3-RFP-305-26 Addendum 1.pdf
PDF 116 KB Posted
- Solicitation number
- RFP-305-26
- Issued by
- Boulder County, Colorado
About this file
This is Addendum 1 to RFP 305-26 issued by Boulder County Public Works in Colorado for improvements to the Eldorado Springs Wastewater Treatment Facility. The project seeks qualified Construction Manager at Risk (CMAR) firms to provide preconstruction and construction services designed to increase system reliability, improve operational efficiency, and ensure continued compliance with Colorado Department of Public Health and Environment regulations. The facility improvements were initiated following a Notice of Violation from CDPHE, though the facility has remained in compliance since the operator change and implementation of interim improvements. The scope includes improvements that can be executed with minimal service interruptions, as most work can proceed without impacting influent flows, with only temporary shutdowns anticipated during specific tie-in activities. The addendum clarifies that proposal pricing must remain valid for 90 days after the proposal due date and specifies that all electronic submittals must be received through the Boulder County Bonfire portal in widely-accessible formats such as PDF, Word, or Excel, with no archived files or external links accepted.
The addendum addresses key clarifications regarding bonding requirements, confirming that bonds apply to the entire contract scope excluding overhead and profit, and should be calculated accordingly on the Attachment A CMAR Proposal Form. Additional clarifications confirm that the bridge currently supports equipment such as 3,000-gallon sludge-hauling trucks and concrete trucks, airflow monitoring equipment is not currently included in the scope, control panel upgrades are not part of the project scope, and approximately 100 feet of laydown space is available on either side of the driveway for contractor staging. The Board of County Commissioners reserves the right to reject any and all bids and to accept the bid deemed in the best interest of Boulder County, with the County assuming no responsibility for delayed or failed electronic submittals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2. Exhibit A - Insurance Requirements.pdf | ||
| 1-1. RFP-305-26 Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 305-26 - ADDENDUM #1
Eldorado Springs Wastewater Treatment Facility Improvements
September 4, 2026
The attached addendum supersedes the original Information and Specifications regarding RFP-305-26 where it adds to, deletes from, clarifies or otherwise modifies. All other conditions and any previous addendums shall remain unchanged.
Proposals must be submitted electronically on or before the Close Date provided on the Boulder County Euna (formerly Bonfire) portal.
Important: No archives (zip files) or links to external sites or files will be accepted. This includes Google Docs and similar sites. All submittals must be received as an attachment in a widely-accessible format such as PDF, Word, or Excel.
Electronic submittals must be received on the Bonfire portal. Submittals sent to any other box will be rejected. It is the sole responsibility of the proposer to ensure their documents are received before the deadline referenced above. Boulder County does not accept responsibility under any circumstance for delayed or failed submittals. No exceptions will be made.
The Board of County Commissioners reserve the right to reject any and all bids, to waive any informalities or irregularities therein, and to accept the bid that, in the opinion of the Board, is in the best interest of the Board and of the County of Boulder, State of Colorado.
https://bouldercounty.bonfirehub.com/ https://bouldercounty.bonfirehub.com/
Questions and Answers for RFP 305-26 - ADDENDUM #1
1. Question: VIII. Conditions of the Proposal
"Pricing in the Proposal must be valid for ninety (60) days after the Proposal due date."
The written number and the numeral do not match. Please confirm: 60 days or 90 days.
• Answer: 90 Days
2. Question: Bonds typically apply to the entire contract value and therefore cover the entire scope.
Attachment A, CMAR Proposal Form, question 4, specifies the bond rate for the construction subtotal. Please review the form so that the bond is calculated on the entire contract value, not the construction subtotal.
• Answer: The form is correct as is. The bond applies to the entire scope but not OH & P.
Questions and Answers from On-Site Meeting
3. Question: What is the bridge capacity?
• Answer: The bridge’s current rated capacity is unknown. However, it regularly supports 3,000-gallon sludge-hauling trucks and has also supported concrete trucks. We will investigate whether an official load rating is available.
4. Question: Is there a regulatory driver for this work?
• Answer: Yes. The facility began developing a long-term capital improvement plan following a Notice of Violation (NOV) from CDPHE. Since changing operators and implementing several interim improvements, the facility has not received any additional violations since December.
However, the required upgrades remain necessary regardless of the facility’s current compliance status.
5. Questions: Do we expect service shutdowns or interruptions?
• Answer: We anticipate minimal, if any, service interruptions. Most of the proposed work can be completed without impacting influent flows. A temporary shutdown may be necessary during certain tie-in activities, but a major facility shutdown is not anticipated.
6. Questions: Are we incorporating airflow monitoring?
• Answer: Airflow monitoring equipment is not currently included in the plans. We can evaluate whether incorporating airflow monitoring would provide operational or maintenance benefits as the design progresses.
7. Questions: Is there adequate room for contractor laydown?
• Answer: Yes. Approximately 100 feet of available space exists on either side of the driveway for contractor laydown and staging.
8. Questions: Are control panel upgrades included in the current scope?
• Answer: No. Control panel upgrades are not currently anticipated as part of the project scope.
| RFP 305-26 - ADDENDUM #1 |
| Questions and Answers for RFP 305-26 - ADDENDUM #1 |
| Questions and Answers from On-Site Meeting |