(3) Quality Assurance Surveillance Plan.pdf
PDF 214 KB Posted
- Solicitation number
- N4215823RS003
About this file
This document includes a quality assurance surveillance plan and a solicitation for rental of tool air compressors, regenerative air dryers, and air receivers. The Navy seeks these items for a one-year base period from March 2023 through February 2024 with an optional six-month extension. Quotes are due by February 6, 2023 and must be submitted electronically to the contact. The award will be made to the lowest priced technically acceptable vendor. The quality assurance plan outlines methods for monitoring vendor performance including customer feedback, inspections, documentation reviews, and defines roles for the contracting officer and contracting officer's representative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (2) Contractor Technical Certification.pdf | ||
| COMBO - N4215823RS003.pdf | ||
| (1) FAR 52.212-1 Addendum.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215823RS003 - QASP
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based
Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2. AUTHORITY
This QASP is issued in accordance with FAR Part 37. The authority for issuance of this QASP is provided under FAR 52.246-4 – Inspection of Services – Fixed Price and 52.212-4 (a) Inspection/Acceptance, which provides for inspections and acceptance of articles, services and documentation called for in the contract to be accomplished by the Contracting Officer or his duly authorized representative.
3. SCOPE
The Quality Assurance Surveillance Plan (QASP) is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The QASP is not part of the contract nor is it intended to duplicate the Contractor’s
Management Plan. The Government will provide the Contractor an informational copy of the QASP to support the Contractor’s efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract and/or task order.
4. GOVERNMENT RESOURCE
Contracting Officer – A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
Contracting Officer's Representative (COR) - individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contact. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5. RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer's Representative (COR) – The COR is responsible for technical administration COR is not empowered to make any contractual commitment or to authorize any contractual changes on the
Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
6. METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this QASP.
Customer Feedback – Customer feedback may be obtained from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing, the detailed nature of the complaint, must be signed and must be forwarded to the COR who shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.
Inspection – Each phase of the services rendered under this contract is subject to Government inspection during the Contractor's operations and after completion of the task. Inspections may be routine functions performed by the COR. The COR shall maintain a Contract Discrepancy Report (CDR), a copy of which shall be provided to the Contractor. Within three (3) days, the Contractor shall reply in writing to the CDR by stating the reason for unsatisfactory performance(s) and shall identify the corrective action(s) that will be taken to prevent a repeat finding.
Documentation – As required by the contractor, the Contractor shall provide written proof of compliance with those items such as Security Clearance, approved NAVSEA cleaning procedure/process and any other documentation as may be deemed necessary by either the COR or the Contracting Officer.
Deliverable/Service
Requirement
Contract Rental
Specifications
Metric Performance
Requirements
Assessment
Method
Frequency AQL Procedures to be taken when performance standards are/are not met
Equipment
Performance
Equipment Operation
Quality
Quality
Equipment meets or exceed contract performance requirements
Contractor maintains equipment in proper working condition
COR/Customer;
100%
Inspection
Customer feedback
COR visual inspections
Initial delivery and as required during performance period
As required for corrective action
Meets standard(s)
Meets standard(s)
100%
FAR 52.212-4 Contract
Terms and Conditions –
Positive: (1) Favorable performance reviews;
(2)
Consideration given to options as warranted
Negative: (1)
Unfavorable performance reviews; (2)
Non-consideration given to options
Additionally: Actions appropriate IAW
FAR 52.246-4
Response to Service
Calls
Timeliness Responds to
Service Calls in accordance with
Contract Standards
Customer feedback
As required for corrective action
Meets standard 95%
SAME AS ABOVE
Equipment Delivery Timeliness Delivers the required number of units as specified in the contract period of performance
COR/Customer
100%
Inspection
Initial delivery and as required during performance period
Meets 95% of
Standards
SAME AS ABOVE
Invoicing Quality
Timeliness
Proper Invoicing
Per Contract
Standards
Inspection
Monthly; or as warranted
Meets 95% of
Standards
SAME AS ABOVE
Equipment return/pick-up
Timeliness Contractor removes unit(s) from NNSY upon expiration of contract rental period IAW contract provisions or immediate notification given to Contracting of non-removal
COR SAME AS ABOVE
File details come from the government source that posted it. Updated .