3-SPECS.pdf
PDF 209 KB Posted
- Attached to
- Emergency Generator Maintenance Service
- Solicitation number
- Bid 4015
- Issued by
- Rensselaer County, New York
About this file
This document is a bid specification for emergency generator maintenance and repair issued by Hudson Valley Community College (HVCC), a public community college located in Troy, NY. The contract seeks an experienced vendor to perform preventative maintenance, testing, and repairs on emergency generators across multiple campus locations in Troy and Malta, NY, including facilities such as Joe Bruno Stadium, Bulmer Telecommunications Center, Brahan Hall, and others. The contract term is from September 1, 2025, to August 31, 2026, with HVCC reserving the right to extend the contract for up to two additional one-year terms, potentially making the maximum contract duration three years.
The bid requires the contractor to have a minimum of 5 years' experience in commercial emergency generator maintenance, with technicians certified by the generator manufacturer or recognized industry programs. The contractor must maintain a business location within 60 miles of HVCC's Troy campus and provide 24/7 emergency response availability. Proposals must be submitted electronically through HVCC's procurement portal, with all work to be performed by the contractor's employees and subject to prevailing wage rates. The specification details extensive requirements for maintenance, testing, and reporting, including adherence to NFPA 110 standards, load bank testing, and submission of service reports with warranties for both parts and workmanship.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Insurance.pdf | ||
| 2-Non Collusive.pdf | ||
| 5-Bid Legal Information.pdf | ||
| 4-Bid Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS FOR EMERGENCY GENERATOR
MAINTENANCE AND REPAIR
BID 4015
SECTION A – STATEMENT OF PURPOSE
Hudson Valley Community College (“HVCC” or the “College”) is seeking an experienced and qualified Vendor (“Contractor”) to perform preventative maintenance, testing, and repairs on emergency generators and associated systems at both the Troy, NY and Malta, NY campuses.
SECTION B – INTRODUCTION
Founded in 1953, Hudson Valley Community College is the largest community college in upstate New York and offers degree and certificate programs in three schools: Business and Liberal Arts; Health Sciences; and Science, Technology, Engineering and Math (STEM). The College also administers the Educational Opportunity Center for academic and career training at no cost to those who qualify.
As one of 30 community colleges in the SUNY system, Hudson Valley enrolls more than 19,000 students in credit and non-credit courses and is a recognized leader in distance learning and workforce development. The College has more than 90,000 alumni.
SECTION C – PROJECT SCOPE
HVCC has emergency generators in the following locations.
Building Location Fuel Type
Joe Bruno Stadium
On the West side of the stadium in between the Home clubhouse & the main entrance to the stadium.
Natural Gas
Bulmer Telecommunications
Center
Outside on the Northwest side of the building.
Natural Gas
Brahan Hall Inside of the electrical room of the lower Southeast corner. Natural Gas
CoGen Plant Southwest corner outside of the Cogen Plant Diesel
Gunether Hall On the roof of the building. (Access through the 2nd floor custodial closet.) Natural Gas
Higbee Hall Outside on the Northeast side of the building.
Diesel-Kerosene Mix
McDonough Sports Complex
Outside of the field house, Northeast corner of the building. Natural Gas
Administration Building
Outside on the Northeast side of the building. Diesel
Administration Building
On the roof of the building. (Access through the 2nd floor custodial closet.) Natural Gas
Daycare Outside on the Northwest corner of the building. Diesel
TEC-Smart Building (Malta) Outside on the North side of the building Natural Gas
STEM Building (Malta) Outside on the Southwest corner of the building. Natural Gas
PART 1 – GENERAL
1.1 Summary
A. Provide all labor, materials, equipment, and services necessary to perform preventative maintenance, testing, and repairs on emergency generators and associated systems at HVCC.
B. Work includes, but is not limited to:
1. Inspection, testing, and servicing of diesel and natural gas emergency generators.
2. Repair and replacement of generator components, including engines, alternators, fuel systems, cooling systems, exhaust systems, control panels, and batteries.
3. Load bank testing and performance verification.
4. Emergency troubleshooting and repairs.
C. Coordinate all work with HVCC to minimize disruption to campus operations and ensure continuous emergency power readiness.
1.2 References
• NFPA 110 – Standard for Emergency and Standby Power Systems.
• NFPA 70 – National Electrical Code.
• Manufacturer service manuals.
1.3 Submittals
• Service Reports: Detailing inspections, maintenance performed, test results, and any corrective actions taken.
• Parts Lists: For replaced components.
• Warranty Documentation.
1.4 Quality Assurance
• Service Provider Qualifications: Minimum of 5 years’ experience in commercial emergency generator maintenance and repair.
• Technicians must be certified by the generator manufacturer or recognized industry programs.
1.5 Warranty
• Manufacturer’s warranties must be provided for all replaced parts.
• Contractor shall provide a workmanship warranty for one (1) year.
PART 2 – PRODUCTS
• OEM or manufacturer-approved replacement parts only.
• Engine oils, filters, and coolant must meet manufacturer specifications.
PART 3 – EXECUTION
3.1 Examination
• Verify equipment condition and site access before work begins.
3.2 Maintenance and Repair
• Perform scheduled maintenance per manufacturer and NFPA 110 requirements.
• Replace worn or defective components with OEM-approved parts.
• Adjust, lubricate, and calibrate as necessary for reliable operation.
3.3 Testing
• Perform monthly and annual testing per NFPA 110.
• Conduct load bank testing as required.
• Verify automatic start and load transfer functionality.
3.4 Cleaning and Protection
• Remove debris and waste materials.
• Protect all equipment and work areas until final acceptance.
SECTION D – SPECIAL REQUIREMENTS
Prevailing Wage Rates HVCC is a public institution; all employees working for Contractors on-site are required to be paid prevailing wage. Contractors must submit certified payroll upon request.
SECTION E – VENDOR QUALIFICATIONS
• Service Provider Qualifications: Minimum of 5 years’ experience in commercial emergency generator maintenance and repair.
• Technicians certified by the generator manufacturer or recognized industry programs.
• Vendor must have a service location within 60 miles of HVCC, Troy, NY.
SECTION F – CONTRACTOR RESPONSIBILITIES
Availability
• Contractor must provide emergency response availability 24 hours a day, 7 days a week.
Schedule of Work
• Contractor must notify HVCC Facilities of planned schedules prior to commencing work.
• Employees must check in with Campus Public Safety at the Parking Garage upon arrival.
• The on-site foreman and project manager’s contact information must be provided to
Public Safety. Public Safety can be contacted at 518-629-7210
Self-Performance of Work
• All work must be performed by the Contractor’s employees. Subcontracting is prohibited unless expressly approved in writing by HVCC.
Project Manager
• Contractor shall designate a competent person to act as Project Manager and primary point of contact.
Final Cleaning
• Contractor must remove all debris and notify HVCC Facilities staff for inspection prior to leaving the site.
Campus Functionality
• The campus must remain fully functional during all work. Any disruption of services must be coordinated with College personnel.
Quotes/Invoices for Service
• Written quotes/invoices must include contract bid number, approved labor rates, material costs, and approved material markups. Lump-sum pricing will not be accepted.
• Invoices must be submitted after service approval.
Work Zone Traffic Control
• Contractors shall cone, barrel, or tape off work areas to protect pedestrians, vehicles, and
College property.
Contract Term
• Contract shall be in effect from September 1, 2025 – August 31, 2026.
• HVCC reserves the right to extend the contract for up to two (2) additional one-year terms at its sole discretion. The maximum possible duration of the contract is three (3) years ending August 31, 2028.
Proximity Requirement
• The contractor must maintain a business location within a sixty (60) mile radius of Hudson Valley Community College’s Troy, New York Campus.
SECTION H – TERMS & CONDITIONS
HVCC may investigate the responsibility of any bidder. The College reserves the right to reject any bid if the evidence submitted does not satisfy HVCC of the bidder’s ability to perform.
The successful Contractor must complete and sign the Service and Supply Agreement located on the HVCC Purchasing website.
Awarded Contractors may not subcontract work without prior written consent from HVCC.
SECTION J – SUBMISSION INFORMATION
Proposals must be submitted electronically through HVCC’s procurement portal:
https://hvcc.bonfirehub.com
• Submissions must be received no later than the Submission Deadline.
• Requests for extensions will not be granted. Late submissions will not be accepted.
• Vendors are encouraged to submit early to avoid technical issues.
Technical Assistance
• Email: support@gobonfire.com
• Phone: 1-800-354-8010
Mail/Hand-Delivery (Sealed Proposals Only):
Tabitha D’Attilio Director of Procurement Hudson Valley Community College Administration Building, Room 240 80 Vandenburgh Avenue Troy, NY 12180 https://hvcc.bonfirehub.com/ mailto:support@gobonfire.com
SECTION K – CONTACTS
Andrew Novak Director of Planning, Design, and Construction Hudson Valley Community College LaPan Services Building, Room 115 80 Vandenburgh Avenue Troy, NY 12180
| SPECIFICATIONS FOR EMERGENCY GENERATOR MAINTENANCE AND REPAIR |
| SECTION B – INTRODUCTION |
| SECTION C – PROJECT SCOPE |
| PART 1 – GENERAL |
| 1.1 Summary |
| 1.2 References |
| 1.3 Submittals |
| 1.4 Quality Assurance |
| 1.5 Warranty |
| PART 2 – PRODUCTS |
| PART 3 – EXECUTION |
| 3.1 Examination |
| 3.2 Maintenance and Repair |
| 3.3 Testing |
| 3.4 Cleaning and Protection |
| SECTION D – SPECIAL REQUIREMENTS |
| Prevailing Wage Rates |
| SECTION E – VENDOR QUALIFICATIONS |
| SECTION F – CONTRACTOR RESPONSIBILITIES |
| Availability |
| Schedule of Work |
| Self-Performance of Work |
| Project Manager |
| Final Cleaning |
| Campus Functionality |
| Quotes/Invoices for Service |
| Work Zone Traffic Control |
| Contract Term |
| SECTION H – TERMS & CONDITIONS |
| SECTION J – SUBMISSION INFORMATION |
| Technical Assistance |
| Mail/Hand-Delivery (Sealed Proposals Only): |
SECTION K – CONTACTS
File details come from the government source that posted it. Updated .