3-NOI 448-2023-003060.pdf

PDF 734 KB Posted

Attached to
Water Distribution System t/w Sanitary Sewer Improvements to serve Blue Lake Addition - Phase 2
Solicitation number
260259
Issued by
Sedgwick County, Kansas

About this file

This is a Notice of Intent (NOI) for Discharge of Stormwater Runoff from Construction Activities submitted to the City of Wichita, Kansas for the Blue Lake Addition project, a 266-lot residential subdivision. The project encompasses 70.5 acres of disturbance within a total site area of 138 acres, with an anticipated start date of June 18, 2016 and completion date of June 18, 2026. Stormwater runoff from the project will drain to the Wichita-Valley Center Floodway through the City of Wichita's Municipal Separate Storm Sewer System (MS4). The NOI includes comprehensive erosion control plans and best management practices (BMPs) to manage stormwater runoff and control erosion and sedimentation during construction activities. The submission includes site plans showing existing and proposed contours, erosion control measures, stormwater management features, and detailed documentation addressing environmental considerations including coordination with the Kansas Historical Society, Kansas Department of Wildlife, Parks & Tourism, and U.S. Army Corps of Engineers regarding potential impacts to historic sites, threatened or endangered species habitat, and jurisdictional waters.

The NOI identifies the receiving water body as the Wichita-Valley Center Floodway within the Arkansas River Basin and addresses site-specific environmental conditions. No Indian Country lands, surface water intakes for public drinking water supplies within one mile of discharge points, or critical water quality management areas are indicated on the project site. The applicant confirmed that the project will disturb ten or more acres within a common drainage area and will implement appropriate sedimentation controls, including design calculations for sedimentation basins where feasible or alternative erosion and sediment control measures as necessary.

View the file

Other files

File Type Posted
2-BP 448-2023-003060.pdf PDF
1-260259 Bid Table.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: ________________________________________________________________ Notice of Intent (NOI)

Effective March 2, 2012 NOI for Discharge of Stormwater Runoff from Construction Activities Page 2 of 3

C. EXISTING CONDITIONS/USES

1) Is any part of the project located on Indian Country land?

If yes: Contact EPA regarding discharging stormwater runoff from industrial activities on Indian Country land.

□ Y; □ N

2) If stormwater runoff drains to or through a Municipal Separate Storm Sewer System (MS4): MS4 Name: _____________________________

3) Name of the first receiving water, stream, or lake: _________________________________, River Basin: _____________________________

4) Are contaminated soils present on the site or is there groundwater contamination located within the site boundary?

If yes: On separate paper please explain in detail the locations, contaminants and concentrations.

□ Y; □ N

5) Are there any contaminated soils that will be disturbed or any contaminated groundwater that will be pumped by the proposed construction activity?

If yes: On separate paper provide a description of the special erosion and sediment control measures to be utilized.

□ Y; □ N

6) Are there any surface water intakes for public drinking water supplies located within ½ mile of the site discharge points? □ Y; □ N

7) Are there any known historical or archeological sites present within the site boundary or any historic structures located within 1000 feet of the project site?

Note: Include documentation of project-specific coordination with the Kansas Historical Society in making this determination.

□ Y; □ N

8) Is any threatened or endangered species habitat located within the site boundary or in the receiving water body?

Note: Include documentation of project-specific coordination with the Kansas Department of Wildlife, Parks & Tourism in making this determination.

□ Y; □ N

9) Will the project impact the line or grade of a stream or does it include dredge or fill of a potential jurisdictional water body or wetlands?

If yes: Include documentation of project-specific coordination with the US Army Corps of Engineers and/or the Kansas

Department of Agriculture, Division of Water Resources in making this determination.

□ Y; □ N

10) Are any Critical Water Quality Management Areas, Special Aquatic Life Use Waters, or Outstanding National Resource Waters located within 2 mile of the facility boundary?

If yes, list the names of all such areas and waters: _______________________________________________________________

□ Y; □ N

D. PROJECT DESCRIPTION

1) Project Description: __________________________________________________________________________________________________

2) Does this NOI include all proposed soil disturbing activities associated with the entire common plan of development?

If no, explain what development areas of the site are not included in this NOI and provide contact information, if available, for the party or parties that own or have operational control of these areas:

3) Anticipated project Start Date: _____________________, and Completion Date: _____________________

4) Estimated total area to be disturbed: __________ Acres Total area of the site: __________ Acres

5) Do you plan to disturb ten or more acres that are within a common drainage area? □ Y; □ N

If yes, will a sedimentation basin be installed in that drainage area? (Attach design calculations for each sedimentation basin.)

If a sediment basin is not feasible, on a separate sheet explain what similarly effective erosion and sediment control measures will be implemented in lieu of a sedimentation basin.

E. Maps

Include an area map showing the outline of the construction site and the general topographic features of the area at least one mile beyond the project site boundary.

F. EROSION CONTROL PLAN AND BEST MANAGEMENT PRACTICES

1) Provide a site plan showing the existing contour, proposed contour, the erosion control measures and the locations of stormwater management or pollution control features including BMPs. Incorporate details and notes as necessary to describe the erosion control plans and BMPs.

2) Provide a description of the best management practices which will be utilized to control erosion, sedimentation and other pollutants in stormwater runoff during construction.

NOI Form-PDF
SWPP
Quad Map-New
Sheets and Views
Layout1
WP on bat and eagle
Eagles Nest2
EC Control
1
Sheets and Views
gr1
2
Sheets and Views
gr2
3
Sheets and Views
gr3
4
Sheets and Views
gr4
5
Sheets and Views
gr5
6
Sheets and Views
gr6
7
Sheets and Views
gr7
8
Sheets and Views
gr8
9
Sheets and Views
gr9
Blue Lake NOI - signature page
prevention signed
N_4: On
Y_10: Off
N_10: On
N_9: On
N_8: Off
N_7: On
N_6: On
N_5: On
River Basin: Arkansas
Y_9: Off
Y_8: On
Y_7: Off
Y_6: Off
Y_5: Off
Y_4: Off
Name of the first receiving water stream or lake: Wichita-Valley Center Floodway
If stormwater runoff drains to or through a Municipal Separate Storm Sewer System MS4 MS4 Name: City of Wichita
N_3: On
Project Name_2: Blue Lake Addition
Y_3: Off
Anticipated project Start Date: 6/18/2016
If yes list the names of all such areas and waters:
the party or parties that own or have operational control of these areas 2:
N_11: Off
the party or parties that own or have operational control of these areas 1:
Y_11: Off
Project Description 1: 266 Lot Residential Subdivision
Project Description 2:
and Completion Date: 6/18/2026
N_13: On
N_12: On
Y_13: Off
Y_12: Off
Estimated total area to be disturbed: 70.5
Total area of the site: 138

File details come from the government source that posted it. Updated .