3_Quality_Assurance_Letter_of_Instruction_Fin.pdf
PDF 946 KB Posted
- Attached to
- Cartridges Federal contract opportunity
- Solicitation number
- FA821321R3052
About this file
This document outlines quality assurance requirements for a federal contract to produce explosive ordnance cartridges. The contractor must allow inspection of production documentation, leak and functional testing, sample selection for lot acceptance testing, x-ray examination, and ammunition data card review. Inspection roles include mandatory witnessing, verification, monitoring, and notification requirements. The contract involves production of 141 impulse cartridges with national stock numbers 1336011184636ES and 1336015197200ES, 159 impulse fin cartridges with national stock numbers 1336011184637ES and 1336015197203ES, and guided missile cartridges with national stock number 1336011259400ES and 1336015195719ES for the Department of the Air Force under solicitation FA821321R3052. Quality assurance will be conducted by the Defense Contract Management Agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821321R3052_______0001.pdf | ||
| FA821321R3052.pdf | ||
| 9_Contract_Data_Requirements_List.pdf | ||
| 12_Special_Packaging_Instructions_F011259400.pdf | ||
| 7_Report_of_Shipment.pdf | ||
| 3_Quality_Assurance_Letter_of_Instruction_Elevon.pdf | ||
| 1_Airmunition_Specification.pdf | ||
| 12_Special_Packaging_Instructions_F008508522.pdf | ||
| 8_CADPAD_Item_Marking.pdf | ||
| 11_SOW_for_Packaging_and_Preservation.pdf | ||
| 5_REPSHIP_of_HAZMAT.doc | DOC document | |
| 10_AFMC_Form_158_Packaging_Requirements.pdf | ||
| 6_DD_Form_1653_Transportation_Data.pdf | ||
| 3_Quality_Assurance_Letter_of_Instruction_Wing.pdf | ||
| 15_Bid_Sets.doc | DOC document | |
| 2_Ammunition_Data_Card.pdf | ||
| 16_JQR.pdf | ||
| 14_Engineering_Data_Lists.pdf | ||
| 13_Item_Description.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: 30-May-2019 | |
| 2019-05-30T06:49:50-0600 | |
| MONK.DAVID.B.1257530864 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 50-8268-4, Alt. 30900-1 Fin Ordnance Cartridge |
| DODIC: V781 |
| Text20: |
| Text19: |
| Part Number Line 2: |
| Contract No: 20-50091 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: AGM-86 (ALCM) |
File details come from the government source that posted it. Updated .