About this file
This is a Bid Bond Requirements document for the Willapa Hills State Park Trail Fish Passage and Habitat Restoration Project administered by Washington State Parks through the MRSC Bonfire Procurement Portal. The project encompasses site preparation, crushed surfacing base and top courses, hot mixed asphalt paving of the park's main road and trail, construction of an elevated boardwalk along a section of trail, site improvements, removal of existing vault restrooms, and construction of two new CXT restroom facilities at Anderson Lake State Park. Bidders must submit responses electronically through the MRSC Bonfire Portal at https://mrscrosters.bonfirehub.com/portal. The document establishes a 60-day acceptance period from the bid opening date, and bidders should refer to Section 11.1 of the Instructions to Bidders in the project manual for additional details. Questions may be directed to contracts@parks.wa.gov.
The bid bond requirements establish a threshold of $35,000, below which no bid bond is required. For bids exceeding $35,000, a mandatory bid bond equal to 5 percent of the total bid amount must be submitted as a single PDF file with the electronic bid submission. Bid bonds for the three lowest bidders will be retained for 30 days or until contract execution with the successful bidder, while all other bid bonds will be released within 15 days of bid opening. If the successful bidder fails to execute the contract or provide a performance bond within 15 days of receiving contract forms, the bid bond may be forfeited as liquidated damages. Failure to provide a required bid bond will render the bid non-responsive.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Bond Requirements
| Willapa Hills State Park Trail |
| Fish Passage and Habitat Restoration Project |
| NW-C1222 |
| https://mrscrosters.bonfirehub.com/portal |
| The Bidder will submit the Bid Bond (if Applicable) to State Parks Public Opportunities MRSC Bonfire Procurement Portal |
| Bid Bond Requirements |
| Bid Guarantee: See Instructions to Bidders 11.1 Bid Bond. No particular bid bond form is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive. |
Bid Bond Threshold
| 1 | A bid bond is not required if the total bid amount, including all additive alternates, is $35,000 or less. |
| 2 | For bids exceeding $35,000, a bid bond of 5% of the total bid amount is mandatory. |
| Acceptable Forms |
| 1 | Acceptable forms of bid guarantee: A bid bond, and must be submitted as part of the bid response. |
| 2 | Scanned copies of the bid bond (e.g., PDF) are acceptable and should be included with the electronic bid submission. |
| Submission Process |
| 1 | Include the bid bond in a single PDF file. |
| 2 | At the time of bid, the bidder must upload an electronic copy of the acceptable bid guarantee to the State Parks Oportunities via MRSC Portal Bonfire https://mrscrosters.bonfirehub.com/portal |
| Retention and Forfeiture |
| 1 | Bid bonds for the three lowest bidders will be retained for 30 days or until a contract is executed with the successful bidder. |
| 2 | All other bid bonds will be released within 15 days of the bid opening. |
| 3 | If the successful bidder fails to execute the contract or provide a performance bond within 15 days of receiving the contract forms, the bid bond may be forfeited as liquidated damages. |
| Bid Validity Period |
| 1 | Bidders must allow for a 60-day acceptance period from the bid opening date. |
| Important Reminder |
| 1 | Review all bid documents thoroughly to ensure compliance with submission requirements, including proper completion and inclusion of the bid bond when applicable. |
| For further details or clarification, refer to Section 11.1 of the "Instructions to Bidders" in the project manual. If you have questions, contact contracts@parks.wa.gov | |
| FALSE | Check the box to the left if the total bid, including all additive alternates, is $35,000 or less, and include this statement with your bid response. No bid bond is required for bids at or below this amount. For bids exceeding $35,000, a bid bond must be submitted instead. Failure to provide a required bid bond will render the bid non-responsive. |
https://mrscrosters.bonfirehub.com/portal Chart Data
| Total | |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |
| ERROR:#REF! | ERROR:#REF! |