3-MS944 SPECIAL PROVISIONS.pdf
PDF 14 KB Posted
- Solicitation number
- US.251220
- Issued by
- York County, Pennsylvania
About this file
This is a Special Provisions document for Contract MS-944 issued by Hanover Borough, Pennsylvania, establishing requirements for a roadway paving project. The contractor must provide traffic control and safety devices in compliance with MUTCD Publications 212 and 213, notify the municipality five working days prior to project start, and complete all work by January 20, 2028, with liquidated damages assessed at $500 per calendar day for delays beyond that date. The project requires submission of delivery tickets, CS-4171 Certificates of Compliance, and TR-465 Daily Bituminous Mixture Certifications for all materials. Key technical requirements include power brooming of the roadway by the municipality prior to work commencement, application of tack coat and prime coat per Specification 408, bituminous seal on abutting pavement and curbs, full-width pavement placement in one pass, and tapering of the final three feet to curb. The contractor must provide design specifications meeting Form 408 five days before work commences and is responsible for defects occurring within one to two years of application. The municipality reserves the right to limit completed work, procure materials best suited to its requirements, and make award determinations based on aggregate totals for like items.
Testing and quality assurance are integral to project execution, requiring oil samples from each distributor truck taken twice daily and witnessed by the municipality, at least three random stone samples taken on-site and witnessed by the municipality, and complete testing in accordance with Specification Form 408 Section 409 except for Superpave volumetric testing. Bills of Lading are required for each shipment of bituminous material per Section 702.1(c) of Specifications 408. The contractor must notify all residents of pending work, submit a Final Completion Certificate and Notice of Completion upon project conclusion, and understand that future contract awards will be based on the quality of work as determined by the municipality. All Prime Contractors and subcontractors must comply with these special provisions, which the contractor's authorized representative must acknowledge by signature on the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(5-06)
SPECIAL PROVISIONS TO CONTRACT MS-944 (Attachment 1-A)
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an “X”
Traffic Control and Safety Devices to be provided by the Contractor (Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)
Delivery tickets for all materials.
CS-4171 Certificate of Compliance and/or TR-465 Daily Bituminous Mixture Certification required for all materials.
Notify the Municipality five working days prior to start of project.
Work to be completed on or before January 20, 2028. After January 20, 2028, liquidated damages apply at the rate of $500 per calendar day.
Roadway to be power broomed by (contractor municipality ) prior to start of project.
Excess material to be removed by (contractor municipality ).
Municipality to inspect project.
Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.
Tack Coat required per Section 460, or 409 for Superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.
Prime Coat require per Section 461 of Specifications 408.
Bituminous Seal on all abutting pavement and curbs required.
Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.
Scratch/Leveling Courses to be placed at the discretion of appointed inspector(s).
Full width pavement with one pass required.
Municipality reserves the right to limit work completed.
Taper pavement the last 3 feet to curb.
For FOB Source bids, hauling distance will determine selection of bid award.
Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.
Incidental Preparation and clean up required. (Project Construction Materials) The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.
Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.
Contractor is responsible for defects that occur within one two years of applications.
Contractor is required to review proposed project with Municipality’s Representative prior to bidding.
Oil samples required from each distributor truck by contractor (1) quart: A.M. & P. M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)
At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.
Complete all testing in accordance with Specification Form 408 Section 409 except for Superpave volumetric testing.
Notice to Proceed will be the date of Contract acceptance.
Final Completion Certificate & Notice of Completion required.
Future award of Contract will be based on quality of work as determined by the municipality.
Contractor notify all residents of pending work to be performed.
My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
CONTRACTOR’S REPRESENTATIVE DATE MUNICIPALITY’S REPRESENTATIVE DATE
Hanover Borough
COMPANY MUNICIPALITY
File details come from the government source that posted it. Updated .