LO
W
M
ATC
H
LIN
E - SEE ABO
VE
BOARDWALK PROFILE
(STA. 1+28 TO 1+60) SL16 TO SL20
EXISTING GRADE
3 FEET EMBEDMENT
EXISTING GRADE
3 FEET EMBEDMENT
ELEV. = 328.50
ELEV. = 325.80
CONSTRUCTION NOTE:
1. STEEL LENGTH ON ALL FRAMING PLANS ONLY REFLECT THE HORIZONTAL DISTANCE,
NOT THE SLOPE DISTANCE. REFER TO THIS PROFILE SHEET FOR DIFFERENT SLOPE.
2. THE CONTRACTOR SHALL FIELD CHECK AND VERIFY ALL DIMENSIONS PRIOR TO
ERECTION OF STEEL BEAMS.
3. CONCRETE PLANK IS NOT SHOWN ON FRAMING PLANS FOR CLARITY.
4. INTERMEDIATE SUPPORTS SHOULD LOCATE IN THE MIDDLE OF W8X18 STEEL BEAMS
UNLESS NOTED OTHERWISE.
5. THE DISTANCE BETWEEN EACH SL LINES SHOULD BE EIGHT FEET MEASURING ALONG
SL 21
STA. 1+60SL 23
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .