(2) Contractor Technical Certification.pdf

PDF 259 KB Posted

Attached to
Rental - (4) Tool Air Compressors, (4) Regenerative Air Dryers, (4) Air Receivers
Solicitation number
N4215823RS003
Issued by

About this file

This solicitation requests quotes for the rental of four tool air compressors, four regenerative air dryers, and four air receivers to be delivered to Naval Station Norfolk. Quotes are due by February 6, 2023 with award based on lowest price technically acceptable. The period of performance is a one-year base period from March 1, 2023 through February 29, 2024 plus a six-month option period. Quotes must include pricing, contact information, business size, payment terms, and signed certification that equipment meets all specifications. The soliciting agency is the Department of the Navy Naval Sea Systems Command. The contractor will be responsible for equipment delivery and removal at no cost, providing all parts and equipment for connections, and responding to service requests within eight hours.

View the file

Other files

File Type Posted
COMBO - N4215823RS003.pdf PDF
(1) FAR 52.212-1 Addendum.pdf PDF
(3) Quality Assurance Surveillance Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (2) – N42158-23-R-S003

Vendor shall certify that equipment being quoted meets the capabilities listed below and that vendor can assume all contractor responsibilities stated below by initialing at the bottom. In order to be considered for award, this must be completed and submitted with the vendor quote.

TECHNICAL CAPABILITES STATEMENT

General Specification for Rental Equipment

Shall be provided with the following capabilities, features and specifications: Yes No

Tool Air Compressor (4 units)

Shall be provided with the following capabilities, features and specifications:

Air Compressor must be oil free and utilize a rotary screw design.

Compressors must deliver Grade “D” air per CGA G-7.1 An oil flooded rotary screw design with attached oil separator is not acceptable.

Gearbox casing must be designed to maintain a vacuum on its oil contents in order to prevent a potential of contamination of the air supply in the event of a seal failure.

Must be electrical powered 460V. Capable of starting and running on a

150 amp circuit breaker.

Compressor to be furnished with a male 500 mcm Kamlock fitting

Provide at least 400 Cubic Feet per Minute (CFM)

Supply pressure must be 125 Pounds per Square Inch (PSI)

Must be capable of running 24 hours/day, 7 days/week

Whip-check devices must be supplied with compressor

Must have moisture separator (electric type) after coolers

Unit must be a complete system

All equipment to connect compressors and dryers shall be provided by the contractor.

Contractor to adhere to the rigging requirements as outlined herein

Requirements for Lifting of Equipment at Naval Station Norfolk.

Unit must be free standing and must have forklift slots (capable of being moved with a forklift).

Contractor must include brochure or technical data sheet for the unit model that will be rented.

Contractor must acknowledge the ability to meet the required delivery date of 01 February 2023 or provide closest date that unit can be delivered.

Regenerative Air Dryer (4 units)

Regenerative Air Dryer must provide an extra low dew point to -

100 F.

Must be capable of handling at least 400 cubic feet minute (CFM) at

125 PSIG.

Electrical Requirements: 110/120 VAC, 60 HZ, 1 Phase

Unit must be heatless design. Heated or refrigerated regenerative air dryer designs are not acceptable

Contractor to adhere to the rigging requirements as outlined herein contractor equipment at Naval Station Norfolk.

Unit must be free standing and must have forklift slots (capable of being moved with a forklift)

Contractor must include brochure or technical data sheet for the unit model that will be rented to NNSY.

Contractor must acknowledge the ability to meet the required delivery

Air Receiver (4 units)

Air Compressor is to be connected to a 200-300 Gallon air receiver tank. Tank must be an ASME coded vessel with a working pressure rating of 200 psig or more. Larger tanks may be acceptable with the approval on Norfolk Naval Shipyard.

Tank is to have a pressure relief valve(s) rated to relief 400 CFM and lift at 200 psi. Tank is to have a pressure regulating/reducing valve set at 120 Pounds per Square Inch (PSI) on the outlet of the receiver tank.

Receiver shall have 2” NPT outlets connections. All equipment to connect compressor, dryer and receiver tank shall be provided by the contractor.

Contractor to adhere to the rigging requirements as outlined herein

Requirements for Lifting of Equipment at Naval Station Norfolk.

Unit must be free standing on a foundation to prevent toppling, must have forklift slots (capable of being moved with a forklift)

Contractor must acknowledge the ability to meet the required delivery

Contractor Responsibility:

Equipment delivery and removal at no cost to the government

Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge

Provide all equipment (i.e. hose, filters, fittings, etc.) to connect temporary compressor to dryer and air receiver. Fitting must be leak free. Hoses and fitting shall be hydrostatically tested to at least 150psi for at least 30 minutes within the past year.

Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government as well as performing preventative maintenance as specified by the equipment’s manufacturer preventative maintenance schedule during the term of the rental period with the government. Contractor is responsible for all travel associated with preventative maintenance. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Naval Station Norfolk.

Post contact information for service/repair of equipment directly on the rental equipment. Contact information must be packaged to withstand being located in an outdoor environment

The contractor shall dispatch a representative in response to a service request to repair and/or replace a rental compressor and/or dryer within eight (8) hours of notification by Norfolk Naval Shipyard at no additional charge, regardless if request is placed during normal business hours. Contractor is responsible for travel associated with repair of equipment. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Naval

Station Norfolk.

When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government.

Provide start up training of equipment to the government. Contractor is responsible for all travel associated with providing startup training of equipment to the government

Clean the air compressor/air dryer prior to delivery to the following requirements:

Air compressor/air dryer shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt loose particles and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.

For uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e. g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.

Equipment is to be capable of being connected in sets. Equipment will be connected in series in the following order: Compressor, dryer, then air receiver. NNSY will connect to air receiver.

Requirements for Lifting of Equipment

The equipment shall be outfitted with suitable attachments for overhead lifting.

For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.

For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-

271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle

(Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.

Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane.

Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.

Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.

The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of

1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).

The equipment shall be provided with a lifting sketch / rigging diagram that meets the Rigging Sketch Requirements as outlined below.

The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).

The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.

A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (757-396-

3345, 3346).

If specialized handling gear other than shackles, standard slings, or chain falls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.

Rigging sketches, as a minimum, shall identify the following:

The weight of the load.

The location of the center of gravity.

The minimum crane capacity.

The minimum capacity / length of slings.

The minimum capacity of other standard rigging gear.

The attachment (lifting) points for the load.

The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.

The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.

Limitations on allowable orientations for any parts making up the lifting assembly.

For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.

A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum

D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.

"D" represents the diameter of the object the sling passes over.

"d" represents the diameter of the sling.

Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.

Components in each handling assembly shall be sized based on the worst case distribution of loads.

When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.

When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:

The proper material is being used, The item is certified IAW NAVFAC P-307.

Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e. eccentricity of the bearing points).

PICKUP/REMOVAL OF RENTAL UNITS:

Unless otherwise notified by NNSY Contacting Office, Code 451, rental/lease unit(s) shall be picked up (removed) by Contractor on the morning after expiration of the established contract period of performance. In the event that this date occurs on a Saturday, Sunday, or a recognized Federal Holiday, the contractor may make the appropriate arrangements to pick-up the equipment on the first working day following the expiration of the contract at no additional cost to the Government. If any difficulty is experienced in picking-up (removing) unit(s), the Contractor MUST immediately request the Contracting Officer’s direction by contacting the specialist Brittany Tavassoli, Code 451 via telephone at 757-396-9694 AND providing notification of same via email to brittany.b.tavassoli.civ@us.navy.mil A

Contractor’s failure to follow the above instruction regarding pick-up/removal of rental units will relieve the Government of any liability for further charges for the equipment.

TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION

Vendor hereby certifies that vendor’s service meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. ___________ (initials)