1_Airmunition_Specification.pdf
PDF 23 KB Posted
- Attached to
- Cartridges Federal contract opportunity
- Solicitation number
- FA821321R3052
About this file
This document provides an ammunition specification for an upcoming federal contract opportunity. The specification covers three types of cartridges to be provided: impulse cartridges with National Stock Numbers 1336011184636ES and 1336015197200ES with a quantity of 141; impulse fin cartridges with NSN 1336011184637ES and 1336015197203ES with a quantity of 159; and guided missile cartridges with NSN 1336011259400ES and 1336015195719ES. The specification outlines requirements for shipment notifications, ammunition data cards, item marking, engineering change proposals, lot acceptance testing, failure analysis reporting, material age limits, and safety provisions. The contractor must meet all technical and quality requirements specified for the cartridges.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821321R3052_______0001.pdf | ||
| FA821321R3052.pdf | ||
| 9_Contract_Data_Requirements_List.pdf | ||
| 3_Quality_Assurance_Letter_of_Instruction_Fin.pdf | ||
| 12_Special_Packaging_Instructions_F011259400.pdf | ||
| 7_Report_of_Shipment.pdf | ||
| 3_Quality_Assurance_Letter_of_Instruction_Wing.pdf | ||
| 15_Bid_Sets.doc | DOC document | |
| 2_Ammunition_Data_Card.pdf | ||
| 16_JQR.pdf | ||
| 14_Engineering_Data_Lists.pdf | ||
| 13_Item_Description.pdf | ||
| 3_Quality_Assurance_Letter_of_Instruction_Elevon.pdf | ||
| 12_Special_Packaging_Instructions_F008508522.pdf | ||
| 8_CADPAD_Item_Marking.pdf | ||
| 11_SOW_for_Packaging_and_Preservation.pdf | ||
| 5_REPSHIP_of_HAZMAT.doc | DOC document | |
| 10_AFMC_Form_158_Packaging_Requirements.pdf | ||
| 6_DD_Form_1653_Transportation_Data.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION
Amended 9 Sep 2019
FD2020-20-50084
NSN: 1336011184637ES/1336015197203ES, 1336011184636ES/1336015197200ES,
1336011259400ES/1336015195719ES
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A REPSHIP shall include all the following data in accordance with attachment 1.
2. Department of Defense Identification Code (DODIC): 1336011184637ES/1336015197203ES:
V781, 1336011184636ES/1336015197200ES: V780, 1336011259400ES/1336015195719ES:
KY40.
3. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)
4. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1 May 2019, reference attachment.
5. Shelf Life Code marking NOT required per MIL-STD-129.
6. Hazard Classification Information:
Hazard Class Division: 1.4
Storage Compatibility Group: C DOT Marking: Cartridges, Power Device DOT Class: 1.4C DOT Label: Explosive 1.4C UN Serial Number: 0276 UN Proper Shipping Name: Cartridges, Power Device
NEW 0.030000 lbs for NSN 1336011184637ES and 1336011184636ES. 0.029000 lbs for NSN 1336011259400ES. 0.02337 lbs for NSN 1336015195719ES. 0.028065 lbs for NSN 1336015197200ES. 0.028770 lbs for NSN 1336015197203ES.
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
7. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For
Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:
COGNIZANT GOVERNMENT ENGINEER
ECPs -- CDRL (DI-SESS-80639D) NORs – CDRL (DI-SESS-80642D) RFVs – CDRL (DI-SESS-80640D)
Distribution Statement: B, Reason: Administrative or Operational (ref. DoD 5230.24)
8. Item(s) must pass both gross and fine leak checks. MIL-STD-883K(2), Method 1014.16 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.
CDRL (DI-QCIC-80553A)
9. Lot Acceptance Test Requirements are: IAW latest Government approved ATP. Contractor
10. The contractor shall furnish a Lot Acceptance Test/Inspection Report in WAWF
CDRL: (DI-NDTI-80809B)
11. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization: AFLCMC/EBHJ Organization E-mail: david.monk.1@us.af.mil
12. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)
13. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (30TUhttp://www.pmddtc.state.gov/regulations_laws/itar.htmlU30T).
14. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall http://www.pmddtc.state.gov/regulations_laws/itar.html be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
15. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: See attached QALI.
16. Contracts involving ammunition and explosives (AE) will contain:
- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments
File details come from the government source that posted it. Updated .