3-STA - I-83 SEWER - PS No 9 CONSTR.pdf
PDF 74 MB Posted
- Attached to
- PENNDOT SR 0083-078 EISENHOWER INTERCHANGE PUMP STATION NO. 9 & SANITARY SEWER RE-ROUTING
- Solicitation number
- Not on record
- Issued by
- Dauphin County, Harveys Lake Borough, Pennsylvania
About this file
This is a construction solicitation document for PENNDOT SR 0083-078 Eisenhower Interchange Pump Station No. 9 & Sanitary Sewer Re-Routing, issued by Swatara Township Authority in Harrisburg, Pennsylvania, with engineering services provided by ARRO Consulting, Inc. The project comprises construction of a new suction lift triplex wastewater pump station including a pump station building with pump room housing three pumps, electrical and generator rooms, control platform, wet well, installation of force main, installation of gravity sanitary sewer with associated manholes, and restoration of all disturbed areas. The Work is divided into four separate contracts: General Construction, Electrical Work, HVAC Work, and Plumbing Work. Bids will be received through the PennBid Program until 10:00 A.M. prevailing time on November 12, 2026. Questions must be submitted through PennBid by 4:00 P.M. prevailing time on November 5, 2026. The apparent low bidder and the next two lowest bidders must submit original Bidding Documents to the Engineer within three business days of bid opening. Bids shall remain open for 30 days from bid opening, or 120 days if award is delayed by required governmental approvals, bond sales, or grant awards. The successful bidder will be selected by the Owner at a later date.
Bidding documents and solicitation details are available online without charge at https://pennbid.bonfirehub.com, with reproduction and placement on other websites prohibited. Bid results will be available for viewing at the PennBid website following bid opening. Bids may be modified or withdrawn at any time prior to opening.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-SR0083-078 C1 Geotech Data for STA.pdf | ||
| 1-STA - I-83 SEWER - PS No 9 HOP.pdf | ||
| 4-Full-Project Manual-Swatara I83-PS9.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .