3-Subcontractors Fillable.pdf
PDF 45 KB Posted
- Solicitation number
- Quote-FP-04-2526 Aerial Thermal Survey for White-Tailed Deer - Similar 1
- Issued by
- Kane County, Illinois
About this file
This is a subcontractors disclosure form for Kane County Forest Preserve District in Illinois related to an aerial thermal survey project for white-tailed deer using unmanned aircraft systems at four forest preserve locations. The form provides space for the bidder to identify up to three subcontractors and describe the specific work each will perform, or to certify that no subcontractors will be used for the project. The document requires the bidder's signature, printed name, and date of submission to authenticate the accuracy of the subcontractor information provided.
The form serves as a transparency and accountability mechanism requiring bidders to disclose their subcontracting arrangements prior to award. It does not specify pricing terms, contract duration, or funding details. Kane County Forest Preserve District, located in Geneva, Illinois, uses this disclosure requirement as part of the competitive bidding process for the aerial thermal survey contract, which will be awarded to the lowest, most responsive and responsible overall bidder.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To preserve and restore the nature of Kane County
1996 South Kirk Road, Suite 320, Geneva, Illinois 60134
Bill Lenert, President Benjamin Haberthur, Executive Director
(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com
SUB-CONTRACTORS
The listed Sub-contractors will perform the work indicated herein:
1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________ http://www.kaneforest.com/
| 1 SubContractor: |
| Work Performed: |
| 2 SubContractor: |
| Work Performed_2: |
| 3 SubContractor: |
| Work Performed_3: |
| No SubContractors will be used for this project: Off |
| Date: |
| Printed Name: |
File details come from the government source that posted it. Updated .